ML112310086
| ML112310086 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/18/2011 |
| From: | Division of Reactor Safety II |
| To: | Southern Nuclear Operating Co |
| References | |
| 50-321/11-301, 50-366/11-301 | |
| Download: ML112310086 (2) | |
Text
Plant Hatch HLT-06 NRC Exam 2011-301 Seating Chart Classroom 172 Andy Beicher Craig Moulton Phillip Cloud Gary Brown Russell Lewis Kristi Taylor Kyle Routh Jimmy Collins Rick Berry Instructor Table Instructor Computer Station
PROPOSES CHANGES TO QUESTIONS AFTER VALIDATION 3 Q#36 At 10:05 bullet, changed RB Bldg. to Rx. Bldg. for consistency in question.
Reason; Editorial Q#37 Changed A Unit 2 is operating to Unit 2 is operating.
Reason; Editorial Q#38 Changed Unit 2 is operating at 14% power when the following indications are observed: to:
Unit 2 is operating at 14% power with RFPT 2A operating at 3600 rpm.
The following indications are observed:
Reason; If RFPT speed is <3500 rpm the RFPT will not trip on low vacuum, therefore stating the rpm value removes challenges later.
Q#41 Changed 2 nd part from After the Main Turbine is tripped, without any additional to After the Main Turbine reaches zero (0) rpm, without any additional Reason; Define the time frame of Main Turbine speed to meet any permissive for auto start of TGOP, because TGOP will not start immediately since the Main Shaft Driven oil pump will still be providing oil.
Q#64 Changed kV in 2 places to VAC.
Reason; Editorial Q#79 Changed E21 to E41 in the D distractor.
Reason; Editorial Q#80 Changed the l part from With 2A RFPT speed increasing to 5800 RPM, the response of 2N2 1-Fl 11.... to With 2A RFPT speed increasing to 5800 RPM, the above response of 2N2 1-Fl 11 Reason; We added the above response to 1 s1 part to ensure the applicant understands that we are talking about only these conditions, not how it would normally operate.