MONTHYEARML0725500632007-08-30030 August 2007 NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 2 Project stage: Request ML0730605502007-09-0707 September 2007 NFPA 805 Transition Pilot Plant FAQ 07-0040 Project stage: Request ML0727402482007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0011, Revision 2 Project stage: Request ML0727402622007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0038 Project stage: Request ML0727402682007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0039 Project stage: Request ML0727402552007-09-28028 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3 Project stage: Request ML0728200152007-10-0808 October 2007 NFPA-805 Transition Pilot Plant FAQ 06-0005, Revision 2 - Definition of a Fire Protection Program (FPP) Change for Harris Project stage: Request ML0735100822007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version) Project stage: Request ML0735500232007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1 Project stage: Request ML0733200282007-11-26026 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition Project stage: Request ML0733700252007-12-0303 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering Analyses Project stage: Request ML0734001472007-12-0606 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 Project stage: Request ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 Project stage: Request ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3 Project stage: Request ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables Project stage: Request ML0813006972008-05-0909 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 2 Project stage: Request ML0814300412008-05-22022 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0040, Revision 2 Project stage: Request ML0815606412008-05-29029 May 2008 Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request HNP-08-061, Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition2008-05-29029 May 2008 Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Request ML0820410142008-05-30030 May 2008 Public Version of Enclosures 2 Through 6 of License Amendment Request to Adopt NFPA-805 Project stage: Request ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa) Project stage: Meeting ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 Project stage: Meeting ML0818905292008-07-11011 July 2008 Summary of Closed Meeting with Progress Energy Carolinas Regarding May 29, 2008, License Amendment Request to Transition the Shearon Harris Nuclear Plant Unit 1, to National Fire Protection Association Standard 805, Performance-Based.. Project stage: Meeting ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 Project stage: Meeting ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 Project stage: Approval ML0824202652008-09-0808 September 2008 Summary of Conference Call with Progress Energy Re License Amendment Request HNP-08-061 for Shearon Harris Project stage: Other ML0826007362008-09-17017 September 2008 Notice of Meeting with Progress Energy Carolinas, Inc. (Pec), to Discuss the Shearon Harris Nuclear Plant, Unit 1 (HNP) National Fire Protection Association (NFPA) Standard 805 License Amendment Request (LAR) Project stage: Meeting ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Acceptance Review ML0828700162008-09-26026 September 2008 Nc Warns Response to Board Notification - Enclosure P-1 - Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review NFPA-805 License Amendment Request, September 26, 2008 Project stage: Request ML0830900742008-11-12012 November 2008 Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834) Project stage: Meeting HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-11-14014 November 2008 Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request Project stage: Meeting HNP-08-121, To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-12-11011 December 2008 To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML0902903272009-03-10010 March 2009 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire Protection Project stage: Other ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 Project stage: Meeting ML0916002812009-06-11011 June 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0921707152009-08-0606 August 2009 Request for Additional Information Regarding Amendment to Adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor . Project stage: RAI HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report2009-08-0606 August 2009 90-Day Inservice Inspection (ISI) Summary Report Project stage: Request HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants2009-08-13013 August 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants Project stage: Response to RAI HNP-09-086, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor.2009-08-28028 August 2009 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor. Project stage: Response to RAI HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor..2009-10-0909 October 2009 Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.. Project stage: Response to RAI HNP-09-096, Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2009-12-16016 December 2009 Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML1001302542010-01-14014 January 2010 Second Request for Additional Information Regarding the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plant Project stage: RAI 05000400/LER-2010-002, Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak2010-01-14014 January 2010 Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak Project stage: Request HNP-10-008, Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2010-02-0404 February 2010 Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML1006009872010-03-0909 March 2010 Discussion of Clarification Questions Related to the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance - Based Standard for Fire Protection for Light . Project stage: Approval HNP-10-040, Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2010-04-0505 April 2010 Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request HNP-10-064, Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants2010-06-0909 June 2010 Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants Project stage: Request ML1017506022010-06-28028 June 2010 Issuance of Amendment Regarding Adoption of National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Approval 2008-07-11
[Table View] |
Text
ENCLOSURE 1 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Progress Energy Serial: HNP-08-121 DEC11 2008 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT 2 TO REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
References:
- 1. Letter from R. J. Duncan to the Nuclear Regulatory Commission (Serial: HNP-08-061), "Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)," dated May 29, 2008
- 2. Letter from M. G. Vaaler, Nuclear Regulatory Commission, to C. L.
Burton, "Shearon Harris Nuclear Power Plant, Unit 1 - Summary of Conference Call with Progress Energy to Discuss License Amendment Request to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)," dated September 8, 2008
- 3. Letter from T. H. Boyce, Nuclear Regulatory Commission, to C. L.
Burton, "Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review Regarding the License Amendment Request to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition),"
dated September 26, 2008
- 4. Letter from C. L. Burton to the Nuclear Regulatory Commission (Serial: HNP-08-113), "Supplement to Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)," dated November 14, 2008 Ladies and Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, "Application of License or Construction Permit," Carolina Power & Light Company (CP&L) doing business as Progress Energy Carolinas Inc. (PEC), is submitting the enclosed Supplement 2 to Harris Nuclear Plant's (HNP) initial NFPA 805 License Amendment Request (LAR) (Reference 1). The submittal of this additional information, consisting of "Attachment Y - NFPA 805 Transition Risk Insights," results from the NRC Acceptance Review of the original LAR (References 2 and 3). Previously submitted Supplement 1 to the LAR (Reference 4) provided the balance of the information requested in the Acceptance Review.
Progress Energy Carolinas, Inc.
Harris Nuclear Plant P. 0. Box 165 New Hill, NC 27562
ENCLOSURE 1 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-121 Page 2 In addition, HNP is providing a revised page 50 (Table 4-5), titled "Page 50 - HNP NFPA 805 Transition Report - Rev 2. docx." This replaces, in its entirety, the existing page 50 (Table 4-5),
titled "Page 50 - HNP NFPA 805 Transition Report - Rev 1. docx" in the Transition Report portion of the submittal dated November 14, 2008 (Reference 4).
In accordance with 10 CFR 50.91(b), HNP is providing the state of North Carolina with a copy of this supplement to the proposed license amendment.
This Supplement contains no new or revised Regulatory Commitments.
Please refer any questions regarding this submittal to Mr. Dave Corlett at (919) 362-3137.
I declare under penalty of perjury that the foregoing is true and correct. Executed on DEC -11 2008 Sincerely, Kimberly A. Harshaw Manager - Support Services Harris Nuclear Plant KAH/kms
Enclosures:
- 1.
Attachment Y - NFPA 805 Transition Risk Insights - Security Related Information
- 2.
Replacement Page in Transition Report, Table 4-5 Fire Area Compliance Summary, "Page 50 - HNP NFPA 805 Transition Report - Rev. 2.docx" Cc:
Ms. B. 0. Hall, N. C. DENR Section Chief Mr. K. J. Korth, Acting NRC Senior Resident Inspector, HNP Mr. L. A. Reyes, NRC Regional Administrator, Region II Ms. M. G. Vaaler, NRC Project Manager, HNP
ENCLOSURE 1 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-121 Page 3 Bc:
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
G. E. Attarian C. L. Burton D. T. Conley J. D. Duhon S. D. Ebneter D. G. Eisenhut R. T. Garner K. Henderson E. D. Hux Mr. D. G. Kilpatrick Mr. H. J. Miller Mr. W. L. Parks Mr. S. T. O'Connor Mr. J. Scarola Mr. M. S. Tuckman Ms. M. G. Vaaler (NRC)
Licensing Files (2 copies)
Nuclear Records to SERIAL: HNP-08-121 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT 2 TO REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
Replacement Page in Transition Report, Table 4-5 Fire Area Compliance Summary
'Page 50 - HNP NFPA 805 Transition Report - Rev 2.docx" (1 Page)
Progress Energy HNP NFPA 805 Transition Report Progress Energy HNP NFPA 805 Transition Report Fire Area 12-A-BAL 12-A-CR 12-A-C RC 12-A-HVIR 12-I-ESWPA 12-I-ESWPB 12-0-TA 12-0-TB 1-A-ACP 1 -A-BAL-A Table 4-5 Fire Area Compliance Summary Area Description FSA NFPA 805 Change Reference Regulatory Basis Evaluations (HNP-(Post-Transition)
(Yes/No)
M/MECH-)
Reactor Auxiliary Building Units 1 1106 4.2.3.2, 4.2.3.2 Yes And 2 Balance Control Room, Reactor Auxiliary 1127 4.2.4 Yes Building Control Room Complex 1126 4.2.4 No Heating, Ventilating, and Instrument 1125 4.2.4 No Repairs, Reactor Auxiliary Building Emergency Service Water Pump 1A 1173 4.2.3.2 No Emergency Service Water Pump 1B 1174 4.2.3.2 No Diesel Fuel Oil Storage Tank A 1175 4.2.3.2 No Diesel Fuel Oil Storage Tank B 1176 4.2.3.2 No Auxiliary Control Panel Room 1124 4.2.3.2, 4.2.3.3.a, No 4.2.4 Reactor Auxiliary Building Unit 1 -
1116 4.2.3.2, 4.2.3.3.a, Yes Lower Elevations 4.2.3.3.b, 4.2.3.3.c, 4.2.4 Reactor Auxiliary Building Unit 1 -
1117 4.2.3.2, 4.2.3.3.b, Yes Upper Elevations 4.2.3.3.c, 4.2.4 Reactor Auxiliary Building Unit 1 -
1105 4.2.3.2, 4.2.3.3.a Yes Analysis Area C Reactor Auxiliary Building Unit 1, 1118 4.2.3.2 No Analysis Area D Reactor Auxiliary Building Unit 1 -
1107 4.2.3.2, 4.2.3.3.a, Yes Analysis Area E 4.2.4 Reactor Auxiliary Building Unit 1 -
1108 4.2.3.2 No Analysis Area F Reactor Auxiliary Building Unit 1 -
1177 4.2.3.2 No Analysis Area G Reactor Auxiliary Building Unit 1 -
1178 4.2.3.2 No Analysis Area H Reactor Auxiliary Building Unit I -
1109 4.2.4 Yes Analysis Area J Reactor Auxiliary Building Unit 1 -
1179 4.2.3.2, 4.2.4 Yes Analysis Area K Yes Yes Yes Yes Yes Licensing Fixed Detection Actions or EEEEs Suppression Required?*
Transitioning?
Required?*
(Yes/No)
(Yes/No)
(Yes/No)
Yes No Yes Yes Yes Yes Yes No Yes Yes No No Yes No No No No No No Yes No No No No Yes 1 -A-BAL-B 1 -A-BAL-C 1 -A-BAL-D 1 -A-BAL-E 1 -A-BAL-F I -A-BAL-G 1 -A-BAL-H 1 -A-BAL-J 1 -A-BAL-K Yes Yes No Yes No No No Yes Yes Yes No No No No No No No No Yes Yes No No No No No No No Page 50 - HNP NFPA 805 Transition Report - Rev. 2.docx