Letter Sequence RAI |
---|
TAC:MD9794, (Approved, Closed) TAC:MD9795, (Approved, Closed) TAC:MD9796, Ice Mass Determination Surveillance Requirements (Approved, Closed) TAC:MD9797, Ice Mass Determination Surveillance Requirements (Approved, Closed) |
|
MONTHYEARML0934305062009-08-25025 August 2009 License Amendment Request for Technical Specification 3.16.13, Ice Condenser Doors, Response to Request for Additional Information Project stage: Response to RAI ML0934306892009-10-23023 October 2009 Response to a Second RAI for a LAR Submitted on October 2, 2008 to Revise TS 3.6.13 - Ice Condenser Doors Project stage: Other ML1003200472010-02-23023 February 2010 Request for Withholding Information from Public Disclosure, Response to Request for Additional Information Concerning License Amendment Request for Revising TS 3.6.13, Ice Condenser Door Project stage: RAI ML1003210052010-03-0202 March 2010 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing, and Order Imposing Procedures for Access to Sensitive.. Project stage: Other NRC-2010-0074, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing, and Order Imposing Procedures for Access to Sensitive..2010-03-0202 March 2010 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing, and Order Imposing Procedures for Access to Sensitive.. Project stage: Approval ML1003211192010-03-0202 March 2010 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing, and Order Project stage: Other ML1003209842010-03-0909 March 2010 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination & Opportunity for Hearing, & Order Imposing Procedures for Access to Sensitive Project stage: Other ML1003210962010-03-0909 March 2010 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing, and Order Project stage: Other ML0933706452010-06-28028 June 2010 License Amendment, Issuance of Amendments Regarding Technical Specification Changes Associated with Verification of Ice Condenser Door Operability Project stage: Approval ML0933800122010-06-28028 June 2010 License Amendment, Issuance of Amendments Regarding Technical Specification Changes Associated with Verification of Ice Condenser Door Operability Project stage: Approval 2010-02-23
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary 2024-09-05
[Table view] Category:Proprietary Information Review
MONTHYEARML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22102A2962022-04-13013 April 2022 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML21327A3372021-12-0606 December 2021 Request for Withholding Information from Public Disclosure ML21187A0962021-08-27027 August 2021 Request for Withholding Information from Public Disclosure for Catawba Nuclear Station Units 1 and 2 ML18030B0722018-02-0909 February 2018 Request for Withholding Information from Public Disclosure ML17093A8792017-04-10010 April 2017 Request for Withholding Information from Public Disclosure ML16033A0862016-02-0404 February 2016 Request for Withholding Information from Public Disclosure ML15161A4142015-06-19019 June 2015 Request for Withholding Information from Public Disclosure ML14324A9682014-12-29029 December 2014 Request for Withholding Information from Public Disclosure ML12251A0242012-09-13013 September 2012 Request for Withholding Information from Public Disclosure (TAC Nos. ME8213 and ME8214 ML1205801222012-02-27027 February 2012 Request for Withholding Information from Public Disclosure by Letter Dated January 12, 2012 ML1024506102010-09-29029 September 2010 Westinghouse Electric Company (Westinghouse), Request for Withholding Information from Public Disclosure ML1025200732010-09-16016 September 2010 Request for Withholding Information from Public Disclosure ML1003200472010-02-23023 February 2010 Request for Withholding Information from Public Disclosure, Response to Request for Additional Information Concerning License Amendment Request for Revising TS 3.6.13, Ice Condenser Door ML0921807362009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and MD8001) - Sup ML0831704442008-12-22022 December 2008 Westinghouse Electric Company (Westinghouse), Application for Withholding Information from Public Disclosure ML0828400042008-10-10010 October 2008 Request for Withholding Information from Public Disclosure, Rev 1 to Methodology Report DPC-NE-1005-P, Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX ML0828400062008-10-10010 October 2008 Request for Withholding Information from Public Disclosure, Response to RAI LAR Revising Methodology Report DPC-NE-1005-P-A Rev 0 Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX ML0821204492008-08-0606 August 2008 Duke Energy Carolinas, LLC, Request for Withholding Information from Public Disclosure for Catawba Nuclear Station, Unit 1 ML0513200802005-05-11011 May 2005 Withholding from Public Disclosure, WCAP-15658-P, Revision 0, Flaw Evaluation Handbook for Catawba Unit 2 Steam Generator Primary Nozzle Weld Regions, September 2004 ML0408909172004-03-26026 March 2004 Withholding from Public Disclosure, Compact Disc, McGuire and Catawba LOCA Input Decks, Proprietary, Framatome Anp, Dated October 3, 2003 ML0408909442004-03-26026 March 2004 Catawba MOX, Request for Withholding Ltr, Proprietary Finding Ltr of 12/10/03 ML0311900552003-04-29029 April 2003 Withholding Information from Public Disclosure, TAC Nos. MB2726, MB2729, MB2578 and MB2579 ML0300302582003-01-0303 January 2003 Units 1 & 2, Withholding from Public Disclosure, DPC-NE-2009P, TAC Nos. MB4502, MB4503, MB4504 and MB4505 ML0214006512002-05-17017 May 2002 Request for Withholding Information from Public Disclosure by Application Dated August 3, 2001 2022-07-19
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 23, 2010 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, AND CATAWBA NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (MD9794, MD9795, MD9796 AND MD9797)
Dear Mr. Repko:
By letter dated August 25, 2009, you submitted a response to a request for additional information from the U.S. Nuclear Regulatory Commission (NRC) staff which enclosed a letter from Westinghouse Electric Company, LLC (Westinghouse), dated August 14, 2009, with an affidavit attached dated August 14, 2009, executed by J. A. Gresham of Westinghouse, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Sections of Applicable Text from LTR-RIDA-06-1 06, Rev. 2 The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(i) The information sought to be withheld from public disclosure, is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
R. Repko -2 (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such Information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, anyone component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
R. Repko -3 (f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in pUblic sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in "Sections of Applicable Text from LTR-RIDA-06-1 06, Rev. 2" (proprietary) for submittal to the Commission, being transmitted by the Duke Energy letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse for Catawba Units I and 2 and McGuire Units I and 2 is that associated with testing of the Ice Condenser lower inlet door function.
This information is part of that which will enable Westinghouse to:
(a) Support the utilities effort in determining the need for various ice condenser door testing.
Further this information has substantial commercial value as follows:
(a) Westinghouse plans to sell the use of the information to its customers for the purpose of future manufacturing, repairs, and testing of the ice condenser lower inlet doors.
(b) Westinghouse can sell support and defense of information regarding future manufacturing, repairs, and testing of the ice condenser lower inlet doors.
(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar details regarding the lower inlet door testing and manufacturing and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
R. Repko - 4 In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the "Sections of Applicable Text from LTR-RIDA-06-106, Rev. 2," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, J may be reached at 301-415-1119.
Sincerely, Jon H. Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369, 50-370, 50-413, and 50-414 cc: Distribution via Listserv (McGuire and Catawba) cc: Mr. J. A. Gresham Westinghouse Electric Company, LLC P. 0 Box 355 Pittsburgh Pennsylvania 15230-0355
ML100320047 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlSCVB/BC NRRlLPL2-1/BC NAME JThompson MO'Brien RDennig GKulesa DATE 02/22/10 02/22/10 02/4/10 02/23/10