ML12179A176

From kanterella
Jump to navigation Jump to search
OL - 2012-06-18 - WBN Project Plan - Unit 2.pdf - Adobe Acrobat Professional
ML12179A176
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/14/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12179A176 (6)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Thursday, June 14, 2012 4:08 PM To:

Poole, Justin; Arent, Gordon; Bryan, Robert H Jr

Subject:

2012-06-18 - WBN Project Plan - Unit 2.pdf - Adobe Acrobat Professional Attachments:

2012-06-18 - WBN Project Plan - Unit 2.pdf For next phone call, Monday 6/18/12 at 9:00 am.

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

705 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2E1C12B7)

Subject:

2012-06-18 - WBN Project Plan - Unit 2.pdf - Adobe Acrobat Professional Sent Date:

6/14/2012 4:08:02 PM Received Date:

6/14/2012 4:07:57 PM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 240 6/14/2012 4:07:57 PM 2012-06-18 - WBN Project Plan - Unit 2.pdf 193199 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

WBN UNIT 2 PROJECT PLAN Page 2 06/18/2012 SOURCE: POD UPDATES, COMMITMENTS I.

SUBMITTAL LOOK-AHEAD Item No.

Description Resp. Person Due Date License Amendments / Technical Specifications

1.

Common Service Station Transformer (CSST) A & B Credit Shea October 12, 2012

2.

U1 Hydrology LAR Shea July 31, 2012

3.

U2 Hydrology FSAR & TS Update Stockton August 16, 2012

4.

SSER Open Item 32: Diesel Generator Frequency Allowable Value Hilmes January 13, 2013 SSER Appendix HH Open Items (requiring submittal)

1.

SSER Open Items 5 & 8: Provide updated core map Westinghouse/Koontz September 21, 2012

2.

SSER Open Item 13: Submit an ASME Section XI Inservice Test Program for the first ten year interval six months before receiving an Operating License.

[Commitment NCO080008033: Item 017 of Enclosure 2 of letter T90 080128 001]

McDonald/Crouch March 2014

3.

SSER Open Item 25: Submit documentation of liability insurance coverage pursuant to 10 CFR 140.11(a)(4)

Arent June 2014

4.

SSER Open Item 37: Submit changes to the Emergency Plan (REP) prior to fuel load Detchemendy June 2014

5.

SSER Open Item 41: Update Plant design displays & dose assessment models to provide two unit capability.

Hilmes/Koontz December 2013

6.

SSER Open Item 61: Fuel Thermal Conductivity Degradation Model (PAD Code) - note currently this is a License Condition - tracking PWROG activity to update code Koontz October 26, 2012

WBN UNIT 2 PROJECT PLAN Page 3 06/18/2012 SOURCE: POD UPDATES, COMMITMENTS Item No.

Description Resp. Person Due Date

7.

SSER Open Item 70: Submit PreService Inspection program update.

McDonald/Crouch September 28, 2012

8.

SSER Open Item 81: General Atomic High Range Rad Monitor - Test Results Hilmes August 31, 2012

9.

SSER Open Item 83: Letter verifying completion of data storm test on DCS Hilmes January 2015

10.

SSER Open Item 117: Provide calculational basis for access to vital areas - mission dose and update FSAR. (Amendment 109) [Commitment 112046729]

Koontz/Arent August 16, 2012

11.

SSER Open Item 134: Provide resolution of dam stability analysis for Cherokee and Douglas Dams finite element analysis.

Ray August 31, 2012

12.

SSER Open Item 138: Following update of ODCM, update annual Chi/Q values in the FSAR. (Amendment 109)

Arent August 16, 2012

13.

SSER Open Item 139: Include cost benefit analysis in next update to FSAR. (Amend 109)

Arent August 16, 2012

14.

Submit a Technical Specification and Bases change package to TVA Licensing to change Table 3.3.3-1, Line item 6 (Reactor Vessel Water Level) to remove the reference to note (g) and bases to show RVLIS as a Type A variable. Need calculation WBNO4SG4047 revised. PER 488815 [Commitment 113307292]

Crouch/Hilmes/Clark August 16, 2012

15.

Submit a FSAR Change Package to TVA Licensing to Amendment 108, Table 7.5-2, Regulatory Guide 1.97 Post Accident Monitoring Variables Lists, will be updated to show RVLIS as a Type A variable. Need calculation WBNO4SG4047 revised. PER 488815

[Commitment 113307350]

Crouch/Hilmes/Clark August 16, 2012 Other Submittals

1.

As-Constructed Fire Protection Report [Commitment 113461862]

Hilmes July 2014

2.

U2 FSAR With As-Constructed Figures [Commitment 112068531]

Arent July 2014

WBN UNIT 2 PROJECT PLAN Page 4 06/18/2012 SOURCE: POD UPDATES, COMMITMENTS Item No.

Description Resp. Person Due Date

3.

Prior to fuel load, a final report will be submitted following certain validation activities as described in the IPEEE Design Report (Enclosure 1). [Commitment 111027893]

Koontz/Enis July 2014

4.

TVA will provide the NRC staff an updated [security] classification scheme that reflects these changes for WBN Unit 2. [Commitment 111033038: RAI Response 3.r of. of Letter T02 100427 001]

Reynolds May 2014

5.

Submit a merged U2 FSAR / U1 UFSAR [Commitment 111360889]

Licensing April 2016

6.

Provide a non-proprietary version of a Westinghouse FSAR Chapter 15 Transient Analysis Submittal Bryan July 2012

7.

Fire Protection Report Hilmes/Wiggall June 28, 2012

8.

10 CFR Part 70 License Extension Bryan August 15, 2012

9.

2 Unit ODCM Woods/Shea September 14, 2012

10.

As-Constructed PRA Guey/Koontz October 2014

11.

TMI Commitment Review Letter Licensing January 2014

12.

Letter to terminate Part 30/40 License after receipt of Part 50 License Licensing January 2015

13.

ASME Section III N-3 Report Crouch September 2014

14.

Letter to NRC for notification of Vital Area Boundary Restoration Licensing May 2014

15.

Unit 2 Completion Letter Licensing December 2014

16.

Fire Protection Report Hilmes/Wiggal July 26, 2012

WBN UNIT 2 PROJECT PLAN Page 5 06/18/2012 SOURCE: POD UPDATES, COMMITMENTS Item No.

Description Resp. Person Due Date Regional Submittals

1.

NOV 391/2010-603-08: Heinemann Breakers Wiggall/Enis/Stockton Extended