ML062400449

From kanterella
Jump to navigation Jump to search
Drawing 25212-26902, Rev, 17 and 12179-EM-102D, Piping & Instrumentation Diagram, Reactor Coolant System. Sheet 4 of 6
ML062400449
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/24/2005
From:
Dominion, Dominion Nuclear Connecticut, Stone & Webster Engineering Corp
To:
Office of Nuclear Reactor Regulation
References
12179-EM-102D, 25212-26902, Rev 17
Download: ML062400449 (1)


Text

12179-EM- 102D B C D E F G H I J K L M N REACTOR CONTAINMENT A

MB4 LT LS LAH YR45, YUR46 476A 476A LAL 1 EM-102A I-2 TR413A *P1B 1 OPEN C 26902 SH 1 EM-102A F-2 E-8 C

26902 SH 1 *P1B MB2 HS CLOSED E-9 STRAINER

  • TI MB4 NOTE 3 FAL 423A (EM-102D)

MB4 (BO)

ZA YAH NOT FULL V929 V911B LO FLOW EM-102A G-1 LO FLOW LO FLOW SSPS LPM ASP CLOSED T SSPS SSPS REACTOR TRIP 26902 SH 1 UPPER SET AT RV

  • MV8002B REACTOR TRIP REACTOR TRIP *TI PERMIT MV SIGHT C 1200 PSIG 504 MB4 STEAM 423C H-10 I *MV8002B GLASS V906B C MB4 *FT TO OPEN OPEN MB4 C FI GENERATOR (BO) LOCAL AIR BLEED OMB FI *FT FI *FT 426 H-9
  • SG1B(B-) CONNECTION V936 VALVE 424 425 426 YE V908B 424 425 (BB)

(BR) (BW) FOR OIL FILL LAH 44B1 LS

& DRAIN LAL 476B EM-102F A-3 M MB4 F

  • V85(B-) HS
  • V83(B-) *V84(B-) 3-DGS-500-54-4 LOWER 2 YE 26902 SH 6 2 IMB *MV SIGHT V907B MB4 8061B 8060B 8059B 44B YR45, YUR46 V903 V909B
  • TE 3-RCS-002-129-1(B-) 8001B REACTOR PLANT GLASS OIL LIFT PUMP EM-102A I-2 (B-) GASEOUS DRAINS T V913B PI 31" 423C P1B1 V912B 26902 SH 1 (BR/BO) EM-107A I-2 500
  • V82(B-) 31" X 29" NOTE 3 V910B 3-RCS-031-8-1(B-) RED. ELB CL 1 CL 4 26907 3-RCS-029-6-1(B-) (EM-102D) 8062B D T OIL PUMP P1B1 RUNNING V2001B V915 1/2 X 3/8 RED. *V4(B-)

3-RCS-029-7-1(B-) 3-RCS-014-64-1(Z-) LOCAL CONNECTION HIGH PS FOR OIL FILL & DRAIN I

  • V923(B-) *V987(B-) 492 PRESS PRESS LOW
  • TE *TE *TE 8079B 421A 421C 421D SV D (BW) (BW) (BW)

EM-102C H-10 W 8036B NOTE 8 *V986(B-)

HS 26902 SH 3 I S C C C MB4 *P1B(B-)

  • AV 3-RCS-006-119-1(B-)

A/S LOW PRESSURE PAL 8036B (B-) SAFETY INJECTION MB4 FO I *P1B EM-112A L-7 3 CHEMICAL & RUNNING *P1B 3 LC 26912 SH 1 V69(B-) DET B B-9 VOLUME CONTROL

  • V67(B-)

EM-104A A-3 3-SIL-006-21-1(A-) 8949B (REACTOR COOLANT PUMP OIL SYSTEM)

(VENDOR SUPPLIED)

  • V68(B-) 26904 SH 1 8038B HS T AVG DEFEAT HS 3-CHS-002-240-2(Z-)

EM-102A C-6 MB4 TR411 3-RCS-002-131-1(B-) 26902 SH 1 *SV EM-102A K-5 8032 MB4 MB4 26902 SH 1 (ZO)

TI TI S HS T DEFEAT 422 421A EM-102A H-4 A/S C C 26902 SH 1 FO T AVG T I I NIS T ALL MB4 REACTOR C *AV EM-102A D-4 TI POWER 4 8032 4 26902 SH 1 421B C (ZO)

SSPS I STM FLO/DUMP BLOCK REACTOR PLANT 3-RCS-375-99-2(Z-)

MB4 GASEOUS DRAINS OVERPOWER LO LO T AVG S FO MB4 I I EM-107A F-4 T S.P.

S OVERPOWER 26907 *V105(Z-)

HS TR 411 SSPS EM-102F-A-3 T TRIP 3/8 PCS EM-102A K-5 C 3-DGS-375-501-4 26902 SH 6 JAH D ISOLATE 26902 SH 1 *V115(Z-)

C EM-102A F-5 3-RCS-002-130-1(B-) MB4 8076 TI 26902 SH 1 LOW T AVG MB4 SSPS I 421C 3-RCS-750-106-2(Z-)

S N0TE 5 FWI MB4 3-RCS-750-108-2(Z-)

OVERPOWER TURBINE RUNBACK/ CL ICN-9 S

REACTOR OVERTEMP T ROD WITHDRAWAL BLOCK NIS I POWER T S.P. TR 411 JAH 5 EM-102A K-6 EM-102A E-6 CL 1502 *V104(Z-) *V103(Z-) 5 8069A 8069B 26902 SH 1 26902 SH 1

  • PT456 C NOTE 2 NOTE 2 PRZ (EM-102D)

EM-102C I-6 I (EM-102D)

PRESS 26902 SH 3 MB4 MB4 3-RCS-750-105-2(Z-)

TAH TAH S S C EM-102A F-7 EM-102A F-6 1 1 26902 SH 1 26902 SH 1 OVERTEMP OVERTEMP SSPS TURBINE RUNBACK/

T TRIP T ROD WITHDRAWAL BLOCK 3-RCS-750-107-2(Z-)

6 6 ZA NOT FULL EM-102A H-1 CLOSE 26902 SH 1 3-RCS-750-33-1(B-)

REACTOR HS VESSEL MB4 *REV1(X-)

REACTOR PLANT 3/4 GASEOUS DRAINS V

  • V86(B-)

EM-107A H-2 NOTE 18 CL 4 CL 1 26907 M

3-DGS-500-60-4 8029B

  • V53(B-) 3-RCS-008-30-1(B-)
  • P1B *V56(B-)

E-9 *MV 8044B 8003B (B-)

7 *V54(B-) 7 8045B NOTES:

3-RCS-150-242-1(B-)

1. FOR GENERAL NOTES AND REFERENCE DRAWINGS 3-RCS-150-32-1(B-) SEE EM-102A (26902 SH 1).
  • V947(B-) 2. VALVE 3RCS*V103 IS FOR REACTOR VESSEL OUTER V O-RING LEAKOFF ISOLATION AND VALVE 3RCS*V104
  • V55(B-) IS FOR REACTOR VESSEL INNER O-RING LEAKOFF ISOLATION.

8043B 3. THE "SPARE" REACTOR COOLANT PUMP MOTOR, (SERIAL No. 91P0641)

DOES NOT HAVE THE UPPER AND LOWER OIL LEVEL INDICATION TEST VALVES INSTALLED AS OPPOSED TO THE FOUR ORIGINAL MOTORS SUPPLIED BY WESTINGHOUSE. TEST VALVES V902/V927, V903/ V929, V904/ V931, 3-RCS-008-29-1(B-) AND V905/ V933 ASSOCIATED WITH REACTOR COOLANT PUMPS 3RCS*P1A, 3RCS*P1B, 3RCS*P1C AND 3RCS*P1D RESPECTIVELY, WILL NOT PHYSICALLY EXIST AT WHICHEVER LOCATION THE "SPARE" REACTOR COOLANT PUMP MOTOR IS INSTALLED. FURTHERMORE, QA IF THE "SPARE" REACTOR COOLANT PUMP MOTOR IS NOT INSTALLED 8 8 EM-102A E-8 DURING ANY OPERATING CYCLE, ALL TEST VALVES NOTED ABOVE WILL EXIST IN THE PLANT.

26902 SH 1 MB4 A C *MV8002B OPEN

  • P1B HS F-10 I

STOPPED MB4

  • MV8001B HS PERM *P1B OPEN AFTER I I-2 MB4 TO START START CLOSE OPEN PERM ZA PS-492 PERM *P1B PERM*P1B OPEN MB4 N-3 I *TE413B,423B I

TO START TO START *TE433B,443B PERM MV EM-102A G-8 IMB OMB TO OPEN STOP 26902 SH 1 *MV8001B I PERM MV

  • P1B *TE413C,423C I I-2 TO OPEN 9096B 9 *TE433C,443C 9
  • MV8001B PERM MV *V72(B-)

TAH CLOSE EM-102A B-1 3-SIH-150-142-1(Z-)

I-2 TO OPEN *FE MB4 26902 SH 1 HIGH PRESSURE 428

  • MV8003B (B-) SAFETY INJECTION NOTE 7 NOT FULL OPEN *V73(B-)

F-7 TR413B EM-113A M-5 NUCLEAR SAFETY RELATED EM-102A G-10 26913 SH 1 STOP C C ZA 8041B QA CAT. I , I I YAHH 26902 SH 1 MB4

  • P1B *MV8001B *FIS *FIS C MB4 TE G-2 428A 428B MB2 FSAR FIGURE Q.A.

488A *V74(B-) (B0) (BP)

TE TE YAH *TI 8095B 488B 484B TE 423B I

  • P1B 484A MB4 (BP)

ASP CLOSED NOTE 17 OPERATIONS CRITICAL RUNNING *TI M YE MB3R 423D *V70(B-)

472A (BP)

C YE YIS ZA 8900B NOT FULL *V75(B-) 3-RCS-150-221-1(B-)

LOCKED YE 472B 472A MB3R EM-102A G-1 NOTE 14 CLOSED 8097B 3-RCS-003-133-1(B-)

10 ROTOR 472E 3/4 "X 1/2 "

UPPER *P1B 26902 SH 1 TE YE YIS (TYP) LOW PRESSURE BEARING OPEN C 480A E-9 SAFETY INJECTION 472C 472C 3-RCS-150-32-1(B-)

LUBE OIL CAD RESERVOIR LO EM-112B H-10 NOTE:

REV. DATE DESCRIPTION BY CHK CORR APP YE *TE *V57(B-) MANUAL REVISIONS TO THIS DOCUMENT FOR REACTOR COOLANT REACTOR PLANT 26912 SH 2 *V71(B-)

472D 420B/ *TE CL 1 CL 4 WHEN AS-BUILT ARE PROHIBITED.

PUMP OIL SYSTEM GASEOUS DRAINS 8042B REVISIONS DURING CONSTRUCTION P.A. No.

SEE DETAIL B (M-3) 421B 423B *MV 8948B

  • SE 3-SIL-010-47-1(B-)

C (BW) (BW) 8002B EM-107A H-2 10-24 496 (B-) 3-RCS-010-132-1(B-) 17 INCORP. DCN DM3-00-0440-05 DLW ASK WBZ MP (BW) 26907 -05 TE 3-DGS-500-55-4 Dominion Nuclear Connecticut, Inc.

C 5-7 480B 16 INCORP. DCN DM3-00-0114-01 JCV NJB DLW RJY R Millstone Power Station

-01 REACTOR *V3(B-)

3-RCS-275-9-1(B-) 3-RCS-275-10-1(B-)

COOLANT *V984(B-) 3-10 N/A 15 INCORP. DCN DM3-00-1072-98 KF CSJ AJS MP PUMP 3-RCS-750-31-1(B-) -99 TITLE 3" *P1B(B-) SSPS MILLSTONE POWER STATION-UNIT NO. 3 SAL N/A 14 7-28 3-RCS-031-8-1(B-) LOOP 2 LOW SPEED 3-RCS-004-22-1(B-)

-98 INCORP. DCN DM3-00-0682-98 KF RJK RFL RFL PIPING & INSTRUMENTATION DIAGRAM EM-102A F-11 EM-102C N-5 REACTOR TRIP *V985(B-)

26902 SH 1 26902 SH 3 N/A 13 4-9 KF RFL AJS MP REACTOR COOLANT SYSTEM DISC PRESSURIZATION INCORP. DCN DM3-00-0347-98

-98 MP 11 MB4 CONNECTION BY CHKD. APP. APP.

S ASK / SGA RSH / GMO DAS / DJR FJL 10-29 N/A 12 INCORP. DCN DM3-00-0941-97 AC MP PAM PAM DATE DATE DATE DATE

-97 2/2/88 2/11/88 2/11/88 2/11/88 DLW SCALE MICROFILM DATE DWG. NO. REV 10-2 NONE N/A 11 INCORP. DCN DM3-00-1186-97 AC RJK PAM

-97 PAM 25212-26902 SH 4 OF 6 17 RESP. ENGR: DESN. ENGR:

71-156 6-25 AJS N/A 10 INCORP. DCN DM3-00-0590-97 KF RFL PAM

-97 PAM STONE & WEBSTER ENGINEERING CORPORATION MF P.A.# NO. DATE REVISIONS BY CHK. CORR APP. BOSTON, MASS.

S&W DWG. NO.12179-EM- 102D