Letter Sequence Supplement |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARML0725500632007-08-30030 August 2007 NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 2 Project stage: Request ML0730605502007-09-0707 September 2007 NFPA 805 Transition Pilot Plant FAQ 07-0040 Project stage: Request ML0727402622007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0038 Project stage: Request ML0727402482007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0011, Revision 2 Project stage: Request ML0727402682007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0039 Project stage: Request ML0727402552007-09-28028 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3 Project stage: Request ML0735500232007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1 Project stage: Request ML0735100822007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version) Project stage: Request ML0733200282007-11-26026 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition. Project stage: Request ML0733700252007-12-0303 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering Analyses Project stage: Request ML0734001472007-12-0606 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 Project stage: Request ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 Project stage: Request ML0735402622007-12-20020 December 2007 Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 0 Project stage: Request ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3. Project stage: Request ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables Project stage: Request ML0814300412008-05-22022 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0040, Revision 2 Project stage: Request HNP-08-061, Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-05-29029 May 2008 Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML0820410142008-05-30030 May 2008 Public Version of Enclosures 2 Through 6 of License Amendment Request to Adopt NFPA-805 Project stage: Request ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa).. Project stage: Meeting ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 Project stage: Meeting ML0818905292008-07-11011 July 2008 Summary of Closed Meeting with Progress Energy Carolinas Regarding May 29, 2008, License Amendment Request to Transition the Shearon Harris Nuclear Plant Unit 1, to National Fire Protection Association Standard 805, Performance-Based.... Project stage: Meeting ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 Project stage: Meeting ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 Project stage: Acceptance Review ML0828700162008-09-26026 September 2008 Nc Warn'S Response to Board Notification - Enclosure P-1 - Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review NFPA-805 License Amendment Request, September 26, 2008 Project stage: Request ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Acceptance Review ML0830900742008-11-12012 November 2008 Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834) Project stage: Meeting HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-11-14014 November 2008 Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request Project stage: Meeting HNP-08-121, Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-12-11011 December 2008 Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML0902903272009-03-10010 March 2009 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire Protection Project stage: Other ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 Project stage: Meeting ML0916002812009-06-11011 June 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0921707152009-08-0606 August 2009 Request for Additional Information Regarding Amendment to Adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor ... Project stage: RAI HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants.2009-08-13013 August 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants. Project stage: Response to RAI HNP-09-086, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor...2009-08-28028 August 2009 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor... Project stage: Response to RAI HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor....2009-10-0909 October 2009 Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.... Project stage: Response to RAI HNP-09-096, Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2009-12-16016 December 2009 Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML1001302542010-01-14014 January 2010 Second Request for Additional Information Regarding the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plant Project stage: RAI HNP-10-008, Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants.2010-02-0404 February 2010 Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Request ML1006009872010-03-0909 March 2010 Discussion of Clarification Questions Related to the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance - Based Standard for Fire Protection for Light ... Project stage: Other HNP-10-040, Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants.2010-04-0505 April 2010 Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Request HNP-10-064, Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants.2010-06-0909 June 2010 Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants. Project stage: Request ML1017506042010-06-28028 June 2010 Redacted - Regarding Adoption of National Fire Protection Association Standard 805 Project stage: Acceptance Review ML1017506022010-06-28028 June 2010 Issuance of Amendment Regarding Adoption of National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants.. Project stage: Approval ML1025108522010-12-28028 December 2010 Corrections of Typographical and Formatting Errors Regarding Amendment No. 133 and the Associated Safety Evaluation Project stage: Approval 2008-07-11
[Table View] |
|
---|
Category:Letter type:HNP
MONTHYEARHNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date2018-09-17017 September 2018 Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval2018-06-0404 June 2018 Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 192018-05-0303 May 2018 Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19 HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2018-05-0202 May 2018 Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation2018-04-20020 April 2018 Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O2018-04-16016 April 2018 Cycle 22 Core Operating Limits Report, Revision O HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-02-16016 February 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 12018-02-14014 February 2018 Cycle 21 Core Operating Limits Report, Revision 1 HNP-18-017, CFR 50.54(q) Evaluations2018-02-0505 February 2018 CFR 50.54(q) Evaluations HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2018-01-22022 January 2018 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-01-18018 January 2018 Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations2018-01-11011 January 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors2018-01-0404 January 2018 Submittal of 14-Day Special Report for Accident Radiation Monitors HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-11-27027 November 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..2017-10-30030 October 2017 Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-10-30030 October 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.2017-10-0202 October 2017 Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-09-14014 September 2017 Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-09-13013 September 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-07-20020 July 2017 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-040, Snubber Program Plan2017-06-0101 June 2017 Snubber Program Plan HNP-17-051, 10 CFR 50.54(q) Evaluation2017-05-24024 May 2017 10 CFR 50.54(q) Evaluation HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center2017-05-24024 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations. HNP-17-047, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations. HNP-17-046, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..2017-04-25025 April 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106.. HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator2017-04-12012 April 2017 Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation2017-03-30030 March 2017 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.22017-02-16016 February 2017 Annual Report in Accordance with Technical Specifications, Section 6.9.1.2 HNP-17-015, Summary of 10 CFR 50.54(q) Evaluation2017-02-15015 February 2017 Summary of 10 CFR 50.54(q) Evaluation 2018-09-17
[Table view] |
Text
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Progress Energy Bro Vicehitpe LPresident Christopher L Burton Harris Nuclear Plant Progress Energy Carolinas, Inc.
NOV 1 4 2008 Serial: HNP-08-113 101CFR 50.90 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARDS FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
References:
- 1. Letter from R. J. Duncan to the Nuclear Regulatory Commission (Serial: HNP-08-061), "Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)," dated May 29, 2008
- 2. Letter from M. G. Vaaler, Nuclear Regulatory Commission, to C. L.
Burton, "Shearon Harris Nuclear Power Plant, Unit 1 - Summary of Conference Call with Progress Energy to Discuss License Amendment Request to Adopt National Fire Protection Association 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)," dated September 8, 2008
- 3. Letter from T. H. Boyce, Nuclear Regulatory Commission, to C. L.
Burton, "Shearon Harris Nuclear Power Plant, Unit 1 -Acceptance Review Regarding the License Amendment Request to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition),"
dated September 26, 2008 Ladies and Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, "Application of License or Construction Permit," Carolina Power & Light Company (CP&L) doing business as Progress Energy Carolinas Inc. (PEC), submitted the above License Amendment Request for the Harris Nuclear Plant (HNP) (Reference 1). As a result of the NRC Acceptance Review of that request (References 2 and 3), HNP is submitting additional information via this supplement. The remaining information, to consist of "Attachment Y - NFPA 805 Transition Risk Insights," will be provided to the NRC in separate correspondence.
As provided in HNP's initial submittal (Reference 1), information associated with HNP's transition is provided in the enclosed HNP Transition Report, including the technical and regulatory justifications supporting the LAR.
P.O.
Box 165 New Hill, NC 27562 T> 919.362.2502 F> 919.362.2095
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-113 Page 2 of the initial submittal (Reference 1) provided the Regulatory Commitments associated with HNP's License Amendment Request. Although this supplement does not change this Enclosure, a duplicate of Enclosure 1 is included in this current submittal for clarity. , which contains a listing of the Transition Report sections for which HNP is requesting specific NRC approval, has been revised to include new Attachments W, X, Y and Z. contains the applicable sections of HNP's Transition Report that have changed since the original submittal of Attachments A through Z. The Attachments that have changed are provided in their entirety as follows:
" Attachment A - NEI 04-02 Table B Transition of Fundamental FP Program and Design Elements (NFPA 805 Chapter 3) - Security Related Information
" Attachment C - NEI 04-02 Table B Fire Area Transition - Security Related Information
" Attachment F - Fire-Induced Multiple Spurious Operations - Resolution Methodology
" Attachment G - Operator Manual Actions - Transition to Recovery Actions- Security Related Information
" Attachment H - NEI 04-02 Frequently Asked Question - Summary Table
" Attachment M - License Condition Changes
" Attachment S - Plant Modifications - Security Related Information
" Attachment W - Internal Events PRA Quality - Security Related Information
" Attachment X - Fire PRA Quality - Security Related Information
" Attachment Z - Fire PRA Quality Post-Transition Process contains HNP's responses to the "Technical Acceptance Issues" identified in the NRC letter dated September 26, 2008 (Reference 3). This Enclosure also provides HNP's resolution of items contained in the tabular "Review Checklist," provided by the NRC as an Enclosure to the September 26, 2008 letter (Reference 3).
In accordance with 10 CFR 50.91 (b), HNP is providing the state of North Carolina with a copy of this supplement to the proposed license amendment.
Please refer any questions regarding this submittal to Mr. Dave Corlett at (919) 362-3137.
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-113 Page 3 I declare under penalty of perjury that the foregoing is true and correct. Executed on NOV 14 2008 Sincerely, Christopher L. Burto Vice President Harris Nuclear Plant CLB/kl
Enclosures:
- 1. HNP Regulatory Commitments (no change)
- 2. Specific Approval Requested in SER
- 3. HNP Transition Report, including revised Attachments
- 4. HNP Responses to "Technical Acceptance Issues" and "Review Checklist" Cc (via CD-ROM):
Ms. B. 0. Hall, N. C. DENR Section Chief Mr. K. J. Korth, Acting NRC Senior Resident Inspector, HNP Mr. L. A. Reyes, NRC Regional Administrator, Region II Ms. M. G. Vaaler, NRC Project Manager, HNP
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-113 Page 4 Bc: Mr. G. E. Attarian Mr. E. D. Hux Mr. C. L. Burton Mr. D. G. Kilpatrick Mr. D. T. Conley Mr. H. J. Miller Mr. J. D. Duhon Mr. S. T. O'Connor Mr. S. D. Ebneter Mr. J. E. Pierce Mr. D. G. Eisenhut Mr. J. Scarola Mr. R. T. Garner Mr. M. S. Tuckman Ms. K. A. Harshaw Ms. M. G. Vaaler (NRC)
Mr. K. Henderson Licensing Files (2 copies)
Nuclear Records
Enclosure 1 to SERIAL: HNP-08-113 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
REGULATORY COMMITMENTS Commitment(s) Scheduled Completion Date
- 1. HNP will complete modifications necessary to The end of Refueling Outage 16 currently support the new licensing basis. scheduled for November 5, 2010 Page El-1 of 1
Enclosure 2 to SERIAL: HNP-08-113 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR In accordance with 10 CFR 50.48(c)(3)(i), Harris Nuclear Plant (HNP), is submitting this License Amendment Request (LAR) to allow HNP to maintain a fire protection program that complies with NFPA 805 as an alternative to the current HNP fire protection license condition. The information provided in the Transition Report contains the information required for submittal, as well as information to facilitate the Nuclear Regulatory Commission (NRC) review and approval of the license amendment.
As stated in Regulatory Position C.2.2 of Regulatory Guide 1.205, HNP requests that certain portions of the Transition Report be reviewed for explicit approval in the HNP 10 CFR 50.48(c) License Amendment/associated Safety Evaluation Report. HNP believes this review and approval will help provide clarity to the new fire protection licensing basis and facilitate future program maintenance and NRC inspection activity.
The following table provides a listing of Transition Report Sections, the Topic, applicable NEI and NRC requirements and guidance, and whether specific approval by the NRC is requested in the License Amendment/associated Safety Evaluation Report.
Specific LARITR Approval Reference Topic Requirement/Guidance Requested in SER Section B-1 Table RG 1.205 (C.2.4), NEI 04-02(2.3, Attachment A 4.3.1, B.1), FAQ 07-0036 Yes Section Nuclear Safety Capability Assessment - Methodology NEI 04-02 (4.3.2, B.2), FAQ 07-0039 Yes (B-2 Table)
Section Nuclear Safety Capability 4.2.2.3, Assessment - Fire Area - by NEI 04-02 (4.3.2, B.2), FAQ 07-0039 Yes (1) 4.8.1 - Fire Area Review Nuclear Safety Capability Attachment C Assessment - Fire Area - by NEI 04-02 (4.3.2, B.2), FAQ 07-0039 No
- Fire Area Review (B-3 Table)
Section 4.3 Non Power Operations (F-1 NEI 04-02 (4.3.3, F), FAQ 07-0040 Yes Attachment D Table)
Section 4.4 Radioactive Release (G-1 NEI 04-02 (4.3.4, G) Yes Attachment E Table)
Section 4.5 Change Evaluations NFPA 805, RG 1.205 (C.3.2), NEI 04- Yes (2) 02 (5.3, App I)
Section Fire-Induced Multiple RG 1.205 (C.3.3), NEI 04-02 (B.2),
4.8.2.1 Spurious Operations FAQ 07-0038 Yes Attachment F resolution methodology Page E2-1 of 3
Enclosure 2 to SERIAL: HNP-08-113 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR Specific LAR/TR Topic Requirement/Guidance Approval Reference Requested in SER Section 4.82.Operator Manual Actions -
TanitontoReovryRG 4.8.2.2 Transition to Recovery FA 1.205 (C.2.2), NEI 0-0YesA 04-02 (B.2),
0-03 Yes Attachment G Actions FAQ 06-0012, FAQ 07-0030 Section 3.4 FAQ Summary Table. (info 10 CFR 50.71(e), NEI 04-02 (4.6.1) No Attachment H only)
Section 4.1.3 Definition of Power Block NFPA 805, FAQ 06-0019 Yes Attachment I Section 4S2c2i2n Existing Engineering 4.2.2.2.1 Attachment J Equivalency EqiaecEvlton Evaluations RG 1.205 (C.2.3), FAQ 07-0033 Yes Section NEI 04-02 (4.3.2, B.2), RG 1.205 4.2.2.2.2 Licensing Action Transition NC 42(4.2 BAQ RG 1.205Yes Attachment K (C.2.4), FAQ 07-0039 Section NFPA 805 Chapter 3 NEI 04-02 (2.3, 4.3.1), RG 1.205 4.1.2.2 Requirements to be included (C.2.4), FAQ 07-0036 Yes Attachment L in the LAR Section 5.2.1 License Condition Changes 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, Attachment M RG 1.205 (C.3.1), NEI 04-02 (4.6.1) Yes Section 5.2.2 Technical Specification 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, Yes Attachment N Changes RG 1.205 (C.2.2), NEI 04-02 (4.6.1)
Section 5.2.3 Orders and Exemptions 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, RG 1.205 (C.2.2), NEI 04-02 (4.6.1) Yes Performance Based 10 CFR 50.48(c)(2)(vii), RG 1.205 Attachment P Methods (C.2.2, C.3.2.3), NEI 04-02 (2.3, 2.4), Yes FAQ 06-0008 Risk-Informed, Performance 10 CFR 50.48(c)(4), RG 1.205 (C.2.2, Attachment Q Based Alternatives to NFPA C.3.2.3), NEI 04-02 (2.3, 4.6.1) Yes 805 Attachment R FSAR Changes (Governed RG 1.205 (C.2.2), NEI 04-02 (4.6.1) Yes (3) by 10 CFR 50.71 (e))
Section Atthn4.8.3S Plant Modifications RG 1.205 (C.2.2), NEI 04-02 (4.6.1) No Attachment S Attachment T Clarification of Prior NRC NEI 04-02 (2.3, B.2), RG 1.205 (C.2.2) Yes Approval Section 5.3.1 No Significant Hazards 10 CFR 50.91, NEI 04-02 (4.6.1, H) Yes Attachment U Consideration Section Aecttcmnt5.3.2 5 Environmental Consideration 10 CFR 51.22(b), NEI 04-02 (H)
Attachment V Yes Section 4.5.1 Fire PRA Peer Review High RG 1.205 (C.4.3) Yes Level Findings RG I.205 IC.4.3)_Yes Page E2-2 of 3
Enclosure 2 to SERIAL: HNP-08-113 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASEDSTANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR Specific LAR/TR Topic Requirement/Guidance Approval Reference TnRequested in SER Section 5.4 Transition Schedule RG 1.205 (C.2.2), NEI 04-02 (4.6.1) Yes Attachment W Internal Events PRA Quality RG 1.174, RG 1.205 No Attachment X PRA Quality RG 1.174, RG 1.205, RG 1.200 No NFPA 805, Section 2.4.4.1; RG Attachment Y nFPA 1.205,RG 1.174, NEI 04-02, Section No Insights 5.3 Attachment Z Fire PRA Quality Post- RG 1.200 No Transition Process Note 1: Request NRC acceptance of the NSCA results based on the Methodology described in Attachment 2. Acceptance does not preclude self approval of future Fire Protection changes per the FP license condition that is provided in this LAR.
Note 2: Request NRC acceptance of the Change Evaluation results. Acceptance does not preclude self approval of future Fire Protection changes per the FP license condition that is provided in this LAR.
Note 3: Request NRC to approve in concept the level of detail proposed for the FSAR.
Page E2-3 of 3