25-May-2006 Page: 1 Job Performance Measure Exam -* -

..d' JPM NO JR001.013 Realign a misaligned RCC Revision #: 0 Review Date: 4/28/2006 Location: Simulator Estimated Time (minutes): 15.00 Candidate:

Evaluator:

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I I 25-May-2006 Job Performance Measure Exam Page:

-- -2. I

'..d' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLEDCOPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

During a Plant Load reduction it was determined that Rod C-7 was not moving and was misaligned by > 12 steps with respect to it's bank. The operators entered AP-RCC.2 RCCRF'I Malfunction and were directed to ER-RCC.2 restoring a Misaligned RCC. The Initial Actions of ER-RCC.2 are complete up to step 4.1.6. The cause of the misalignment was a blown fuse which is repaired.

Initiating Cues :

Realign Rod C-7 per ER-RCC.2 section 4.2. An Instructor will act as CO to adjust Turbine load to control Tave as directed by the procedure and will respond to any condition not related to the rod realignment. An I&C Tech is avalible in the relay room to perform any action required there.

1

I I

25-May-2006 Page:

Job Performance Measure Exam -- - -

Description:

Restore a Misaligned RCCA JPM Tasks Task ID: 001-019-04-01A Task Standards :

In accordance with the procedure Tools :

Terminating: Cues Task Completion Trainee States Task is Completed References :

=

- ID Descristion Review Date Ref Flag PRER ER-RCC.2 RESTORING A MISALIGNED RCC Safely Considerations Consequences of Inadequate Performance:

Core design limit challenge Thermal design limit challenge General Comments :

Simulator Setup: Start at any at power IC (100%). Reduce load to <75% at 2%/min. At 80% power insert MALF ROD3 for Rod C-7. Decrease load until <75% and >12 steps misaligned on Rod C-7.

Place Rods in Manual and adjust turbine load to maintain Tave at Tref. Clear MALF ROD3.

25-May-2006 Page: 4 Job Performance Measure Exam --

-4 Performance Checklist 1 Element : Conditions : Standards :

Review ER-RCC.2 Same as element Comments :

Satisfactory n Unsatisfactory 0 2 Element : Conditions : Standards :

Align Step counter , Locate CBD Group 1&2 step counters. Verify they are equal. If Not then step Rods out 1/2 step.

Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Record Step Count Records CBD step count for later reference.

Comments :

Satisfactory Unsatisfactory

  • 4 Element : CRITICAL Conditions : Standards :

Place Rod Selector Switch to the Locate Selector Switch and affected Bank place to the CBD position Comments :

Satisfactory Unsatisfactory 0 5 Element : Conditions : Standards :

Notify I&C to switch P/A Same as element converter to the Bank D poition and record reading Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Disconnect a lift coils for the Locate Lift Coil Disconnects.

affected bank except for the Disconnect all Bank D Rods inisaligned rod except for C-7

I 25-May-2006 Job Performance Measure Exam Page:

- '.I

'4 Comments :

Satisfactory Unsatisfactory 0

  • 7 Element : CRITICAL Conditions : Standards :

Insert affected RCC to one MRPI Note: Rod Control Urgent Failure Locate the In/Out/Hold tranistion below the Bank position will Come in , This is an expected switch. Insert C-7 till MRPI alarm for C-7 tranistion to one below the rest of bank D.

Stop as soon as the tranistion is made.

Comments :

Satisfactory Unsatisfactory

  • 8 Element : CRITICAL Conditions : Standards :

Reconnect all Bank Lift Coils Reconnects all Lift Coils for D Bank Comments :

-u Satisfactory 0 Unsatisfactory

  • 9 Element : CRITICAL Conditions : Standards :

Disconnect Lift Coil for the Disconnect the Lift Coil for affected Rod c-7 Comments :

Satisfactory 0 Unsatisfactory 0 10 Element : Conditions : Standards :

Reset the Urgent Failure Alarm Locate and dpress the alarm reset pushbutton Comments :

Satisfactory Unsatisfactory c]

~ ~~ _ _ ~ ~

  • 11 Element : CRITICAL Conditions : Standards :

Insert the affected Bank to the Locate the In/Out/Hold same MRPI tranistion as the switch. Insert bank till MRPI 4 affected Rod. tranistion to the same value as Rod C-7. Stop as soon as the tranistion is made.

25-May-2 006 Job Performance Measure Exom Page:

-- . -41

. Comments :

Satisfactory 0 Unsatisfactory c]

  • 12 Element: CRITICAL Conditions : Standards :

Reconnect the affected Rod Lift Reconnect the Lift Coil for Coil c-7 Comments :

Satisfactory 0 Unsatisfactory

  • 13 Element : CRITICAL Conditions : Standards :

Reset Step Counter for the Locates counter and reset rod affected group to match the position unaffected group position Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Withdraw Bank to position Locate the In/Out/Hold recorded in step 4.2.2 switch. Withdraw Bank D to the poition previously recorded. Add Boron as necessary for temperature control Comments :

Satisfactory Unsatisfactory

~______

15 Element: Conditions : Standards :

Notifiy I&C to reset P/A CUE: No further actions Same as element converter.

Comments :

Satisfactory Unsatisfactory 0

25-May-2006 Page:

Job Performance Measure Exam ~ -71

'bkM Questions Question Answer References Reference Type Reference ID Description Ref Flag

I I 25-May-2 006 Job Performance Measure Exam Page:

-- I JPM NO JR004.0 12 Burp the VCT to Remove H2 Prior to a Shutdown (Option 1 normal, Option 2 N2 Regulator Set Incorrectly)

Revision #: 0 Review Date: 5/16/2006 Location: Simulator Estimated Time (minutes): 20.00 Candidate:

Evaluator:

-u-Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed -By Date

I I

I 25-May-2006 Page:

Job Performance Measure Exam -- . -2.

NOTE THE EVALUATORWILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is preparing for a shutdown to replace a Hot leg RTD.

Initiating Cues :

You have been directed to Burp the VCT to remove H2 per S-3.3C "H2 or 0 2 removal from the primary system by burping the VCT with N2". Local lineups per Section 5.1 are complete. It is not desired to use the 60 gpm orifice. A NLO is standing by to perform local actions. Current RCS CB is PPm.

u*'

25-May-2006 rformarace Measure Exam Page:

-- -3. I

I

Description:

Nitrogen Purge The Volume Control Tank ( E M JR004.012)

JPM Tasks Task ID: 004-008-01-01 Task Standards :

ALIGN N2 to VCT, complete one burp.

Tools :

Terminatine Cues Task Completion References :

ID

- Descrintion Review Date Ref Flag

-..-/

PRO 0-2.2 PLANT SHUTDOWN FROM HOT 0 SHUTDOWN TO COLD CONDITIONS PRS s-3.3c H2 OR 0 2 REMOVAL FROM PRIMARY 0 SYSTEM BY BURPING VOLUME CONTROL TANK WITH N2 Safety Considerations Consequences of Inadequate Performance:

General Comments :

Setup simulator at any at power I-C.

Record RCS Boron Concentration in the initiating cue Option 2 Set N2 Regulator to 14.7 psi LOA CVC60 When called to secure H2 to VCT set LOA CVC 59 to 14.7 When called to check N2 to VCT set LOA CVC 60 to 35psi.

I I I

I 25-May-2006 Job Performance Measure Exam Page:

-- . -4 1 I

.d Performance Checklist 1 Element : Conditions : Standards :

Review S-3.3C. Reviews cautions and completed steps.

Comments :

Satisfactory Unsatisfactory 2 Element : Conditions : Standards :

Notify NLO to isolate H2 and N2 Calls A 0 and instructs 261 to VCT. and 262 to be closed.

Comments :

Satisfactory Unsatisfactory 3 Element : Conditions : Standards :

Record VCT press. Locate meterhecord pressure.

-- Comments:

Satisfactory 0 Unsatisfactory [rl

  • 4 Element: CRITICAL Conditions : Standards :

Place 112A to VCT position. Locate switch. Place to 112c.

Comments :

Satisfactory Unsatisfactory 0

  • 5 Element: CRITICAL Conditions : Standards :

As VCT pressure increases to - Locates AOV-258 switch 15-20 psi higher then the recorded opedcloses 258 to maintain value from step 5.3.3, open pressure.

AOV-258. Close 258 when press

- 5 psi higher than recorded value.

Comments :

Satisfactory Unsatisfactory

~~

  • 6 Element: CRITICAL Conditions : Standards :

Determine required Boric Acid Obtain blend rate from PPCS.

blend rate.

I 1 25-May-2006 Job Performance Measure Exam Page:

-- -5 I

'\-J Comments :

Satisfactory Unsatisfactory c]

  • 7 Element: CRITICAL Conditions : Standards :

Open AOV-1 1OC RMW to VCT. Locate switch. Place to open.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 8 Element : CRITICAL Conditions : Standards :

Place RMW Mode to Borate. Locate switch. Place to borate.

Comments :

Satisfactory 0 Unsatisfactory 0 n Element : Conditions : Standards :

Set Boric Acid integrate to Set to value so that BA does Q'

sufficient value. not stop prior to 85% in VCT.

Comments :

Satisfactory Unsatisfactory c]

  • 10 Element: CRITICAL Conditions : Standards :

Adjust HCV-11 OA and HCV- 111 Locate control and adjust as to value in step 5.3.5.3.1 necessary to match values.

Comments :

Satisfactory Unsatisfactory 0 "11 Element: CRITICAL Conditions : Standards :

Open HCV-Ill. Locate valve. Place to open.

Comments :

Satisfactory 0 Unsatisfactory 0

--.J Element: CRITICAL Conditions : Standards :

Start a RMW pump. Locate switch. Start pump.

I 25-May-2006 Page: 6 Job Performance Measure Exam _- - -

~.4 Comments :

Satisfactory Unsatisfactory 0

  • 13 Element : CRITICAL Conditions : Standards :

Place RMW control to start. (NOTE: As level increases, the Locate switch. Place to start.

operator vents the VCT per step 5 Verify BA pump starts.

of the JPM.)

Comments :

Satisfactory 0 Unsatisfactory 0

  • 14 Element : CRITICAL Conditions : Standards :

When level greater than or equal Locates controls. Place to 85% stop boration and RMW. RMW control to stop. Stop RMW pump.

Comments :

Satisfactory Unsatisfactory 0 15 Element : Conditions : Standards :

Place RMW control to stop, stop Locate switches. Place in RMW pump. stop.

Comments :

Satisfactory 0 Unsatisfactory 0

~

16 Element : Conditions : Standards :

Place AOV-11 OC to Auto. Locate switch. Place in auto.

Comments :

Satisfactory Unsatisfactory 17 Element : Conditions : Standards :

Place HCV-111 to Auto. Locate switch. Place in auto.

Comments :

L..l Satisfactory 0 Unsatisfactory 0 18 Element : Conditions : Standards :

Lineup RMW for Auto Operation RMW mode to Auto RMW control to start

1 25-May-2006 Page:

I Job Performance Measure Exam I . -7 1 I

'ij Comments :

Satisfactory Unsatisfactory 0 19 Element: Conditions : Standards :

Veri@ VCT vent closed AOV-258 CUE: Pressure Burping is not Locate switch. Veri@

desired. position or close.

Comments :

Satisfactory 0 Unsatisfactory 0 20 Element: Conditions : Standards :

N/A Section 5.3.7 Comments :

Satisfactory Unsatisfactory c]

  • '1 Element: CRITICAL Conditions : Standards :

Dispatch NLO to open N2 Calls NLO.

Regulator outlet 262.

Comments :

Satisfactory Unsatisfactory c]

  • 22 Element: CRITICAL Conditions : Standards :

Place LCV-112A in HUT NOTE: Option 1 go to step 26. Locate control. Place switch position. in HUT position.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 23 Element: CRITICAL Conditions : Standards :

Option 2 Monitors pressure when < 15 When pressure drops below 15 psi places 112A in VCT psi, stop diverting water. position.

Comments :

Satisfactory n Unsatisfactory

25-May-2006 Page: 8 Job Performance Measure Exam - - -

h/ Element : Conditions : Standards :

Notify NLO to check N2 regulator Call NLO to check N2 lineup. regulator. NL.0 adjusts N2 regulator.

Comments :

Satisfactory Unsatisfactory 0 25 Element: Conditions : Standards :

When pressure returns to normal, Place 112A to HUT.

continue Burp.

Comments :

Satisfactory 0 Unsatisfactory 0 26 Element: Conditions : Standards :

Monitor VCT PressLevel. CUE: No further actions.

Comments :

d-Satisfactory o Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

25-May-2 006 Job Performance Measure Exurn Page:

-- . -:I JPM NO JR006.002 Nitrogen Makeup to Accumulator Revision #: 7 Review Date: 5/16/2006 Location: Simulator Estimated Time (minutes): 30.00 Candidate:

Evaluator:

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I 1 25-May-2006 Job Performance Measure Exam Page:

-- 2 I NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLEDCOPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is operating at 100 % power. The "A"Accumulator pressure is 705 psig. It has slowly decreased over several days.

Initiating Cues :

The Shift Manager directs you to increase the pressure in the "A" Accumulator to 745 psig (f or

- 10 psig) per S-16.2 using nitrogen cluster "A".

I I 25-May-2006 Job Performance Measure Exam Page:

3. I I

Description:

Nitrogen Makeup to Accumulator (JR006.002)

JPM Tasks Task ID: 006-007-01-01B Task Standards :

In accordance with the procedure Without violating Tech Specs Correctly demonstrating proper use of all applicable HU Tools Tools :

Procedure Terminatinp; Cues Task Completion References :

'I---/

ID Descrbtion Review Date Ref Flag PRS S-16.2 NITROGEN MAKE-UP TO THE SI ACCUMULATORS Safetv Considerations Lifting of a Relief Valve, High Noise Hazard Consequences of Inadequate Performance:

Procedure Violation Tech Spec Violation General Comments :

Initialize any at power IC. Open AOV-834A and HCV-945 to decrease Accumulator "A" pressure to

<705 psig (PI-941) and alarm C-11 received. Close AOV-834A and HCV-945.

25-May-2006 Page: 4 Job Performance Measure Exam -- ~

\-J Performance Checklist 1 Element : Conditions : Standards :

Obtain a controlled copy of Same as element. Review S- 16.2 and review caution. Procedure and ensure correct revision Comments :

Satisfactory 0 Unsatisfactory 0

  • 2 Element: CRITICAL Conditions : Standards :

Open Accumulator AOV-834A Switch to open demonstrating Proper Touch STAR Comments :

Satisfactory 0 Unsatisfactory 0 3 Element: CRITICAL Conditions : Standards :

Open Auxiliary Building N2 Switch to open demonstrating

, Supply Valve, AOV-846. Proper Touch STAR L-l Comments :

Satisfactory Unsatisfactory c]

4 Element : Conditions : Standards :

Recognize Step 5.3 complete and Instructor initial as SS.

initial step.

Comments :

Satisfactory 0 Unsatisfactory c]

~~

5 Element: CRITICAL Conditions : Standards :

Establish communication with the (Booth instructor respond as AO.) Demonstrate Proper 3-way AO. Direct A 0 to perfondverify communications the following valve manipulation:

LJ Comments :

Satisfactory Unsatisfactory

25-May-2006 Job Performance Measure Exam Page:

- - - 'I d Element : Conditions : Standards :

Direct A 0 to verify Cluster A, B, CUE: Respond that valves are Demonstrate Proper 3-way C valves closed; V-l803A, B, C. closed. communications Comments :

Satisfactory 0 Unsatisfactory [7

  • 7 Element : CRITICAL Conditions : Standards :

Direct A 0 to open "A" Cluster CUE: Respond that V-l806A is Demonstrate Proper 3-way Valve, V-1806A. open. communications Comments :

Satisfactory 0 Unsatisfactory 0

  • 8 Element : CRITICAL Conditions : Standards :

Ask A 0 what cluster pressure is CUE: Respond that "A" Cluster Demonstrate Proper 3-way and record. pressure is 2000 psig. communications Comments :

LJ Satisfactory 0 Unsatisfactory 0

~~ ~~

9 Element : Conditions : Standards :

Direct A 0 to open V-l805A. CUE: Respond that V-l805A is Demonstrate Proper 3-way open and 944C is operable communications Comments :

Satisfactory 0 Unsatisfactory 0 10 Element : Conditions : Standards :

Direct A 0 to verify regulator CUE: Respond that regulator Demonstrate Proper 3-way discharge pressure is < 755 psig. pressure is 750 psig. communications Comments :

Satisfactory Unsatisfactory 0

  • 11 Element : CRITICAL Conditions : Standards :

Direct A 0 to open V-944D. Set LOA SIS6 at 2500.0 to get Demonstrate Proper 3-way pressure increase and report communications V-944D is open.

-.-/'

Comments :

Satisfactory Unsatisfactory

25-May-2006 Page: 6 Job Performance Measure Exam -- . -

--I Element: CRITICAL Conditions : Standards :

When accumulator pressure NOTE: The N2 supply valves must Observation of Accumulator reaches 750 psig, direct A 0 to be closed before AOV-846 or the Pressure.

close N2 Supply Valve, V-944D. N2 relief valve will lift. Demonstrate Proper 3-way communications LOA SIS6 set at 0 and report V-944D is closed.

Comments :

Satisfactory Unsatisfactory 0 13 Element : Conditions : Standards :

Direct A 0 to close V- 1805A. CUE: V- 1805A is closed. Demonstrate Proper 3-way communications Comments :

Satisfactory 0 Unsatisfactory 0 14 Element: Conditions : Standards :

Direct A 0 to report cluster CUE: Cluster "A" pressure is 1000 Demonstrate Proper 3-way

'-j pre sure. psig. communications Comments :

Satisfactory 0 Unsatisfactory 0

~~ _ _ _ _ _ ~

  • 15 Element : CRITICAL Conditions : Standards :

Direct A 0 to close V-l806A. CUE: Respond that V-l806A is Demonstrate Proper 3 -way closed. communications Comments :

Satisfactory Unsatisfactory 0

  • 16 Element : CRITICAL Conditions : Standards :

Close Auxiliary Building N2 Stop Switch to closed Valve, AOV-846. demonstrating Proper Touch STAR

-4' Comments :

Satisfactory Unsatisfactory 0

t i 25-May-2006 Page: 7 Job Performance Measure Exam - - -

- 4 ' Element: CRITICAL Conditions : Standards :

Close Accumulator Fill Valve, CUE: No further action. Switch to closed AOV-834A. demonstrating Proper Touch STAR Comments :

Satisfactory 0 Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

Performance Measure Exam Page:

-- -l. I U

JPM NO JR003.001 Perform Attachment RCP Start (Option 1 No Faults, Option 2 Seal Failure on Pump Start, Option 3 No CCW Cooling in Operation)

Revision #: 7 Review Date: 313 1/2006 Location: Simulator Estimated Time (minutes): 14.00 Candidate:

Evaluator:

i Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

'i I I 25-May-2006 Job Performance Measure Exam Page:

_- . -". I

'L' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INlTIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLEDCOPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant experienced a small break LOCA. E-0 was performed and a transition made to E- 1, then to ES-1.2. Busses 11A & 11B are energized.

Initiating Cues :

The CRF directs you to start the RCP "A"per ES-1.2, Step 11D.

r I 25-1Mny-2006 rformance Measure Exam Page:

-- -3. I

'.-J'

Description:

Perform Attachment RCP Start (JR003.001)

JPM Tasks Task ID: 003-001-05-01A Task Standards :

RCP started Tools :

Procedure Terminating Cues Task Completion Trainee States Task is Completed References :

ID Descrintion Review Date Ref Flag

---/

PRES ES- 1.2 POST LOCA COOLDOWN AND DEPRESSURIZATION Safetv Considerations Consequences of Inadequate Performance:

Mitigation of the LOCA may be delayed.

General Comments :

25-May-2 006 Page: 4 Job Performance Measure Exam -- -

J OPTION 1:

1) Any full power IC (19).
2) Insert MALF RCS2A,B,C or D at 2000 gpm. Perform E-0, E-1, ES-1.2 to step 11. Trip both RCP's.

Depressurize until Przr level >13% (40% adverse). Reduce leak to 1000 gpm after Przr level achieved.

3) Ensure Annunciators A-24 and A-7 extinguished.

OPTION 2:

1) Same conditions as above.
2) Insert MALF RCS12A (200 gpm, 0,O) as conditional after RCPs are tripped.

(JMRCS 12A=WRCSOG( 1).GT.8000).

OPTION 3:

1) Any full power IC
2) Insert malfunction MALF RCS2A, 2000 gpm
3) Insert MALF EDS6
4) Complete E-0, E- 1, ES- 1.2 to step 11
5) Clear MALF EDS6 6 ) Restore off-site power (clear EDSG) per ER-ELEC.1
7) Verify CCW pump off

25-May-2 006 Page: 5 Performance Measure Exam -- ~

\4 Performance Checklist 1 Element : Conditions : Standards :

Obtain copy of Attachment RCP Same as element.

START.

Comments :

Satisfactory 0 Unsatisfactory 0 2 Element : Conditions : Standards :

Observes caution at start of Same as element.

attachment, Comments :

Satisfactory Unsatisfactory c]

  • 3 Element: CRITICAL Conditions : Standards :

Start RCP Lift Oil Pump. Run for 2 minutes before start RCP.

Verify Oil Lift Pressure Light is lit. (Locate lights, verify lit)

Comments :

Satisfactory 0 Unsatisfactory 0 4 Element : Conditions : Standards :

Verify Przr Spray Valves closed. Locate controllers.

Verify demand indicator at 0%.

Verify valve position green lights lit.

Comments :

Satisfactory Unsatisfactory 0

\

W

25-May-2006 Page: 6 Job Performance Measure Exam -- -

d'Element : Conditions : Standards :

CCW in service to "A" RCP with Option 1: Verify CCW Pump CCW temperature and flow running.

alarms extinguished. Verify alarm A-7 extinguished.

Option 3 Refers to Attachment 1 5.2 to restore ccw.

Comments :

Satisfactory Unsatisfactory 6 Element : Conditions : Standards :

Option 3 Only: Reviews Caution Same As Element and Note at beginning of Attachment 15.2 Comments :

Satisfactory 0 Unsatisfactory d'Element Conditions : Standards :

\ '

Option 3 Only: Verify Seal Locate Seal Injection flow injection is in service meter Verify Flow to RCP Seal Injection Comments :

Satisfactory 0 Unsatisfactory 0 8 Element : Conditions : Standards :

Option 3 Only: Check adequate Determine offsite power power avalible to run CCW pump. avaliable. Locates 14/16 Normal Feed Breaker and verifies closed Comments :

Satisfactory Unsatisfactory 0

  • 9 Element : CRITICAL Conditions : Standards :

Option 3 Only: Start one CCW Note: which pump is started is not Locates Pump switch, Pump critical operates swith to start pump.

L/

Comments :

Satisfactory Unsatisfactory 0

1 1 25-May-2006 Page:

Performance Measure Exam - - -

'w Element: Conditions : Standards :

Option 3 Only: Verify MOV-8 17 Locates Valve , Verifies open Position Comments :

Satisfactory 0 Unsatisfactory I7 11 Element: Conditions : Standards :

Option 3 Only: Verify MOVs Locates Valve ,Verifies 749A and 754A are Open Position Comments :

Satisfactory 0 Unsatisfactory [ZI 12 Element: Conditions : Standards :

Option 3:Verify MOV-759A open Locate Valve Indication Comments :

Satisfactory Unsatisfactory Ll' 13 Element : Conditions : Standards :

Option 3 Detemine that Seal Same As Element Injection is in service return to Att 15.0 .

Comments :

Satisfactory Unsatisfactory 14 Element: Conditions : Standards :

"A"RCP Seal Inlet < 135 degrees. Locate Meters, veri6 < 135 degrees F.

Comments :

Satisfactory Unsatisfactory 0 15 Element: Conditions : Standards :

"A"RCP Motor Bearing At PPCS select GD RCPS temperature < 200 degrees. and verify motor bearing

'\J' temperature "GREEN" or use recorder if selected.

25-May-2006 Page:

Job Performance Measure Exam - - - 81 Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Injection flow 6 gpm. Locate meter. Verify > 6 gpm.

Comments :

Satisfactory 0 Unsatisfactory c]

Element : Conditions : Standards :

Lab Seal d/p > 15 inches of water. Locate meter. Verify > 15".

Comments :

Satisfactory 0 Unsatisfactory c]

Element : Conditions : Standards :

Verify "A" RCP #1 Seal d/p > 220 Locate meter. Verify > 220 psid. psid.

Comments :

Satisfactory Unsatisfactory c]

Element : Conditions : Standards :

RCP Oil Level alarm Alarm A-24 extinguished.

extinguished.

Comments :

Satisfactory Unsatisfactory Element : Conditions : Standards :

RCP Oil Level indicator on scale. Locate meter. Verify on scale.

Comments :

Satisfactory Unsatisfactory Element : Conditions : Standards :

Opedcheck open RCP Seal Outlet If valve closed, open.

Valve, AOV-270A.

If valve open, verify open.

25-May-2006 Page: 9 Job Performance Measure Exam -- . -

-a Comments :

Satisfactory 0 Unsatisfactory 0 22 Element: Conditions : Standards :

If MOV-313 OPEN: - Locate valve switch. Verify position.

-Verify VCT pressure >15 psig. - Locate meter. Verify > 15 psig.

- Verify #1 Seal Leakoff within - Obtain figure. Locate the Normal Operating Range of meter. Verify flow within Figure RCP SEAL LEAKOFF. acceptable range of the graph.

-"A"RCP Standpipe low level -Alarm B- 11 extinguished.

alarm extinguished.

Comments :

Satisfactory 0 Unsatisfactory 0 Element : Conditions : Standards :

If MOV-3 13 CLOSED:

- Verify #1 Seal Inlet temperature. -Verify temperature < 135 degrees.

-Verify #1 Seal d p . -Verify seal d/p > 220 psid.

Comments :

Satisfactory 0 Unsatisfactory 0

~~ ~ ~ ~ _ _ _ _ _ _ _

  • 24 Element: CRITICAL Conditions : Standards :

Start "A" RCP. CUE: (If notifies CRF that RCP is -Notify CRF ready to start ready) Start "A"RCP. RCP (not critical to task).

-Switch to start.

Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

'.w' Observes indications. OPTIONS 1 & 3 Same as element.

CUE: No further action.

I I

25-May-2006 Job Performance Measure Exam Page:

I - - I I

Comments :

Satisfactory 0 Unsatisfactory 0

  • 26 Element: CRITICAL Conditions : Standards :

OPTION 2: CUE: No further action. OPTION 2: Same as element.

(May refer to AR's and Observes seal failure conditions AP-RCP. 1.)

and stops RCP.

Comments :

Satisfactory 0 Unsatisfactory 0

~

-- 1 1

I 16-May-2006 Page:

Job Performance Measure Exam -- . -l .

Ll JPM NO JR103.007 Manually Close CNMT Isolation Valve on CI Failure (Option 1 no faults, Option 2 MOV 3 13 cannot be closed remotely)

Revision#: 0 Review Date: 4/1/2006 Location: Simulator Estimated Time (minutes): 5.00 Candidate:

Evaluator:

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

16-May-2006 Page: 2 Job Performance Measure Exam _- . -

-.4 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

An SI occurred while the plant was at 100% power. While performing E-0 it was determined that Containment Isolation failed to actuate.

Initiating Cues :

Verify Containment Isolation in accordance with Step 12 of E-0.

16-May-2006 Page: 3 Job Performance Measure Exam -- . -

Description:

Respond To Containment Isolation JPM Tasks Task ID: 103-002-04-01 Task Standards :

All brightldim status lights indicate bright (all CI and CVI valve close) or manual actions initiated to close valves outside the control for those valves that cannot be closed from the Control Room.

Tools :

Terminating Cues All valves closed or actions initiated to close alternate isolation valves.

References :

%u-ID DescriDtion Review Date Ref Flag PRAR AR-A-26 CONTAINMENT ISOLATION Safety Considerations Consequences of Inadequate Performance:

Failure to isolate CNMT will result in exceeding 10CFRl 00 Dose Limits for accidents.

General Comments :

1) Setup IC-19.
2) Insert malfunction MALF RPS6
3) Option 2 Insert SW OVR CVC4 1C off. MOV 3 13 cannot be operated from the MCR.
4) Insert MALF RCS2A DBLOCA
5) Complete E-0 up to step 12.

16-May-2006 Job Performance Measure Exam Page:

__ . -4. I

\ I Performance Checklist 1 Element : Conditions : Standards :

Review E-0 step 12 Same as Element.

Comments :

Satisfactory 0 Unsatisfactory 0 2 Element : Conditions : Standards :

Check Annunciator A-25/26. Locate Annunciators.

Determine not lit. Locate CI pushbutton and depress.

Comments :

Satisfactory Unsatisfactory 0

  • 3 Element: CRITICAL Conditions : Standards :

Check CI/CVI status lights bright. Determine all lights not bright.

- Close affected valves by placing switch to close or Close/remote switch to close.

Per Attachment 3.O

- Pull stop CNMT SWP Pumps.

- Dispatch A 0 to close 1723/1728 locally.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 4 Element: CRITICAL Conditions : Standards :

OPTION 2 Per Attachment 3.0 Determine MOV-3 13 cannot be - Dispatch A 0 to close closed. V-3 15A and V-3 15C locally.

NOTE: If A 0 dispatch to locally close MOV-3 13 the critical step is not met.

.'-.J Comments :

Satisfactory Unsatisfactory 0

I 1 16-May-2006 Page:

Job Performance Measure Exam Element : Conditions Standards :

Verify CNMT Fan Cooler Status Locate lights. Verify bright.

Light - Bright.

Comments :

Satisfactory Unsatisfactory 0

-~ ~

Element : Conditions : Standards :

Verify Letdown Orifice valves Locate valve indications and closed. verify closed.

CUE: No further actions.

Comments :

Satisfactory 0 Unsatisfactory [7

~~~

JPM Questions Question References Reference Type Reference ID Description Ref Flag

-. I i I

I 30-May-2006 Job Performance Measure Exam Page:

-- . lI

-- I

- 1 JPM NO JR064.002 Start and Load the Emergency Diesel Generator (PT-12.1)

Revision #: 13 Review Date: 4/25/2006 Location: Simulator Estimated Time (minutes): 24.00 Candidate:

Evaluator:

.u--

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

~

30-May-2006 Page: 2 rformance Measure Exam -_ ~

L' NOTE THE EVALUATORWILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLEDCOPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is at power with a normal electrical lineup.

hitiatin2 Cues :

A surveillance test of the "A"EDG is due following minor maintenance. Appropriate supervisory permission has been obtained. The HCO has logged the start of the test and announced that Bus 18 is not available for general access. Diagnostic test personnel, QC personnel and Aux Operators are at the D/G and ready for the test. The "B" D/G is operable and in normal standby condition. Safety barriers have been erected and pre-start alignment per T-27.1 is completed. Fire detection zone S-33D has been disconnected. Operations has verified ITS section 3.8.1 Condition B is met. Perform the "A" D/G post-maintenance surveillance test.

30-May-2006 Page: 3 Job Performance Measure Exam - . -

Description:

Start and Load the Emergency Diesel Generator (PT-12.1)

JPM Tasks Task ID: 064-009-02-01A Task Standards :

Perform the Surveillance Test IAW PT-12.1 Tools :

Terminating Cues Option 1: D/G has been loaded to 2050KW (+25 -0) with power factor of approximately .9.

Option 2: Option 1 critera met plus D/G correctly aligned for post SI operation.

References :

-ID Description Review Date Ref Flap d2 PRPT PT- 12.1 EMERGENCY DIESEL GENERATOR A Safetv Considerations Consequences of Inadequate Performance:

Failure to correct perform the test could result in undectected inoperably of the D/G.

Incorrect performance can also result in damage to the D/G andor its associated electrical equipment.

General Comments :

Initialize any stable at power IC. Verify selected A/C Service Water Pump is not running. (ie, "A" running, "C" secured, "C"selected) Place synchroscope in "B'l D/G position and turn off D/G voltmeter and ammeter.

Copy of PT-12.1 ready.

Option 2: SI occurs following loading to max load; Insert OVR-RPSO4, ON, Trains Trigger 1

'd When max load is reached insert Trigger 1

30-May-2006 Page: 4 Performance Measure Exam

~

-- ~

'W' Performance Checklist 1 Element : Conditions : Standards :

Procedure CUE: Provide copy of PT- 12.1.

Comments :

Satisfactory Unsatisfactory 2 Element : Conditions : Standards :

Verify Initial Conditions. Review Same as element.

precautions. Verify that Step 4.4 is marked as post-maintenance.

Comments :

Satisfactory Unsatisfactory c]

I 3 Element : Conditions : Standards :

Verify Service Water status. CUE: A 0 reports running SW Reads note prior to Step 6.4, Pump selected. and directs A 0 to select the

.-.---' running SW Pump.

(LOA CLG25, CLG26)

Comments :

Satisfactory 0 Unsatisfactory 4 Element : Conditions : Standards :

Notify Energy Operations. CUE: Energy Operations has been Same as element.

notified.

Comments :

Satisfactory Unsatisfactory c]

5 Element : Conditions : Standards :

Verify Start Relay and Air Start Same as element lamps illuminated.

Comments :

Satisfactory 0 Unsatisfactory c]

-u--

6 Element : Conditions : Standards :

Verif.J/place "A"Gen ammeter Same as element.

svitcff in B position.

1 1

I 30-May-2006 Page:

Job Performance Measure Exam -- - -".

Comments :

Satisfactory 0 Unsatisfactory 0 Element : Conditions : Standards :

Verify/place "A"Gen voltmeter Same as Element switch in B--C position.

Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Declare "A" D/G inoperable. NOTE: Examinee should N/A the Notify CRS to declare D/G monthly asterisked surveillance inoperable steps.

Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Circle the Fuel Oil Transfer Pump CUE: "A"Fuel Oil Transfer Pump Same as element.

Suction Strainer and Engine Fuel Suction Strainer is currently in Oil Filter that are in service. service.

"A"Fuel Oil Filter is currently in service.

Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Notify A 0 to check expansion CUE: A 0 report expansion tank Same as element.

tank level level 314 full Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Notify Control Room Operators to CUE: Log complete Same as element.

fill in D/G demand log Comments :

Satisfactory Unsatisfactory 0

I 1 3O-Mi[y-%006 Job Performance Measure Exam Page:

-- I

~'-,. Element : Conditions : Standards :

Notify Control Room Operators Same as element that alarm J-24 will come in.

Comments :

Satisfactory n Unsatisfactory

  • I3 Element : CRITICAL Conditions : Standards :

Start "A" D/G. record start time. Locate Start switch place to start, verify the D/G start by verifing Voltage and Freq.

Comments :

Satisfactory Unsatisfactory 0 14 Element: Conditions : Standards :

Record voltage and frquency. Same as element Note LOA GENl1 to reset local alarm

.-/

Comments :

Satisfactory Unsatisfactory 0 15 Element: Conditions : Standards :

Notify A 0 to check Local Alarms CUE: A 0 reports all alarms are Same as Element normal Comments :

Satisfactory Unsatisfactory 0 16 Element: Conditions : Standards :

Direct Test personnel to check CUE: All readings are normal Same as element pyrometer readings Comments :

Satisfactory Unsatisfactory

~ ~~~ ~

'- Element : Conditions : Standards :

-eHave test personnel verify start of CUE: Auto start verified. Manual Same as element.

Supply Fan 1A2. start of 1Al not desired.

I 1 3 0-May-2 006 Job Performance Measure Exam Page:

-- -7.I

<u' Comments :

Satisfactory 0 Unsatisfactory 0 18 Element : Conditions : Standards :

At MCB read and record 33 ft Locate Met tower recorder or MET Tower air temperature. get info from PPCS Comments :

Satisfactory Unsatisfactory 0 19 Element : Conditions : Standards :

Direct taking of initial readings. CUE: 10 minutes have passed and Same as element.

all readings have been taken per Data Sheet 1 and Sheet 2; and all are normal. A 0 has copy of data sheets.

Comments :

~~ ~

Satisfactory Unsatisfactory 0 20 Element : Conditions : Standards :

Record voltage and frequency. Same as element.

Verify that they meet the Data sheet 7 acceptance critera.

Comments :

Satisfactory Unsatisfactory 0 21 Element : Conditions : Standards :

Place Voltage Regulator in Locate AUTO/MAN voltage Manual, achieve 480V +/- 5V. switch, place to MAN, adjust Return Voltage Regulator to manual voltage as necesary, AUTO. return switch to AUTO.

Comments :

Satisfactory Unsatisfactory u

Element : CRITICAL Conditions : Standards :

Place Unit/Parallel Switch in Locate switch, place in Parallel. parallel

3U-iMa~-2006 Page: 8 Job Performance Measure Exam -- ~

~-d Comments :

Satisfactory Unsatisfactory 0

  • 23 Element : CRITICAL Conditions : Standards :

Select bus 18 with synchroscope. Locate switch, place in Bus 18 position Comments :

Satisfactory Unsatisfactory 0

~~~ ~~ ~

  • 24 Element : CRITICAL Conditions : Standards :

Adjust Generator voltage to 5 to Locate Auto voItage control, 10 volts above Running voltage. adjust as necessary.

Comments :

Satisfactory Unsatisfactory c]

Element : CRITICAL Conditions : Standards :

Adjust Governor Control so that Adjusts speed slowly and L'

synchroscope is turning slowly in observes synchroscope for the fast direction. (2 - 5 rpm on proper indications of 2 - 5 synchroscope) rpm.

Comments :

Satisfactory n Unsatisfactory [7

~

  • 26 Element : CRITICAL Conditions : Standards :

Close selected breaker, pick up Ensures synchroscope turning 300-500 KW. slowly in the fast direction.

Closes breaker slightly before 12 o'clock. Picks up proper load. Proceeds to next 2 steps without delay.

Comments :

Satisfactory Unsatisfactory 0 r -

Element : Conditions : Standards :

-d Maintain power factor at Adjust the AUTO voltage approximately .9 Lagging. controller to maintain power factor between .85 and .95 per precautions.

I 30-MUY-2006 Puge: 9 Job Performance Measure Exam -- . -

> 4 Comments  :

Satisfactory Unsatisfactory

~~

0 ~

  • 28 Element : CRITICAL Conditions : Standards :

Select other synchroscope CUE: Maintenance performed was Locate switch, place to Bus position, close other breaker. not major. 14 position. Locate and close Bus 14 breaker NOTE: Examinee should N/A Step 6.17.

Comments :

Satisfactory Unsatisfactory 0

  • 29 Element : CRITICAL Conditions : Standards :

Load to 2050 KW (+25, -0). Locate the governor control raise to pick up load evenly, approximately 500 KW every 30 seconds.

Comments :

-u-Satisfactory Unsatisfactory 0 30 Element : Conditions : Standards :

Records time 2050 KW attained. Same as element.

Comments :

Satisfactory Unsatisfactory 0 31 Element : Conditions : Standards :

Maintains approximately .9 CUE:Option 1 No further action. Maintains between .85 and Lagging power factor during load .95 per precautions.

changes.

Comments :

Satisfactory 0 Unsatisfactory 0

~

77 Element : Conditions : Standards :

Option 2: Inadvertant SI CUE: SI has just occured the CRS References attachment 8 of v

direct you to perform required PT-12.1 Emergency DIG actions

30-May-2006 Job Performance Measure Exam Page:-- l-0 I Comments :

Satisfactory 0 Unsatisfactory 0

~

Element : Conditions : Standards :

Reviews actions of attachment 8 Reviews step 1-3 of attachment Same as element Comments :

Satisfactory Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Adjust DIG voltage to Locate Auto Voltage Contol Approximately 480 Volts for the A D/G. Adjusts control to lower voltage to approximately 480 Volts on the output voltmeter.

Comments :

Satisfactory n Unsatisfactory

~~

Element : Conditions : Standards :

Verify that the SI sequence is Checks to verify that all the complete. sequencer loads have started Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Transfer the A D/G governor to Locates Uniflarallel switch Unit mode of operation and transfer it to Unit Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Adjust A D/G Speed Locates Frequency meter and Governor speed control.

Adjusts governor speed control to lower frequency to approximately 60 Hz

30-May-2006 Job Performance Measure Exam page:

I ".I tLJ' Comments :

Satisfactory 0 Unsatisfactory 0 38 Element: Conditions : Standards :

Notify CRS that attachment 8 is CUE: No further actions Notifies CRS complete Comments :

Satisfactory 0 Unsatisfactory 0 JPM Ouestions Question Answer qferences kderence Type Reference ID Description Ref Flag

9-iMny-2 006 Page: 1 Job Performance Measure Exam -- ~

~,<J JPM NO JR012.001 Defeat a Failed Przr Pressure Channel Revision #: 7 Review Date: 5/8/2006 Location: Simulator Estimated Time (minutes): 12.00 Candidate:

Evaluator:

4 Actuai Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

~~

I I

-!I 9-May-2006 Page:

Job Performance Measure Exam --

.-d NOTE THE EVALUATORWILL EXPLAIN THE JPM INITIAL CONDITIONSAND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant was operating at  % power when PI-429 failed high. The operators took appropriate actions.

Initiating Cues :

PT-429 failed high. The operators took all appropriate actions. The Shift Supervisor directs you to defeat the failed Przr instrument channel per ER-INST.l, Step 4.4.5.A Turbine Runback did not occur.

d

9-May-2006 Page: 3 Job Performance Measure Exam -- -

J

Description:

Defeat a Failed Przr Pressure Channel (JR012.001)

JPM Tasks Task ID: 012-006-01-01E Task Standards :

Tools :

Terminating Cues References :

-ID Description Review Date Ref Flag

~.-. PRER ER-INST. 1 REACTOR PROTECTION BISTABLE DEFEAT AFTER JNSTRUMENTATION LOOP FAILURE Ssfetv Considerations Consequences of Inadequate Performance:

General Comments :

At power IC. Insert MALF P Z N A , close MOV-5 16 PORV Block Valve per ER-INST. 1 Step 4.4.3.

9-May-2006 Job Performance Measure Exam Page:

-- . - .I Performance Checklist Element : Conditions : Standards :

Obtain controlled copy of Same as element.

ER-INST.1.

Comments :

Satisfactory Unsatisfactory Element : Conditions : Standards :

Refer to appropriate section of Same as element.

ER-INST. 1,Step 4.4.5.

Comments :

Satisfactory 0 Unsatisfactory Element : Conditions : Standards :

Verify P/429A defeat in normal Go to PLP Rack.

position. Verify P/429A in Normal position.

Comments :

Satisfactory 0 Unsatisfactory 0

~

Element : CRITICAL Conditions : Standards :

Place switch T-405E to Loop A - Go to RIL Rack, unlock and Unit 1. open door.

Shift switch from operate to Unit #l.

Go to R-1 Protection Channel

  1. 1 cabinet, unlock and open door.

Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Trip bistable Overtemperature Pull and lift switch.

.u Trip. 405 LOOPA-1

9-May-2006 Job Performance Measure Exam Page:

I . -

I Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Trip bistable for High Pressure Pull and lift switch.

trip. 429 Channel 1 Comments :

Satisfactory n Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Trip Bistable for Low Pressure Pull and lift switch.

trip 429 Channel 1 Comments :

Satisfactory 0 Unsatisfactory 17 Element : CRITICAL Conditions : Standards :

Trip bistable for SI.429 Channel Pull and lift switch.

1 Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Trip bistable for Unblock SI. 429 Pull and lift switch.

Channel 1 Comments :

Satisfactory Unsatisfactory c]

Element : CRITICAL Conditions : Standards :

Place proving switch P/429B to In PLP Rack place P/429B Defeat (UP) in PLP Rack. switch to Defeat.

Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Place Przr Pressure Recorder Place switch on MCB to switch to Position 1-3. position 1-3.

I i 9-May-2006 Job Performance Measure Exam Page:

- - -:I Lj Comments :

Satisfactory Unsatisfactory c]

12 Element: Conditions : Standards :

Verify Bistable Status Lights Same as E l e m e n t Comments :

Satisfactory Unsatisfactory c]

13 Element: Conditions : Standards :

Delete 401/405 from processing Veri@ on PPCS screen 401/405 are Same as element.

on PPCS if operable. being defeated.

CUE: No further action.

Comments :

Satisfactory 0 unsatisfactory 0

9-May-2006 Job Performance Measure Exam Page:

-- -:I

>4-JPM NO JR029.001 Startup the Containment Mini Purge Revision #: 2 Review Date: 5/8/2006 Location: Simulator Estimated Time (minutes): 8.00 Candidate:

Evaluator:

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

9-May-2006 Page: 2 Job Performance Measure Exam - . -

Ll' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLEDCOPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENllUES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

A routine Cnmt entry is required tomorrow Initiating Cues :

The Shift Manager directs you to place Mini Purge System in service. A Containment Mini-Purge Release has been initiated and SM & RP approvals have been received.

9-May-2 006 Page:

Job Performance Measure Exam --

. /

v

Description:

Startup the Containment Mini Purge (JR029.001)

JPM Tasks Task ID: 029-007-01-01A Task Standards :

Tools :

Terminating; Cues References :

-ID Description Review Date Ref Flag L .. PRS S-23.2.3 CONTAINMENT MTNI-PURGE SYSTEM OPERATION Safetv Considerations Consequences of Inadequate Performance:

General Comments :

Verify Mini-Purge is secured in IC, may be performed at any operating IC.

Fill out a S-23.2.3 with the initial conditions signed off.

Option 2: When Mini Purge is started, ramp R-14 up to 3E5 CPM MALF RMS02D, 3E5, 120 sec ramp.

9-May-2006 Job Performance Measure Exam Page:

-- - -:I Performance Checklist Element : Conditions : Standards :

Procedure CUE: Hand student a copy of S-23.2.3.

Comments :

Satisfactory Unsatisfactory Element : Conditions : Standards :

Reviews precautions. Same as element.

Comments :

Satisfactory Unsatisfactory Element : Conditions : Standards :

Verify Mini Purge Roof Vent CUE: Report V-7479 locked Direct A 0 to verify.

Isolation Valve, V-7479, locked closed.

closed.

Comments :

Satisfactory 0 Unsatisfactory Element : CRITICAL Conditions : Standards :

Open Mini Purge Exhaust Valve, Shift switch to open.

AOV-7970.

Comments :

Satisfactory Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Open Mini Purge Exhaust Valve, Rotate switch to open.

AOV-7971.

Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Open Mini Purge Supply Valve, Rotate switch to open.

AOV-7478.

I I 9-May-2006 Page:

Job Performance Measure Exam I - -

51 1.J Comments :

Satisfactory Unsatisfactory "7 Element: CRITICAL Conditions : Standards :

Open Mini Purge Supply Valve, Rotate switch to open.

AOV-7445.

Comments :

Satisfactory 0 Unsatisfactory 0

~~ ~

8 Element : Conditions : Standards :

Observe note before 5.1.6.

Comments :

Satisfactory Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

- ,, Start "A" Mini Purge Supply and CUE: Containment pressure has Rotate switch to run.

verify Containment pressure increased slightly and stabilized.

increase.

Comments :

Satisfactory Unsatisfactory 0 10 Element: Conditions : Standards :

Recognize R-14 Alarm Acknowledges alarms.

Refers to precaution in S-23.2.3 or AR for R-14 alarms.

Comments :

Satisfactory Unsatisfactory 0

~~

"11 Element: CRITICAL Conditions : Standards :

Determine Mini-Purge. Must be Same as Element.

shutdown Comments :

Satisfactory Unsatisfactory 0

9-May-2006 Job Performance Measure Exam Page:

- - - :I

-.I-&j Element : CRITICAL Conditions : Standards :

Stop Mini-Purge Blower 1A. Same as Element.

Comments :

Satisfactory Unsatisfactory

  • 13 Element : CRITICAL Conditions : Standards :

Closes supply valves 7478 and Same as Element.

7445.

Comments :

Satisfactory Unsatisfactory c]

  • 14 Element: CRITICAL Conditions : Standards :

Closes exhaust valves 7970 and Same as Element.

7971. CUE: No further actions.

Comments :

-v' Satisfactory Unsatisfactory 0

25-May-2006 Page: 1 Job Performance Measure Exam -- . -

JPM NO JN086.002 Secure Ventilation Systems During a Fire Revision#: 0 Review Date: 4/1/2006 Location: Int Bldrr-Hot Estimated Time (minutes): 10.00 Candidate:

Evaluator:

.+i Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I I 25-May-2006 Job Performance Measure Exam Page:

-- . -2. I

~-J NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF P M REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

A fire has occurred on the intermediate floor of the Auxiliary Building. The operators are responding per procedure FW-5 .O, Auxiliary Building (AB) Intermediate Floor.

InitiatinF Cues :

The Shift Manager has directed you to secure ventilation in accordance with FRP-5.0, Step 1.5.

I 1 25-May-2006 Job Performance Measure Exam Page:

- - - :I

Description:

Respond To A Plant Fire On Site JPM Tasks Task ID: 086-001 01 Task Standards :

Ventilation fans specified in Step 1.5 are shutdown.

Tools :

Hearing Protection Safety Glasses Hard Hat Terminatinp Cues Task Completion

.4 References :

-ID Description Review Date Ref Flag PRFRP FRP-5.0 AUXILIARY BUILDING INTERMEDIATE 0 FLOOR Safety Considerations Consequences of Inadequate Performance:

Spreading of smoke and fire in the plant.

General Comments :

r i 25-May-2006 Job Performance Measure Exam Page:

4. I d'

Performance Checklist 1 Element : Conditions : Standards :

Review FRP-5.0 Step 1.5. Same as Element.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 2 Element: CRITICAL Conditions : Standards :

Secure the "C" AB Exhaust Fan. Proceed to Fan Control Intermediate Building Top Level Simulate securing fan.

Comments :

Satisfactory 0 Unsatisfactory 0 3 Element : Conditions : Standards :

Verify AB A AHU and AB B Proceed to Vent Control

.- Supply are off. Panel (by Controlled Access Door).

CUE: Lights are green.

Comments :

Satisfactory 0 Unsatisfactory

25-May-2 006 Page: 5 Job Performance Measure Exam - - -

- L A Element : CRITICAL Conditions : Standards :

Place Master Vent Control to Locate switch on Control lloff I. Panel.

Simulate placing to "Off'.

Verify the following fans stopped:

- 1B Exhaust A/B Red light off at Vent Panel CUE Light is off

- 1B Exhaust C Check for Air Flow at grate outside change room (Hot Shop)

CUE: No Air Flow

- CA Exhaust A/B Green Light on (Vent Panel)

CUE: light is green

- AB Exhaust F CUE:Red Light off on Vent Panel Comments :

. I u'

Satisfactory 0 Unsatisfactory c]

  • 5 Element: CRITICAL Conditions : Standards :

Secure the AB Main Exhaust Fans Locate Controls of Vent AandB panel.

Simulate securing fans.

Cue Lights are green Comments :

Satisfactory Unsatisfactory 0

  • 6 Element: CRITICAL Conditions : Standards :

Secure the G Fan. Proceed to Control (East end SFP). Simulate stopping fan.

CUE: Fan Stops.

CUE: No further actions.

Comments :

i/' Satisfactory 0 Unsatisfactory c]

I 1 25-May-2006 Job Performance Measure Exam Page:

- - - 41

\.JM Questions Question Answer References Reference Type Reference ID Description Ref Flag

30-May-2006 Job Performance Measure Exam Page:

-I. I u'

JPM NO JC035.006 Perform ATTACHMENT RUPTURED STEAM GENERATOR PART B Revision #: 5 Review Date: 6/3/2004 Location: Turb Bldg.

Estimated Time (minutes): 12.00 Candidate:

Evaluator:

.~

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

30-May-2006 Page: 2 Job Performance Measure Exam -- - -

d' NOTE THE EVALUATORWILL EXPLAIN THE JPM INlTIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAhIINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant has experienced a Steam Generator tube rupture. The plant is in procedure E-3, STEAM GENERATOR TUBE RUPTURE. The MSIV cannot be closed.

Initiating Cues :

Plant is in E-3, STEAM GENERATOR TUBE RUPTURE. You have been directed to complete RUPTURED STEAM GENERATOR ATTACHMENT PART B. Do not operate any plant equipment. Simulate use of ladders as appropriate.

x'

1 I

30-May-2006 Job Performance Measure Exam Page:

1 31 I 1

--i/

Description:

ATTACHMENT RUPTURED STEAM GENERATOR PART B (JC035.006)

JPM Tasks Task ID: 035-010-05-01A Task Standards :

In accordance with the procedure Tools :

TerminatinP Cues Trainee States Task is Completed Task Completion References :

- ID Description Review Date Ref Flag PRATT ATT- 16.O ATTACHMENT RUPTURED S/G PRE E-3 STEAM GENERATOR TUBE RUPTURE Safetv Considerations Safety Glasses Hearing Protection Hard Hat Safety Shoes Leather Gloves Consequences of Inadequate Performance:

Spread of contamination Increased difficulty mitigating tube rupture General Comments :

- Provide copy of ATT-16.0.

- Should provide laser pointer.

30-May-2006 Job Performance Measure Exam Page:

-- . 41

. 4 Performance Checklist 1 Element : Conditions : Standards :

NOTE NOTE: Evaluator supply copy of attachment. Should supply laser pointer for hothard to access spots.

Comments :

Satisfactory Unsatisfactory 0 2 Element : Conditions : Standards :

Proceed to Turbine Bldg. Same as element.

Comments :

Satisfactory Unsatisfactory 0

  • 3 Element : CRITICAL Conditions : Standards :

MFW Regulating Valve and NOTE: May allow laser for - Locate valves.

Bypass Valve Manual Isolation 398913988. - Simulate closing.

u Valves.

- SIG A, V-3985, V-3989 CUE:(If student requests eSOMS

- SIG B, V-3984, V-3988 location) eSOMS gives valve location at: TB MEZZ, FEED REG VALVE AREA, ELEV (3985,3984=6),(3989,3988=3)

CUE: The valve no longer turns in that direction.

Comments :

Satisfactory 0 Unsatisfactory

  • 4 Element : CRITICAL Conditions : Standards :

Reheat Steam Chain Valves. CUE: the valve no longer turns in - Locate valves.

- V-3551 (1A MSR) that direction. - Simulate closing.

- V-3550 (1B MSR)

- V-3553 (2A MSR) CUE:(If student requests eSOMS

- V-3552 (2B MSR) location) eSOMS gives valve location at: TI3 MEZZ, #1 MSR's AREA, ELEV 12

' d Comments :

Satisfactory El Unsatisfactory

I I

I 30-May-2006 Job Performance Measure Exam Page:

5

\.-,' Element : CRITICAL Conditions : Standards :

Steam Dump Header Isolation and CUE: The valve no longer turns in - Locate valves.

Bypass Valves. that direction. - Simulate closing.

- V-3532 and V-3659

- V-3533 and V-3658 NOTE: May allow laser to preclude climbing over hot pipes.

CUE: (If student requests eSOMS location) eSOMS gives valve location at: TB MEZZ, MAIN STEAM HEADER AREA, ELEV 10 Comments :

Satisfactory n Unsatisfactory 0

  • 6 Element: CRITICAL Conditions : Standards :

Reheat Steam Line Warmup CUE: the valve no longer turns in - Locate valves.

Valves. that direction. - Simulate closing.

- V-3645

- V-3646 NOTE: May allow laser for

-V-3647 3645f3646.

- V-3648 CUE: (If student requests eSOMS location) eSOMS gives valve location at: TB MEZZ, #lMSR's AREA (for valves 3645 ELEV 8,

& 3646 ELEV 9), # MSR's AREA (for valves 3647 ELEV 5, & 3648 ELEV 4)

Comments :

Satisfactory 0 Unsatisfactory 0

  • 7 Element: CRITICAL Conditions : Standards :

Reheat Steam Line Common CUE: the valve no longer turns in - Locate valve.

Vent. that direction. - Simulate closing.

- V-8500 CUE:(If student requests eSOMS location) eSOMS gives valve location at: TB MEZZANINE LP J

HEATER A DRAINS AREA, ELEV 6

I 1 4I 30-May-2006 Page:

Job Performance Measure Exam - - -

Comments:

Satisfactory Unsatisfactory 0

  • 8 Element: CRITICAL Conditions : Standards :

Steam to Trap header Isolation CUE: The valve no longer turns in - Locate valves.

Valves. that direction. - Simulate closing.

- V-8513

- V-8529 CUE:(If student requests eSOMS

- V-3596 alve location at: TB MEZZANINE

- V-3598 MAIN STEAM HEADER AREA, ELEV 6 (for 8513), TB MEZZANINE TURBINE OIL RESERVOIR AREA, ELEV 6 (for valves 8529,3596,3598)

Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

,-, Report completion to Control NOTE: Acknowledge radio Same as element.

Room. communication.

CUE: No further action.

Comments :

Satisfactory n Unsatisfactory JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

. 25-May-2006 Job Performance Measure Exam Page:

-l. I JPM NO JN071.002 Release the "A"Gas Decay Tank Revision #: 0 Review Date: 4/1/2006 Location: Aux Bldg Estimated Time (minutes): 20.00 Candidate:

Evaluator:

,,4 Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I I I 25-May-2006 Performance Measure Exam Page:

-- - 2l

' -d' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is operating with a small fuel leak. The "A"GDT is full and must be released per the release permit.

Initiating Cues :

Release the "A"GDT per S-4.2.5, Release of Gas Decay Tank.

25-May-2006 Job Performance Measure Exam Page:

-- 3I

  • e

Description:

Conduct an Authorized Gas Release JPM Tasks Task ID: JO71-003-01-01 Task Standards :

Conduct the release in accordance with S-4.2.5 Release of a GDT.

Tools :

Hard Hat Safety Glasses Hearing Protection Dosimetry Terminating Cues

..-, Task Completion References :

-ID Descrbtion Review Date Ref Flag PRS S-4.2.5 RELEASE OF GAS DECAY TANK 0 Safety Considerations Consequences of Inadequate Performance:

Exceeding release rates specified by permit General Comments :

Develop a gas release with a release rate less than the maximum.

25-May-2 006 Job Performance Measure Exam Page:

-- 4.I Performance Checklist Element : Conditions : Standards :

Review procedure. Same as Element.

CUE: Give candidate copy of procedure complete up to step 5.0.1 and release form.

Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Close inlet to A GDT Locate control.

PCV-1036A. Simulate placing to close.

Cue: Green lighr is lit.

CUE: Green light lit Location Waste Panel Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Close GT Reuse Valve Locate control.

AOV- 1629. Simulate placing to close.

Location Waste Panel Comments :

Satisfactory n Unsatisfactory 0 Element : Conditions : Standards :

Verify GDT A outlet to Gas Locate control.

Analyzer PCV-1036B closed CUE: Green light lit Location Waste Panel Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Verify all manual outlet valves If Location is requested eSOMS Locate valve.

16 17, 1618, 1619, 1620 Locked poistion is Aux BLD Intermediate Verify Locked Closed closed. level GDT alley 5' elevation CUE: All valves are locked closed.

I 25-May-2006 Page: 5 Job Performance Measure Exam I . -

L/ Comments:

Satisfactory Unsatisfactory c]

  • 6 Element: CRITICAL Conditions : Standards :

Close Release Valve RCV-14. Locate Control.

Simulate closing.

CUE: Valve is closed.

Comments :

Satisfactory 0 Unsatisfactory 7 Element : Conditions : Standards :

Remove Hold on V-1617. Locate valve.

CUE; ESOMS release sheet indicates hold on V1617 relreased.

Simulate removing hold.

CUE: Hold removed.

Comments :

u Satisfactory Unsatisfactory c]

  • I? Element: CRITICAL Conditions : Standards :

Unlock and open V-16 17 Locate valve.

Simulate unlocking and opening.

CUE: Valve no longer turns in that direction.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 9 Element: CRITICAL Conditions : Standards :

Throttle opens RCV-014 while Locates control throttle open maintaining less than release rate. while monitoring release rate.

CUE: R-14 indicates a slight increase.

Comments :

i_-

Satisfactory 0 Unsatisfactory

25-May-2006 Page: 6 Job Performance Measure Exam - . -

Element : Conditions : Standards :

Notify Control Room of release Simulate calling Control initiation Room.

CUE: A GDT indicate 4 p s i pressure.

Comments :

Satisfactory Unsatisfactory 0 Element : CFUTICAL Conditions : Standards :

Close RCV- 14. Locate Control.

Simulate closing.

CUE: Valve indicates closed.

Comments :

Satisfactory 0 Unsatisfactory Element : Conditions : Standards :

Notify Control Room. Simulate calling Control.

CUE: Pressure is 4 psi Comments :

Satisfactory Unsatisfactory [7 Element : CRITICAL Conditions : Standards :

Close and Lock 1617. Locates valve.

Simulate closing and locking.

CUE: Valve no longer turns in that direction.

Comments :

Satisfactory Unsatisfactory [7 Element : Conditions : Standards :

Remove Hold on PCV-1036A. Locate valve.

CUE: Hold is removed.

CUE: No further actions.

Comments :

Satisfactory Unsatisfactory

25-May2006 Page: 7 Job Performance Measure Exam - -

L ~ MQuestions Question Answer References Reference Type Reference ID Description Ref Flag