2011 BRAIDWOOD STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 1\1 2443 WARRENVillE ROAD, SUITE 210 LISLE, ILLINOIS 60532*4352 June 15,2011 Mr. Michael J. Pacifio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Braidwood Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Gary Dudek, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of June 27, 2011.

The NRC staff will administer the operating tests during the weeks of June 20 and 27, 2011.

Please contact Mr. Bruce B. Palagi, Chief Examiner, at 630-829-9611 if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.govlreading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via ListServ

Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief !'Juclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUB..IECT: OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Braidwood Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Gary Dudek, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of June 27,2011.

The NRC staff will administer the operating tests during the weeks of June 20 and 27, ?011.

Please contact Mr. Bruce B. Palagi, Chief Examiner, at 630-829-9611 if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, lett by K.K..

Hironori Peterson, Chief

~ f/

Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via ListServ DISTRIBUTION:

See next page Document Name: G:\DRSIII\DRS\Work in Progress\BRA 06_11 DRS OL exam approval.doc o Publicly Available 0 Non-Publicly Available 0 Sensitive o Non-Sensitive To receive a copy of this document, indicate in the box: "C" =Copy without atlachrnenVenclosure "E" =Copy with atlachrnenVenclosure "N" =No copy OFFICE NAME Rill JRKwei~r:co

~.. " I r, Rill BBPalagi PR IN Rill HPeterson W.:v'>.k.r I I DATE 06/\~ 111 0611.6/11 06hcf'/11 OFFICIAL RECORD COPY

Letter to Michael J. Pacilio from Hironori Peterson dated June 15, 2011.

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Daniel Merzke RidsNrrPMBraidwood Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariana Linda Linn Patricia Buckley Tammy Tomczak ROPreports Resource

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 February 14, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road WarrenvilielL 60555

SUBJECT:

BRAIDWOOD STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Pacilio:

In a telephone conversation on January 20,2011, between Mr. B. Kempen and Mr. B. Palagi, arrangements were made for the administration of licensing examinations at the Braidwood Station during the weeks of June 20 and 27, 2011. In addition, the NRC will make an examination validation visit to your facility the week of May 30, 2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by March 14,2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by April 25, 2011. Pursuant to Title 10, Section 55.40(b){3}, of the Code of Federal Regulations (10 CFR 55..40{b}(3>>, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures. and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E af NUREG,..1021 contains a number of NRC policies and guideUnes that will be in effect while the written examinations and operating tests are being administered.

M. Pacilio -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024).

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAIPrivacy Services Branch (T-5 F52). U. S. Nuclear Regulatory Commission. Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget. Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, a copy of this letter will be II available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Kempen has been advised of the poliCies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 license Nos. NPF-72; NPF-77 DISTRIBUTION:

See next page

M. Pacilio -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mall to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Kempen has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely, lUI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\BRA 02_11 DRS OL.docx o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, Indicate In the box: "C"" Copy without attachmenVenclosure "E"" Copy with attachmenVenciosure "N" '" No copy OFFICE Rill 11\1 Rill 1;1 I J NAME BPalagi:co ~ HPeterson JAi/J DATE 02/1~ 111 (j;R) 021 t~ 111 VJV OFFICIAL RECORD COPY

Letter to Michael J. Pacilio from Hironori Peterson dated February 14, 2011.

SUB..IECT: BRAIDWOOD STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Daniel Merzke RidsNrrPMBraidwood Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak John McHale

October 7, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road WarrenvillelL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAM1NATIONS: NRC REGION'" EXELON STATIONS

Dear Mr. Pardee:

In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region III power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows:

Station 2009 2010 2011 2012 Braidwood 10/05 N/R 6/20 N/R Byron N/R 9/27 9/12 9/10 Clinton 8/24 N/R 8/22 N/R Dresden 03/09 03/08 3107 3/05 LaSalle N/R 09/13 N/R 9/17 Quad Cities 11/30 N/R 5/30 3/26 N/R - None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

C. Pardee ~2-A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829~9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station

C. Pardee -2 A supplementary letter will be sent to each station'S training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a COPl of this document, iodieate in the box "C* = COpy w/o attach/enc! "E" == COpy with attach/enc! "N" '" No COpy OFFICE RIII:DRS I RIII:DRS I RIII:DRS 1 J NAME JKweiser:co DMcNeil HPeterson DATE 10102/08 10/02108 10107/08 OFFICIAL RECORD COpy

C. Pardee -3 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station B. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 cc: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager Licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Station Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director - Quad Cities Nuclear Power Station

Letter to Charles G. Pardee from Hironori Peterson dated October 7,2008

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION:

Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRSIII Patricia Buckley Tammy Tomczak

.' f

. j Exelon\~

Exeion Nuclear 4300 Winfield Road Nuclear Warrenvllle,lL 60555 RS-09-109 August 13. 2009 U. S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, DC 20555-0001 Braidwood Station. Units 1 and 2 ;t / ~ 6 I I Facility Operating License Nos. NPF*72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF*37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Statioll. Unit 1 Facility Operating license No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR*19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating license Nos. NPF*11 and NPF-18 .

NRC Docket Nos. 50-~73 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF*85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuc/ear Generating Station Renewed Facility Operating license No. DPR*16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 172009

August 13, 2009 U. S. Nuclear Regulatory Commission Page 2

Subject:

Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2010. eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments. the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.

Je Man ger - Licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Attachment 1 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPlRES: 10/3112011 (10*2(08)

Estimated borden per res~onse to comply with this voluntary Information collection request; 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his In(ormatlon collection is used to plan budgets and resources far operator examinations. Send comments r~ardlnH burden esllmatll to the Records and FOIAlP!ivacy Services Branch -5 F 3). U.S.

OPERATOR LICENSING Nuclear R~ulatary CommissIOn, Washington, DC 20555-000 ,or brc internet e-mail to In oCOliects@nrc.gov, and to the Desk Officer, OffICe of In ormatton EXAMINATION DATA and Regulatory Affairs, NE 8-10202. (3150-0131), Office 01 Mana~ent and Budget. WaShington, DC 20503. If a means used to impose an Infomtation collection does not display a currentiy valid OMB control number, Ille NRC may not conduct or 5:nsor, and a person is not required to respond to, the Information collect on.

fACILITY NRCREGJON Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINArlONS PROPOSED NUMBER CY.2010 Cy20n CY2012 Cy.2113 NUMBER OF REACTOR 0 7 0 5 OPERATORS NUMBER OF SENIOR REACTOR 0 II 0 12 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR .2 0 OPERATORS* UPGRADE 0, .2 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED OATES PRIMARY DATE N/A 06120/2011 N/A 03/1412013 ALTERNATE DATE N/A 07111/2011 N/A 04/1812013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF Z1 0 0 0 1 0 0 19 CANDIDATES NRC FORM 536 (10-2008) PRiNTEO ON ReCYCLEO PAPER

Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1()'2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator exsmlOallons. Send comments rer.rdin~ burden estimate to the Records and FOIAlPrlv8cy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatOry Commission, Washington, DC 20556-000

  • or brc internet e-mail to in ocoliects@nrc'gov. and to the Desk Officer. Office of in ormation EXAMINATION DATA and Regulatory Affairs, NE B-l0202, (3150-0131). Office of Management and Budget, WashIngton. DC 20503. If a means used to impose an informallon collection does not display a currently valid OMB control number. the NRC may not conduct or ,;rc0nsor. and a person is not required to respond to, Iha information colle on, FACILITY NRC REGION Byron Station. Units 1 and Z Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50454 and STN 50455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy 2013 PROPOSED NUMBER CY 2010 CY 20ll CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CylOll Cy2012 Cy2013 NUMBER OF REACTOR 8 0 0 OPERATORS 6

NUMBER OF SENIOR REACTOR 6 6 6 OPERATORS -INSTANT 8

NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 1 I 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09/27/2010 09/26/2011 0912412012 09/2312013 ALTERNATE DATE N/A 10/03/2011 10/0112012 10/0712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 CY 2011 PROPOSED ~-

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 6 0 0 0 6 0 0 CANOl DATES NRC FORM 536 (1(1.2008) PRINTED ON RECYCLED PAPER

I

  • Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRC FORM S3I u.s. NUCLEAR REGULATORY COMMISSION APPRoveOBYOMB: NO.3150-0131 EXPIRES: 0Il'3112OO8

(,,200$)

E,lImlted burden n' coII4K1Ion reql/4llll: hour.

re~"" to comply with this volunltry IlIforml1lon Itlnlol'l!1lllDn C:oItI:tIon ill uled to plan bud!J!tta and ,elOUl"CM for Op!ll1ltor , ..mlllilioni. Send _ n i l ~rd~ burden OPERATOR LICENSING ,lIIIml" to lIIe Recordl Ind FOlAlPrivecy SIlVlcot Branch ~ F 3). u. s.

Nud_ R:1OIy Commllilon, Wllhlngton. DC 2OS65-000

  • Of

.-mI. 10 III ~8r' and 10 the c... 0. ., 0ftIce of I

=.!emttlion EXAMINATION DATA and Reg=Alfan:, NE *10202. (l15().013t). 0ftIce of Mena= and Budg<<, WIlli ;ton. DC 20503. If II mellll used 10 ImpotIIlIII fonnIIIIon colltlic:llon dOlI not CIiIpIIIy

  • CUmlll!ly valid OMS conflol number, tile NRC I'I'Iay 1101 conduct uontor. and a peraon I, not required to "apond 10, the Inronn.tlollco n.

FACIUTY NRCAEGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION t:'REPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2010 CY2011 CY2012 CY2013 lICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 6 0 6 6 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS

  • INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* UMrrED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1012512010 1210512011 N/A 08119/2013 ALTERNATE DATE 1110112010 12111/2011 N/A 0812812013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE C'( 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEI1 DECEMBER ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES PRIHTEO ON RECYCLED PAPER

Attachment 4 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31!l0'()131 EXPIRES: 1013112011 (10.2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information COllection Is used to plan budgets and resources lor operator examinations. Send comments re~ardl~burden estimate to the Records and FOIA/Privacy Services Branch -5 F ). U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission. Washington. DC 205!l5-OO0

  • or ~ Intemet e-mail to In ocollects@nrc~v. and 10 Ihe Desk Officer. Office of In ormation EXAMINATION DATA and Regulat~ Affairs. NE 8-10202. (3150'()131). OHlce of Management and Budget. Washington. DC 20503. If 8 means used to Impose an information collectIOn does not display a currently valid OMS control number. the NRC may nol conduct or sponsor. and a person Is not required to respond 10. the information collectIon.

FACII.ITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 1012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 Cy 2011 Cy 2012 CylO13 PROPOSED NUMBER NUMBER OF REACTOR 2 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 6 9 9 9 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1 1 OPERATORS-UPGRADE 1 1 NUMBER OF SENIOR REACTOR 0 OPERATORS* LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 03/0812010 03/07/2011 03/0512012 03/0412013 ALTERNATE DATE 04/0512010 04104/2011 04/0212012 0410112013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 Cy 2011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 11 0 0 0 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150'()131 EXPIRES: 10/31/2011 (10.2008) Estimated burden per res~on$e to comply wilh this voluntary information collection requesl: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is used 10 plan budgets and resources for operalor examinations. Send comments re:tardi~ burden estimate to Ihe Records and !'OIA/Prlvacy Services Branch ~ -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~UlalOry Commission, Washinglon, DC 20555-000 ,or b~ internel e-ma" 10 in OCOIl9l:IS@nrc.~v. and 10 the Desk Officer. Office of In ormation EXAMINATION DATA and Regulalo~ Affairs, NE 8-10202. (3150'()131). Office 01 Management and Budget. Wash nglon. DC 20503. If II means used to Impose an infonmalion collection does nol display a currently valid OMB control number. the NRC may not conduct or sponsor. and a person is not required 10 respond 10. the Information collectIOn.

FACILITY NRC REGION LaSalle County Station, Units I and 2 Facility Operating License Nos. NPF-l1 and NPF-18 III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER Cy 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATEO NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011

- CY2011

- CY 2013 NUMBER OF REACTOR 3 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 11 0 8 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09114/2010 N/A 09/24/2012 N/A ALTERNATE DATE 09121/2010 N/A 10101/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTEO ON RECYCLED PAPER

Attachment 6 Response to RIS 2009-11 Page 1 of 2 U.s. NUCU!AR REGULATORY CO_lION APPAO\II!O BY OMS: EXPIRI8: 1013112011

~"'ORMUI NO. 311JO.013t tOo.,.,

~ burdN f: ~InIIDrmIItaiI ccIIIIcIIan I'IqUIIIt 1Iaur.

to COI!IPIY .... tNt voIuUy iIIfcInMtIoft decIIIoIt .. UNCI " pIIn ~

.., --~ _ _1IIIIcIM. Send~dIIL--

OPERATOR UCENSING ....... 10 . . Rec:ianM""~ ServIcM e-ctt .. F ), u.s.

,....,~CoInnlIIbI. W""I11111111~ DC d .10m. .., "(31Il0-0131),

....

  • or:J.:

EXAMINAnON DATA .-I "

..,~~

.... DIMIc 0IIIcIr. 01loI 01 0II0e0l .... ~

~W ~ aGI03. ** --.1IIitId" ~.. ...

oaIIdOn doM nat nat COndu~lIOr* .nd

  • InfDnn8llon *

,.l'I0II ..

.~wiId 0Mt CIII1RI nuilIbIr.... ~ ~

nat nIqIInd to "'IIPOM to. IN r/ItCU(Y IR:RIGION Umerkk GeIHn" Statio.. UalU I ad 2 FKIIIty Opera..., Licea.. NOlo NPF-39'" NPF-85 I NRC Docket NOlo so..351 ad 50-353

~ PROPOSED EXAMINATION PREPARAOON SCHEDULE PROPOSED NUMBER ESTlM4TED NUMBER OF CY 101' CY2.11 Cylill Cyl.13 UCENSEE-PREPARED 1 0 1 t EXAMINATIONS ESTIMATED NUMBER OF NRePREPAREO EXAMINATIONS * * *

  • B. INlnAl OPERATOR LICENSE EXAMINAnONS PROPOSED NUMBER cy 11**

CylOU CyllU cylO13 NUWBER OF REACTOR OPERATORS 6

  • II I NUMBER OF SENIOR RE:ACTOR OPERATORS -INSTANT 7 0 5 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 5 0 1 NUMBER OF SENIOR RI:ACTOR OPERATORS - UMIlED * *
  • 0 PROPOSED DATES PRIMARY DATE 10l04I%01. N/A l0J0t1lO12 N/A ALTERNATE DATE 10l181:Z11. N/A "124IlO11 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 101. Cy 2.11 PROPOSED NUMBER MARCH JUNE [sEPTEMBER DECEMBER MARCH JUNE [sEPTEMBER DECEMBER ESTIMATED NUMeEROF CANDIDATES I) 0 I 0
  • 16 0 I

Attachment 6 Response to RIS 2009-11 Page 2of2 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 10131/2011 (10*2008) Estimated burden per res~onS8 to comply with this voluntary information collection request: t hOur, his information collection is used to plan budgets and resources for operator examinations. Send comments retardln~ burden estimate 10 the Records and FOIA/Privacy Services Branch *5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory CommiSllion, Washington. DC 20555-000 ,or ~ Inlernel e*mail to i ocollec;ts@nrc,~v, and to the Desk Officer, OffIce of In ormalion EXAMINATION DATA and RegUlato~ Allsfrs, NE B*l0202, (315O-O131~ Office of Management and Budget, WS$h "gton, DC 20503. If a mesns used to Impose an Information collection does not display a currenUy valid OMS control number. the NRC may not conduct or sponsor, and a person is not required to respond to, Ihe

'nformation coliecUon.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER CY 2011 CY 2012

- CY 2013 ESTIMATED NUMBER OF LlCENSEE*PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010

- CY 2011 Cy2012 Cy2013 NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

  • INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR 0 OPERATORS - LIMITED 8 0 0 PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/0712010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2006) PRINTED ON RECYCLED PAPER

Attachment 7 Response to RIS 2009*11 Page 1 of 1 NRC FORM 538 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 10131/2011 (l().2(lOe)

Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is used to plan budgets and resources for operator examinations. Send comments r1.rdln~ burden estimate to the Records and FOiAlPrlvacy Services Branch *5 F 3). U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington. DC 20555-000

  • or ~ internet EHnsiliO in OCOtlecls@nrc.~v. and to the Desk Officer. Office of In ormation EXAMINATION DATA and RegUISlo~ Affairs. NE 8*10202, (3150.0131). Office of Manegament and Budget. Wash ngloo, DC 20503. If a means used to impose an information colleclion does not display a currently valid OMB control number, the NRC may nol conduct or s~nsor, and a person Is not required to respond to, the information collect .

FACILITY NRC ReGION Oyster Creek Nuclear Generating Station Renewed FaciHty Operating License No. DPR*16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2012 Cy 2013 PROPOSED NUMBER Cy 2011 ESTIMATED NUMBER OF lICENSEE*PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY2012 CY20t3 NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 7 7 8 0 OPERATORS

  • INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 1 2 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 05/1712010 0711112011 05128/2012 N/A ALTERNATE DATE 05/24/2010 0711812011 0610412012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 20ll PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (11).2008) PRINTED ON RECYCLED PAPER

Attachment 8 Response to RIS 2009-11 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150~131 EXPIRES: 10/31/2011 (1(1.2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collecllon is used 10 plan budgets and resources for operator examinations. Send comments ~ardlng burden estlmale to the Records and FOIAlPrivacy Services Branch -5 F 3). U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission. Washington. DC 20555-000 ,or b?; intemet e-mail 10 in ocoliecls@orc.~, and 10 the Oesk OffICer. OffICe olin ormation EXAMINATION DATA and Regulal~ AHairs, NE 8-10202, (3150~131). Orfk:e of Man~emenl and Budget. Wash nglon, DC 20503. II a means used 10 impose an nformation collection does not display a currently valid OMS control number. the NRC may not conduct or ~onsor. and a person is not required to raspond to. the

.nformatlon colle n.

FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER

- CY 2011 CY 2011 CY 2013 ESTIMATED NUMBER OF LICENSEE*PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy2012 Cy2013 PROPOSED NUMBER CY 2010 CY2011 NUMBER OF REACTOR 0 6 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 10 OPERATORS . INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 3 0 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED

  • 0 0 0 PROPOSED DATES PRIMARY DATE
  • 01131/2011 N/A 02/11/2013 ALTERNATE DATE

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANDIDATES NRC FORM 536 (1()..2(1()8) PRINTED ON RECYCLED PAPER

  • See Attachment 6 (limerick Generating Station) for Limited SRO numbers and exam dates

Attachment 9 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150"()131 EXPIRES: 10131/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntery information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collect/on is used 10 plan budgets and resources fO( operator examlnallons. Send comments ~rdln~ burden estimate to the Records and FOIAIPrivacy Services Branch -5 F 3). U.S.

OPERATOR LICENSING Nuclear R:;v.ulalO/Y Commission. Washington. DC 20555-000

  • Of b~emel e-mail to in ocollecls@nrc~v. and to the Desk Off1cer, Office of In aden EXAMINATION DATA and Regulalory AffairS, NE -10202, (3150"()131). Office of Management and Budget. Washington, DC 20503. It a means used 10 Impose an Information collection does nol display a currently valid OMB conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR-29 and DPR-30 lJI NRC Docket Nos. 50-Z54 and 50-Z65 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY Z010 Cy ZOll Cy 2011 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF L1CENSEE*PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy2013 PROPOSED NUMBER Cy 2010

- CyZOtl

- CY2012 NUMBER OF REACTOR 0 6 4 3 OPERATORS NUMBER OF SENIOR REACTOR 6 11 10 16 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1 1 OPERATORS* UPGRADE 0 0 NUMBER OF SENIOR REACTOR OPERATORS

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER eSTIMATED NUMBER OF 6 6 6 14 0 0 0 0 CANDIDATES NRC FORM 536 (1()'2008) PRINTED ON RECYCLED PAPER

Attachment 10 Response to RIS 2009-11 Page 1 of 1 NRC FORM 531 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO.3150.()131 EXPIRES: 1013112011 (1()'2008)

EII""atlld burden .f1/ ....

cdl8d1On requ.1It: hour.

~. to comply with tills voluntary informallon InIbmNltlan collection '- UIIId to plan bI.JdgeIlI end tMOUlIlU for operalOr .KMllnationa. SeIld earn_III r~~bur'den

=

elllrmate to the Recorda and FOIAIPriv.cr SaM:cM Sfancll *5 F ). U.S.

OPERATOR UCENSING Nudul R:tlatory COTm'IIuIon. WuIllnglOn, DC 20665-000

  • Of ~1iItemII1 e-mail to I con~nn:s:' Ind 10 the Detk Oltbr. 0IIIQe of I ilio n EXAMINATION DATA end ReQu=tr.n. HE 10202. (3150-0131). Oftlee d Budge!. WI on. DC 20503. If * .-ns UMd to ImpoM en cclleCUon doe. not display a c:umHlUy VIIIId OMS conll'd nurnblf. !III NRC may not conduct o~lOr. and. pll'lIon Is n01 r.qulred 10 ...apond to. th .

InfolmaUon col FACIUTY NRCREOION Three MDt Island Nadar Statio., Uolt 1 FacWty Oper.tlDI Llcea.e 110. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010

- Cyl011 CylOll CylOI3 I.ICENSEE-PREPARED 1 t 0 1 EXAMINATIONS ESTIMATED NUMBER Of NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INlnAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY 1010 CY201l CylOl1 Cy2013 1 10 0 OPERATORS NUMBER OF SENIOR REACTOR 1 10 0 8 OPERATORS

  • INSTANT NUMBER OF SEMOR REACTOR I 0 OPERATORS* UPGRADE 0 1 NUMBER OF SENIOR REACTOR 0 OPERATORS

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBeR DECEMBER ESTIMATED NUMBER OF 11 0 0 0 18 0 0 0 CANDIDATES NRC FORM 1138 (10.2008) PRINTED ON ReCYClED PIIPER

AmerGen~

An Exelon Company wwwexeloncorp.com AmerGen Energy Company, LLC Nuclear 4300 Winfield Road Exelon GeneratIon Warrenville, Il 60555 4300 Wmfield ROJd Warrenville, Il 60555 RS-08-092 July 22, 2008 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF*37 and NPF-66 NRC Docket Nos. SrN 50*454 and SrN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50*461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-~5 "

NRC Docket Nos. 50-237 and 50-249 laSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-l1 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50=219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR*56 NRC Docket Nos. 50-277 and 59-278

July 22. 2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC RegUlatory Issue Summary 2008-16, "Preparation and Scheduling of Operator licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27,2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010.

Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (lGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate.

There are no regulatory commitments contalned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.

Respectfully,

~Yvl~L-Darin M. Benyak Director - Licensing and Regulatory Affairs

July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station

  • Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0
  • Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2008-16 Attachment 1 Page 1 of 1 NRC FORM 5.16 II.S NUCLEAR REGlLATORY COMMISSION /IPPROVEO BY OMS: NO. JIS()*lHJI EXPIRFS II!!IJ I r.0IJ!!

IlI-lllIlS) EMimated burden ~r re",p~ to 4."~Hnply with thJlI. ~li1:'ntary infllrmation

\."uJk'1.1iun req~~: I hour, This innKmatll.ln ~ullectlHn IS u~ tt.l plan bud~ets and ~HJI\:C!S I 1pt!1aUlf C'Qmjn;ttiul1~. ~ummems refardi~

OPERATOR LICENSING ."i..,,,'" 'heli)fR""urd, aAd fOIAlPnva.;ySend So"'IC'" Bra",:h T*5 bUrden 3)' U.s.

~~r[ '~;'S6~~~*~tJ~~,:~n:

EXAMINATION DATA Jild Re¥ul.1l"ry Aft'ai

  • IJI~O(31). OtT.:."f MFmem aIld Budget. Wa~htngton. OC 2050.1. If 3 mean~ used fO !mpo.-.e an Int'urrrud'un i.l.)IIt(Uua due!>. I'Mlt dt!i'lay a ,"limnll)' valid OMS ~nntloll1tJm~r. the NRC may nnt ;."unduet or 'Pt,"!,\ur. ,uld a ~r~1R ~ nut requlftd t(1 re~u1d to, the infilrrt13!lltl t'olJet:uon, FACILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2010 CYgQ11 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESirMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY 2011 CY2012 NUMBER OF REACfOR OPERATORS 1 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 12 0 12 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LrMITED 0 0 0 0 PROPOSED DATES PRrMARY DATE 10/05/2009 NlA 6120/2011 NlA ALTERNATE DATE 10119/2009 N/A 7/11/2011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER JUNE MARCH SEPTEMBER DECEMBER ESTrMATED NUMBER OF 0 0 0 0 21 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 2 Page 1 of 1 NRC FORM 5)6 u.s NUCLEAR REGULATORY COMMISSION APPROVED BY 01118: NO. 31S0*01JI EXPIRES: 1l1V) 1I1fKlII fll-ZtMl!lI E!'oI imaled burden ~r I'f~p..)n.~ ttll'llmply with Itti~ .voluntary IOfllnn31icm odlet:lit.m rrqueSf: , hour, This mfmmat;on ,ttUe\.'lldo is Uiited to plan budgets

~:af~~~f:/W*~!:.~'~;;JFbI~;~~:e~~~:7r~*~ff~i~r~rt:g, OPERATOR LICENSING ~~a~I~IR~'I::liiZt~~r::"~~~:I~~~~~tg~~~k~'t:t~~}~~ ~:;rJ~l,:~~

EXAMINATION DATA and Regulatory Affairs, NEf)O.IU.!02. 01 Si).OI3I). Oftke or Management and 8udgc~. Wasfllfigtnn. DC :OSO:l. If a means u~ tn lmp-)r.t ~Il infhrm;)("lA c('!lleCllnn does nut di~lay:& currently valid OM.B cHntrnl numbtt.lhe NRC ma~

~f~~~~o~t:;~,JnO :l peN)n js nut requ..-ed tu rt~lOd tn. the FACILITY NRC REGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 ES11MATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 0 9 0 7 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 8 12 6 NUMBER OF SENIOR REAcroR OPERATORS-UPGRADE 0 1 1 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NlA 9/27/2010 9/12/2011 9/10/2012 ALTERNATE DATE NlA 10/04/2010 9/2612011 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DOCE!\1BER MARCH JUNE SEPrEMBER DECEMBER ESTIMATED NUMBER OF 0 17 0 0 0 12 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 3 Page 1 of 1 NRCFORM~.l6 u.s ~UCLF,AR RJWULATORY COMMISSION APPROVED BV oM8: NO..IISO-0131 EXPIRES: 01!l31f.!(1011

,8*20051 E"im.ned l\urden per ~Ift~ ttl o)mpl~ with Ibis V\Jklntary mfllnnOiIJcm lullecllon request: I r.,)ur, TIltS mill~lit\n Cullet1K)n IS u~ In n budget!i j~ fe'~)ur~e~ lilr Hpe1'alur eummafklR!It,

.,,,.male til the Re<,."d., and FOINPnva.:y S<tvic .

OPERATOR LICENSING NIIC~a.r ReIUUU\HY Cmnmili~.,n. Wa~hlntllun. I t'wmalJ tn in 'K'ollt-ctS@Df'Cd)W,.1l"Kt1ll lhe ~k Ot11cer. Offk.'e j)f In ofmatJ.'n EXAMINATION DATA and Re~ulatY Air,irs. N B*I0202. (3150-0131). Office "r M3nagement and Budget, WIl.'Ihmgtnn. DC :20503. If a mean." u~ Itl Jmp.1se an informat"'*

..:oUcclion does not dispby '" t:'urrently v.ahd OMS ~tJJinll number. the NRC may nul conduct or ~msor. :uld a persun if; AOf requited to resp)nd tn. the

,"Ctlrmafton t..'t)Uet.1km.

FACILITY NRC REGION Clinton Power Station, Unit 1 III Facility Operating License No. NPF*62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2Q1Q CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 6 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8/24/2009 NlA 8/22/2011 N/A ALTERNATE DATE 8117/2009 N/A 812912011 N/A C. PROPOSED GENERIC FUNDAMENTAlS EXAMINATION (GFE) SCHEDULE CY2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER SEPTEMBER MARCH JUNE DECEMBER ESTIMATED NtJMBEROF 0 0 0 0 0 9 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 4 Page 1 of 1 NRCf'ORM S.16 u.s NUCLEAR REGULATORY COPt1MISSION APPROVED BY OMB: NO. } I31}0J3 I EXPIRES: fJlV3I1"~JII

!l1*ZOOS)

EMimated burden ~r re~p()ru;e f(l t.'t>mply with tlu!; \1}k:lnfary Inflmn<.ninn

\.*otJe\:tion ('eque~; J hour. This intb~ltm \:'oU<<:tion 1:- u..ed to plan bodset!i

~~~r:iI~~:;~hef~~~~~~~~~i~~~f'J~k~"8r~~fT~~t~~r:rs.

OPERATOR LICENSING Nudear Re~"lalnry Comm;,,')1I, Wa"'inllton, DC ~0555*11OO1. or ~l. 1Il1erne!

e*mall ttl III Ot'\'ISect~@nr('.~H'.;,tOO ttl the Dtsk. OtfK:er. Offi\;e Hfln urmaunn EXAMINATION DATA and Rtlllll3lory Affair<, NE B*IH~1.1315().nJlII. OITice IlfMalU~"'nl and Bud~<l. W.<bl"~tnl\, DC 10503. If. mea"" u<<!d In Imp"'" .n Infurmawn t'nlJect~m does. not display.l {:urrentl)' vrihd OMB t:ontro! number. fhe NRC mll)l nut \:ooou(.:1 Of !<<pO"~lf. 300 a person It. nOi required ttl re"pond ttl, the inthrmation (.'\llIeclinn.

FACIUT'V NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 4 10 8 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 1 NUMBER OF SENIOR REAcroR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/09/2009 310812010 3107/2011 3/05/2012 ALTERNATE DATE 4/06/2009 4/05/2010 4/0412011 410212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 cr2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 14 0 CANDIDATES

Response to RIS 2008-16 Attachment 5 Page 1 of 1 NRC FORM SJ6 U,S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. JIS()'uOI EXPIRES: 1l!V311::!OOl1

\M-I0IlSI r;.S(im~td burden per re~lnlriC to ..,unply with Ihbi volunrary iniOf1llafiun i,:oHtl1kHl reque."~ I hour. thiS inhltTl\atton ~llUecunn IS used to pl;m budl!t:IS

~::~~~tih/W~~~~iJ~~~~:?:~~~n;:r~~*hert~i~r}~~:.

OPERATOR LICENSING Nudear Re~utatmyCnmmi!('sllllt. Wa.'i.hinglnl'1. DC :!OS5S ..t.lj(H.urb~nlternet l""-m3r1 to In )(()fIet-1stltl\fC<:f)V. and to tbe Desk Offic!!':r. Ofti~e nf 10 rntation EXAMINATION DATA and Regulator)' Affairs, NE S*1()102. <JI!ID*0I31). ORk<: ,'1 M."",emen! and Sudget, Wa.,hmgt"., IX :OSl)). Ii. mean, .",d 101m!",,,, an iJlf.."":Ilion

<,,11a:1"0 do"" "'~ di'l'l.y a rum:fItl~ valid OMD <,.,**)1 nu_r. (lit NRC may nut l*OOOlk.'1 or ~pnMnr. and a penon is nnt required to respl11d tu~ the mfMmafinn fulk:t:tiun.

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 III Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINAnONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 0 4 0 4 NUMBER OF SENIOR REACfOR OPERATORS*INSTANT 0 8 0 8 NUMBER OF SENIOR REACfOR OPERATORS*UPGRADE 0 2 0 2 NUMBER OF SENIOR REAcroR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NlA 9/14/2010 NlA 9/1812012 AtTERNATE DATE NlA 9/21/2010 N/A 9/2512012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 Cy 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 0 0 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 6 Page 1 of 1 NRCFORMS.16 u.s NUCLEAR REGULATORY COMMISSION APPROV~D BY OMB: NO. JI51l-0131 EXPIRES, OlVJ II~OCl!l IM*ZOOS. E~Ima1ed buf'tkon per ~ln~ fl' Ctlmp!y with lhh,V\d~uttary inftJrmalit)n

\.:t)n~.11on re~S1: I tlmr. ThIs inlnrmallon \,.'1,}It<<"on 1'\ ustd Iii plan budgtts

~!:!~~~~~~fr./C;[~~~~~:J~~~i~:;c:~r:::~:;!n:~~~f~i~tr.rtr5.

OPERATOR LICENSING NUi,:lear R~blnry CHmmi~"'inn. Wa>hin~lOn. OC ,'!OS5's~OOOl. or internet or e-m;l1llo in *oUe...",,@nrc.~v* .tOO ht lbe De\k. Offkef. Off,,)! uf In Mmaliun EXAMINATION DATA and Regulilh>')' AIli"",. NE B*Itl~I~. IJISIl-0I3!). 011;';. or M.nJgemenl .and 8udg.tr. W...,hJIlgtnn. OC ~'03. Ii' a mean~ used tu Impuse an IOthrmatiun

'oll<<.1i". """. J1(X di.pl.y HUlTently v.11d OMB <mumi number. the NRC may flot l"ondtk.1 or ~msur. and a person is nnt required to resp.lnd It), the informiltklU l..*uile1.:linn.

~'ACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2Q1Q CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED

  • 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 0 6 0 4 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 3 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED or 0 0 0 PROPOSED DATES PRIMARY DATE .. 10/04/2010 N/A 10/0812012 ALTERNATE DATE . 10/18/2010 NlA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 16 0 0 0 0 0 0 CANDIDATES
  • See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates

Response to RIS 2008-16 Attachment 7 Page 1 of 1 NRCrORMSl' u.s :-IlJCLEAR REGULATORY COMMISSION APPROVED IIY OMB: NO.3 "0-41131 EXPIRES: IllV311~00I!

,11-184151 E,'ifnnated burdtn per rer-puose Ull'ornply with fbi, vtlllJntat)' tnlnnnatau,

,,*ullet'rion reqlM!Sl: 1 ht)Uf. nus Into~i.IIlun t:u llect ion IS, u~d (0 plan budgets

~~~~~~~'~~ttf{~~r:'~~~~~~rs::~k~8~hfT~i~~S.

OPERATOR LICENSING ~:"~~~()~~~::;'~~I~@mmi~siun. W3~hingttHt. DC 2O~SS-()(HH. url~l)~~~=

EXAMINATION DATA .00 R.~.Ia'"ry Aff;",.

Bud8e~. W.u.tungltln.

<31 Sfl.0I J I). orr",. uOd.nagcment .00 Sins u~ tel itnpH5e Jin il'lfimnation mll",1,.. 11<,", nUl display * <urrellll~ valid OMS ""ntn>1 number. !be NRC may nol cnnducf or 'Plflsur. :u1d a pefMm IS Oul requtrtd tv ~;\fltuJd h), the mfilrmUltUn c\lll<<1 inn.

FACILITY NRC REGION Oyster Creek Nuclear Generating Station I Facility Operating License No. DPA-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6 6 6 0 NUMBER OF SENIOR REACfOR OPERATORS-INSTANT 10 8 10 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATFS PRIMARY DATE 5/04/2009 5/17/2010 511612011 NlA ALTERNATE DATE 5111/2009 5/24/2010 5/23/2011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~ CY2Q1Q PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 0 0 16 0 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 8 Page 1 of 1 NRCFORMSJ6 ll,S NUCLEAR REGULATOR V COMMISSION APPROVED BV OMS: NO, J15t).0131 EXPIRES: IlI!/l1l111011

.1I-.lOO5) E..'4i~ed burden per rtspun.."t 10 t.'omply with rhi!-> voluntary inlilrmat)(lQ coUe<:rKm request: I hour. This informauun cullet,ton is ul'id to pjan bud~tts

at~~:::f~fR~~i~~A)J~~;~~;c~~:~B:'::hf-r:~I~f~reel.

OPERATOR LICENSING x~~~;;.r,~K)~r,:=

EXAMINATION DATA 131SO-01.l1 ).OfflC. lIf Man.ge"",,,, iU1d mean... used tOlmpO!ie an infurmattolt

<,,11.,,1 IOn doe. nut di'Play , ,u.....l11l~ valid OMB CUllln)l number. lhe NRC may nul conduct Of 'iX>n.wr. and a PCf~}J1 '"' Ill" required to re~)f)d to. tne inthrmation \'4lIJectkln.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2Q1g ESTIMA'T'BD NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 2 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 10 0 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 6 0 0 0 PROPOSED DATES 12107/2009 PRIMARY DATE 1210612010 NlA 1210312012 8/03/2009 - lSRO 1211412009 ALTERNATE DATE 1211312010 NlA 12110/2012 8/10/2009 - LSRO C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CV~ cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 16 0 0 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 9 Page 1 of 1 NRCFORMSJ6 u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.*11 5()'flI If EXPIRES: 0III.l WOOl!

\Jl.ZllII51 Estimated bun1en per rC'P'msc to ~omply with Ihis Vlltunt3T} informat",n (uJlectkln request: I huur, Thb mlh~,JtunI:111~tit\n ia usrd til pLlnhudgetll

~~~~~~:~The'¥i~r:;::~}~~:~~:e::;~~n::~~fT~~j~~~~s.

OPERATOR LICENSING EXAMINATION DATA :t~~~~~~~It~~~t~~t1~~~:;'~~~:frl~r.):= Offire of !'4anagement Olnd Budget~ Wa"h,"gtnl~ DC :!()~03. If It mean.'!, u....ed tu impnse an mfmmafton

,,*l)tl~\.1ion doe~ on' dl~liY a (:um:ntly valMJ OMB ~:~)tlt1ul number, the NRC may

.It ..:nnchlct or 'PoHlMa, and a person is I1HI reqUIred tn re~oo to. the inrormalion C:Hlta'1ion, FACILITY NRCREGJON Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 cy2010 CY 2011 CY2012 NUMBER OF REAcroR OPERATORS 6 0 6 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 0 10 10 NUMBER OF SENIOR REAcroR OPERATORS-UPGRADE 0 0 1 1 NUMBER OF SEN lOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 11/30/2009 NlA 5/29/2011 311212012 ALTERNATE DATE 12107/2009 NlA 6/1212011 312612012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 16 0 0 0 14 CAi'jDIDATES

Response to RIS 2008-16 Attachment 10 Page 1 of 1 NRcrORM 536 u.s NUCLEAR RIlGULA TORY COMMISSION APPROVED BY OMB: NO. 3151}.0131 EXPIRES: ()liI3111'~

IlI-lfMIS) E.~limaled burden prr respt)n.~ to rompl)' with th;~ .vuluntary lnff)fmZltion 1."t~Uect.m reqlJe~. J t)Jur. Thh. infurmah:lO ~"ljI1a.1IOn i~ u:'iU tn plan bud~ets

~~ l'<>Ource' lilf . .~i~~~.

OPERATOR LICENSING Nu...:lear

~mailtu . t~:;.rr~r;)~~r:~

EXAMINATION DATA Jnd R'8U 1t. Office ,Jf MaO"l!l'menl and Budgel. Washms;ton. DC ~1503, If.a mean~ "sed 10 imp>se an intiumauJn

\.'oll<<uon dots nut di:.;play a ~UiT('nrly' VJhrJ OM:B ,,:oOlml number. lhe NRC ma)'

nut \"tmduct llr sponlior. arid 3 pen.m ,. . !lot (eqmTed hI re~'nd tu. the Inthrmation ~()na:tion.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC* PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 6 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATFS PRIMARY DATE 5/25/2009 N/A 5/30/2011 NlA ALTERNATE DATE 610112009 NlA 610612011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 15 0 0 0 CANDIDATES

Exelon Generation Company. lLC wwwexeloncorp.com Braidwood Station Nuclear 35100 South Route 53. SU1te 84 BracevIlle, Ie. 604c7-g619 September 6, 2007 BW070067 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road, Suite 210 Usle, IL 60532-4352 Attn: Operator Licensing Branch Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NACOocketN'os:5Q;456and 50-457

Subject:

Updated Braidwood Future Initial Ucense Training Schedule Dates

Reference:

Letter from D. M. Benyak (Exelon Generation Company, LLC and AmerGen Energy Company, LLC) to u. S. NRC, "Response to NRC Regulatory Issue Summary 2007*

17, 'Preparation and Scheduling of Operator Licensing Examinations,'" dated August 13,2007 The purpose of this letter is to provide revised operator license examination dates in response to NRC Regulatory Issue Summary (RIS) 2007-17, npreparation and Scheduling of Operator Licensing Examinations" for Braidwood Station. This updated information revises the proposed operator license examination dates originally provided in the referenced letter.

The revised operator license examination dates are provided in the attached NRC Form 536.

If you have any questions about this letter, please contact Mr. David Gullott at (815) 417-2800.

~fU-Thomas Coutu Site Vice President Braidwood Nuclear Power Station.

TC/DGIvk

Attachment:

Revised NRC Form 536 - Braidwood Station

Attachment 1 Page 1 of 1 NRC FOItM !lIi u.s NUCLEAR REGtlLATORY COMMISSION APPROVED BY OMB: NO. JlS()'0131 EXPIRES: OIVllf.lWll (ll-lOO5)

Estimated butden per response!() rompl¥ wilh Ibis voluntary infbrmation c'llilertion request: I hour. This inform.llon collection is budgets and. resources fur operator examination&.. Setxt comments estimate to lhe RecOrds and FOIAlPrivacy Services

  • OPERATOR LICENSING Nuclear ~uJatory Commission. WuhinRl: DC :1£)SS e*maillO in K.llIIeL~'4ii>~, and II! lhe sk Offi(;er. 0If1CC of I ormlllion EXAMINATION DATA and ReJuJato~ NTal"" *1020:!. (31so.o131), Office ofManaJemcnl and Budge!, W..b glon. DC 2OS0J.lf a mC'.ul~ u>ed to impose ... infornwion c'Ollerti:m dil<!'1lOI display a =nt~ valid OMS rontrOl .umber. the NRC may not condoo or sponsor, and
  • penon .. nol required 10 respond 10, the Infbrmation oollec1ion.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY200B CY2009 CY2010 CY2011 NUMBER OF REACI'OR OPERATORS 0 1 0 6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 13 0 12 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 1 0 2 NUMBER OF SENIOR REACTOR OPERATORS*LlMfI'ED 0 0 0 0 PROPOSED DATES 6/2712011 PRIMARY DATE 10/5/09 7/1512011 710512011 -

ALTERNATE DATE 10/19/09 712212011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY200B cv2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SE.PTEMBER DECEMBER BSTIMATIID NUMBER OF 0 14 0 0 0 0 0 18 CANDIDATES

AmerGen,,. Exel~n An ExeJon Company www.exeloncorp.com Nuclear AmerGen Energy Company, lLC Exelon Generation 4300 Winfield Road 4300 Winfield Road Warrenville.IL 60555 Warrenville.ll 60555 RS-07-116 August 13.2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station. Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and SIN 50-455 Clinton Power Station. Unit 1 Facility Operating license No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station. Units 2 and 3 Renewed Facility Operating License Nos. DPR*19 and DPR-25 NBC Docket Nos. 50:2~7 and 50=249 laSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF*11 and NPF-18 NRC Docket Nos. 50-373 and 5Q-37~

Limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF*39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC DQcket NQs. 50=277 and 50-278

August 13, 2007 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 5(}265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2007-17 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," dated July 12.2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested in operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 2011. Attachments 1 through 10 provide responses to RIS 2007-17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009. 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual site examination that involves both LGS and PBAPS, rather than repeating the .same information on both attachments. the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary.

The operator licenSing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818.

Respectfully.

"b~~~L Darin M. Benyak Director - Licensing and Regulatory Affairs

August 13, 2007 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for laSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2007-17 Attachment 1 Page 1 of 1 NRC FORM S"'" u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OM8: NO. JlS!J.l1l31 EXPIRES, U!V31121XlII (11-:10051 ESlimllted burden per mpt"'" to """"Iy with Ihis "tlluntar~ informal ion t.:ufl<<.'tion~: J hour. Tbrs InfhrmatlOrt alll<<tkul is used to J>lan budget",

~~:~~~~~eRRr:f:~:J~~~~~~~~,'rr:.:fr4'~J~~.

OPERATOR LICENSING w~~~~~~~~~~:;rl:t=

EXAMINATION DATA 202. !315().,013lJ. om.:. IIr ManaselllC1ll and Budget. W~,hllli!on, DC 2OSi)3.lf a mew used III imp'r,e an inform31ion

_,,'1<<1"" <kit. "'~ display a _"Um!lIIly valid OM8 ,,,",rol number. the NRC may l'klt \),HI(jUl1 1)( ~ponsor. and a person i\ nul requi'ed to 1'e'1X1rli tn. the inthl'l'mflOd fnltec.:tioo.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating Ucense Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY~ CY201Q CYgQU ESTIMATED NUMBER OF UCENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY~ CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0 1 0 6 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 0 13 0 12 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 1 0 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARYDAT6 1015/09 4/412011 ALTERNATE DATIl 10/19/09 511612011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~ CY~

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 14 0 0 0 0 0 18 CANDIDATES

Response to RIS 2007*17 Attachment 2 Page 1 of 1 NRC FORM SJ6 u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OMS; NO. JI5(}*(JJJI EXPIRES; OlII3lf.!1X)II (lI*lIJO!i)

E";f!liIIed hurden per rt'P""'" to comply with Ihi......tDIII...y in~'rm.lOI.

l"ulla.'fMlD reque~: I huur, This mihfmatkJD \.."Ulle(;tKlR i!l u.~ in plan bud~tts dl1d rtSl1Qt'l'es Ihr operator (MJ:min<lliofl~, Send to'1l '

'Mirnale to tilt R<<urd, and FOIAlPrivac,' .

OPERATOR LICENSING EXAMINATION DATA and Regul.t0l')! Mf." I) I). 00.." ,I( M..",emelll anti Budge!. W..hml!l".' DC :!(l503.1f. me... u.ed to .mp"'" an infl"malK**

\,;nI1a.1kH) doe~ not di!oopLay It currently V'JIKI OMS L'l)ml\lJ number. the NRC may

~~'~red;~~."nd a peo-;on ~ nut mquRd ro l'eJiX,nd ttl, the FACILITY NRC REGION Byron Station. Units 1 and 2 III Facility Operating License Nos. NPF*37 and NPF*66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY~ CYgQ1Q CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY~ CYgQ1Q CY2011 NUMBER OF REACTOR OPERATORS 8 0 8 5 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 5 0 6 7 NUMBER OF SENIOR REACTOR OPERAlDRS*UPGRADE 1 0 1 0 NUMBER OF SENIOR REACTOR OPERAlDRS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5119/2008 612012010 817/2011 ALTERNATE DATE 5/2612008 0612712010 811412011 C. PROPOSED GENERIC FUNDAMENTAIS EXAMINATION (GFE) SCHEDULE CY 2008 CY~

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER JUNE MARCH SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 14 0 0 0 CANDIDATES

Response to RIS 2007*17 Attachment 3 Page 1 of 1 NRC FOIIMS.16 e.s NU(:LEAR RE(;llLATORY COMMISSION APPROVED BY OM8: NO, llsn*OlJl EXPIRES: (llV3I1:1J011 (K*ZfI05)

~~:=~L~ ~r::ffht~:r!fl:f\li~i~tl:~.~I~it~~J~~~i~~O~~tt~

~ I'(soun.'t:'i: for operator exatninatkm".

OPERATOR LICENSING EXAMINATION DATA (.11~).!)131~ Oftk. "rMa...~.melll Budge!. .,bIOGlo.. DC :!tOO). If a means .<eII 10 lrnpo,;e a" inr.mnation and

<ollO<tioo d"", out di'f'lay

  • cumlll', valid OMB ,""'mlnumber. 1M NRC rnay fl()f \.'Ull(itK11lf spunsor. and ,ij per.lttn is not required to rrspmd tn. the inlhanatilm cultection.

FACIUTY NRC REGION Clinton Power Station, Unit 1 III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYgQQa CY2009 CY~ CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2QQ2 CY~ CYgQU NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 3 0 3 NUMBER OF SENIOR REACfOR OPERATORS*L1MITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8124/2009 812212011 ALTERNATE DATE 8117/2009 812912011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2008 CY~

PROPOSED NUMBER MARCH JUNB SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 9 0 0 0 0 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 4 Page 1 of 1 NRC FORrtt 536 U.S NUCLEAR REGULATORY COMl\IISSION APPROVED 8Y OMB: NO. 31~~)1J1 EXPIRES: OIV3II:!tX18 tll-lOO5)

E>lilllllted burden per re,po"" tn (t,mpl~ with this ""I.otary inIi,nnaI**n (flftr\'lion l1!qUeSI: I htHU. TIlls i~nt'nrmauul1 t,:nltet'1ion i.", u~ 10,plan budgets

~::;~:::fhe"Rr~~~~:JFbr~;::c~~~~n:'::~,~~t~ff.~~.

OPERATOR LICENSING Noctear Re~ulat" .

EXAMINATION DATA

  • BudtlOl. W..,hmgtn". DC :!O'03.lfa ""'. .. u..ed!!l impo!e on infi'rmolju.

Ma",,~.mel1l and

",1111<.110. une, not dl.'play. currently ""lid OMB ,,,"unl numOO. tM NRC may i~~)~~:~ ~~}~;n=.. and 3 penon ir. not requ~ tn re4'Cmd to. 1t1t FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating license Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYgQQ§ CY2Qg2 CY 2.Q1Q CY2Q11 ESTIMATED NUMBER OF LICENSEE*PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATfONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2oo9 CY 2.Q1Q CY2011 NUMBER OF REACTOR OPERATORS 5 5 4 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 7 5 10 8 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS*LlMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/3/2008 3/9/2009 21812010 3/7/2011 ALTERNATE DATE 41712008 41612009 31812010 4/412011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2008 CYgQQ2 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEFIEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 14 0 CANDIDATES

Response to RIS 2007*17 Attachment 5 Page 1 of 1 NRC FORM 534 V.S NUCLEAR REGIlL\TORV COMMISSION APPROVED BY OMB: NO. JI~*OI31 EXPIRES,Ollf.llr.tlOll

!8*lflO5l E.. . itn(lled burden per "'P',... III illlllpil w~h 'hi' ...,runtary i.<<",.OIio.

\,'uJl~l.ln I'tQue~: I hour. This inrormallun CIlllectioo is w.ed tn~~ bud&ttJ

~~I~~t~r'"~~-

el.l'nlOIe IlIlhe ~111'd<,n<! f jy""y 5o",i.:<< B..""h (., 31. U.s, OPERATOR LICENSING , ~!:,5o\}~ ;;;r,~l!~':t":

EXAMINATION DATA 11o, Office IIf M""il~el!'tn! and to If1'II:klst' an mfl)rm.afJun a"u""nll~ "'Jlid OMB "".lflll number. the NRC ....y

~lot (O~ or spo~f;()r. and it ptNUI IS not required to respond ttl. ~he mG'mulI,on "'\'iIre..."fKUI.

FACILITY NRCREQ'ON LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY~ CY2Q1Q CY2211 ESTIMATED NUMBER OF UCENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2.QQ§ CY~ CY2010 CY 2011 NUMBER OF REACfOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACfOR OPERATORS*INSTANT 6 0 8 0 NUMBER OF SENIOR REACfOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACfOR OPERATORS-UMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 811812008 911412010 ALTERNATE DATE 8125/2008 9/21/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~ Cy 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPl'EMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 6 Page 1 of 1 NRC FORM 536 u.s NUCL!l.\R REGlIL.\TORV COMMISSION APPROVED BY OMB: NO. 3 "()~1131 EXPIRES, 1l!II3112001l (Il0020115)

E<tim,ted burden per """".... h' mmply with this "'lullIat)' inlilrm";n"

'I.Tti'll~

and res(iurccjO f{if operator txaminaliun1i. Send l

,"imate tn the Re<1lrd, """ FOIAlPriw< .

OPERATOR LICENSING ,.

EXAMINATION DATA Manag'ment and to impose ita inlhrmation

<"Rlml number. the NRC may not ,"undue( Uf spo~~r. and .1. person IS t¥)( requ:irW to re~pond 10. lhe inf,umation l~,na.1Inn.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 5()"353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED N1..jMBER CY2008 CY2009 CYgQ.1Q CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

  • 1 0 EXAMINATIONS ESTIMAlED NUMBER OF NRC*PREPARED 1 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CYgQQ2 CY2010 CY2Qll NUMBER OF REACTOR OPERATORS 3 0 9 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 11 0 9 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0
  • 0 0 PROPOSED DATES PRIMARY DATE 10/20/2008
  • 10/0412010 NlA ALTERNATE DATE 10/27/2008

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 18 0 0 CANDIDATES

  • See Attachment 8 (Peach Bottom AtomiC Power Statton) for LSRO numbers and exam dates

Response to RIS 2007-17 Attachment 7 Page 1 of 1 NRC FORM 536 u.s NUCLEAR REGULATOR\' COMMISSION APPROVED BY OM8; NO WlI)'()131 EXPIRES;OIUJII:!UUR til-ZOOS)

E"i_td burden per re'ponse 10 ""mply .. it~ this ..>ium....y iOrurmatK'.

\."ull<<lion ~st: I hour. Thi:;. inf(ltmutHlfl \."tJlIet.1.kll'l is w.ed to plan budg~I.~

~~;'~:~~f~fiR'~r..:~?~~~:;:-~~~"B'::"~!I.f.~~~'1f.:,

OPERATOR LICENSING EXAMINATION DATA ~~.;~~~~~f~~~~~~r~~y~~;i~~~:;rl~ll~~~":

,,,lIed'm 1~)13I). Qft1c.-e "I'Manage""'ll and roSOl, If. me_ used lu impose an intormllli".

dt.., .01 display a cUl1'I!mly' valid OMB ,-on/lUI .umbot. the NRC .... y not ~(indu..1 Of ~)fJSI:)f, and a perion is nut required to resplnd 10, the:

mthrmatkm l.'Ulla:t.tn, FACILITY NRC REGION Oyster Creek Generating Station I Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2QQ.f1 CY2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINA1l0NS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR OPERATORS 5 6 6 4 NUMBER OF SENIOR REACI'OR OPERATORS-INSTANT 9 10 10 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 2 NUMBER OF SENIOR REACI'OR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 41712008 6115/2009 6114/2010 3/1412011 ALTERNATE DATE 4/1412008 612212009 6121/2010 312112011 C. PROPOSED GENERIC FUNDAMENTAIS EXAMINATION (GFE) SCHEDULE CY2008 CY2QQa PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 0 0 0 16 0 0 16 CANDIDATES

Response to RIS 2007-17 Attachment 8 Page 1 of 1 NItC FORM 536 II.S NVCLEAR REGVLATORY COMMISSION APPROVED BY OMB: NO.JI'O-0131 EXPIRES: OIIIlll:!ll!lI!

{1I.lfMlSI Est/m.ted b"rd~. per "'!lon", tu L_ply wilh th" v"lul1tary ml\lrmaJion Ctll1et1inn requesl: I nuur, - (.'ollecti.n is. used tu plan budget~

and ~)un:~ fur Ilper.unr eSClmotte to tht Rtt.'C.,nL...

OPERATOR LICENSING  :!Os:.~;;;r,~~~'::.~":

EXAMINATION DATA Budg<l. Wa<bmgtun. DC :!II II.OIt'Il'eMMaOllj1.cmem and

. If a _ ** U!IOd 10 Imp an 101"111'<11110

""1....1.011 d"e. not display. currently 1I;l1ic! OMII et",tn,1 number. the NRC ""'y nut COndULi or *;pomor. ;tAd a peC'l'illl1l is nul required to respnnd to. lhe informa!klft t:nllet.'I.)fI,.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2OO9 CY221Q CY2211 ESTIMATED NUMBER OF UCENSEE*PREPARED 1 1 and 1 LSRO 1 0 EXAMINATIONS ESTIMAlED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY~ CY2010 CY2211 NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 9 7 10 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 2 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 6 0 0 PROPOSED DATES 12/7/2009 PRIMARY DAlE 121812008 121612010 7/27/2009 . LSRO ALTERNAlE DAlE 12115/2008 1211412009 1211312010 C. PROPOSED GENERIC FUNDAMENTAlS EXAMINATION (GFE) SCHEDULE CY2QQ§ CYgQQi PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPlEMBER DECEMBER ESTIMATED NUMBER OF 0 0 7 0 0 0 14 0 CANDIDATES

Response to RIS 2007*17 Attachment 9 Page 1 of 1 NRC fORM$J6 U.S NUCLEAR REGULA TORY COMMISSION APPROVED BY OMS: NO. ll:l!l./)Ill EXPIRES:flllf.lI1111011 ffl.%0051 Estimated burden per ""fl"II!'t to "~,mply lNit~ tbis ",.Iuotat)' infM"""".

cotlet:tion request: ) hout, Thi,. inti.l~llOn CtlJtet..iiun is used If) Ian ~ets

~ re~)urces Illr oper3tnr exammatlnns. Send OPERATOR LICENSING EXAMINATION DATA

). Of!kt 01' MlIII(Igoment .md a mtllJ'lS uled to impuse an mfdrmation

""llti<.tion

  • not disp"y
  • CWT<'ntlf valid 0"'18 mntrol .umber. ,he NRC may oot (,'l.lIldut1 \)f ~n..'*.or. and.a person i~ I'kJt required ttl respond to. rhe:

inrormatkm cllJICt1i1.m.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYgQQJl CY2009 CY2010 CY2011 ESTIMATED NUMBBR OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY gQQJl CY2QQ2 CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0 4 6 0 NUMBER OF SENrOR REACTOR OPERATORS* INSTANT 0 11 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 0 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1011612009 10/1812010 ALTERNATE DATE 10/2312009 10/25/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CV2008 CY2QQi PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF , 0 16 0 0 0 15 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 10 Page 1 of 1 NRC FORM 536 U.S NUCLEAR RllGlILATORY COMMISSION APPROVED BY OMB: NO. ) ISO-OIJ I EXPIRES: 01113 1F.!C1Il8

,&-moS)

E>limated burden per 1~"fl<'I1.'" !t) <"mpl~ witb !hi' ""I,mary inli.ltmllliu"

((l'l<<tkm RQue:il: f buur. Thili inllrmalk>n 1."t)11et.1imt iii u~ In plan and resuurces t(lf nperator t'lI:amin&ttinn.'\. Send comment, ~ardi~ burden bud,.:,,,

e.timOle b' lhe RC<1ltd, and r-oIAIPri_y Servke, BrollC~.l.T*S J).l:'S.

OPERATOR LICENSING EXAMINATION DATA if~~}~f~i~~t~

, ~.

I). OffICe or Manac."""" alld used (tl impow an InrhrlTUUlofl roltel.'Uon doe~ mlt dl~plia)' II cull"efttlX V3lid OMS l'tmtnll number. the NRC NY flOI l."OOOtk.'f il( ~HlS(lr. and a perFotln !S noC required ttl rt1ipund tn, lht illthrmation (.'nl~1jnn.

FACILlTV NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CYgQQ2 CY2Q1Q CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY~ CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0 10 0 8 NUMBER OF SENIOR REAcroR OPERATORS-INSTANT 0 6 0 8 NUMBER OF SENIOR REAcroR OPERATORS-UPGRADE 0 1 0 1 NUMBER OF SENIOR REAcroR OPERATORS*LlMrrED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/25/2009 5/30/2011 ALTERNATE DATE 611/2009 61612011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY gQQ§ CY~

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 0 0 0 0 0 0 0 CANDIDAlES