Category:Technical Specification
MONTHYEARML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML22343A1152022-12-0909 December 2022 Transmittal of Technical Specification Bases Revision 75 ML22251A3982022-09-0808 September 2022 Technical Specification Bases Revision 74 and Technical Requirements Manual Revision 70 ML22053A2332022-02-22022 February 2022 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML21323A1702021-11-19019 November 2021 Technical Specifications Bases Revision 73 ML21106A3002021-04-16016 April 2021 Technical Specification Bases Revisions 71 and 72 ML20282A9532020-10-0808 October 2020 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML17258B2142017-09-15015 September 2017 Palo Verde, Units 1, 2, and 3 - Technical Specification Bases Revision 64 and Technical Requirements Manual Revision 64 ML16365A2402016-12-30030 December 2016 Emergency License Amendment Request to Extend Diesel Generator 3B Completion Time ML16356A6892016-12-21021 December 2016 Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time ML16154A5482016-05-26026 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification (TS) Bases Revision 63 and Technical Requirements Manual (TRM) Revision 63 ML16154A5802016-05-12012 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 - Replacement Pages and Insertion Instructions ML16154A6142016-05-12012 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 ML15139A2972015-04-24024 April 2015 Technical Specification (TS) Bases, Revision 62 ML15139A2992015-04-24024 April 2015 Technical Specification Bases (TS Bases), Revision 62, Replacement Pages and Insertion Instructions ML15139A3002015-04-24024 April 2015 Technical Specification Bases (TS Bases), Revision 62 ML15027A0642015-01-0909 January 2015 Technical Specification (TS) Bases Revision 61 and Technical Requirements Manual (TRM) Revision 62 ML14255A0632014-08-29029 August 2014 Technical Specification Bases, Revision 60 ML14255A0642014-08-20020 August 2014 PVNGS Technical Specification Bases (TS Bases), Revision 60, Replacement Pages and Insertion Instructions ML14091A8792014-03-21021 March 2014 Technical Specification (TS) Bases Revision 59 and Technical Requirements Manual (TRM) Revision 59 ML14091A9572014-03-19019 March 2014 Technical Specification Bases (TS Bases) Revision 59 Replacement Pages and Insertion Instructions ML14091A9562014-03-19019 March 2014 Technical Specification (TS) Bases Revision 59 ML13280A2642013-09-27027 September 2013 Request to Amend Technical Specification 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip ML13217A0542013-07-0303 July 2013 Enclosure 1 - Technical Specifications Bases, Revision 58 ML13217A0552013-07-0303 July 2013 Enclosure 1 - Technical Specifications Bases, Revision 58 ML13120A5002013-04-16016 April 2013 Technical Specification (TS) Bases Revision 57 and Technical Requirements Manual (TRM) Revision 57 ML13120A5012013-04-10010 April 2013 Technical Specification Bases, Revision 57 ML13120A5022013-04-10010 April 2013 Technical Specification Bases (TS Bases) Revision 57, Replacement Pages and Insertion Instructions ML13120A5042013-04-10010 April 2013 Technical Requirements Manual (TRM) Revision 57 Replacement Pages and Insertion Instructions ML12353A1582012-12-12012 December 2012 Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML12191A3502012-06-26026 June 2012 Technical Specification (TS) Bases Revision 56 and Technical Requirements Manual (TRM) Revision 56 ML12193A0412012-05-30030 May 2012 Technical Specification Bases, Revision 56 ML12193A0422012-05-25025 May 2012 Insertion Instructions Technical Specifications Bases, Revision 56, Summary of Changes ML12076A0452012-03-0808 March 2012 Request for Amendment to Eliminate the Use of the Term Core Alteration in the Technical Specifications ML11287A0342011-09-0101 September 2011 Technical Specification Bases Revision 55 ML11287A0332011-09-0101 September 2011 Insertion Instructions for Technical Specification Bases Revision 55, Summary of Changes ML1106107632011-01-26026 January 2011 PVNGS Technical Specification Bases, Revision 54 ML1033506462010-11-10010 November 2010 Technical Specification Bases, Revision 53 ML1021500352010-07-21021 July 2010 Technical Specifications Bases Revision 52 Update ML0935608452009-12-0909 December 2009 Submittal of Changes to the TS Bases Incorporated Into Revision 51, Implemented on December 2, 2009 ML0928102272009-09-28028 September 2009 Request to Amend Technical Specification (TS) 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter ML0923801512009-08-18018 August 2009 Submittal of Technical Specifications Bases Revision 50 Update ML0915602292009-05-28028 May 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26 ML0823408392008-08-13013 August 2008 Technical Specifications Bases Revision 49 Update ML0819800322008-07-0202 July 2008 Request for Amendments to Technical Specification 4.2.2, Control Element Assemblies 2024-08-27
[Table view] Category:Amendment
MONTHYEARML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML22053A2332022-02-22022 February 2022 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML20282A9532020-10-0808 October 2020 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML16365A2402016-12-30030 December 2016 Emergency License Amendment Request to Extend Diesel Generator 3B Completion Time ML13120A5042013-04-10010 April 2013 Technical Requirements Manual (TRM) Revision 57 Replacement Pages and Insertion Instructions ML12076A0452012-03-0808 March 2012 Request for Amendment to Eliminate the Use of the Term Core Alteration in the Technical Specifications ML0928102272009-09-28028 September 2009 Request to Amend Technical Specification (TS) 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter ML0819800322008-07-0202 July 2008 Request for Amendments to Technical Specification 4.2.2, Control Element Assemblies ML0733004592007-11-14014 November 2007 Request for Amendment to Add Technical Specification LCO 3.0.8 to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers, Using Consolidated Line Item Improvement Process (CLIIP) ML0628300572006-09-28028 September 2006 Change Limitations (LCO 3.0.4 & SR 3.0.4) Using the Consolidated Line Item Improvement Process (Cliip), and Application for Technical Specification Change to Correct Example 1.4-1 ML0627603672006-09-26026 September 2006 Application for Technical Specification Change Regarding Main Steam Isolation Valves (LCO 3.7.2) ML0625504132006-09-12012 September 2006 Technical Specifications - Errata to Amendment No. 161, Dated July 27, 2006 ML0626301802006-08-16016 August 2006 Request for Amendment to Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.9, 3.8.1.10, & 3.8.1.14 ML0606105982006-02-23023 February 2006 Request for Emergency Amendment to Technical Specifications 3.7.8, Essential Spray Pond System (Esps) and 3.8.1, AC Sources - Operating. ML0532202292005-11-16016 November 2005 (13 TS Pages) Palo Verde Ngs, Units 1,2 & 3 - Issuance of Amds. 157//157/157 Replacement of Steam Generators and Uprated Power Operations and Associated Administrative Changes. (Tacs. MC3777/3778/3779) ML0518902372005-07-0707 July 2005 Tech Spec Pages for License Amendments 155, 155 and 155 Main Steam Safety Valves ML0515204132005-05-26026 May 2005 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity and Steam Generator Tube Inspection Length Through the Tubesheet ML0436203232004-12-16016 December 2004 Request for Amendment to Delete Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports, Using the Consolidated Line Item Improvement Process ML0420102892004-07-0909 July 2004 Request for a License Amendment to Support Replacement of Steam Generators & Uprated Power Operations in Units 1 and 3, and Associated Administrative Changes for Unit 2 ML0408503162004-03-23023 March 2004 Technical Specification Pages for Amendment Nos. 152, 152 an 152, Palo Verde Nuclear Generating Station, Units 1, 2 and 3 ML0408503142004-03-19019 March 2004 Technical Specification Pages, Amendments 151 ML0402908772004-01-22022 January 2004 Response to NRC Request for Additional Information Regarding License Amendment Request to Technical Specification 3.8.1, AC Sources - Operating and 3.8.4, DC Sources - Operating ML0328810362003-10-0707 October 2003 Request for Amendment to Technical Specification 5.5.6, Pre-Stressed Concrete Containment Tendon Surveillance Program and 5.5.16, Containment Leakage Rate Testing Program. ML0323200402003-08-13013 August 2003 Response to Request for Additional Information to Proposed Amendment to TS 3.2.4, 3.3.1, & 3.3.3 ML0319700172003-07-10010 July 2003 Response to Request for Additional Information to Proposed Amendment to Technical Specification 3.2.4, 3.3.1, & 3.3.3 ML0312604122003-04-25025 April 2003 Request for a License Amendment to Revise Technical Specification 5.3, Unit Staff Qualifications ML0203003112002-01-29029 January 2002 TS Pages Amendments 138 Boron Dilution Alarm System and Refueling Operations-Nuclear Instrumentation 2024-03-08
[Table view] Category:Technical Specifications
MONTHYEARML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22343A1152022-12-0909 December 2022 Transmittal of Technical Specification Bases Revision 75 ML22341A6132022-12-0707 December 2022 Application to Revise Technical Specifications to Adopt TSTF-107- a, Separate Control Rods That Are Untrippable Versus Inoperable ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML16043A3612016-01-29029 January 2016 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15247A5182015-09-0404 September 2015 Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML15065A0312015-02-27027 February 2015 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML14202A3782014-09-0909 September 2014 Issuance of Amendment Nos. 194, 194, and 194, Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip (TAC Nos. MF2879-81) ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13294A5762013-11-25025 November 2013 Issuance of Amendment Nos. 192, 192, and 192, Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML13217A0562013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML13217A0572013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML1126202932011-12-15015 December 2011 Issuance of Amendment Nos. 188, 188, and 188, Adoption of TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML12193A0442011-11-17017 November 2011 Technical Requirements Manual, Revision 56, Replacement Pages and Insertion Instructions ML11287A0322011-09-0101 September 2011 Technical Requirements Manual, Revision 55 ML11287A0312011-09-0101 September 2011 Technical Requirements Manual (TRM) Revision 55 ML0531100452011-04-21021 April 2011 Current Facility Operating License NPF-41, Tech Specs, Revised 09/28/2017 ML11098A0012011-04-21021 April 2011 Appendices a, B, C, and D - Palo Verde Nuclear Generating Station, Unit 3 ML1108719552011-04-21021 April 2011 License Renewal - Appendices a, B, C, and D to the Renewed Operating License for Unit 1 (NPF-41) ML11098A0002011-04-21021 April 2011 Appendices a, B, C, and D - Palo Verde Nuclear Generating Station, Unit 2 ML1108802752011-03-29029 March 2011 Revised Technical Specifications from March 29, 2011 Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal of a License Amendment Request to Revise TS Pages ML1106107622011-01-26026 January 2011 PVNGS Insertion Instructions for Technical Specifications Bases Changed Pages, Revision 54 ML1012602112010-09-10010 September 2010 Issuance of Amendment Nos. 179, 179, and 179, Revise License Condition for Maximum Power Level and Miscellaneous Technical Specification Changes ML1013102242010-04-29029 April 2010 Request for Amendment to Technical Specification 5.5.8, Inservice Testing Program ML1013103962010-04-29029 April 2010 Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using the Consolidated Line Item Improvement Process ML1013102252010-04-29029 April 2010 Supplement to Amendment Request Associated with Administrative Changes - New Retyped Technical Specification Page ML1005600232010-02-24024 February 2010 Response to Request for Updated Technical Specification Page ML1006400942010-02-23023 February 2010 Response to Request for Updated Technical Specification Page ML0934504852009-11-30030 November 2009 Request for Amendment to TS Table 3.3.5-1,Engineered Safety Features Actuation System Instrumentation, and Figure 3.5.5-1, Minimum Required Refueling Water Tank (RWT) Volume & Supporting Changes ML0906410142009-02-19019 February 2009 Request for Technical Specification Amendment and Exemption from 10 CFR 50, Appendix G, to Relocate the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Enable Temperatures ML0802500682008-01-17017 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0733811392007-11-28028 November 2007 Inservice Inspection Program, Third Interval - Snubber Program ML0719401202007-07-25025 July 2007 Technical Specifications, Revised Shutdown Control Element Assembly Insertion Limits ML0710603712007-05-16016 May 2007 Technical Specifications, Issuance of Amendment Nos. 167, 167, and 167 AC Sources - Operating Surveillance Requirements ML0709400842007-03-23023 March 2007 Special Report 3-SR-2006-001-01, 12th Refueling Outage, Steam Generator Eddy Current Examination ML0707801552007-03-0808 March 2007 Revision to Request for Amendment to Diesel Generator Technical Specification Surveillance Requirements 3.8.1.9, 3.8.1.10, and 3.8.1.14 ML0704702872007-02-22022 February 2007 Technical Specification Pages - Amendment Nos. 166, 166, and 166 Containment Isolation Valves ML0703500422007-02-21021 February 2007 Technical Specification, Amendment Nos. 165, 165, & 165 - Increased Flexibility in Mode Restraints (TAC Nos. MD3153, MD3154, & MD3155) ML0703901032007-01-25025 January 2007 Response to NRC Request for Additional Information Regarding Request for Amendment to Technical Specification Surveillance Requirements 3.8.1.9, 3.8.1.10, and 3.8.1.14 ML0633905302006-12-0505 December 2006 Tech Spec Pages for Amendments 164, 164, and 164 Extended Allowed Outage Time for Emergency Diesel Generators ML0632400492006-11-17017 November 2006 Technical Specifications - Issuance of Amendments 163, 163, and 163, Revise TS 3.7.2, Main Steam Isolation Valves (Msivs), to Include Specific Requirements ML0631905452006-11-14014 November 2006 Tech Spec Pages for Errata to Amendment No. 162, Dated October 31, 2006 Changes to Security Plan ML0628401112006-10-31031 October 2006 Technical Specification - License Pages - Issuance of Amendment 162 Changes to Security Plan 2024-06-14
[Table view] |