MN No.18-012 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 14, 2018 Licensee: PSEG Nuclear LLC (PSEG)
Facilities: Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem)
Hope Creek Generating Station (Hope Creek)
Docket Nos: 50-272, 50-311, 50-354 Date/ Time: May 30, 2018 4:30 p.m. to 6:00 p.m.
Location: Webinar (advance registration required)
Purpose:
The U.S. Nuclear Regulatory Commission (NRC) will host a webinar to present the NRCs assessment of safety performance at Salem and Hope Creek for 2017, as described in the annual assessment letters dated February 28, 2018. Following the presentation, the NRC will respond to questions specific to the safety performance of Salem and Hope Creek and the NRCs role in ensuring safe plant operations.
NRC Attendees: F. Bower, Chief, Division of Reactor Projects (DRP), Branch 3 J. Hawkins, Senior Resident Inspector, Hope Creek S. Haney, Resident Inspector, Hope Creek P. Finney, Senior Resident Inspector, Salem A. Ziedonis, Resident Inspector, Salem J. Kim, Project Manager, Plant Licensing Branch I M. Draxton, Project Engineer, DRP, Branch 3 Public Participation: This is a Category 3 Meeting. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance for the Salem and Hope Creek sites during 2017. Then, following the presentation, members of the public will have the opportunity to ask questions specific to the safety performance of Salem and Hope Creek and the NRCs role in ensuring safe plant operations. Those wishing to submit questions can do so in writing or verbally during the webinar. The NRC staff will provide guidance during the webinar on the methods available to ask a question.
Alternatively, questions may be submitted in advance to Fred.Bower@nrc.gov.
Interested members of the public should register at the internet address below. After registering, a confirmation email will be sent with details for joining the webinar. This is a virtual public meeting where participants will be able to see the presentation on a computer screen and hear the presenters through a computers speaker system. If a computer or speaker system is not available to you, there is an option to join via a phone call-in number. Attendees must still register to obtain the phone call-in number.
MN 18-012 2 In order to participate, please register for the webinar no later than one business day prior to the May 30, 2018, meeting at:
https://attendee.gotowebinar.com/register/4799468700958243842 System Requirements for Attendees for the webinar:
https://support.logmeininc.com/gotowebinar/help/system-requirements-for-attendees-g2w010003 If you have any questions or should need assistance concerning registration for the meeting, please call or email the meeting contact.
Meeting
Contact:
Mark S. Draxton, Projects Branch 3 (610) 337-5375 E-mail: Mark.Draxton@nrc.gov The NRCs annual assessment letter regarding Salem Nuclear Generating Station, Unit Nos. 1 and 2s performance during 2017 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18058A115. The NRCs annual assessment letter regarding Hope Creek Generating Stations performance during 2017 can be found in ADAMS with Accession Number ML18058A106. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRCs annual assessment process and the safety performance of Salem and Hope Creek can be found on the NRCs website at:
https://www.nrc.gov/reactors/operating/oversight.html.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this webinar, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the webinar shall make their requests known to the NRC meeting contact no later than two business days prior to the May 30, 2018, meeting.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.
/RA/
Approved by: ____________________
Fred L. Bower, III, Chief Projects Branch 3 Division of Reactor Projects cc: Distribution via ListServ
ML18134A198 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME PFinney per email JHawkins per email MDraxton FBower DATE 5/11/18 5/14/18 5/14/18 5/14/18 MN No.18-012 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 14, 2018 Licensee: PSEG Nuclear LLC (PSEG)
Facilities: Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem)
Hope Creek Generating Station (Hope Creek)
Docket Nos: 50-272, 50-311, 50-354 Date/ Time: May 30, 2018 4:30 p.m. to 6:00 p.m.
Location: Webinar (advance registration required)
Purpose:
The U.S. Nuclear Regulatory Commission (NRC) will host a webinar to present the NRCs assessment of safety performance at Salem and Hope Creek for 2017, as described in the annual assessment letters dated February 28, 2018. Following the presentation, the NRC will respond to questions specific to the safety performance of Salem and Hope Creek and the NRCs role in ensuring safe plant operations.
NRC Attendees: F. Bower, Chief, Division of Reactor Projects (DRP), Branch 3 J. Hawkins, Senior Resident Inspector, Hope Creek S. Haney, Resident Inspector, Hope Creek P. Finney, Senior Resident Inspector, Salem A. Ziedonis, Resident Inspector, Salem J. Kim, Project Manager, Plant Licensing Branch I M. Draxton, Project Engineer, DRP, Branch 3 Public Participation: This is a Category 3 Meeting. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance for the Salem and Hope Creek sites during 2017. Then, following the presentation, members of the public will have the opportunity to ask questions specific to the safety performance of Salem and Hope Creek and the NRCs role in ensuring safe plant operations. Those wishing to submit questions can do so in writing or verbally during the webinar. The NRC staff will provide guidance during the webinar on the methods available to ask a question.
Alternatively, questions may be submitted in advance to Fred.Bower@nrc.gov.
Interested members of the public should register at the internet address below. After registering, a confirmation email will be sent with details for joining the webinar. This is a virtual public meeting where participants will be able to see the presentation on a computer screen and hear the presenters through a computers speaker system. If a computer or speaker system is not available to you, there is an option to join via a phone call-in number. Attendees must still register to obtain the phone call-in number.
MN 18-012 2 In order to participate, please register for the webinar no later than one business day prior to the May 30, 2018, meeting at:
https://attendee.gotowebinar.com/register/4799468700958243842 System Requirements for Attendees for the webinar:
https://support.logmeininc.com/gotowebinar/help/system-requirements-for-attendees-g2w010003 If you have any questions or should need assistance concerning registration for the meeting, please call or email the meeting contact.
Meeting
Contact:
Mark S. Draxton, Projects Branch 3 (610) 337-5375 E-mail: Mark.Draxton@nrc.gov The NRCs annual assessment letter regarding Salem Nuclear Generating Station, Unit Nos. 1 and 2s performance during 2017 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18058A115. The NRCs annual assessment letter regarding Hope Creek Generating Stations performance during 2017 can be found in ADAMS with Accession Number ML18058A106. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRCs annual assessment process and the safety performance of Salem and Hope Creek can be found on the NRCs website at:
https://www.nrc.gov/reactors/operating/oversight.html.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this webinar, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the webinar shall make their requests known to the NRC meeting contact no later than two business days prior to the May 30, 2018, meeting.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.
/RA/
Approved by: ____________________
Fred L. Bower, III, Chief Projects Branch 3 Division of Reactor Projects cc: Distribution via ListServ
ML18134A198 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME PFinney per email JHawkins per email MDraxton FBower DATE 5/11/18 5/14/18 5/14/18 5/14/18