DiabloCanyonNPEm Resource From: Tan, Miranda [M1TF@pge.com]
Sent: Wednesday, November 10, 2010 1:44 PM To: Pick, Greg Cc: Grebel, Terence; Soenen, Philippe R
Subject:
SAPN 50336850 - Elastomer Hoses Attachments: SAPN 50336850.pdf Importance: High
- Greg, Attached is the updated elastomer hoses notification SAPN 50336850. PMs have been created for periodic replacement of hoses at a 10 year frequency. The hoses will be short lived based on the period replacements and therefore have no impact to the LRA. SAPN 50336850 is now closed.
- Best, Miranda Tan 805 781 9415
<<SAPN 50336850.pdf>>
1
Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2182 Mail Envelope Properties (D065043718A59C4B99DDA1862BB067DE01BA2454)
Subject:
SAPN 50336850 - Elastomer Hoses Sent Date: 11/10/2010 1:44:05 PM Received Date: 11/10/2010 1:44:54 PM From: Tan, Miranda Created By: M1TF@pge.com Recipients:
"Grebel, Terence" <TLG1@pge.com>
Tracking Status: None "Soenen, Philippe R" <PNS3@PGE.COM>
Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov>
Tracking Status: None Post Office: exchange12.Utility.pge.com Files Size Date & Time MESSAGE 364 11/10/2010 1:44:54 PM SAPN 50336850.pdf 98484 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Notification: 50336850 U-0 Type: DA Work Type: EVAL AANS
Description:
LR Question on Sys 25 Elastomer Hoses Order:
Funct. Loc: DC-0-04 U0 SYS 04 TURBINE STEAM SUPPLY Reported By: PNS3 Philippe R. Soenen Rpt By Work Ctr: PL Contact Info: PNS3 Philippe R. Soenen 805/544-6984 Created On: 23 Aug 10 16:25 Planner Group:
Main Wrk Ctr: EMS-005 Kubran Krystina - KHK3 PROBLEM DESCRIPTION 08/23/2010 16:25:46 Jana M. Orlando (JMSO) Phone 805/545-3126 08/19/2010 16:55:41 Philippe R. Soenen (PNS3) Phone 805/781-9782 During the an NRC insepction walkdown elastomer hoses were identified in the compressed air system for the portion of the system that is in scope for license renewal. The material type of elastomer had previously not been identified as within license renewal scope for system 25. The question was raised on how these elastomer hoses would be aging managed for the period of extended operation.
The license renewal project team has determined that these elastomer hoses are within the scope of license renewal and would have to be aging managed by an aging management program or periodically replaced. If periodically replaced the hoses would be screened out from requiring aging management per 10 CFR 54.
The project recommends the creation of a PM that would periodically replace these hoses and eliminate the requirement to apply an aging management program to these hoses.
The final determination on periodically replacing these hoses or commiting to applying an aging management program will need to be communicated to the NRC as part of the License Renewal review process.
Event Date 19 Aug 10 Notif Required By 19 Nov 10 Station Sig.: 3 Work Group Eval Print Date: 10 Nov 10 10:26 PG&E Corporation DIABLO CANYON Page 1 of 7
Notification: 50336850 U-0 Type: DA Work Type: EVAL AANS
Description:
LR Question on Sys 25 Elastomer Hoses Order:
A task will be initiated off this notification to track the sumittal to the NRC.
08/23/2010 16:25:40 Jana M. Orlando (JMSO) Phone 805/545-3126 The issue/event documented on this notification was reviewed by the Notification Review Team (NRT) and determined to be the indicated significance level per OM7.ID1, Attachment 1, Category 18.1. If additional information is discovered that would affect the significance level determination, contact a member of the NRT or e-mail DCPP NRT Members.
DN closed to DA.
09/15/2010 13:50:58 Michael D. Wright (MDW4) Phone 805/545-4067 Re-routed to System Engineer:
Action:
Work with PM group to create a PM for hose replacements on a 10 yr frequency for air lines associated with the backup air bottles to the 10% ADV's.
If there is any question an the scope of the air lines, contact the License renewal project.
10/19/2010 03:13:41 Krystyna H. Kubran (KHK3) Phone 805/545-3231 Orders for STP I-4-pcv19/20/21/22 have a step to inspect air supply hoses and:
A. Replace air supply hoses and fittings IAW MP I-2.24-3 as needed.
B. Perform any dedication activities as required.
C. Perform pressure check and verify no leaks IAW MP I-2.24-4 This may be expanded to include all elastomer hoses associated with each valve.
10/26/2010 00:11:40 Michael D. Wright (MDW4) Phone 805/545-4067 Print Date: 10 Nov 10 10:26 PG&E Corporation DIABLO CANYON Page 2 of 7
Notification: 50336850 U-0 Type: DA Work Type: EVAL AANS
Description:
LR Question on Sys 25 Elastomer Hoses Order:
The request was for the elastomer hoses from the backup air bottles to the PCV's. The request was to create a PM to replace, not inspect, at a 10 year frequency. By "replacing" versus "inspecting" we do not have to develop an aging management program. Again, these are the hoses at the bottles.
Please review this with MSE Manager prior to closing.
10/26/2010 15:29:06 Krystyna H. Kubran (KHK3) Phone 805/545-3231 System engineer is requesting that SAPOs for STP I-4-pcv19/20/21/22 have Operation 0100 updated to reflect that ALL elastomer hoses are to be visually checked.
Current Operation description:
INSPECT AIR SUPPLY HOSES AND:
REPLACE AIR SUPPLY HOSES AND FITTINGS IAW MP I-2.24-3 AS NEEDED.
PERFORM ANY DEDICATION ACTIVITIES AS REQUIRED.
PERFORM PRESSURE CHECK AND VERIFY NO LEAKS IAW MP I-2.24-4 Request update to read:
INSPECT ALL ELASTOMER AIR SUPPLY (AND BACK UP SUPPLY) HOSES AND:
REPLACE AIR SUPPLY HOSES AND FITTINGS IAW MP I-2.24-3 AS NEEDED.
PERFORM ANY DEDICATION ACTIVITIES AS REQUIRED.
PERFORM PRESSURE CHECK AND VERIFY NO LEAKS IAW MP I-2.24-4 PCV-19 (Unit 1)
FLOC DC-1-04-P-VOA-MS-1-PCV-19 Ref Maintenance Plan # 7713 Next Order: 64038438 Due: 10/14/2012 PCV-19 (Unit 2)
FLOC DC-2-04-P-VOA-MS-2-PCV-19 Print Date: 10 Nov 10 10:26 PG&E Corporation DIABLO CANYON Page 3 of 7
Notification: 50336850 U-0 Type: DA Work Type: EVAL AANS
Description:
LR Question on Sys 25 Elastomer Hoses Order:
Order coded under FLOC: DC-2-04-I-CI-HIC-516 Ref Maintenance Plan # 9680 Next Order: 64026248 Due: 11/01/2011 PCV-20 (Unit 1)
FLOC DC-1-04-P-VOA-MS-1-PCV-20 Ref Maintenance Plan # 7714 Next Order: 64026506 Due: 02/25/2011 PCV-20 (Unit 2)
FLOC DC-2-04-P-VOA-MS-2-PCV-20 Ref Maintenance Plan # 9681 Next Order: 64026172 Due: 11/01/2011 PCV-21 (Unit 1)
FLOC DC-1-04-P-V-MS-1-PCV-21 (note FLOC is coded V rather than VOA)
Ref Maintenance Plan # 7715 Next Order: 64021726 Due: 12/11/2011 PCV-21 (Unit 2)
FLOC DC-2-04-P-VOA-MS-2-PCV-21 Ref Maintenance Plan # 9682 Next Order: 64042243 Due: 02/12/2012 PCV-22 (Unit 1)
FLOC DC-1-04-P-VOA-MS-1-PCV-22 Order coded under FLOC: DC-1-04-I-CI-HIC-546 Ref Maintenance Plan # 7716 Next Order: 64018443 Due: 05/15/2011 PCV-22 (Unit 2)
FLOC DC-2-04-P-VOA-MS-2-PCV-22 Order coded under FLOC: DC-2-04-I-CI-HIC-546 Ref Maintenance Plan # 9683 Next Order: 64043606 Due: 01/08/2012 Print Date: 10 Nov 10 10:26 PG&E Corporation DIABLO CANYON Page 4 of 7
Notification: 50336850 U-0 Type: DA Work Type: EVAL AANS
Description:
LR Question on Sys 25 Elastomer Hoses Order:
10/28/2010 13:39:41 Janis L. Bailey (JXDJ) Phone 545-3370 Notification due date extended to allow completion of corrective actions for creation of PMs.
11/03/2010 09:13:27 Krystyna H. Kubran (KHK3) Phone 805/545-3231 Engineering creation of PMs will be as follows:
Components: Elastomer hose which connects the portable back up air bottle to the hard metal fixed air line piping.
Frequency of Replacement: 10 years (as recommended by engineering mngmnt) 11/04/2010 16:01:34 John N. Mellinger (JNM1) Phone 805/545-4691 The following PM tasks have been initiated for replacement of the Back-up air bottle hoses:
29192 64064235 (New) REPLACE 1-PCV-22 BACKUP AIR HOSES 11/27/2013 29191 64064234 (New) REPLACE 1-PCV-21 BACKUP AIR HOSES 12/07/2013 29189 64064232 (New) REPLACE 1-PCV-19 BACKUP AIR HOSES 01/02/2014 29194 64064237 (New) REPLACE 2-PCV-20 BACKUP AIR HOSES 01/02/2014 29190 64064233 (New) REPLACE 1-PCV-20 BACKUP AIR HOSES 01/29/2014 29193 64064236 (New) REPLACE 2-PCV-19 BACKUP AIR HOSES 01/29/2014 29195 64064238 (New) REPLACE 2-PCV-21 BACKUP AIR HOSES 03/08/2014 29196 64064239 (New) REPLACE 2-PCV-22 BACKUP AIR HOSES 03/08/2014 These PMs have been aligned with the bottle gauge calibration pm tasks.
Print Date: 10 Nov 10 10:26 PG&E Corporation DIABLO CANYON Page 5 of 7
Notification: 50336850 U-0 Type: DA Work Type: EVAL AANS
Description:
LR Question on Sys 25 Elastomer Hoses Order:
11/10/2010 08:54:19 Krystyna H. Kubran (KHK3) Phone 805/545-3231 PMs are created and in place per work control process.
Creation and implementation of PMs were the goal of this SAPN. Actions are now complete for closure. SAPN now closed.
Print Date: 10 Nov 10 10:26 PG&E Corporation DIABLO CANYON Page 6 of 7
Notification: 50336850 U-0 Type: DA Work Type: EVAL AANS
Description:
LR Question on Sys 25 Elastomer Hoses Order:
Funct. Loc: DC-0-04 U0 SYS 04 TURBINE STEAM SUPPLY NOTIFICATION TASKS OVERVIEW Task Task Code Text Task Text User Task
- Status Status 1 Evaluate the following (See Long Text) Track submittal of approach determined TDNA TSCO 2 Evaluate the following (See Long Text) MSE manager review TDNA TSCO STATUS DETAILS System Status: NOCO NOPT ATCO User Status: 20 APPV Approved Print Date: 10 Nov 10 10:26 PG&E Corporation DIABLO CANYON Page 7 of 7