November 22, 2006 Mr. Peter T. Dietrich Site Vice President James A. FitzPatrick Nuclear Power Plant Entergy Nuclear Operation, Inc.

P.O. Box 110 Lycoming, NY 13093-0110

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MD2667)

By letter dated July 31, 2006, Entergy Nuclear Operations, Inc. submitted an application pursuant to 10 CFR Part 54, to renew the operating license for James A. FitzPatrick Nuclear Power Plant for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, an area where additional information is needed to complete the review.

Based on discussions with Mr. Rick Plasse of your staff, a mutually agreeable date for your response is within 30 days from the date of this letter. If you have any questions regarding this letter or if circumstances result in your need to revise the response date, please contact me at 301-415-1458 or by e-mail at nbl@nrc.gov.

Sincerely,

/RA/

N. B. (Tommy) Le, Senior Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosure:

As stated cc w/encl: See next page

ML063200113 OFFICE PM:RLRB:DLR LA:RLRA:DLR BC:RLRB:DLR NAME NBLe I. King RAuluck DATE 11/21/06 11/17/06 11/22/06

Letter to Peter Dietrich from N B Le dated November 22, 2006

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MD2667)

HARD COPY DLR R/F E-MAIL:

JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff G. Hunegs, SRI E. Cobey R. Lanifer J. Boska

REQUEST FOR ADDITIONAL INFORMATION JAMES A. FITZPATRICK LICENSE RENEWAL APPLICATION SCOPING & SCREENING METHODOLOGY RAI 3.0-1 Quality Assurance Program Attributes in Appendix A, Updated Safety Analysis Report Supplement, and Appendix B, Aging Management Programs and Activities The NRC staff reviewed the applicants AMPs described in Appendix A, Updated Safety Analysis Report Supplement, and Appendix B, Aging Management Programs and Activities, of the James A. FitzPatrick Nuclear Power Plant (JAFNPP) license renewal application (LRA). In addition, the NRC staff reviewed each individual AMP basis document to ensure consistency in the use of the quality assurance attributes for each program. The purpose of this review was to assure that the aging management activities were consistent with the staffs guidance described in NUREG-1800, Section A.2, Quality Assurance for Aging Management Programs (Branch Technical Position IQMB-1).

Based on the NRC staffs evaluation, the descriptions and applicability of the plant-specific aging management programs (AMPs) and their associated quality attributes provided in Appendix A, Section A.2.1, and Appendix B, Section B.0.3, of the LRA are generally consistent with the staffs position regarding quality assurance for aging management. However, the NRC staff noted that the AMP basis documents did not consistently describe the application of the JAFNPP 10 CFR Part 50, Appendix B, Quality Assurance Program, for the corrective action, confirmation process, and administrative control attributes in each AMP. The NRC staff, therefore, requests that the applicant provide the following information to address these issues:

a.

A supplement to the description in the Appendix A, Section A.2.1, of the LRA to clearly indicate the application of the JAFNPP 10 CFR Part 50, Appendix B, Quality Assurance Program for the corrective action, conformation process, and administrative control attributes in each program.

b.

A consistent description for each AMP bases document which describes the application of the JAFNPP 10 CFR Part 50, Appendix B, Quality Assurance Program for the corrective action, confirmation process, and administrative control attributes in each AMP.

Enclosure

FitzPatrick Nuclear Power Plant cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Peter T. Dietrich Site Vice President Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Kevin J. Mulligan General Manager, Plant Operations Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Resident Inspector's Office James A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. David Wallace Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. James Costedio Manager, Regulatory Compliance Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271

FitzPatrick Nuclear Power Plant cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Steven Lyman Oswego County Administrator 46 East Bridge Street Oswego, NY 13126 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Mr. Rick Plasse Project Manager, License Renewal Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. James Ross Nuclear Energy Institute 1776 I Street, N.W. Suite 400 Washington, DC 20006-3708