Request for Information (MOD/50.59) Baseline Inspection
ML080660098
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/05/2008
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML080660098 (7)


Text

March 5, 2008 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION REQUEST FOR INFORMATION FOR (MOD/50.59) BASELINE INSPECTION

Dear Mr. Bezilla:

On June 23, 2008, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) baseline inspection at the Davis-Besse Nuclear Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedure IP 71111.17. The on-site portion of the inspection will take place on June 23 through June 27, 2008 and July 7 through July 11, 2008.

Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.

The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available for review by the Regional Office no later than April 18, 2008. The second group of documents requested by the inspection team, are specific items for review by the Regional Office no later than June 6, 2008. The third group of requested documents contains additional items that the team will review, or need access to, during the inspection, and should be available by the first day of the on-site inspection, June 23, 2008. The fourth group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. Melvin Holmberg. We understand that our regulatory contact for this inspection is Jerry Wolf (419) 321-8001 of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9748 or via e-mail at msh@nrc.gov.

M. Bezilla In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-346 License Nos. NPF-3

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, Chief, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners

M. Bezilla In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-346 License Nos. NPF-3

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, Chief, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners DOCUMENT NAME: G:\DRS\Work in Progress\Ltr 02__08 Davis Besse RFI AKD2.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME MHolmberg: ls DHills DATE 03/05/08 03/05/08 OFFICIAL RECORD COPY

Letter to Mr. Mark B. Bezilla from Mr David E. Hills dated March 5, 2008.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION REQUEST FOR INFORMATION AN NRC PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION DISTRIBUTION:

RAG1 TEB TJW2 RidsNrrDirsIrib MAS KGO JKH3 JER7 CAA1 DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Report: 05000346/2008008(DRS)

Inspection Dates: June 23 through July 11, 2008 Inspection Procedures: IP 71111-17, Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Lead Inspector: Melvin Holmberg (630) 829-9748 msh@nrc.gov I. Information Requested for In-Office Preparation Week The following information is requested by April 18, 2008, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff. We will request that certain items be made available to the Regional Office during the week prior to the inspection (by June 6, 2008). We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information for the last Permanent Modification inspection (January 23, 2006) to the present. If you have any questions regarding this information, please call the team leader as soon as possible.

1. List of permanent plant modifications to risk significant systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.

2. List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should only include 50.59 evaluations for the following:
a. UFSAR changes that have been updated in accordance with 10 CFR 50.71(e)(4);
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been issued.

2 Enclosure

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

3. List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document, (i.e., the modification or procedure to which the evaluation applies).

4. List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.
5. List of calculation changes that have been issued for use.
6. List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and 50.59 change implementation.

The list should contain the number, title, and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.

7. Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations, or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.
8. UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.
9. Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.
10. Name(s) and phone numbers for the regulatory and technical contacts.
11. Current management and engineering organizational chart.

3 Enclosure

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST II. Information Requested to be Sent to the Region III Office Prior to Inspection (June 6, 2008)

Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.

III. Information Requested to be Available on First Day of Inspection (June 23, 2008)

1. Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.
  • Original FSAR Volumes;
  • Original SER and Supplements (for Original FSAR);
  • FSAR Question and Answers;
  • Quality Assurance Plan;
  • Technical Specifications;
  • Latest IPE/PRA Report;
  • Vendor Manuals; and
2. Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:
  • Drawings supporting the modifications;
  • Procedures affected by the modifications; and
3. Current management and engineering organizational chart.

IV. Information Requested to be provided throughout the inspection

1. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the team leader.

4 Enclosure