ML090080073

From kanterella
Jump to navigation Jump to search
Notice of Meeting with PSEG to Discuss Issues Associated with the Yellow Performance Indicator (PI) for the Salem Unit 1 Emergency AC Power System That Occurred in the Fourth Quarter of 2007
ML090080073
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/08/2009
From: Arthur Burritt
Reactor Projects Branch 3
To:
BURRITT AL
References
MN 09-001
Download: ML090080073 (3)


Text

MN No.09-001 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING January 8, 2009 Licensee: PSEG Nuclear LLC (PSEG)

Facilities: Salem Nuclear Generating Station, Unit No. 1 (Salem Unit 1)

Docket Nos: 50-272 Date/Time: January 21, 2009, at 2:00 p.m.

Location: Salem 911/Emergency Services Center 125 Cemetery Road Woodstown, New Jersey 08098 (856) 769-2900

Purpose:

Regulatory Performance Meeting with PSEG management to discuss issues associated with the Yellow performance indicator (PI) for the Salem Unit 1 Emergency AC Power system that occurred in the fourth quarter of 2007.

NRC Attendees: D. Lew, Director, Division of Reactor Projects A. Burritt, Chief, Projects Branch 3, Division of Reactor Projects D. Schroeder, Senior Resident Inspector, Salem B. Welling, Senior Resident Inspector, Hope Creek S. Barber, Senior Project Engineer PSEG Attendees: R. Braun, Site Vice President, Salem Nuclear Generating Station G. Gellrich, Plant Manager, Salem Nuclear Generating Station C. Neely, Director, Regulatory Affairs G. Sosson, Director, Engineering Services Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting. After the business portions, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding PSEGs performance in this area. The NRC will also be available to answer other questions including those related to the results of the special inspection that reviewed PSEGs performance during its response to a pressurizer draindown event that occurred on October 15, 2008, at Salem Unit 1.

Meeting

Contact:

Arthur Burritt, Chief, Projects Branch 3 610-337-5069 E-mail: arthur.burritt@nrc.gov

2 This meeting notice and the attached meeting agenda can also be located in ADAMS with accession number ML090080073. ADAMS is accessible at: http://www.nrc.gov/reading-rm/adams.html. The NRC assessment of PSEG performance related to the Yellow PI was documented in a supplemental inspection report that was issued on December 11, 2008. PSEG will be given the opportunity to respond to the information in this report and to inform the NRC of new or existing programs to improve performance in this area. The Yellow PI supplemental inspection report can be located in ADAMS with accession number ML083460017.

Additional information relative to the NRCs assessment process and safety performance at Salem: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs policy statement, Enhancing Public Participation in NRC Meetings, applies to this meeting. The policy statement can be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by January 16, 2009, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if` there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: ____/RA/________________

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects cc w/encl:

W. Levis, President and Chief Operating Officer, PSEG Power T. Joyce, President and Chief Nuclear Officer, Salem Nuclear R. Braun, Site Vice President P. Davison, Director of Nuclear Oversight E. Johnson, Director of Finance G. Gellrich, Salem Plant Manager J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP L. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, NJ Radiation Protection Programs P. Mulligan, Chief, NJ Bureau of Nuclear Engineering, DEP H. Otto, Ph.D., Administrator, DE Interagency Programs, DNREC Div of Water Resources Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance

3 Agenda NRCs Regulatory Performance Meeting Salem Unit 1 January 21, 2009 Introductions and Opening Remarks Discuss inspection results for Salem Unit 1 Yellow PI PSEGs Response and Remarks Closing Remarks Short Break NRC to address public questions

4 Distribution w/encl: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

RIDSNRRADRO RIDSNRRDIRS RIDSNRRDIRSLPAB RIDSNRRDORL RIDSNRRDORlLpl1-1 RIDSNRRDORlLpl1-2 S. Collins, RA A. Patel, RI, Hope Creek M. Dapas, DRA D. Lew, DRP S. Williams, RI OEDO J. Clifford, DRP R. Nelson, NRR M. Gamberoni, DRS H. Chernoff, NRR D. Roberts, DRS R. Ennis, PM, NRR A. Burritt, DRP J. Shea, NRR, Backup L. Cline, DRP N. Valentine, NRR J. Bream, DRP D. Screnci, PAO D. Schroeder, DRP, SRI, Salem N. Sheehan, PAO B. Welling, DRP, SRI, Hope Creek N. McNamara, SLO H. Balian, DRP, RI, Salem K. Venuto, OA Regional Administrator Secretary, RI Region I Receptionist Deputy Regional Administrator Secretary, RI PMNS DRP Division Secretary, RI Region I Docket Room (with concurrences)

DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI ML090080073 SUNSI Review Complete: _ALB____ (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH3\COMMUNICATIONS\EXTERNAL\PUBLIC MEETINGS\2009-01-XX SALEM YELLOW MSPI PI REGULATORY PERFORMANCE MEETING\2009_01_12 SALEM HOPE CREEK MEETING NOTICE.DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME LCline/LC ABurritt/ ALB DATE 1/ 7 /09 1 / 7 /09 OFFICIAL RECORD COPY