ML072910030

From kanterella
Jump to navigation Jump to search
Schematic Diagram 25203-39256, Schematic Isolation Module. Sheet 32
ML072910030
Person / Time
Site: Millstone 
Issue date: 01/14/1999
From:
Dominion Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
References
06-0841B 25203-39256
Download: ML072910030 (1)


Text

Q.A.

25203-39256 SH. 32 SCHEMATIC ISOLATION MODULE 12/9/98 N/A N/A MILLSTONE UNIT 2 WATERFORD, CT.

EATON DWG. NO.

S6N637 SH. 1 OF 1 JMM/WBZ NOTE:

1. FOR ISOLATION MODULE TEST SET SEE DRAWING 39256 SH.399 REDRAWN FROM SAME NNECO DWG. NO. REV. 1 2

INCORP.

DCN DM2-00-0944-98 1-14

-99 WBZ JPP JPP JMM REVISIONS DURING CONSTRUCTION NO.

REVISIONS BY CHK APP APP BY DATE SCALE CHKD.

DATE APP.

DATE APP.

DATE TITLE DWG. NO.

DATE NOTE:

MANUAL REVISIONS TO THIS DOCUMENT WHEN AS-BUILT ARE PROHIBITED.

CAD S:\\MILLSTONE\\4\\DATA1\\MPCAD\\mpdesign\\Users\\scott84\\DGN\\MP\\25203\\CONTROL\\30000\\C3925632.HYB 08/21/2007 R

Dominion Nuclear Connecticut, Inc.

Millstone Power Station