Letter Sequence RAI |
---|
TAC:ME1834, Control Room Habitability (Approved, Closed) TAC:ME1836, Control Room Habitability (Approved, Closed) |
Results
Other: LR-N16-0144, Completion of Activities to Support Entry Into the Period of Extended Operation, ML092400531, ML092400532, ML092430231, ML092460442, ML092470039, ML092520185, ML092650382, ML092660174, ML092660447, ML100850459, ML102280211, ML102430586, ML11125A024
|
MONTHYEARLR-N09-0192, Information to Support NRC Staff Review of the Application for Renewed Operating License2009-08-18018 August 2009 Information to Support NRC Staff Review of the Application for Renewed Operating License Project stage: Request LR-N09-0161, PSEG Nuclear, Salem Nuclear Generating Station, Units 1 and 2, Transmittal of License Renewal Application2009-08-18018 August 2009 PSEG Nuclear, Salem Nuclear Generating Station, Units 1 and 2, Transmittal of License Renewal Application Project stage: Request ML0924005312009-08-18018 August 2009 PSEG Nuclear, Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application, Volume 2 of 3 Project stage: Other ML0924302312009-08-18018 August 2009 PSEG Nuclear, Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application, Volume 1 of 3 Project stage: Other ML0924005322009-08-18018 August 2009 PSEG Nuclear, Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application, Volume 3 of 3 Project stage: Other ML0924604422009-09-0303 September 2009 Delaware Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0924700392009-09-0404 September 2009 Comment on Salem - Hope Creek License Renewal Applications from Citizen Project stage: Other ML0926601742009-09-0707 September 2009 Comment on License Renewal for Salem and Hope Creek Power Plants - Goodman Project stage: Other ML0925201852009-09-0808 September 2009 Comments About Relicensing Salem and Hope Creek Reactors in Nj, Steven Hegedus Project stage: Other ML0926503822009-09-0808 September 2009 Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0926604472009-09-23023 September 2009 Hope Creek, E-mail from Ruth Panella Comments on License Renewal Project stage: Other ML1008502062010-03-24024 March 2010 Task Order No. 004 Under Delivery Order No. NRC-DR-03-09-061 Project stage: Acceptance Review ML1008504592010-04-0606 April 2010 Project Manager Change for the License Renewal of Salem Nuclear Generating Station, Units 1 and 2 (TAC No. ME1834 and ME1836) Project stage: Other ML1007606612010-04-14014 April 2010 RAI Regarding Balance of Plant Scoping and Screening Results for the Salem Nuclear Generating Station Units 1 & 2 (Tac Nos. ME1834 and ME1836) Project stage: RAI ML1013805112010-05-24024 May 2010 Request for Additional Information for the Salem Generating Station, Units 1 and 2, License Renewal Application, Section 3.3.2 (TAC Nos ME1836 and ME1834) Project stage: RAI LR-N10-0191, Response to NRC Request for Additional Information Dated April 30, 2010, Regarding Scoping and Screening Methodology for License Renewal Application2010-05-28028 May 2010 Response to NRC Request for Additional Information Dated April 30, 2010, Regarding Scoping and Screening Methodology for License Renewal Application Project stage: Response to RAI ML1014600612010-06-0707 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Regarding Section 3.5 (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1014400812010-06-10010 June 2010 Request for Additional Information for the Review of the Salem Generating Station, Unit 1 and Unit 2, License Renewal Application Identified During the Audit (TAC ME1836 and ME1834) Project stage: RAI ML1014600772010-06-10010 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC ME1832 and ME1836) Project stage: RAI ML1014810092010-06-11011 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Project stage: RAI ML1015504712010-06-11011 June 2010 RAI for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Sections 3.1.2 and 3.3.2 (TAC No ME1834/ME1836) Project stage: RAI ML1014801892010-06-14014 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Regarding Sections 4.3 and 4.4 (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1013905372010-06-17017 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application(Tac Nos ME1834, ME1836) Project stage: RAI ML1016201902010-06-25025 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2, License Renewal Application (Tac ME1834/ME1836) Project stage: RAI ML1016804022010-06-29029 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2, License Renewal Application Regarding Subsection 3.1.2.2.14 (TAC ME1834/ME1836) Project stage: RAI ML1014807262010-06-30030 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Regarding Section B.3.1.1 (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1017203642010-07-12012 July 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1&2 LRA Regarding ASME Section XI ISI, Subsections Iwb,Iwc, and Iwd (TAC Nos. ME1834/ME1836) Project stage: RAI LR-N10-0243, Response to NRC Request for Additional Information Dated June 14, 2010, Related to Sections 4.3 and 4.4 License Renewal Application2010-07-13013 July 2010 Response to NRC Request for Additional Information Dated June 14, 2010, Related to Sections 4.3 and 4.4 License Renewal Application Project stage: Response to RAI ML1019504872010-07-19019 July 2010 Request for Additional Information for the Salem Generating Station, Unit 1 and Unit 2, License Renewal Application, Section 4.6 (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1019606342010-07-23023 July 2010 Request for Additional Information for the Salem Generating Station, Unit 1 and Unit 2, License Renewal Application (TAC ME1834 and ME1836) Project stage: RAI ML1019304962010-07-30030 July 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC No. ME1834 and Me 1836) Project stage: RAI ML1019504792010-08-0303 August 2010 Request for Additional Information Regarding ASME Section XI, Subsection IWE for the Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1019704742010-08-0303 August 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application Regarding Bolting Integrity (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1015402422010-08-0606 August 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application for Buried Piping Inspection Program (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1020004042010-08-0909 August 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC Nos. ME1834 and ME1836) Project stage: RAI LR-N10-0295, Responses to NRC Requests for Additional Information Dated July 12, 2010, July 19, 2010 and July 23, 2010 Related to Various Sections of License Renewal Application2010-08-10010 August 2010 Responses to NRC Requests for Additional Information Dated July 12, 2010, July 19, 2010 and July 23, 2010 Related to Various Sections of License Renewal Application Project stage: Response to RAI ML1020304172010-08-19019 August 2010 RAI Regarding the Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC ME1834 & ME1836) Project stage: RAI ML1022802112010-08-25025 August 2010 Scoping and Screening Audit Summary Regarding the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application Project stage: Other LR-N10-0313, Responses to Request for Additional Information Dated 08/03/10, Related to Bolting Integrity and 07/30/10 to Steam Generators and Question Posed During Region 1 Inspection, Regarding License Renewal Application2010-08-26026 August 2010 Responses to Request for Additional Information Dated 08/03/10, Related to Bolting Integrity and 07/30/10 to Steam Generators and Question Posed During Region 1 Inspection, Regarding License Renewal Application Project stage: Response to RAI LR-N10-0322, Response to NRC Request for Additional Information, Dated August 6, 2010 Related to the Buried Piping Inspection Program Associated with License Renewal Application2010-09-0707 September 2010 Response to NRC Request for Additional Information, Dated August 6, 2010 Related to the Buried Piping Inspection Program Associated with License Renewal Application Project stage: Response to RAI ML1024600782010-09-29029 September 2010 RAI for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC Nos. ME1834 and ME1836) Project stage: RAI ML1026003402010-10-12012 October 2010 RAI for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application for Buried Piping Inspection Program (TAC No. ME1834 and ME1836) Project stage: RAI ML1029102492010-10-25025 October 2010 Request for Additional Information for Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application on Structures Monitoring (TAC No. ME1834 and ME1836) Project stage: RAI ML1029300492010-11-0404 November 2010 Request for Additional Information for Salem Nuclear Generating Station, Units 1 and 2, LRA on Primary Water Stress Corrosion Cracking in Steam Generator Tube-to-Tube Sheet Welds Project stage: RAI ML1030101002010-11-0404 November 2010 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station, Units 1 and 2 Project stage: Approval ML1031201722010-11-0404 November 2010 Safety Evaluation Report with Open Items Related to the License Renewal of Salem Nuclear Generating Station, Units 1 and 2 Project stage: Approval ML1024305862010-11-0909 November 2010 Audit Report Regarding the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME1834 and ME1836) Project stage: Other ML1028101942010-11-22022 November 2010 RAI for Salem Nuclear Generating Station Units 1 and 2 LRA for Use of Westems Program in Metal Fatigue Analysis Project stage: RAI ML1032700762010-12-10010 December 2010 RAI for Salem Nuclear Generating Station Units 1 and 2 LRA Project stage: RAI LR-N10-0414, Response to NRC Request for Additional Information, Dated October 25, 2010, Related to Structures Monitoring Associated with License Renewal Application2010-12-14014 December 2010 Response to NRC Request for Additional Information, Dated October 25, 2010, Related to Structures Monitoring Associated with License Renewal Application Project stage: Response to RAI 2010-06-11
[Table View] |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22055A0702022-02-22022 February 2022 NRR E-mail Capture - Final RAI - Salem 1-Relief Request Associated with Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2021-LLR-0085) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21068A4142021-03-0909 March 2021 NRR E-mail Capture - Final RAI for Salem Unit 1 LAR to Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21043A1442021-02-11011 February 2021 NRR E-mail Capture - Salem - Final RAI Alternative for Examination of ASME Section XI, Category B-B, Item Number B2.11and B2.12 (L-2020-LRR-0103) ML21021A2592021-01-21021 January 2021 NRR E-mail Capture - Final RAI - Salem 1 - Steam Generator Tube Inspection Report ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection ML18267A1712018-09-21021 September 2018 NRR E-mail Capture - Final RAI from PRA Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18264A0122018-09-20020 September 2018 NRR E-mail Capture - Final RAI from I&C Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18250A3132018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18171A3212018-06-20020 June 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Adopt TSTF-411 and 418 (L-2017-LLA-0442) ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17212B1152017-07-31031 July 2017 Request for Additional Information - Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Amendment Request (CACs MF9364 and MF9365) ML17199A1122017-07-18018 July 2017 Request for Additional Information - Salem Units 1 and 2 - Accident Monitoring Instrumentation License Amendment Request (CAC Nos. MF8859 & MF8860) ML17192A1672017-07-11011 July 2017 Request for Additional Information - Salem Unit 1 - Steam Generator Tube Inspection Report ML17115A4032017-05-0909 May 2017 Request for Additional Information Regarding Relief Request SC-14R-171 - Use of Code Cases N-695-1 and N-696-1 ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16218A0052016-08-11011 August 2016 Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001 ML16195A4492016-07-14014 July 2016 Request for Additional Information Regarding Chilled Water System Modifications ML16188A4152016-07-0707 July 2016 Request for Additional Information Aging Management Program Plan for Reactor Vessel Internals ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML16013A1592016-02-17017 February 2016 Request for Additional Information Regarding Chilled Water System Modifications ML15287A1412015-11-0202 November 2015 Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML15287A1052015-11-0202 November 2015 Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) (CAC Nos. MF5831 & MF5832) ML15299A3832015-10-29029 October 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request Regarding Chilled Water System Modification ML15069A1812015-03-31031 March 2015 Request for Additional Information Aging Management Program Plan for Reactor Vessel Internals (TAC Nos. MF5149 and MF5150) ML15075A2602015-03-24024 March 2015 Request for Additional Information Spring 2014 Steam Generator Tube Inspections ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2422014-06-28028 June 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML14135A2912014-06-0202 June 2014 RAI Regarding Request for Relief SC-I4R-140 from American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection ML14086A6362014-04-30030 April 2014 Request for Additional Information Regarding Core Operating Limits Report ML14066A2952014-03-0606 March 2014 Licensed Operator Positive Fitness-For-Duty-Test (FY14) ML13330A5672013-11-22022 November 2013 Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13304B9362013-10-29029 October 2013 Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) ML13270A4142013-10-17017 October 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0913 and Mf ML13249A0112013-09-0505 September 2013 Weko Seal Relief Request RAI ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13192A2322013-07-11011 July 2013 Draft Request for Additional Information Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation. ML13186A1672013-07-11011 July 2013 Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13179A3032013-06-28028 June 2013 RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation) ML13137A4882013-06-0505 June 2013 Request for Additional Information Relief Request SC-l4R-133 ML13149A0862013-06-0505 June 2013 Request for Additional Information Decommissioning Funding Status Report ML13102A2752013-04-25025 April 2013 Request for Additional Information Change to PSEG Emergency Plan to Remove the Backup R45 Plant Vent Radiation Monitor Indications ML13063A7172013-03-11011 March 2013 Second Request for Additional Information Deletion of Condition for Inoperable Control Area Air Condition System/Control Room Emergency Air Conditioning System Isolation Dampers 2022-02-22
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 October 12,2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION FOR BURIED PIPING INSPECTION PROGRAM (TAC NOS. ME1834 AND ME 1836)
Dear Mr. Joyce:
By letter dated August 18, 2009, Public Service Enterprise Group Nuclear, LLC, submitted an application pursuant to Title 10 of the Gode of Federal Regulations, Part 54 for renewal of Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Units 1 and 2, respectively. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." During its review, the staff has identified areas where additional information is needed to complete the review.
The staff's request for additional information is included in the Enclosure. Further requests for additional information may be issued in the future.
Items in the enclosure were provided to John Hufnagel and other members of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2981 or bye-mail at bennett. brady@nrc.gov.
Sincerely, Bennett M. Brady, Project Manager Projects Branch 1 DiviSion of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION FOR BURIED PIPING INSPECTION PROGRAM (TAC NOS. ME1834 AND ME1836)
RAI B.2.1.22-02 Follow-up to RAI B.2.1.22
Background:
Given that there have been a number of recent industry events involving leakage from buried or underground piping, the staff required further information to evaluate the impact that these recent industry events might have on the applicant's Buried Piping Inspection and Buried Non Steel Piping Inspection Programs. By letter dated August 6, 2010, the staff issued RAI B.2.1.22 requesting that the applicant provide information regarding how Salem will incorporate the recent industry operating experience into its aging management reviews and programs. The applicant responded on September 7,2010. In reviewing the response, the staff had further questions.
Issue:
a) The applicant's response stated that "Planned direct visual inspections of excavated piping typically include the entire circumference and a length of approximately eight feet (based on a standard shoring box size), when practical." The staff does not have enough information to evaluate the statement, "when practical." While the staff acknowledges that examining buried pipe from the exterior surface may sometimes not be possible due to plant configuration (e.g., the piping is located underneath foundations); nevertheless, it is important to expose a large enough length of the piping in order to establish reasonable assurance of the condition of the piping system. The staff believes that in instances where it is not possible to expose eight feet of piping during each inspection, an alternative examination should be proposed. The staff notes that it is reasonable to substitute an ultrasonic volumetric examination from the interior of the pipe provided the surface is properly prepared.
b) The applicant's response stated that, "Salem Units 1 and 2 buried piping systems do not have cathodic protection installed. None of the seven above systems within the scope for license renewal have dedicated cathodic protection systems. The lack of cathodic protection is an input to the risk ranking methodology." The staff believes that cathodic protection is an important preventive measure for steel piping. The staff notes that there have been several instances where coating failures have occurred or specified coatings have not been installed, resulting in either leakage occurring or pipe minimum wall thicknesses being challenged, examples include:
- i. From the LRA, "In 2001, a section of the buried No. 12 service water piping at Salem Unit 1 was excavated to determine the cause of leakage. The source of leakage was a break in the steel bell ring, which is installed over one pipe joint section of the service water piping. The apparent cause of the break was a crack ENCLOSURE
- 2 that occurred during the installation of the steel bell ring or an initial flaw in the metal. Additionally, the metal and mortar was cracked in about the same area, which could indicate that this area was cracked at installation. Contributing to the growth of the initial crack and subsequent corrosion of the steel bell ring was improper protection of the carbon steel bell ring on the underground service water buried pipe joint. Therefore the apparent cause of the failure was an installation flaw and improper coating protection of the joint and not an age related failure mechanism."
ii. From the LRA, "In 2004, buried carbon steel piping in the Salem Unit 1 fuel oil system was excavated to repair leakage at a welded joint. The socket-welded joint was not properly wrapped with a protective tape. The wrap for this joint was originally missing altogether and the leakage was caused by direct exposure to groundwater and subsequent corrosion, not by aging."
iii. In the RAI response, the applicant stated an example from 2010 where it was determined that a significant portion of the Unit 1 buried auxiliary feedwater (AFW) system piping had it's coating inadvertently removed during construction.
This resulted in areas of the piping degrading, although all degraded portions were determined to be operable after re-analysis.
iv. In the RAI response, the applicant stated an example from 2010, "A small pipe leak was found on a 1-inch Control Air System pipe buried in sand in the Fuel Transfer Tube Area. The through wall leak was located at a location where the protective coating on an elbow was damaged. The apparent cause of the coating damage was that personnel previously stepped on the pipe thus damaging the coating."
The staff believes that cathodic protection is an important preventive measure for steel piping where soil resistivity values are below 20,000 ohm cm. The staff also believes that an acceptable alternative to protecting steel piping with a cathodic protection system is to demonstrate, that actual corrosion rates are low enough such that minimum design wall thickness for the buried pipe will not be reached within the period of extended operation. The staff notes that the analyses that accompanied the buried pipe inspections of the Unit 1 AFW system demonstrated that the pipe wall as-found conditions were determined to meet operability limits; however, the staff lacks sufficient information to determine if the minimum design wall thickness would have been met through the period of extended operation. The staff also notes that the applicant, givenrecent operating experience, has proposed to perform three additional opportunistic or focused excavations and direct inspections of carbon steel piping and components during each ten year period commencing ten years prior to the period of extended operation.
c) Given that the non-radioactive drain system, as stated in LRA Section 2.3.3.18, interfaces with areas such as the diesel generator sump, fuel handling building, refueling water storage tank pipe tunnel, and sump piping that ends at the interface with the Unit 2 radwaste system, the staff does not have enough information to determine if the non-radioactive drain system contains hazardous material during normal operation (i.e., material which, if released, could be detrimental to the environment such as diesel
-3 fuel and radioisotopes that exceed EPA drinking water standards). The staff believes that there is a minimum set of excavated and visual inspections of buried piping segments that contain hazardous materials that should be conducted to establish a reasonable basis of assurance that aging effects are not adversely impacting buried pipe and resulting in the release of hazardous materials to the environment.
d) Neither the LRA nor RAI response described the quality of the backfill in the vicinity of buried in-scope piping. The staff understands that the presence of rocks and sharp objects in the backfill around buried pipes is a leading precursor of degradation of buried piping when over time; ground movement causes these materials to come in contact with the buried pipe resulting in damage to the pipe's coating or external surfaces.
Request:
a) Define what is meant by "when practical" in relation to the length of piping being excavated for inspection. Additionally, where it is not practical to excavate and inspect eight feet of piping for each inspection, state what alternative means will be utilized to determine the condition of the piping material, or justify why inspecting less than eight feet of piping in the context of all planned inspections for each discrete material type provides a reasonable assurance of the condition of the buried pipe and coatings where applicable.
b) For buried in-scope steel piping respond to the following:
- i. Provide sufficient detail for the staff to determine that the site soil resistivity in the vicinity of all buried steel pipe exceeds 20,000 ohm cm and if this is the case, explain why the corrosion on the AFW system occurred to such a degree as was observed during inspections, or ii. Provide sufficient detail for the staff to determine that all buried in-scope steel piping will meet or exceed the minimum design wall thickness throughout the period of extended operation assuming that no coatings are applied to the piping, or iii. Justify why the inspections that have been conducted, and the proposed four inspections of steel piping in each ten year period commencing ten years prior to the period of extended operation, are sufficient to determine the extent of condition of miSSing or damaged coatings, before any buried in-scope steel piping segment will not meet the minimum design wall thickness throughout the period of extended operation.
c) For buried in-scope piping respond to the following:
- i. Does the non-radioactive drain system contain hazardous material during normal operation?
-4 ii. If the non-radioactive drain system contains hazardous material during normal operation, state what percent of total linear feet of buried in-scope non radioactive drain system piping, will be inspected by excavation and direct inspection, during each ten year period starting ten years prior to the period of extended operation. If there are no planned inspections for this piping, justify why it is acceptable to not inspect in-scope buried pipe containing hazardous materials.
d) For buried in-scope piping respond to the following:
- i. Provide details on the quality of the backfill in the vicinity of in-scope buried pipes.
ii. If there is no information on the condition of the quality of backfill beyond initial installation specifications (Le., no documented observations of the quality of the backfill), justify why the planned inspections are adequate to detect potential pipe degradation as a result of coating damage or holidays, or damage to the exterior surface of non-coated piping.
'.. ML102600340 OFFICE PM:DLR:RPB1 LA:DLR BC:DLR:RPB1 PM:DLR:RPB1 NAME B. Brady YEdmonds B. Pham B. Brady DATE 10/7/10 9123/10 10/12110 10/12110
Letter to T. Joyce from B. Brady dated October 12,2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR SALEM NUCLEAR GENERATING STATION UNITS 1 AND 2 LICENSE RENEWAL APPLICATION FOR BURIED PIPING INSPECTION PROGRAM (TAC NOS. ME1834 AND ME 1836)
DISTRIBUTION:
HARDCOPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource BPham BBrady CEccleston REnnis CSanders BHarris, OGC ABurritt, RI RConte, RI MModes, RI DTifft, RI NMcNamara, RI