August 20, 2007 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: James A. Fitzpatrick Nuclear Power Plant
SUBJECT:
SUMMARY
OF PUBLIC MEETINGS ON THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT REGARDING THE JAMES A. FITZPATRICK NUCLEAR POWER PLANT LICENSE RENEWAL REVIEW (TAC NO. MD 2667)
On Wednesday, August 01, 2007, members of the U.S. Nuclear Regulatory Commission (NRC) held public meetings in Oswego, New York, at the Town of Scriba Municipal Building, concerning the NRC staffs environmental review of the application submitted by Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations, Inc. (Entergy), for renewal of the James A. FitzPatrick Nuclear Power Plant (JAFNPP) operating license. The purpose of the meeting was to provide the public with an opportunity to comment on the draft supplemental environmental impact statement (DSEIS), which was issued in June 2007. Formal presentations were made by the NRC staff.
The DSEIS is a site-specific supplement for JAFNPP to the ?Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437). The NRC staff described the overall license renewal process and provided a description of the National Environmental Policy Act review process. The NRC staff also described the preliminary results of the analysis.
The environmental impacts of continued operation were preliminarily characterized as small in all areas. The impacts of alternatives (including the no-action alternative) were preliminarily characterized as potentially reaching moderate to large significance in at least some environmental areas.
After the formal presentations were given by the NRC staff, members of the public were invited to provide comments. Approximately 30 people attended the two sessions. Participants included members of the public, representatives of the NRC, Entergy, local media, and the New York State Department of Environmental Conservation.
In an effort to improve communication and increase interaction with members of the public, the NRC staff conducted open houses for one hour before each meeting. The staff provided displays and brochures and met with members of the public to answer questions about the proposed renewal of the JAFNPP operating license.
A combined listing of participants for both public meetings is provided in Enclosure 1. is a copy of the meeting handouts provided during the public meeting open house.
The official corrected transcripts for the afternoon and evening meetings are publicly available at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible at http://adamswebsearch.nrc.gov/dologin.htm. The transcripts for the afternoon and evening meetings are listed under Accession Nos. ML072260051 and ML072260053, respectively.
A copy of the slides used during the NRCs presentation is also available in ADAMS under Accession No. ML072260023. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov.
The closing date to accept comments on the JAFNPP DSEIS is September 05, 2007. The NRC staff will consider all comments on the JAFNPP DSEIS and make any necessary revisions to the document prior to issuing its final supplemental environmental impact statement, scheduled for January 2008.
/RA/
Jessie M. Muir, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosures:
As stated cc w/enclosures: See next page
- 1. Meeting Summary (w /Encls. 1 & 2): ML072270042
- 2. Afternoon Transcript (Corrected): ML072260051
- 3. Evening Transcript (Corrected): ML072260053
- 4. Slides: ML072260023
- 5. Package: ML072270039 OFFICE PM:DLR:REBB LA:DLR BC:DLR:REBB NAME J. Muir (w/comments)
I. King R. Franovich DATE 08/15/07 08/15/07 08/20/07
Memo to Entergy Nuclear Operations, Inc. from J. Muir dated August 20, 2007 DISTRIBUTION:
SUBJECT:
SUMMARY
OF PUBLIC MEETINGS ON THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT REGARDING THE JAMES A. FITZPATRICK NUCLEAR POWER PLANT LICENSE RENEWAL REVIEW (TAC No. MD 2667)
E-Mail RidsNrrDlr B. McDowell (mcdowell5@llnl.gov)
N. Le J. Boska G. Huneg OGC (RidsOGCMailRoom)
L. Subin OPA (RidsOpaMail)
N. Sheehan, Region I C. Tucci, NRR Technical Communications Assistant LIST OF PARTICIPANTS JAMES A. FITZPATRICK NUCLEAR POWER PLANT DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT MEETINGS AUGUST 01, 2007 PARTICIPANTS AFFILIATION Jessie M. Muir U.S. Nuclear Regulatory Commission (NRC)
Rani Franovich NRC Samuel Hernandez NRC Steve Klementowicz NRC Robert Palla NRC Ngoc Le NRC Neil Sheehan NRC Gordon Huneg NRC Bruce McDowell Lawrence Livermore National Laboratory Michael Stevens Local Resident Gary Toth Local Resident, Carpenters Local 747 Tom Gurdziec Local Resident Dick Schilling Local Resident Paul Spicer Carpenter Mike Rodgers Entergy Nuclear Operations, Inc. (Entergy)
Jill Brochu Entergy Rick Plasse Entergy Bonnie Bostain Entergy Gary Young Entergy Charles McChesney The Post-Standard Chris Hogan New York State Department of Environmental Conservation (NYSDEC)
Roy Jacobson, Jr.
NYSDEC AGENDA FOR PUBLIC MEETING TO DISCUSS THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR THE LICENSE RENEWAL OF JAMES A. FITZPATRICK NUCLEAR POWER PLANT WEDNESDAY, AUGUST 01, 2007 Two Sessions - 1:30 p.m. to 4:30 p.m. and 7:00 p.m. to 10:00 p.m.*
I.
Welcome and Purpose of Meeting 5 minutes (Rani Franovich)
II.
Overview of License Renewal Process 10 minutes (Rani Franovich)
III.
Results of the Environmental Review 15 minutes (Jessie Muir)
IV.
How Comments can be Submitted 5 minutes (Jessie Muir)
V.
Public Comments As needed VI.
Closing 5 minutes (Rani Franovich)
- The NRC staff will host informal discussions one hour prior to each meeting session.
No formal comments on the Draft Supplemental Environmental Impact Statement (DSEIS) will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meetings or in writing, as described in the attached Federal Register Notice.
Welcome to the NRCs Open House Associated with the Environmental Review for the proposed License Renewal of James A. FitzPatrick Nuclear Power Plant This open house is intended to provide an opportunity for interested members of the public and staff from other Federal, State, and local agencies to interact with the NRC staff in an informal information exchange.
The NRC is gathering information necessary to prepare a Supplemental Environmental Impact Statement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, regarding the proposed renewal of the operating license for James A.
FitzPatrick Nuclear Power Plant. Please note that if you wish to provide formal comments regarding the draft Supplemental Environmental Impact Statement (DSEIS), they must be presented at todays transcribed public meeting, provided in writing, or provided by e-mail by September 05, 2007. Comments received after this date will be considered if it is practicable to do so, but the NRC staff is able to assure consideration only for comments received on or before this date. Written comments on the DSEIS should be sent to:
Chief, Rules and Directives Branch Division of Administrative Services Office of Administration Mailstop T-6D 59 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Comments may be hand-delivered to the NRC at 11545 Rockville Pike, Rockville, Maryland, between 7:45 a.m. and 4:15 p.m. on Federal workdays. Submittal of electronic comments may be sent by e-mail to the NRC at FitzPatrickEIS@nrc.gov.
Thank you for your participation.
FitzPatrick Nuclear Power Plant cc:
Mr. Michael R. Kansler President & CEO /CNO Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Senior Vice President Engineering & Technical Services Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Peter T. Dietrich Site Vice President Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Kevin J. Mulligan General Manager, Plant Operations Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Joseph P. DeRoy Vice President, Operations Support Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. James Costedio Manager, Licensing Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
FitzPatrick Nuclear Power Plant cc:
Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspectors Office James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Michael Balboni Deputy Secretary for Public Safety State Capitol, Room 229 Albany, NY 12224 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. John P. Spath New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306 Mr. John Doering BWR SRC Consultant P.O. Box 189 Parker Ford, PA 19457 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Mr. Kenneth E. Burdick, Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Mr. Rick Plasse Project Manager, License Renewal Entergy Nuclear Operations, Inc.
James A. Fitzpatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Ms. Julie Keys Nuclear Energy Institute 1776 I Street, NW Suite 400 Washington, DC 20006-3708
FitzPatrick Nuclear Power Plant cc: Mr. Randolph Bateman Mayor of Oswego, New York 13 West Oneida Street Oswego, NY 13126 Mr. Leonard J. Ponzi Oswego County Legislator 28 Mitchell Street Oswego, NY 13126 Ms. Mary Bennett Penfield Library SUNY-Oswego 7060 State Route 104 Oswego, NY 13126 Ms. Carol Ferlito Oswego Public Library 140-142 East Second Street Oswego, NY 13126 Ms. Carolyn Patrickson 390 Dry Bridge Road Mexico, NY 13114 Mr. Steve Boudreau 264 Stafford Avenue Syracuse, NY 13206 Mr. Charles McChesney 18 Canalview Mall Fulton, NY 13069 Alderman Constance M. Cosemento Common Council, City Hall Oswego, NY 13126 Alderman Barbara A. Donahue Common Council, City Hall Oswego, NY 13126 Alderman Edward J. Harrington Common Council, City Hall Oswego, NY 13126 Alderman Daniel G. Donovan Common Council, City Hall Oswego, NY 13126 Alderman Timothy B. Rice Common Council, City Hall Oswego, NY 13126 Alderman Richard L. Atkins Common Council, City Hall Oswego, NY 13126 Mr. Russ Johnson, Legislature Chairman 5 Burleigh Terrace Fulton, NY 13069 Mr. Reuel A. Todd, Sheriff 39 Churchill Road Oswego, NY 13126 Ms. Patricia Egan, Director Emergency Management Office 200 North Second Street Fulton, NY 13069 Mr. Terry E. Grimshaw, Mayor 3236 Main Street P.O. Box 309 Mexico NY 13114 Town Supervisor New Haven P.O. Box 141 New Haven, NY 13121 Ms. Alyse Peterson New York State Energy Research and Development Authority 17 Columbia Circle Albany, NY 12203 Mr. Chris Hogan New York State Department of Environmental Conservation Division of Environmental Permits 625 Broadway, 4th Floor Albany, NY 12233
FitzPatrick Nuclear Power Plant cc: Mr. Andrew Kasius New York Department of State Division of Coastal Resources 41 State Street Albany, NY 12231 Mr. John Filippelli U.S. EPA Region 2 Chief DEPP-Strategic Planning and Multi-Media Programs Branch 290 Broadway - 25th Floor New York, NY 10007-1866