- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance
Results
Other: JAFP-06-0167, Environmental Analysis of Aquatic Conditions, JAFP-07-0019, License Renewal Application, Amendment 9, ML062160557, ML062480235, ML063250406, ML063480585, ML063480596, ML063550121, ML071060390, ML073380132, ML073380155, ML073380404
|
MONTHYEARJAFP-06-0067, Annual Radioactive Effluent Release Report for 20052006-04-26026 April 2006 Annual Radioactive Effluent Release Report for 2005 Project stage: Request JAFP-06-0078, Annual Radiological Environmental Operating Report2006-05-10010 May 2006 Annual Radiological Environmental Operating Report Project stage: Request ML0621605572006-07-31031 July 2006 License Renewal Application, Appendix E Through End Project stage: Other ML0624802352006-09-26026 September 2006 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the James A. Fitzpatrick Nuclear Power Plant Project stage: Other Press Release-I-06-055, NRC to Discuss Process for Review of License Renewal Application for Fitzpatrick Nuclear Plant, Seek Input on Environmental Review2006-10-0303 October 2006 Press Release-I-06-055: NRC to Discuss Process for Review of License Renewal Application for Fitzpatrick Nuclear Plant, Seek Input on Environmental Review Project stage: Request ML0629601542006-10-12012 October 2006 Slides Used During the Environmental Scoping Meeting Related to the License Renewal Review of James a FitzPatrick Nuclear Power Plant 10/12/2006 Project stage: Meeting ML0630301952006-10-12012 October 2006 Transcript of Proceedings, Afternoon Public Scoping Meeting on Environmental Issues Pertaining to the License Renewal for James A. FitzPatrick Nuclear Power Plant Project stage: Meeting ML0630302092006-10-12012 October 2006 Transcript of Proceedings, Evening Public Scoping Meeting on Environmental Issues Pertaining to the License Renewal for James A. FitzPatrick Nuclear Power Plant Project stage: Meeting ML0629801482006-10-30030 October 2006 Summary of Public Environmental Scoping Meetings Related to the Review of the James A. Fitzpatrick Nuclear Power Plant, License Renewal Application Project stage: Meeting ML0628503822006-11-0707 November 2006 Request for Additional Information Regarding the Review of the License Renewal Application for James A. Fitzpatrick Nuclear Power Plant Project stage: RAI ML0632403312006-11-14014 November 2006 Comment (2) of Christopher M. Hogan on the Environmental Report - License Renewal Application for James A. FitzPatrick Nuclear Power Plant Project stage: Request ML0701604152006-11-17017 November 2006 JAFNPP - SEIS Web References - Parks Canada Lake Ontario Project stage: Request ML0632001132006-11-22022 November 2006 Request for Additional Information, James a FitzPatrick Nuclear Power Plant (Scoping and Screening) Project stage: RAI ML0632504062006-11-27027 November 2006 Environmental Site Audit Regarding James A. Fitzpatrick Nuclear Power Plant License Renewal Application Project stage: Other ML0632001262006-11-29029 November 2006 Request for Additional Information Regarding the Review of the License Renewal Application for James A. FitzPatrick Nuclear Power Plant Project stage: RAI ML0630602572006-11-29029 November 2006 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for James A. Fitzpatrick Nuclear Power Plant Project stage: RAI ML0636201672006-12-0606 December 2006 JAFNPP Er Ref 4-4 316(a) Demonstration - Appendices Project stage: Request ML0634805962006-12-0606 December 2006 Attachment 1: James A. FitzPatrick Nuclear Power Plant, License Renewal Application, Amendment 1 & License Renewal Commitments List, Revision 0 Project stage: Other ML0634805852006-12-0606 December 2006 Submittal of the License Renewal Application, Amendment Project stage: Other ML0636201652006-12-0606 December 2006 JAFNPP Er Ref 4-4 316(a) Demonstration Submission Main Report Project stage: Request ML0701604012006-12-0606 December 2006 JAFNPP - SEIS Web Reference - New Yorks Sturgeon Project stage: Request JAFP-06-0167, Environmental Analysis of Aquatic Conditions2006-12-0606 December 2006 Environmental Analysis of Aquatic Conditions Project stage: Other ML0636201752006-12-0606 December 2006 JAFNPP Er Ref 8-6 ORNL 1993 Project stage: Request ML0636201602006-12-0606 December 2006 JAFNPP Er Ref 3-3 Esri Energy Currents 2004 Project stage: Request ML0701203222006-12-20020 December 2006 NYSDEC Caterpillars - JAFNPP SEIS Web Reference Project stage: Request ML0701203762006-12-20020 December 2006 JAFNPP - SEIS Web References - Biology of Rice Creek Field Station Project stage: Request ML0701203242006-12-26026 December 2006 NYSDEC Chronic Wasting Disease - JAFNPP Web Reference Project stage: Request ML0701203182006-12-26026 December 2006 NYSDEC Chronic Wasting Disease Project - JAFNPP SEIS Web Reference Project stage: Request ML0701203842006-12-26026 December 2006 JAFNPP - SEIS Web Reference - Common Reed Project stage: Request ML0701203782006-12-26026 December 2006 JAFNPP - SEIS Web Reference - Japanese Knotwood Project stage: Request ML0701203362006-12-27027 December 2006 Usfws Indiana Bat - JAFNPP SEIS Web Reference Project stage: Request ML0701203112006-12-27027 December 2006 Fair Haven Beach State Park - JAFNPP SEIS Web Reference Project stage: Request ML0701203092006-12-27027 December 2006 Selkirk - JAFNPP SEIS Web Reference Project stage: Request ML0701203022006-12-27027 December 2006 Beaver Lake - JAFNPP SEIS Web Reference Project stage: Request ML0701203512006-12-27027 December 2006 JAFNPP - SEIS Web Reference - Mammals of Rice Creek Field Station Project stage: Request ML0701203372006-12-28028 December 2006 NPDES Vegetated Buffers - JAFNPP SEIS Web Reference Project stage: Request ML0701203502006-12-29029 December 2006 JAFNPP - SEIS Web Reference - Red Fox Project stage: Request ML0701203482006-12-29029 December 2006 JAFNPP - SEIS Web Reference - Striped Skunk Project stage: Request ML0701203392006-12-29029 December 2006 Cdep Upland Sandpiper - JAFNPP SEIS Web Reference Project stage: Request ML0701203412006-12-29029 December 2006 Cdep Least Bittern - JAFNPP SEIS Web Reference Project stage: Request ML0701203432006-12-29029 December 2006 Red Billed Grebe - JAFNPP SEIS Web Reference Project stage: Request ML0701203172006-12-29029 December 2006 NYSDEC Habitats in NYS - JAFNPP SEIS Web Reference Project stage: Request ML0704704712007-01-0101 January 2007 Great Lakes St. Lawrence Seaway - Ballast Water Project stage: Request ML0705100552007-01-0101 January 2007 Nrg Website Project stage: Request ML0704704492007-01-0101 January 2007 Fws Lower Great Lakes Fishery Resource Office Project stage: Request ML0635501212007-01-0808 January 2007 Environmental Project Manager and Schedule Change for the Licnese Renewal Environmental Review for James A. FitzPatrick Nuclear Power Plant Project stage: Other ML0701203302007-01-11011 January 2007 Wetland Digital Data - JAFNPP SEIS Web Reference Project stage: Request ML0701605692007-01-16016 January 2007 JAFNPP - SEIS Web Reference - Mills 2003: Status of the Lake Ontario Food Web in a Changing Ecosystem Project stage: Request ML0701603952007-01-16016 January 2007 JAFNPP - SEIS Web Reference - Great Lakes St. Lawrence Seaway System - Port of Oswego Project stage: Request ML0701603992007-01-16016 January 2007 JAFNPP - SEIS Web Reference - Natural Waterfront Natural Resources Project stage: Request 2006-12-27
[Table View] |
Text
Event Text Power Reactor Event Number: 43635 Facility: FITZPATRICK Region: 1 State: NY Unit: [1] [ ] [ ]
RX Type: [1] GE-4 NRC Notified By: GENE DORMAN HQ OPS Officer: PETE SNYDER Notification Date: 09/12/2007 Notification Time: 09:58 [ET]
Event Date: 09/12/2007 Event Time: 06:35 [EDT]
Last Update Date: 09/12/2007 Emergency Class: NON EMERGENCY 10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION Person (Organization):
JAMES TRAPP (R1)
Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX 1
M/R Y
100 Power Operation 0
Hot Shutd REACTOR SCRAM FOLLOWING INTAKE STRUCTURE TRAVELING SCREEN FOULING "As a result of high winds and a severe storm front moving through the area a Nuclear Plant Operator (NPO) intake canal water murky, wind speed was noted to be 40 MPH. The Traveling Screens were placed in the con mode of operation and increased monitoring was put in effect. At 0520 the NPO noted that 'a lot of weeds an coming in through the intake' and that a full trash basket had been changed out. At approximately 0630 the reported that the traveling screens were not moving and intake level was lowering due to the influx of debris Nuclear Operator (SNO) entered the appropriate Abnormal Operating Procedure (AOP) for lowering intake lev commenced rapid power reduction. At 0635 with intake level at 240 feet the SNO inserted a manual scram a the appropriate AOP and Emergency Operating Procedure (EOP).
"Reactor Vessel level decreased to less than 177 inches above the top of active fuel resulting in a Primary Co Isolation System (PCIS) Group 2 isolation signal. The PCIS Group 2 isolation resulted in a valid signal to close valves in the Drywell Floor Drain System, the Drywell Equipment Drain System, the Residual Heat Removal (
System, the Traversing In-Core Probe (TIP) System, the Containment Atmosphere Dilution (CAD) System, an Reactor Water Clean-Up (RWCU) System. However, as a result of the power reduction the operators were ab maintain reactor vessel level above the actuation setpoint for the High Pressure Coolant Injection (HPCI) Sys the Reactor Core Isolation Cooling (RCIC) Systems and these systems were not required to operate.
"At 0640 the Scram was reset, at 0710 the Group 2 PCIS Isolation was verified, and at 0729 the Group 2 PCI was reset.
"The cause of the traveling screens stopping has been determined to be due to shear pins on the traveling w shearing due to excessive debris loading.
"All equipment responded as expected during the downpower and subsequent manual Scram. All rods are in plant is stable in MODE 3, Hot Shutdown." Decay heat is being removed by dumping steam to the condenser turbine bypass valves. The safety buses are being powered by offsite power. The 'B' train Residual Heat Rem was out of service at the time of the event for planned maintenance.
The licensee notified the NRC Resident Inspector.
- UPDATE FROM G. DORMAN TO J. KNOKE AT 1205 EDT ON 09/12/07 * * *
"At 1034 with the plant shutdown and a cooldown in progress reactor vessel (RV) level lowered to less than 1 above TAF [Top of Active Fuel]. This resulted in a valid Reactor Protection System (RPS) Scram signal and a 2 Isolation Signal. AP systems responded as expected. Reactor vessel level remained above the actuation set HPCI and RCIC and they were not required to operate. RV level was restored and the Scram was reset.
"At the time of the initial event and at this update the plant is in LCO action statement 3.5.1.A for the 'B' RHR being out of service. The system is being restored at this time.
The licensee notified the NRC Resident Inspector. The licensee also notified the state and is providing a press the media. Notified R1DO (Trapp).
Page 4 of 5 NRC: Event Notification Report for September 13, 2007 10/25/2007 http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2007/20070913en.html