UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 29,2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME 1834 AND ME 1836)

Dear Mr. Joyce:

By letter dated August 18, 2009, Public Service Enterprise Group Nuclear, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 for renewal of Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Units 1 and 2, respectively. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." During its review, the staff has identified areas where additional information is needed to complete the review.

The staff's request for additional information is included in the Enclosure. Further requests for additional information may be issued in the future.

Items in the enclosure were provided to John Hufnagel and other members of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2981 or bye-mail at bennett.brady@nrc.gov .

Sincerely, Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosure:

As stated cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NO. ME 1834 AND ME 1836)

RAJ 3.1.1-02 Follow-up to RAI 3.1.1-01 on SNGS SG DP PWSCC

Background:

Based on foreign operating experience, the staff's concern in RAI 3.1.1-01 was about the potential impact of primary water stress corrosion cracking (PWSCC) in steam generator (SG) divider plate assembly on adjacent components, which are part of the reactor coolant pressure boundary (channel head, tubesheet, tube-to-tubesheet weld). In its response to RAI3.1.1-01, dated July 08,2010, the applicant describes the materials of its SGs divider plate assembly, which are Alloy 600 for the stub runner and the divider plate, and Alloy 82/182 for the welds that attach the divider plate and stub runner to each other, and to the channel head and to the tubesheet. The applicant also provides additional elements in order to justify why the potential for cracking of its SG divider plate propagating into adjoining components and resulting in loss of the integrity of the reactor coolant pressure boundary would not be expected to occur, and therefore the SGs divider plate does not require an aging management program consisting of inspections for crack propagation.

Issue:

Although not considered to be an immediate safety issue, the potential presence of cracks in Alloy 600 steam generator divider plate assemblies may result in a condition where these cracks could propagate into surrounding pressure boundary areas, such as the tube-to tubesheet welds and the channel head. Although the applicant has provided qualitative arguments for concluding that divider plate cracking is not a concern, the RAI response does not provide an appropriate and sufficient basis for justifying the applicant's conclusions. Further, the use of analytical tools to predict the behavior of service-induced cracking (in other components) has not always bounded actual service performance of these cracks.

Request:

The applicant is requested to provide an aging management program (AMP), changes to an existing AMP, or a commitment to inspection(s) that would demonstrate the condition of the steam generator divider plate assemblies to support a conclusion that there will be no adverse consequences of divider plate assembly degradation during the renewed license period.

ENCLOSURE

September 29,2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME 1834 AND ME 1836)

Dear Mr. Joyce:

By letter dated August 18,2009, Public Service Enterprise Group Nuclear, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 for renewal of Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Units 1 and 2, respectively. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." During its review, the staff has identified areas where additional information is needed to complete the review.

The staff's request for additional information is included in the Enclosure. Further requests for additional information may be issued in the future.

Items in the enclosure were provided to John Hufnagel and other members of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2981 or bye-mail at bennett.brady@nrc.gov .

Sincerely, IRA!

Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession No'.. ML102460078 OFFICE PM:DLR:RPB1 LA:DLR BC:DLR:RPB1 PM:DLR:RPB1 NAME B. Brady Y. Edmonds B. Pham B. Brady DATE 09/15/10 9115110 09/28/10 09/29/10 OFFICIAL RECORD COpy

Letter to T. Joyce from B. Brady dated September 29, 2010

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR SALEM NUCLEAR GENERATING STATION UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. ME1834 AND ME 1836)

DISTRIBUTION:

HARDCOPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource BPham BBrady CEccleston REnnis CSanders BHarris, OGC ABurritt, RI RConte, RI MModes, RI DTifft, RI NMcNamara, RI