ML072910028
| ML072910028 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/04/2007 |
| From: | Dominion Nuclear Connecticut |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 06-0841B 25203-39069, Rev 9 | |
| Download: ML072910028 (1) | |
Text
Q.A.
1 2
3 4
AW10-K22 LATCH (THIS DWG.)
ANN. "LOW SG PRESS. BYPASS" (DWG. 25203-39069 SH.23A)
SPARE AUTO REMOVAL OF LOW SG PRESS. BYPASS (THIS DWG.)
25203-39069 SH. 19 C.E. DWG. NO.
E-18767-411-040 BECHTEL DWG. NO.
7604-M806-529-4 REACTOR TRIP (ZERO POWER MODE AND LOW PRESSURE)
BYPASS SCHEMATIC WBZ 8-27-96 N/A N/A MILLSTONE UNIT 2 WATERFORD, CT.
WBZ 8
INCORP. DCN DM2-S-0638-96 PER DCR M2-S-0190-96 11/19
/96 RTM DME MEL MEL THERMAL PWR 2-5 HIGHEST LOW S G PRESS.
S2 N/A N/A 9
INCORP.
DCN DM2-00-0342-97 DSJ REDRAWN FROM SAME NNECO DWG. NO. REV. 7 8-19
-97 GFD RWD JB S:\\MILLSTONE\\4\\DATA1\\MPCAD\\mpdesign\\Users\\scott84\\DGN\\MP\\25203\\PROJECT\\30000\\P3906919.HYB 08/21/2007 A
C E
D F
G H
J 3
4 1
2 5
6 7
8 9
10 11 12 13 K
B NO.
DATE REVISIONS BY CHK.
APP.
APP.
REVISIONS DURING CONSTRUCTION BY DATE SCALE CHKD.
DATE APP.
DATE DWG. NO.
APP.
DATE TITLE A
C E
D F
G H
J K
B 5
6 7
8 9
10 11 12 13 NOTE:
MANUAL REVISIONS TO THIS DOCUMENT WHEN AS-BUILT ARE PROHIBITED.
CAD Dominion Nuclear Connecticut, Inc.
Millstone Power Station R