ML093100671

From kanterella
Jump to navigation Jump to search
Confirmation of Requested Initial Operator License Examinations for H. B. Robinson Steam Electric Plant
ML093100671
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/06/2009
From: Kennedy K
Division of Reactor Safety II
To: Mccartney E
Carolina Power & Light Co
References
RNP-RA/09-0074
Download: ML093100671 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 November 6, 2009 Mr. Eric McCartney Vice President Carolina Power and Light Company H.B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR H. B. ROBINSON STEAM ELECTRIC PLANT

Dear Mr. McCartney:

In a letter dated August 27, 2009, Serial # RNP-RA/09-0074, your staff responded to Regulatory Issue Summary 2009-011 and requested we schedule initial license operator examinations for H. B.

Robinson Steam Electric Plant. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

Plant / 2010 2011 Station Date Applicants Date Applicants H.B. N/R N/R 2/28 14 Robinson 11/28 15

  • N/R - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each stations training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-562-4550.

CP&L 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Kriss M. Kennedy, Director Division of Reactor Safety Docket Nos.: 50-261 License Nos.: DPR-23 cc: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE MTW OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE PGC /RA/ MTW /RA/ KMK /RA/

NAME PCapehart MWidmann KKennedy DATE 11/03/2009 11/04/2009 11/06/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 3 cc w/encl: Koda Smith Brian C. McCabe Training Manager Manager, Nuclear Regulatory Affairs H. B. Robinson Steam Electric Plant Unit 2 Progress Energy Carolinas, Inc. Electronic Mail Distribution Electronic Mail Distribution David T. Conley Eric McCartney Associate General Counsel Vice President Progress Energy Service Company, LLC H. B. Robinson Steam Electric Plant Unit 2 Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution S. D. West Superintendent Security R. J. Duncan, II H. B. Robinson Steam Electric Plant Vice President Progress Energy Nuclear Operations Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution Susan E. Jenkins Director, Division of Waste Management Ernest J. Kapopoulos, Jr. Bureau of Land and Waste Management Plant General Manager S.C. Department of Health and Carolina Power & Light Company Environmental Control Electronic Mail Distribution Electronic Mail Distribution Christos Kamilaris R. Mike Gandy Director Division of Radioactive Waste Mgmt.

Fleet Support Services S.C. Department of Health and Carolina Power & Light Company Environmental Control Electronic Mail Distribution Electronic Mail Distribution Curt A. Castell W. Lee Cox, III Supervisor (Acting) Section Chief Licensing/Regulatory Programs Radiation Protection Section Carolina Power & Light Company N.C. Department of Environmental H. B. Robinson Steam Electric Plant Commerce & Natural Resources 3581 West Entrance Road Electronic Mail Distribution Hartsville, SC 29550 John H. O'Neill, Jr.

C. T. Baucom Shaw, Pittman, Potts & Trowbridge Manager 2300 N. Street, NW Support Services - Nuclear Washington, DC 20037-1128 Carolina Power & Light Company Electronic Mail Distribution Robert P. Gruber Executive Director Thomas D. Walt Public Staff - NCUC Vice President 4326 Mail Service Center Nuclear Oversight Raleigh, NC 27699-4326 Carolina Power and Light Company Electronic Mail Distribution Public Service Commission State of South Carolina Chairman P.O. Box 11649 North Carolina Utilities Commission Columbia, SC 29211 Electronic Mail Distribution

CP&L 4 Letter to Eric McCartney from Kriss Kennedy dated November 6, 2009

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR H. B. ROBINSON STEAM ELECTRIC PLANT Distribution w/encl:

RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource ORA, RII K. Kennedy H. Christensen M. Widmann P. Capehart J. Vincent R. Musser J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing