JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0129-005 0 JPM Title Duration Page On-Load Closure of a Low Pressure Intercept Valve 10 minutes COVER SHEET

[New]

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.

7.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0129-005 On-Load Closure of a Low Pressure Intercept Valve Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

N3011 - Turbine Steam Task:

02N3000003 - Close a turbine control valve with turbine on line

References:

Required (R) / Available (A) 23.109, Turbine Operating Procedure (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • The plant is operating normally at 100% power.

Initiating Cue(s):

  • The CRS directs you to perform On-Load Closure and Restoration of #1 Low Pressure Intercept Valve (N3021-F013A) in accordance with 23.109, Turbine Operating Procedure, for troubleshooting.
  • Engineering is standing by #1 LPIV.

Terminating Cue(s):

  1. 1 Low Pressure Intercept Valve (N3021-F013A) reopens to 100%, and cancellation of the test is verified.

Task Standard:

On-Load Closure and Restoration of #1 Low Pressure Intercept Valve (N3021-F013A) is performed in accordance with 23.109, Turbine Operating Procedure.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0129-005 On-Load Closure of a Low Pressure Intercept Valve Revision: 0 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

3 - Reactor Pressure Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 241000 - Reactor/Turbine Pressure Regulating System K/A STATEMENT:

Knowledge/Ability Statement and ratings A4. Ability to manually operate and/or monitor in the control room: (CFR: 41.7 / 45.5 to 45.8)

A4.09 Combined intermediate valves (operation) .......................................................... 3.2 / 3.1 Maintenance Rule Safety Classification:

N3012-01 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0129-005 On-Load Closure of a Low Pressure Intercept Valve Revision: 0 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

NOTE: Examinee is expected to announce the beginning of the test and associated alarms received to the Control Room (CRS). The examiner should acknowledge all of these announcements.

  • 1. Place Steam Valve On Load Test Mode
  • 1. Steam Valve On Load Test Mode Select Select Switch to 10%. Switch is rotated to the 10% position.
  • 2. Momentarily depress SELECT pushbutton
  • 2. SELECT pushbutton for #1 LPIV is for desired Low Pressure Intercept Valve momentarily depressed.

and verify backlight comes ON.

Verifies pushbutton backlight comes ON.

  • 3. Depress Steam Valve On Load Test red
  • 3. Steam Valve On Load Test red VALVE VALVE TEST pushbutton and verify: TEST pushbutton is momentarily depressed.
a. VALVE TEST light comes ON.

Verifies:

b. Selected Low Pressure Intercept Valve closes to 10%, if open. a. VALVE TEST light comes ON.
c. Annunciator 4D91, ELECTRIC b. #1 LPIV closes to 10%.

GOVERNOR TROUBLE, alarms.

c. Annunciator 4D91, ELECTRIC
d. White GOVERNOR FAULT light GOVERNOR TROUBLE, alarms.

comes ON.

d. White GOVERNOR FAULT light comes ON.
  • 4. Depress Steam Valve On Load Test white
  • 4. Steam Valve On Load Test white TRIP TRIP SOLENOID A or TRIP SOLENOID SOLENOID A or TRIP SOLENOID B B pushbuttons, and verify: pushbutton is depressed.
a. Selected Low Pressure Intercept Verifies:

Valve closes, if open.

a. #1 LPIV closes.
b. TRIP SOLENOID A or B light comes
b. White TRIP SOLENOID A (B) light ON.

comes ON.

  • 5. Depress Steam Valve On Load Test
  • 5. Steam Valve On Load Test green TRIP green TRIP RESET pushbutton and RESET pushbutton is depressed.

verify:

Verifies:

a. Selected Low Pressure Intercept
a. #1 LPIV opens to 10%.

Valve opens to 10%.

b. White TRIP SOLENOID A (B) light
b. White TRIP SOLENOID A (B) light goes OFF.

goes OFF.

  • 6. Depress Steam Valve On Load Test white
  • 6. Steam Valve On Load Test white CANCEL TEST pushbutton and verify: CANCEL TEST pushbutton is depressed.
a. Cancel Test light comes on. Verifies:
b. Low Pressure Intercept Valve opens a. White Cancel Test light comes on.

to controlling position.

b. #1 LPIV opens to 100%.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0129-005 On-Load Closure of a Low Pressure Intercept Valve Revision: 0 Page 4 ELEMENT STANDARD

7. After a delay, verify: 7. Verifies:
a. White CANCEL TEST light goes OFF. a. White CANCEL TEST light goes OFF.
b. Red VALVE TEST light goes OFF. b. Red VALVE TEST light goes OFF.
c. Associated Low Pressure Intercept c. #1 LPIV red SELECT light goes OFF.

Valve red SELECT light goes OFF.

d. White GOVERNOR FAULT light goes
d. White GOVERNOR FAULT light goes OFF.

OFF.

e. Annunciator 4D91, ELECTRIC
e. Annunciator 4D91, ELECTRIC GOVERNOR TROUBLE, clears.

GOVERNOR TROUBLE, clears.

CUE: End JPM when #1 LPIV is fully open and verification is made that test is cancelled.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0129-005 On-Load Closure of a Low Pressure Intercept Valve Revision: 0 Page 5 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room. Notify Examinee if JPM is Time Critical (only if JPM is NOT Alternate Path.)

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0129-005 On-Load Closure of a Low Pressure Intercept Valve Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0129-005 On-Load Closure of a Low Pressure Intercept Valve Revision: 0 Page 7 Simulator Setup IC#:

IC-20 Malfunctions:

Number Title Value Delay Ramp None Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp None Special Instructions:

Initialize the simulator to IC-20, and place in RUN when ready to begin the JPM.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0129-005)

Initial Conditions:

  • You are the CRNSO.
  • The plant is operating normally at 100% power.

Initiating Cue(s):

  • The CRS directs you to perform On-Load Closure and Restoration of
  1. 1 Low Pressure Intercept Valve (N3021-F013A) in accordance with 23.109, Turbine Operating Procedure, for troubleshooting.
  • Engineering is standing by #1 LPIV.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0127-101 2 JPM Title Duration Page Perform RPS Manual Scram Functional Test [Bank] 10 minutes COVER SHEET Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments 1.

2.

3.

  • 4.

5.

  • 6.

7.

  • 8.

9.

  • 10.

11.

12.

13.

14.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

C7100 - Reactor Protection System Task:

02C7100001 - Place a Reactor Protection Channel in the tripped condition

References:

Required (R) / Available (A) 24.610.01- RPS Manual Scram Functional Test (R)

Tools and Equipment Required:

Marked up copy of 24.610.01 with steps 4.1, 4.2, and 4.3 initialed as complete.

Initial Conditions:

  • You are the Control Room NSO.
  • Plant conditions are as you see them.
  • A Licensed Operator is in the Relay Room standing by to assist.

Initiating Cue(s):

  • The CRS directs you to perform RPS Manual Scram Functional Test in accordance with 24.610.01.
  • Prerequisites for the test have been met.

Terminating Cue(s):

Functional test of Manual Scram Trip System A1 and A2 is complete.

Task Standard:

Perform RPS Manual Scram Functional Test in accordance with 24.610.01.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

7 - Reactor Protection System K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 212000 - Reactor Protection System K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations (CFR: 41.5 /

45.6):

A2.03 Surveillance testing .............................................................................................. 3.3 / 3.5 Maintenance Rule Safety Classification:

C7100-02 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD NOTE: Examinee will announce actions which change plant conditions/alarms with Crew Update.

CUE: Provide examinee with Cue Sheet and marked-up copy of 24.610.01.

1. Verify following annunciators clear: 1. Verifies annunciators 3D73, 3D74, 3D77,
a. 3D73, TRIP ACTUATORS A1/A2 and 3D78 are clear.

TRIPPED

b. 3D74, TRIP ACTUATORS B1/B2 TRIPPED
c. 3D77, MANUAL TRIP A SYS TRIP
d. 3D78, MANUAL TRIP B SYS TRIP CUE: When contacted, the operator in the Relay Room reports that white Scram Group 1, 2, 3,

& 4 lights for RPS A and RPS B are ON.

2. Verify the following: 2. Contacts the operator in the Relay Room
a. White Scram Group 1, 2, 3, and 4 to verify white Scram Group 1, 2, 3, and 4 lights RPS A are ON (RR H11-P609) lights RPS A and RPS B are ON.
b. White Scram Group 1, 2, 3, and 4 lights RPS B are ON (RR H11-P611)
3. Verify the following: 3. Verifies the blue scram GROUP 1, 2, 3, &
a. Blue scram GROUP 1, 2, 3, and 4 4 lights for Pilot Scram Valve Solenoids, lights for Pilot Scram Valve Solenoids, Trip System A and Trip System B, are Trip System A, are ON (COP H11- ON.

P603)

b. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B, are ON (COP H11-P603)
  • 4. Momentarily depress C7100-M603A
  • 4. Momentarily depresses Manual Scram Manual Scram Trip A1 pushbutton on Trip A1 pushbutton.

COP H11-P603.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 4 ELEMENT STANDARD CUE: When contacted, the operator in the Relay Room reports that white Scram Group 1, 2, 3,

& 4 lights for RPS A are OFF.

5. Verify: 5. Verifies:
a. Annunciator 3D77, MANUAL TRIP A a. Annunciator 3D77 alarms.

SYS TRIP, alarms. b. Red backlight for Manual Scram Trip

b. Red backlight for C7100-M603A, A1 Switch comes ON.

Manual Scram Trip A1 Switch comes c. White scram Group 1, 2, 3, & 4 lights ON. for RPS "A" are OFF. (Relay Room)

c. White scram Group 1, 2, 3, and 4
d. Blue scram GROUP 1, 2, 3, & 4 lights lights for RPS "A" are OFF.(RR H11-for Pilot Scram Valve Solenoids, Trip P609)

System A are OFF.

d. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A are OFF.(COP H11-P603)
  • 6. Cycle C7100-M605, Scram Reset Switch,
  • 6. Rotates Scram Reset Switch to both to both positions (GP 1/4, GP 2/3) and GP 1/4 and GP 2/3 positions, and then release. (COP H11-P603) releases switch.

CUE: When contacted, the operator in the Relay Room reports that white Scram Group 1, 2, 3,

& 4 lights for RPS A are ON.

7. Verify the following: 7. Verifies:
a. Red backlight for C7100-M603A, a. Red backlight for Manual Scram Trip Manual Scram Trip A1 Switch, is A1 Switch is OFF.

OFF. b. Annunciator 3D77 has cleared.

b. Annunciator 3D77, MANUAL TRIP A c. White scram Group 1, 2, 3, and 4 SYS TRIP, has cleared. lights for RPS A are ON. (Relay
c. White scram Group 1, 2, 3, and 4 Room) lights for RPS A are ON. (RR H11-
d. Blue scram GROUP 1, 2, 3, and 4 P609) lights for Pilot Scram Valve Solenoids,
d. Blue scram GROUP 1, 2, 3, and 4 Trip System A are ON.

lights for Pilot Scram Valve Solenoids, Trip System A are ON. (COP H11-P603)

  • 8. Momentarily depress C7100-M606A
  • 8. Momentarily depresses Manual Scram Manual Scram Trip A2 pushbutton on Trip A2 pushbutton.

COP H11-P603.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 5 ELEMENT STANDARD CUE: When contacted, the operator in the Relay Room reports that white Scram Group 1, 2, 3,

& 4 lights for RPS A are OFF.

9. Verify: 9. Verifies:
a. Annunciator 3D77, MANUAL TRIP A a. Annunciator 3D77 alarms.

SYS TRIP, alarms. b. Red backlight for Manual Scram Trip

b. Red backlight for C7100-M606A, A1 Switch comes ON.

Manual Scram Trip A1 Switch comes c. White scram Group 1, 2, 3, and 4 ON. lights for RPS A are OFF. (Relay

c. White scram Group 1, 2, 3, and 4 Room) lights for RPS "A" are OFF.(RR H11-
d. Blue scram GROUP 1, 2, 3, and 4 P609) lights for Pilot Scram Valve Solenoids,
d. Blue scram GROUP 1, 2, 3, and 4 Trip System A are OFF.

lights for Pilot Scram Valve Solenoids, Trip System A are OFF.(COP H11-P603)

  • 10. Cycle C7100-M605, Scram Reset Switch, *10. Rotates Scram Reset Switch to both to both positions (GP 1/4, GP 2/3) and GP 1/4 and GP 2/3 positions, and then release. (COP H11-P603) releases switch.

CUE: When contacted, the operator in the Relay Room reports that white Scram Group 1, 2, 3,

& 4 lights for RPS A are ON.

11. Verify the following: 11. Verifies:
a. Red backlight for C7100-M606A, a. Red backlight for Manual Scram Trip Manual Scram Trip A1 Switch, is A1 Switch is OFF.

OFF. b. Annunciator 3D77 has cleared.

b. Annunciator 3D77, MANUAL TRIP A c. White scram Group 1, 2, 3, and 4 SYS TRIP, has cleared. lights for RPS A are ON. (Relay
c. White scram Group 1, 2, 3, and 4 Room) lights for RPS A are ON. (RR H11-
d. Blue scram GROUP 1, 2, 3, and 4 P609) lights for Pilot Scram Valve Solenoids,
d. Blue scram GROUP 1, 2, 3, and 4 Trip System A are ON.

lights for Pilot Scram Valve Solenoids, Trip System A are ON. (COP H11-P603)

12. Verify following annunciators clear: 12. Verifies annunciators 3D73, 3D74, 3D77,
a. 3D73, TRIP ACTUATORS A1/A2 and 3D78 are clear.

TRIPPED

b. 3D74, TRIP ACTUATORS B1/B2 TRIPPED
c. 3D77, MANUAL TRIP A SYS TRIP
d. 3D78, MANUAL TRIP B SYS TRIP Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 6 ELEMENT STANDARD CUE: When contacted, the operator in the Relay Room reports that white Scram Group 1, 2, 3,

& 4 lights for RPS A and RPS B are ON.

13. Verify the following: 13. Contacts the operator in the Relay Room
a. White Scram Group 1, 2, 3, and 4 to verify white Scram Group 1, 2, 3, and 4 lights RPS A are ON (RR H11-P609) lights RPS A and RPS B are ON.
b. White Scram Group 1, 2, 3, and 4 lights RPS B are ON (RR H11-P611)
14. Verify the following: 14. Verifies the blue scram GROUP 1, 2, 3, &
a. Blue scram GROUP 1, 2, 3, and 4 4 lights for Pilot Scram Valve Solenoids, lights for Pilot Scram Valve Solenoids, Trip System A and Trip System B, are Trip System A, are ON (COP H11- ON.

P603)

b. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B, are ON (COP H11-P603)

CUE: End JPM when functional test of Manual Scram Trip System A1 & A2 is complete.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 7 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room. Notify Examinee if JPM is Time Critical (only if JPM is NOT Alternate Path.)

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0127-101 Perform RPS Manual Scram Functional Test Revision: 2 Page 9 Simulator Setup IC#: Any IC Malfunctions:

Number Title Value Delay Ramp None Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp None Special Instructions:

None Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0127-101)

Initial Conditions:

  • You are the Control Room NSO.
  • Plant conditions are as you see them.
  • A Licensed Operator is in the Relay Room standing by to assist.

Initiating Cue(s):

  • The CRS directs you to perform RPS Manual Scram Functional Test in accordance with 24.610.01.
  • Prerequisites for the test have been met.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0157-003 0 JPM Title Duration Page Restore Offsite Power to ESF Bus 64B and EDG Bus 10 minutes COVER SHEET 11EA [New]

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.

2.

  • 3.
  • 4.
  • 5.

6.

7.

  • 8.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0157-003 Restore Offsite Power to ESF Bus 64B and EDG Bus 11EA Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

R1400 - 4160V ESF Distribution Task:

02R1102013 - Restore Offsite Power to 4160V ESF Busses

References:

Required (R) / Available (A) 23.321, Engineered Safety Features Auxiliary Electrical Distribution System (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • Offsite power is available, and the System Service Transformers are available.
  • EDG 11 was manually started and is supplying ESF Bus 64B by way of EDG Bus 11EA and ESF-EDG Bus Tie Breaker B8.
  • The SM has authorized returning the ESF and EDG Busses to offsite power.

Initiating Cue(s):

  • The CRS directs you to restore offsite power to ESF Bus 64B and EDG Bus 11EA.
  • Another operator will be responsible for the shutdown of the EDG and placing it in standby.

Terminating Cue(s):

EDG 11 Output Breaker EA3 is open.

Task Standard:

Offsite power is restored to ESF Bus 64B and EDG Bus 11EA in accordance with 23.321.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

6 - Electrical K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 262001 - A.C. Electrical Distribution K/A STATEMENT:

A4. Ability to manually operate and/or monitor in the control room: (CFR: 41.7 / 45.5 to 45.8)

A4.02 Synchroscope, including understanding of running and incoming voltages........ 3.4 / 3.4 Maintenance Rule Safety Classification:

R1400-01 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0157-003 Restore Offsite Power to ESF Bus 64B and EDG Bus 11EA Revision: 0 Page 2 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with the Cue Sheet.

  • 1. Place Synchronize Switch for Bus 64B
  • 1. Synchronize Switch for Bus 64B Normal Normal Feeder Breaker B6 to ON. Feeder Breaker B6 placed to ON.
2. Verify: 2. Verifies:
  • Div. I Syn. Bus Running Volt Meter
  • Div. I Syn. Bus Running Volt Meter indicates voltage on SST # 64 indicates voltage on SST # 64 secondary windings (~120V AC). secondary windings (~120V AC).
  • Div. I Syn. Bus Starting Volt Meter
  • Div. I Syn. Bus Starting Volt Meter indicates voltage on ESF Bus 64B indicates voltage on ESF Bus 64B

(~120V AC). (~120V AC).

  • Division I Synchroscope is operating.
  • Division I Synchroscope is operating.
  • 3. With EDG Governor Control Switch,
  • 3. EDG Governor Control Switch is rotated adjust EDG speed until synchroscope is to Raise/Lower until the synchroscope is rotating slowly in the FAST direction. rotating slowly in the FAST direction.
  • 4. With EDG Voltage Control Switch, adjust
  • 4. EDG Voltage Control Switch is rotated to Starting Voltage until it is equal to or Raise/Lower until Starting Voltage is slightly higher than Running Bus Voltage equal to or slightly higher than Running indication. Bus Voltage indication.

NOTE: When Breaker B6 is closed, EDG load must be immediately raised to prevent the EDG from tripping on reverse power.

  • 5. When Synchroscope is at approximately
  • 5. ESF Bus 64B Normal Feeder Breaker B6 two minutes till 12 o'clock, close ESF Bus is closed.

64B Normal Feeder Breaker B6.

6. Place Synchronize Switch for ESF Bus 6. Synchronize Switch for Bus 64B Normal 64B Normal Feeder Breaker B6 to OFF. Feeder Breaker B6 placed to OFF.
7. Reduce EDG 11 load to approximately 7. EDG Governor Control Switch is rotated 300kW while maintaining kVARS positive. to Lower until EDG 11 load is ~300kW with positive kVARS.
  • 8. Open EDG 11 Output Breaker EA3.
  • 8. EDG 11 Output Breaker EA3 is opened.

CUE: End JPM when EDG 11 Output Breaker EA3 is open.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0157-003 Restore Offsite Power to ESF Bus 64B and EDG Bus 11EA Revision: 0 Page 3 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room. Notify Examinee if JPM is Time Critical (only if JPM is NOT Alternate Path.)

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0157-003 Restore Offsite Power to ESF Bus 64B and EDG Bus 11EA Revision: 0 Page 4 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0157-003 Restore Offsite Power to ESF Bus 64B and EDG Bus 11EA Revision: 0 Page 5 Simulator Setup IC#:

Any IC Malfunctions:

Number Title Value Delay Ramp None Remote Functions:

Number Title Value Delay Ramp R30RF0021 EDG11 Local Alarm Reset Pushbutton RESET 0 0 Override Functions:

Number Title Value Delay Ramp None Special Instructions:

1. Initialize simulator and place in RUN.
2. Start EDG 11 per 23.307, section 5.14:
a. Place EDG 11 Start/Stop switch in START.
b. Allow EDG 11 to come up to 120V and 60Hz.
3. Parallel EDG 11 to ESF Bus 64B per 23.307, section 6.1:
a. Place EA3 Sync Switch in ON.
b. Place EA3 Auto/Manual Switch in MANUAL.
c. Using EDG Governor Control, ensure Sync Scope move slowly in Fast direction.
d. Using EDG Voltage Control, ensure Start Bus voltage is ~3 volts higher than Sync Bus voltage.
e. At ~5 minutes from Top Dead Center of Sync Scope, close EA3.
f. Immediately apply 750-1000 KW with VARs >0 using EDG Governor Control.
g. Apply 200-400 KVARs using EDG Voltage Control.
h. Place EA3 Sync Switch in OFF.
4. Open Normal Feeder Breaker B6 when EDG 11 is carrying full Bus 64B load.
5. Trigger remote function above to reset local EDG 11 alarms.
6. Acknowledge all control room alarms.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0157-003)

Initial Conditions:

  • You are the CRNSO.
  • Offsite power is available, and the System Service Transformers are available.
  • EDG 11 was manually started and is supplying ESF Bus 64B by way of EDG Bus 11EA and ESF-EDG Bus Tie Breaker B8.
  • The SM has authorized returning the ESF and EDG Busses to offsite power.

Initiating Cue(s):

  • The CRS directs you to restore offsite power to ESF Bus 64B and EDG Bus 11EA.
  • Another operator will be responsible for the shutdown of the EDG and placing it in standby.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0073-002 2 JPM Title Duration Page CCHVAC Shift In Normal Mode [Bank] 20 minutes COVER SHEET Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

1. 18.

2.

3.

4.

5.

6.

7.

8.

  • 9.

10.

11.

  • 12.

13.

14.

15.

16.

17.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

T4102 - Control Center HVAC Task:

02T4102009 - Shift the operating divisions of CCHVAC

References:

Required (R) / Available (A) 23.413, Control Center HVAC (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the CRNSO.
  • The plant is operating normally at power.
  • Division 1 CCHVAC is operating.

Initiating Cue(s):

  • CRS directs you to shift divisions of CCHVAC, placing Div 2 CCHVAC in service.
  • A pre-job brief is completed.
  • An operator is in the field, standing by for direction.
  • All prerequisites are completed.
  • The CCHVAC Chiller unit will be automatically loaded.
  • The Makeup Air Radiation Monitors have been verified, second checked in service by Smith and Jones, and logged in the Unit Log.

Terminating Cue(s):

Division 2 CCHVAC is operating, and Division 1 is shutdown.

Task Standard:

Division 2 CCHVAC is operating, and Division 1 is shutdown, in accordance with 23.413, Control center HVAC.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

9 - Radioactivity Release K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 290003 - Control Room HVAC K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the CONTROL ROOM HVAC and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.01 Initiation/reconfiguration. ...................................................................................... 3.1 / 3.2 Maintenance Rule Safety Classification:

T4102-01 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

1. Verify Div 2 Mode Select switch is 1. Div 2 Mode Select switch is verified in selected to the same mode as Div 1. Normal mode.
2. Verify Div 2 Emergency Air Intake 2. Div 2 Emergency Air Intake Selector Selector switch in AUTO. switch verified in AUTO.
3. Verify T4100-B006, Div 2 CCHVAC 3. T4100-B006, Div 2 CCHVAC Supply Fan Supply Fan switch is in AUTO. switch is verified in AUTO.
4. Verify T4100-C040, Div 2 CCHVAC 4. T4100-C040, Div 2 CCHVAC Chilled Wtr Chilled Wtr Pump switch is in AUTO. Pump switch is verified in AUTO
5. Verify T4100-B027, Div 2 CCHVAC Equip 5. T4100-B027, Div 2 CCHVAC Equip Room Room Cooler switch is in AUTO. Cooler switch is verified in AUTO
6. Verify T4100-C030, Div 2 CCHVAC 6. T4100-C030, Div 2 CCHVAC Return Air Return Air Fan switch is in AUTO. Fan switch is verified in AUTO
7. Verify T4100-B008, Div 2 CCHVAC 7. T4100-B008, Div 2 CCHVAC Chiller Chiller switch is in AUTO. switch is verified in AUTO
8. Verify T4100-C048, Div 2 CCHVAC 8. T4100-C048, Div 2 CCHVAC Emerg Emerg Makeup Fan switch is in AUTO. Makeup Fan switch is verified in AUTO
  • 9. Place Control Center HVAC Div 2 switch
  • 9. Control Center HVAC Div 2 switch placed in ALL AUTO. in ALL AUTO.
10. Verify T4100-B006, Div 2 CCHVAC 10. T4100-B006, Div 2 CCHVAC Supply Fan Supply Fan starts. verified started.
11. Verify T4100-C040, Div 2 CCHVAC 11. T4100-C040, Div 2 CCHVAC Chilled Wtr Chilled Wtr Pump starts. Pump verified started.
  • 12. Place Control Center HVAC Div 1 switch *12. Control Center HVAC Div 1 switch placed in ALL STOP. in ALL STOP.
13. Verify T4100-C030, Div 2 CCHVAC 13. Verify T4100-C030, Div 2 CCHVAC Return Air Fan starts. Return Air Fan verified started.
14. Verify T4100-B008, Div 2 CCHVAC 14. T4100-B008, Div 2 CCHVAC Chiller Chiller starts and remains loaded. verified started and loaded.

CUE: Rounds operator reports that Div 2 AUTO-MANUAL Switch is in AUTO.

15. When evaporator and condenser vacuum 15. Directs a rounds operator to place or have stabilized, place or verify Div 2 verify Div 2 AUTO-MANUAL Switch is in AUTO-MANUAL Switch is in AUTO. AUTO.

CUE: Rounds operator reports normal operation of T4100-B008, Div 2 CCHVAC Chiller.

16. Verify normal operation of T4100-B008, 16. Directs the rounds operator to verify Div 2 CCHVAC Chiller, by observing local normal operation of T4100-B008, Div 2 instrument readings. CCHVAC Chiller, by observing local instrument readings.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 4 ELEMENT STANDARD

17. Verify proper damper lineup for Div 2 17. Damper lineup verified for Div 2 CCHVAC CCHVAC in service using Enclosure A - in service using Enclosure A.

Normal Mode.

18. Verify Div 2 EECW TCV is in AUTO. 18. Div 2 EECW TCV is verified in AUTO.

CUE: End JPM when Div 2 CCHVAC is running in Normal mode and all required verifications have been made.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 5 Evaluator Notes:

Ensure Division 1 CCHVAC is in service.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

CCHVAC indications are located on the H11P808 and H11P809 Panels.

The CMC Switches for the coolers, chillers, pumps, and fans are all AUTO / OFF - RESET / RUN /

TRIPPED, and are positioned in AUTO normally.

A two position switch for each division gives the components a run or stop signal depending on being in ALL STOP or ALL AUTO to allow one or the other division to be in service. The mode switch next to it allows a choice of modes of operation and has CHLORINE / RECIRCULATION / NORMAL / PURGE positions. Once the mode is selected, pushing the RESET pushbutton causes the division to align the components and dampers to that mode of operation.

The system aligns to Recirculation mode on a secondary containment isolation signal which is generated by LL2, High Drywell Pressure, or High Radiation / Inoperable from Fuel Pool or RBHVAC Monitors. The dampers are two positioned indicators of OPEN or CLOSED and the normal position is determined by the mode of operation.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 6 Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room. Notify Examinee if JPM is Time Critical (only if JPM is NOT Alternate Path.)

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0073-002 CCHVAC Shift In Normal Mode Revision: 2 Page 8 Simulator Setup IC#:

Any IC with Div. 1 CCHVAC in service.

Malfunctions:

Number Title Value Delay Ramp None Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp None Special Instructions:

None Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0073-002)

Initial Conditions:

  • You are the CRNSO.
  • The plant is operating normally at power.
  • Division 1 CCHVAC is operating.

Initiating Cue(s):

  • CRS directs you to shift divisions of CCHVAC, placing Division 2 CCHVAC in service.
  • A pre-job brief is completed.
  • An operator is in the field, standing by for direction.
  • All prerequisites are completed.
  • The CCHVAC Chiller unit will be automatically loaded.
  • The Makeup Air Radiation Monitors have been verified, second checked in service by Smith and Jones, and logged in the Unit Log.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0108-403 0 JPM Title Duration Page RWCU Pressure Control During Blowdown (Alt. Path) 20 minutes COVER SHEET

[New]

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.

2.

  • 3.
  • 4.
  • 5.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0108-403 RWCU Pressure Control During Blowdown (Alt. Path) Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

G3300 - Reactor Water Cleanup System Task:

02A0001089 - Recognize, respond to, and correct loss of RWCU

References:

Required (R) / Available (A)

SOP 23.707, Reactor Water Cleanup (R)

ARP 02D102, RWCU Blowdown Line Pressure High/Low (R)

Tools and Equipment Required:

None Initial Conditions:

  • The plant is in the process of starting up.
  • During shift turnover reactor water level increased to +205" on the narrow range level indication.
  • RWCU blowdown flow is stable at ~60 gpm.
  • Plant conditions are as you see them.

Initiating Cue(s):

  • You are the Control Room NSO.
  • The CRS has directed you to lower reactor water level to 197" using RWCU Blowdown to the Main Condenser up to 100 gpm in accordance with 23.707.
  • All prerequisites and steps 8.2.2.1 thru 8.2.2.4 of 23.707 are complete.

Terminating Cue(s):

02D102 is clear, and G3300-F033 and G33-F035 are closed.

Task Standard:

G3352-F033 is manually closed and G33-F035 is cycled open and closed due to high blowdown line pressure in accordance with ARP 02D102.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0108-403 RWCU Pressure Control During Blowdown (Alt. Path) Revision: 0 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

2 - Reactor Water Inventory Control K/A

Reference:

K/A SYSTEM: 204000 - Reactor Water Cleanup System K/A STATEMENT:

A1 Ability to predict and/or monitor changes in parameters associated with operating the REACTOR WATER CLEANUP SYSTEM controls including: (CFR: 41.5 / 45.5)

A1.07 RWCU Drain Flow ..................................................................................................... 2.9 / 2.9 Maintenance Rule Safety Classification:

G3300-05 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0108-403 RWCU Pressure Control During Blowdown (Alt. Path) Revision: 0 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

  • 1. Slowly open Blowdown FCV G33-F033 until *1. Adjusts the blowdown controller in the open an increase is noted on RWCU Blowdown direction.

Flow indication, G33-R602.

NOTE: When blowdown flow is raised above 65 gpm, G33-F034 fails closed, and annunciator 02D102 will alarm indicating high pressure in the blowdown line.

Alternate Path begins when 2D102 alarms.

CUE: As CRS, acknowledge announcement. If asked, direct examinee to perform the actions of ARP 2D102.

2. Recognize closure of G33-F034, and receipt 2. Announces closure of G33-F034 and receipt of 02D102, RWCU Blowdown Line Press of 02D102, RWCU Blowdown Line Press High/ Low. High/ Low.
  • 3. Close or verify closed, G3300-F033, RWCU *3. Recognize failure of G3300-F033, RWCU Blowdown FCV. Blowdown FCV, to isolate on high pressure, and manually closes valve.
  • 4. Fully open G33-F035, RWCU B/D To RW Iso *4. Fully opens G33-F035.

Valve.

  • 5. When alarm clears, close G33-F035, RWCU *5. Closes G33-F035 when alarm 02D102 B/D To RW Iso Valve. clears.

CUE: End JPM when 02D102 is clear, and G3300-F033 and G33-F035 are closed.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0108-403 RWCU Pressure Control During Blowdown (Alt. Path) Revision: 0 Page 4 Evaluator Notes:

Start this JPM at the CRS Desk in the Simulator.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Example Cue: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating ________

amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Example Cue: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0108-403 RWCU Pressure Control During Blowdown (Alt. Path) Revision: 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0108-403 RWCU Pressure Control During Blowdown (Alt. Path) Revision: 0 Page 6 Simulator Setup IC#:

IC-05 or saved IC with this setup.

Malfunctions:

Number Title Value Delay Ramp C97MF0275 02D102 RWCU Blowdown Line Pressure High/Low 1 0 0 cd=H_P602_A169_2 EQ 0 C97MF0275 02D102 RWCU Blowdown Line Pressure High/Low 0 5 0 cd=H_P602_A167_2 EQ 1 Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp G301G3352F034_MTVFAILSP G3352-F034 Fail to Specified Position 0 0 0 Special Instructions:

1. If Setup is captured in an IC then initialize to that IC and place in RUN, then go to step 4. Otherwise, initialize the simulator to IC-5, and place the simulator in RUN.
2. Raise Reactor Water Level to +205" using SULCV in Manual, then place in Auto.
3. Set Blowdown flow to ~60 gpm [G3352-F033 ~20% open and G3352-F031 fully closed].
4. Open and execute lesson 315_0108_403.lsn.
5. Trigger Setup step.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0108-403)

Initial Conditions:

  • The plant is in the process of starting up.
  • During shift turnover reactor water level increased to +205" on the narrow range level indication.
  • RWCU blowdown flow is stable at ~60 gpm.
  • Plant conditions are as you see them.

Initiating Cue(s):

  • You are the Control Room NSO.
  • The CRS has directed you to lower reactor water level to 197" using RWCU Blowdown to the Main Condenser up to 100 gpm in accordance with 23.707.
  • All prerequisites and steps 8.2.2.1 thru 8.2.2.4 of 23.707 are complete.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0140-408 0 JPM Title Duration Page Manually Initiate Core Spray System with E2150-F005B 10 minutes COVER SHEET Stuck Shut (Alt Path) [Bank]

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.

2.

  • 3.

4.

  • 5.

6.

  • 7.

8.

9.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0140-408 Manually Initiate Core Spray System with E2150-F005B Stuck Revision: 0 Shut (Alt Path) Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

E2100 - Core Spray System Task:

02E2100003 - Initiate the Core Spray System manually

References:

Required (R) / Available (A) 23.203, Core Spray System (A) 23.203, Enclosure A (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • The reactor has scrammed.
  • The EOPs have been entered.
  • RPV Water level has decreased to less than 30 inches.
  • Both divisions of RHR and Core Spray have failed to automatically initiate.

Initiating Cue(s):

The CRS directs you to initiate Division II Core Spray and inject water into the RPV to raise level.

Terminating Cue(s):

Division I Core Spray System is injecting into the RPV.

Task Standard:

Division I Core Spray is injecting into the RPV in accordance with 23.203.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

2 - Reactor Water Inventory Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 209001 - Low Pressure Core Spray System K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the LOW PRESSURE CORE SPRAY SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.02 Valve openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.2 / 3.2 Maintenance Rule Safety Classification:

E2100-02 Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0140-408 Manually Initiate Core Spray System with E2150-F005B Stuck Revision: 0 Shut (Alt Path) Page 2 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0140-408 Manually Initiate Core Spray System with E2150-F005B Stuck Revision: 0 Shut (Alt Path) Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD NOTE: Examinee will announce actions which change plant conditions/alarms with Crew Update.

CUE: Provide examinee with Cue Sheet. Examinee should use 23.203, Enclosure A hard card at H11P601.

2. Verify Reactor Pressure is below 2. Reactor Pressure is below 461 psig.

461 psig.

  • 3. Throttle open, E2150-F005B, DIV 1 CS
  • 3. E2150-F005B is noted to not respond to INBD ISO VLV. Open pushbutton.

Alternate Path begins when the E2150-F005B fails to open.

CUE: Direct examinee to manually start Division I Core Spray and inject water into the RPV.

4. Report to the CRS that Division II Core 4. Report and recommendation made.

Spray System injection valve failed to open. Recommend using Div I Core Spray.

NOTE: Examinee may place Core Spray Pumps B and/or D in OFF or Auto.

6. Verify Reactor Pressure is below 6. Reactor Pressure is below 461 psig.

461 psig.

  • 7. Throttle open, E2150-F005A, DIV 1 CS
  • 7. E2150-F005A is open.

INBD ISO VLV.

8. As Reactor Pressure decreases and flow 8. Verifies E2150-F031A, closes.

through each division exceeds 775 gpm, as indicated on E21-R601A, Div 1 Core Spray Flow Ind, verify E2150-F031A, Core Spray Minimum Flow Bypass, closes.

9. Inform CRS that Division I Core Spray is 9. CRS is informed that Division I Core injecting into the RPV. Spray is injecting into the RPV.

CUE: End JPM when Division I Core Spray System is injecting into the RPV.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0140-408 Manually Initiate Core Spray System with E2150-F005B Stuck Revision: 0 Shut (Alt Path) Page 4 Evaluator Notes:

This is an Alternate Path JPM. The E21-F005B will be stuck shut.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Example Cue: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating ________

amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Example Cue: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0140-408 Manually Initiate Core Spray System with E2150-F005B Stuck Revision: 0 Shut (Alt Path) Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0140-408 Manually Initiate Core Spray System with E2150-F005B Stuck Revision: 0 Shut (Alt Path) Page 6 Simulator Setup IC#:

IC-91, or IC-06 Malfunctions:

Number Title Value Delay Ramp E21MF0002 Core Spray Injection Valve Fails As-Is E2150-F005B 0 0 0 E41MF0009 HPCI Auto Start Failure ACTIVE 0 0 E51MF0006 RCIC Auto Start Inhibit ACTIVE 0 0 B31MF0066 RHR Loop A Rupture 5 0 0 B31MF0066 RHR Loop A Rupture CLEAR 0 0

[cd=H_P602_C014_2 LT 33]

Remote Functions:

Number Title Value Delay Ramp E21RF0005 Core Spray Div 1 Auto Start Defeat DEFEAT 0 0 E21RF0006 Core Spray Div 2 Auto Start Defeat DEFEAT 0 0 E11RF0069 RHR Div 1 Auto Start Failure ACTIVE 0 0 E11RF0070 RHR Div 2 Auto Start Failure ACTIVE 0 0 Override Functions:

Number Title Value Delay Ramp P805_A297_1 SULCV Isolation Valve Close Switch 1 0 0 Special Instructions:

1. If using IC-91, initialize the simulator and perform the following:
a. Open and execute lesson 315_0140_408.lsn.
b. Bypass step Setup.
c. Trigger step E21-F005B Stuck Shut.
2. If using IC-06, initialize the simulator, place in RUN, and perform the following:
a. Open and execute lesson 315_0140_408.lsn.
b. Trigger steps Setup and E21-F005B Stuck Shut.
c. Place simulator in FREEZE when level reads approximately 22 wide range and reactor pressure is about 135 psig.
3. Place the Mode Switch in Shutdown, and place both ADS switches to Inhibit.
4. Place simulator in RUN just prior to starting the JPM.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0140-408)

Initial Conditions:

  • You are the Control Room NSO.
  • The reactor has scrammed.
  • The EOPs have been entered.
  • RPV Water level has decreased to less than 30 inches.
  • Both divisions of RHR and Core Spray have failed to automatically initiate.

Initiating Cue(s):

  • The CRS directs you to initiate Division II Core Spray and inject water into the RPV to raise level.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0139-005 0 JPM Title Duration Page Manually Isolate HPCI System (Alt Path) [New] 10 minutes COVER SHEET Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.

2.

3.

4.

  • 5.
  • 6.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

E4100 - High Pressure Coolant Injection System Task:

02E4100005 - Initiate High Pressure Coolant Injection manually

References:

Required (R) / Available (A) 23.202, High Pressure Coolant Injection System (A) 23.202, Enclosure C (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • The reactor has scrammed.
  • The EOPs have been entered.
  • RPV Water level has decreased to less than 40 inches.
  • Both HPCI and RCIC automatically initiated.
  • HPCI flow was manually reduced to minimum, and RCIC has tripped.

Initiating Cue(s):

The CRS directs you to raise HPCI flow rate, and inject water into the RPV to raise level to 173 - 214.

Terminating Cue(s):

HPCI System is manually isolated.

Task Standard:

HPCI System is shutdown and isolated in accordance with ARP 2D49 and/or 2D53.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 0 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

SF-5 K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 295032 - High Secondary Containment Area Temperature K/A STATEMENT:

EA1. Ability to operate and/or monitor the following as they apply to HIGH SECONDARY CONTAINMENT AREA TEMPERATURE: (CFR: 41.7 / 45.6)

EA1.05 Affected systems so as to isolate damaged portions............................................. 3.7 / 3.9 Maintenance Rule Safety Classification:

E4100-06 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 0 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

  • 1. Raise HPCI injection flow using on
  • 1. HPCI injection flow is raised on E41-E41-K615, HPCI Pump Flow Controller. K615, HPCI Pump Flow Controller.

Alternate Path begins when HPCI flow has been raised to >2000 gpm.

2. Respond to annunciators 1D70, Steam 2. Announces the alarms to the CRS, and Leak Detection Diff Temp High, and references the appropriate ARPs.

1D66, Steam Leak Detection Ambient Temp High.

CUE: If examinee requests H11-P614 information, report that alarmed module is for HPCI Equipment Room, and temperature is reading 155°F.

3. Direct an operator to RR H11-P614, 3. Directs operator to RR H11-P614, NSSS NSSS Temperature Recording and Leak Temperature Recording and Leak Detection Cabinet, to determine alarmed Detection Cabinet, to determine alarmed module and temperature. module and temperature.
4. Respond to annunciators 2D49, HPCI 4. Announces the alarms to the CRS, and Logic A Isolation Trip Signal Initiated, and references the appropriate ARPs.

2D53, HPCI Logic B Isolation Trip Signal Initiated.

CUE: If examinee reports the isolation failure and requests direction, direct him/her to manually isolate the HPCI System.

  • 5. Verify HPCI Turbine has tripped and is
  • 5. Verifies HPCI Turbine has tripped and isolated. recognizes system has NOT isolated.

NOTE: Closing either E41-F002 or E41-F003 will effectively isolate the HPCI System.

  • 6. Manually close E41-F002, HPCI Steam
  • 6. Manually closes E41-F002, HPCI Steam Supply Inboard Isolation Valve, and/or Supply Inboard Isolation Valve, and/or E41-F003, HPCI Steam Supply Outboard E41-F003, HPCI Steam Supply Outboard Isolation Valve. Isolation Valve.

CUE: End JPM when the HPCI System is manually isolated.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 0 Page 4 Evaluator Notes:

This is an Alternate Path JPM. The steam supply line will break as flow is raised, and the system will fail to automatically isolate.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Example Cue: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating ________

amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Example Cue: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 0 Page 6 Simulator Setup IC#:

IC-20 Malfunctions:

Number Title Value Delay Ramp E51MF0012 RCIC Turbine Exhaust Check Valve Failure E51-F040 0 0 0 B31MF0066 RHR Loop A Rupture 5 0 0 B31MF0066 RHR Loop A Rupture [NOTE 1] CLEAR 0 0 E41MF0007 HPCI Steam Line Break [NOTE 2] 20 0 0 Remote Functions:

Number Title Value Delay Ramp EOPRF0022 E41-F002 Isolation Defeat for RPV Venting [NOTE 3] DEFEAT 0 0 EOPRF0023 E41-F003 Isolation Defeat for RPV Venting [NOTE 3] DEFEAT 0 0 Override Functions:

Number Title Value Delay Ramp P805_A297_1 SULCV Isolation Valve Close Switch 1 0 0 P603_A048_1 Reactor Mode Switch in Shutdown 1 10 0 P601_A213_2 ADS Inhibit Switch Logic A 1 20 0 P601_A215_2 ADS Inhibit Switch Logic B 1 20 0 NOTE 1: Conditional on RPV level <33 (H_P602_C014_2 LT 33).

NOTE 2: Conditional on HPCI flow >2000 gpm (H_P602_A140_1 GT 2000).

NOTE 3: Conditional on E41-F003 fully open (H_P602_B114_1 EQ 0).

Special Instructions:

1. Initialize the simulator, place in RUN, and perform the following:
a. Manually run the HPCI Flow Controller to minimum.
b. Open and execute lesson 315_0139_005.lsn.
c. Trigger step Setup.
d. Place simulator in FREEZE when EOP Defeats have auto triggered (about 1 minute).
2. Place the Mode Switch in Shutdown, and place both ADS Inhibit switches to Inhibit.
3. Place simulator in RUN just prior to starting the JPM.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0139-005)

Initial Conditions:

  • You are the Control Room NSO.
  • The reactor has scrammed.
  • The EOPs have been entered.
  • RPV Water level has decreased to less than 40 inches.
  • Both HPCI and RCIC automatically initiated.
  • HPCI flow was manually reduced to minimum, and RCIC has tripped.

Initiating Cue(s):

  • The CRS directs you to raise HPCI flow rate, and inject water into the RPV to raise level to 173 - 214.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0110-406 1 JPM Title Duration Page Perform Rod Pattern Adjustment with Difficult Rod 15 minutes COVER SHEET Movement (Alt. Path) [Modified]

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

1. *18.
  • 2. 19.
  • 3. *20.
4. *21.
  • 5. *22.
  • 6. *23.
7. 24.
  • 8. 25.
9. *26.
  • 10. *27.
  • 11.
  • 12.
  • 13.
  • 14.

15.

  • 16.

17.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-406 Perform Rod Pattern Adjustment with Difficult Rod Movement Revision: 0 (Alt. Path) Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

C1102 - Control Rod and Drive Mechanism Task:

02C1150029 - Recognize and respond to Difficult Rod Movement

References:

Required (R) / Available (A)

SOP 23.106, Control Rod Drive Hydraulics System (R)

SOP 23.623, Reactor Manual Control System (R)

Tools and Equipment Required:

None Initial Conditions:

  • The plant is operating normally.
  • Reactor power level has been lowered for a rod pattern adjustment.

Initiating Cue(s):

  • You are the P603 operator.
  • You are to perform a rod pattern adjustment in accordance with SNE direction.

Terminating Cue(s):

Control Rod 06-31 is successfully moved to position 06.

Task Standard:

Control Rod 06-31 is successfully unstuck in accordance with 23.106.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

1 - Reactivity Control K/A

Reference:

K/A SYSTEM: 201003 - Control Rod and Drive Mechanism K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.01 Stuck rod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.4 / 3.6 Maintenance Rule Safety Classification:

C1100-08 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-406 Perform Rod Pattern Adjustment with Difficult Rod Movement Revision: 0 (Alt. Path) Page 2 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet and marked up Post-LPSP Pull Sheet.

NOTE: Examiner will perform as CRS, SNE/STA, and as verifier. Verifier confirms appropriate rod selection, intended rod movement, and intended final rod position.

1. Review 23.623, Attachment 1 before rod 1. 23.623, Attachment 1 is reviewed.

movement.

  • 2. Place or verify Rod Select Power switch in
  • 2. Rod Select Power switch is placed in ON.

ON.

  • 3. Control Rod 06-31 pushbutton backlight is pushbutton on Rod Select Matrix. ON brightly on Rod Select Matrix.
4. Verify LPRMs displayed are the correct 4. LPRMs are verified correct for the control rod LPRMs for the selected rod. 06-31.

CUE: SNE directs that Notch Override is NOT to be used for this rod pattern adjustment.

  • 5. Momentarily place Rod Movement Control
  • 5. Rod Movement Control switch taken to OUT switch to OUT NOTCH. NOTCH and released.
  • 6. Verify rod motion and position using 4-Rod
  • 6. 4-Rod Display and Full Core Display Display and Full Core Display. indicates selected rod did not move.

Alternate Path begins when control rod 06-31 does not move.

CUE: CRS acknowledges announcement and directs performance of 23.106, section 6.12.

7. Announce failure of rod to move, and 7. Rod motion failure announced and recommend CRS enters 23.106 for difficult recommendation made.

rod movement.

CUE: If asked, control rod 06-31 is NOT on the List of Susceptible Cells on the 60 day or 30 day test frequency.

  • 8. Determines that control rod 06-31 is not on of Susceptible Cells on the 60 day or 30 day the List of Susceptible Cells on the 60 day or test frequency. 30 day test frequency.

CUE: Dispatched operator reports that lineup is correct at HCU for control rod 06-31.

9. Dispatch an operator to verify correct valve 9. Operator dispatched to verify lineup.

lineup at the HCU for control rod 06-31.

  • 10. Increase drive water pressure 15 to 25 psid. *10. C1152-F003 is closed until drive water pressure indicates ~280 - 290 psid.
  • 11. Hold Rod Movement Control switch in IN for *11. Rod Movement Control switch is held in IN one to two minutes. for one to two minutes.

CUE: SNE/STA directs that control rod 06-31 be withdrawn to position 02.

  • 12. Consult with SNE/STA. *12. Consults with SNE/STA.
  • 13. Momentarily place Rod Movement Control *13. Rod Movement Control switch taken to OUT switch to OUT NOTCH. NOTCH and released.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-406 Perform Rod Pattern Adjustment with Difficult Rod Movement Revision: 0 (Alt. Path) Page 3 ELEMENT STANDARD

  • 14. Verify rod motion and position using 4-Rod *14. 4-Rod Display and Full Core Display Display and Full Core Display. indicates selected rod did not move.

CUE: CRS acknowledges announcement and directs continuing 23.106 from step 6.12.6.

15. Announce failure of rod to move. 15. Rod motion failure announced.
  • 16. Hold Rod Out Notch Override switch in *16. Rod Out Notch Override switch is held in EMER ROD IN for several seconds. EMER ROD IN for several seconds.
17. Verify control rod 06-31 Full-In light is ON. 17. Control rod 06-31 Full-In light is verified ON.
  • 18. Simultaneously place Rod Out Notch *18. Rod Out Notch Override switch is placed to Override switch to OVERRIDE and Rod OVERRIDE and Rod Movement Control Movement Control switch to OUT NOTCH for switch is placed to OUT NOTCH several seconds. simultaneously for several seconds.

CUE: CRS acknowledges announcement and directs continuing 23.106 from step 6.12.7.

19. Announce failure of rod to move. 19. Rod motion failure announced.
  • 20. Increase Drive Water Pressure to 300 psid. *20. C1152-F003 is closed until drive water pressure indicates 300 psid.
  • 21. Hold Rod Movement Control switch in IN for *21. Rod Movement Control switch is held in IN one to two minutes. for one to two minutes.

CUE: SNE/STA directs that control rod 06-31 be withdrawn to position 02.

  • 22. Consult with SNE/STA. *22. Consults with SNE/STA.
  • 23. Momentarily place Rod Movement Control *23. Rod Movement Control switch taken to OUT switch to OUT NOTCH. NOTCH and released.
24. Verify rod motion and position using 4-Rod 24. Verifies 4-Rod Display and Full Core Display Display and Full Core Display. indicates proper rod motion.

CUE: CRS acknowledges announcement.

25. Announce successful rod motion. 25. Successful rod motion announced.
  • 26. Reduce Drive Water pressure to 255 to *26. C1152-F003 is opened until drive water 265 psid. pressure indicates ~265 psid.

CUE: CRS directs examinee to continue the rod pattern adjustment.

  • 27. Withdraw control rod 06-31 to position 06 *27. Rod Movement Control taken to OUT while observing nuclear instrumentation NOTCH. When the settle function is response. complete, this step is repeated until the rod is at Position 06.

CUE: End the JPM when Control Rod 06-31 is successfully moved to position 06.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-406 Perform Rod Pattern Adjustment with Difficult Rod Movement Revision: 0 (Alt. Path) Page 4 Evaluator Notes:

Provide the examinee with the post-LPSP Pull Sheet (attached) for the rod pattern adjustment.

You will act as the SNE to verify the correct control rod is selected for movement.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-406 Perform Rod Pattern Adjustment with Difficult Rod Movement Revision: 0 (Alt. Path) Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-406 Perform Rod Pattern Adjustment with Difficult Rod Movement Revision: 0 (Alt. Path) Page 6 Simulator Setup IC#:

IC-20 Malfunctions:

Number Title Value Delay Ramp C11MF0072 CONTROL ROD 06-31 BLADE STUCK ACTIVE 0 0 C11MF0072 CONTROL ROD 06-31 BLADE STUCK CLEAR 0 0 cd='H_P603_B004_1 GT 295 AND P603_A059_3 EQ 1' NOTE: Malfunction clears when Drive Water Pressure is >295 psid and Rod Movement Control is placed in OUT NOTCH.

Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp BCBGB31R621AOUT2_SP Recirc Flow Controller A Auto Setpoint 53.5 0 60 BCBMB31R621AOUT2_SP Recirc Flow Controller B Auto Setpoint 53.5 0 60 Special Instructions:

1. Initialize the simulator to IC-20 and place in RUN.
2. Verify or raise drive water pressure to ~265 psid.
3. Open and Execute Lesson 315_0110_406.lsn, or set the malfunctions as indicated above.
4. Trigger step Setup (Overrides and Blade Stuck). NOTE: The next step (blade unstuck) is set to trigger on conditional.
5. When power has stabilized at ~85%, place the simulator in FREEZE or begin the JPM.

NOTE: Ensure file Post-LPSP Pull Sheet is printed out and attached to this JPM.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Page 7 Cue Sheet: (JP-OP-315-0110-406)

Initial Conditions:

  • The plant is operating normally.
  • Reactor power level has been lowered for a rod pattern adjustment.

Initiating Cue(s):

  • You are the P603 operator.
  • You are to perform a rod pattern adjustment in accordance with SNE direction.