ML19084A110

From kanterella
Jump to navigation Jump to search
April 10, 2019 Public Meeting Notice for Salem Nuclear Generating Station, Units 1 and 2; Hope Creek Generating Station
ML19084A110
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/25/2019
From: Brice Bickett
Reactor Projects Branch 3
To:
Bickett B
References
MN 19-002
Download: ML19084A110 (3)


Text

MN No.19-002 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 25, 2019 Licensee: PSEG Nuclear LLC (PSEG)

Facilities: Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem)

Hope Creek Generating Station (Hope Creek)

Docket Nos: 50-272, 50-311, 50-354 Date/ Time: April 10, 2019 4:30 p.m.

Location: Webinar (advance registration required)

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will host a webinar to present the agencys assessment of safety performance at Salem and Hope Creek for 2018, as described in the annual assessment letters dated March 4, 2019.

NRC Attendees: B. Bickett, Chief, Division of Reactor Projects (DRP), Branch 3 J. Hawkins, Senior Resident Inspector, Salem A. Ziedonis, Senior Resident Inspector, Hope Creek S. Haney, Resident Inspector, Hope Creek P. Finney, Senior Project Engineer, DRP, Branch 3 J. Kim, Project Manager, Plant Licensing Branch I Public Participation: This is a Category 3 Meeting. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance at the Salem and Hope Creek sites during 2018. Following the presentation, members of the public will have the opportunity to ask questions specific to the safety performance of Salem and Hope Creek, and the NRCs role in ensuring safe plant operations. Those wishing to submit questions can do so in writing or verbally during the webinar. The NRC staff will provide instructions during the webinar on the methods available to ask a question. Alternatively, questions may be submitted in advance to brice.bickett@nrc.gov.

Interested members of the public should register for this virtual public meeting at: attendee.gotowebinar.com/register/1086277202642708738.

After registering, a confirmation email will be sent with details for joining the webinar. Participants will be able to see and hear the webinar via computer or mobile device. Those without access to a computer or mobile device can join the webinar via a telephone call in number.

Registration is required to obtain the call-in number, also.

MN 19-002 2 System Requirements for Attendees for the webinar:

https://support.logmeininc.com/gotowebinar/help/system-requirements-for-attendees-g2w010003 Meeting

Contact:

B. Bickett, Chief, Division of Reactor Projects, Branch 3 (610) 337-5312 E-mail: Brice.Bickett@nrc.gov The NRCs 2018 annual assessment letter for Salem can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession Number ML19064B390.

The NRCs annual assessment letter for Hope Creek is available in ADAMS at ML19064B374.

ADAMS can be accessed from the NRC website (www.nrc.gov).

Additional information on the NRCs annual assessment process and the safety performance of Salem and Hope Creek is posted at: www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If reasonable accommodation is needed to participate in this webinar, or if a meeting notice or other information is needed in another format (e.g., Braille, large print), please notify the NRCs meeting contact no later than two business days prior to the April 10, 2019, meeting.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

/RA/

Approved by: ____________________

Brice Bickett, Chief Projects Branch 3 Division of Reactor Projects cc: Distribution via ListServ

ML19084A110 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME AZiedonis per email PFinney per email MHenrion BBickett DATE 3/22/19 3/22/19 3/22/19 3/25/19