ML062400451

From kanterella
Jump to navigation Jump to search
Drawing 25212-26902, Rev 20 and 12179-EM-102E, Piping & Instrumentation Diagram, Reactor Coolant System. Sheet 5 of 6
ML062400451
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/24/2005
From:
Dominion, Dominion Nuclear Connecticut, Stone & Webster Engineering Corp
To:
Office of Nuclear Reactor Regulation
References
12179-EM-102E, 25212-26902, Rev 20
Download: ML062400451 (1)


Text

12179-EM- 102E B C D E F G H I J K L M N A YR45 FAL YUR46 MB4 YAH EM-102A I-2 LPM 1 HS 26902 SH 1 1 MB4 YR45 YUR46 EM-102A I-3 26902 SH 1 MB4 MB4 MB4 HI/LO AUCT S S S

  • TR433A
  • P1D CLOSED EM-102B F-1 STEAM C C C H-10 26902 SH 2 GENERATOR REACTOR *SG1D(D-) MB4 MB4 MB4 VESSEL ZA M YE NOT FULL *FT FI *FT FI *FT FI
  • REV1(X-) EM-102A G-2 44D1 CLOSED ASP 446 445 444 OMB 26902 SH 1 *TI 446 445 444 (DB) (DW) (DR)
  • MV8002D 443C YE OPEN (DO) 44D 2 E-8 *V163(D-) 2
  • MV *TE 8059D *V165(D-)

REACTOR PLANT 8001D 443C EM-102F A-5 8060D 31" 8061D GASEOUS DRAINS (D-) (DR/DO) 26902 SH 6 EM-107A L-2 3-RCS-002-142-1(D-) 31" X 29" *V166(D-)

3-RCS-029-16-1(D-) 3-RCS-029-17-1(D-) RED. ELB 26907 3-RCS-031-18-1(D-) 8062D 3-DGS-500-50-4 1"

  • V8(D-) 3-RCS-029-17-1(D-)

3-RCS-012-103-1(D-) 3/8 "x 1/2 " RED.

  • V977(D-) *TE *TE *TE *V925(D-)
  • PCV456 441A 441C 441D D 3RHS*MV8702B (DY) (DY) (DY) 8079D EM-102C B-5 HIGH/LOW EM-112A C-4 *V976(D-) NOTE 8 26902 SH 3 PRESSURE 26912 SH 1 3RHS*MV8701B HIGH/LOW EM-112A F-4 INADEQUATE CORE I PRESSURE COOLING SYSTEM 26912 SH 1 3 3 C

MB4 MB3 ASP MB4

  • PI PI *PI PR 403 403B (DP) 403A (DP) 403
  • PI MB4 50 *PT405/*PT405A (DP) EM-102A J-3 I

C I/V

  • PT *PT *PT LY PI 403A 403 50 C 402 51B (DW) (DW) (DP)

OMB 3-RCS-750-41-1(D-)

4 4

  • V154(D-) SSPS LT IMB 8071B 51B TAH NOTE 16 LP SAFETY INJECTION RESIDUAL EM-102A F-7 26902 SH 1 MB4 EM-112A A-1 3-RCS-750-254-2(D-) LT LS LAH 3-RCS-006-140-1(D-) 26912 SH 1 I LO C 478A 478A LAL LO
  • V142(D-) HS- T DEFEAT LOW PRESSURE TURBINE RUNBACK TR411 C 8949D OVERTEMP OVERTEMP EM-102A H-5 3RCS *V966(D-) SAFETY INJECTION ROD WITHDRAWAL EM-102A I-7
  • V2005(D-) T TRIP T TRIP BLOCK 26902 SH 1 EM-112A L-9 26902 SH 1 CL CL 26912 SH 1 STRAINER ICN9 1502 RESIDUAL MB4 MB4 TAH C C 3-SIL-006-25-1(A-) JAH NOTE 3 HEAT REMOVAL EM-102A F-7 MB4 EM-102D S S EM-102A F-6 MB4 V933 V911D EM-112A B-1 3RCS-008-40-1(D-) 26902 SH 1 S TI 26902 SH 1 T 26912 SH 1 UPPER 441A SET AT RV 3-RCS-500-253-2(D-) SIGHT 1200 PSIG 506 5 TR411 SSPS T V934 V906D 5 GLASS EM-102A I-8 LOCAL AIR BLEED TALL OVER POWER CONNECTION VALVE 26902 SH 1 EM-102A C-4 MB4 V908D T TRIP 3-RCS-003-147-1(D-) FOR OIL FILL LAH LS 3-RCS-150-223-1(D-) MB4 26902 SH 1 I & DRAIN JAH LAL 478B 3-SIH-150-144-1(Z-) LOWER F
  • V145(D-) S HS EM-102A D-6 I SSPS SIGHT HIGH PRESSURE STM FLO/DUMP BLOCK V907D MB4 8900D SAFETY INJECTION 26902 SH 1 GLASS V909D C V905 EM-113A M-3 TURBINE RUNBACK OVERPOWER T V913D OIL LIFT PUMP I MB4 PI V912D P1D1 LO LO TAVG ROD WITHDRAWAL T 502 26913 SH 1 BLOCK NOTE 3 MB4 S V910D
  • V967(D-) C EM-102D TI HS D D OIL PUMP P1D1 RUNNING 441C TR411 PCS ISOLATE V2001D T V917 EM-102A I-7 LOCAL CONNECTION PS HIGH OVERTEMP 26902 SH 1 FOR OIL FILL & DRAIN I T S. P.

MB4 494 PRESS TI 3-CHS-003-662-2(Z-) I PRESS OVERPOWER T S. P.

  • V147(D-) 441B LOW TAVG 6 CHEMICAL & I SSPS TAVG LO 6 FWI MB4 MB4 8379B W VOLUME CONTROL TI EM-104A C-2 REACTOR P1D(D-)

NIS I MB4 442 26904 SH 1 POWER

  • V148(D-)

S

  • PT458 *P1D I *P1D 8379A PRZ REACTOR C EM-102C F-4 NIS I RUNNING F-10 PRESS POWER 3-RCS-003-145-1(D-) 26902 SH 3 HS-TAVG DEFEAT ZA NOT FULL EM-102A C-7 C EM-102A G-2 CLOSED 26902 SH 1 PAL 26902 SH 1 MB4 V

3/4 " *P1D

  • V156(D-) 3-DGS-500-58-4 NOT FULL LOW PRESSURE H-10 DETAIL D NOTE 18 OPEN REACTOR COOLANT PUMP SAFETY INJECTION 8029D REACTOR PLANT *P1D OPEN OIL SYSTEM EM-112B N-8 GASEOUS DRAINS H-10

( VENDOR SUPPLIED) 26912 SH 2 EM-107A K-2 7 *V146(D-) 7 26907 HS 3-SIL-010-51-1(D-) M 8948D MB4 3-RCS-008-40-1(D-) *V128(D-)

3-RCS-010-146-1(D-) *V131(D-)

8044D *MV 3RCS-275-20-1(D-) 8003D 3-RCS-150-244-1(D-) (D-)

3-RCS-150-42-1(D-) *V129(D-)

3-RCS-008-39-1(D-)

TAH OMB IMB 8045D MB4 OPEN HS PERM YAHH 8097D V ZA *TR433B NOTE 7 3/4 "X 1/2 " MB4 MB4

  • V149(D-) MB4 EM-102B F-8 C (TYP) *V945(D-)

26902 SH 2 C C C

  • V130(D-)

PERM MV TO OPEN

  • FE *SE LOW SPEED NOTE 17 *MV8001D YAH SSPS 448 8043D 498 8 PERM MV REACTOR TRIP 8 (D-) I C-2 MB4 TE (DY)

TO OPEN HI/LO AUCT 490A

  • V150(D-) *P1D MB4 EM-102A G-9 TE TE
  • FIS 8095D *TE413B, 423B H-10 FOR REACTOR COOLANT 486B 490B TE S 448B *FIS *TE433B, 443B ASP 26902 SH 1 PUMP OIL SYSTEM 448A *MV8001D *TI 482B (DP) EM-102A G-8 SEE DETAIL D (M-5)

(DO) D-1 443D PERM MV TO OPEN 8041D 26902 SH 1 (DP) C YE

  • P1D
  • V151(D-) M 474A H-10 MB3R SAL
  • TE413C, 423C CLOSED NOTE 14 YIS YE EM102A F-11
  • TE433C, 443C TE 474A 474B UPPER EM-102A B-2 ZA MB3R 486A C 26902 SH 1
  • P1D BEARING
  • V152(D-) 26902 SH 1 MB4 OPEN YIS LUBE OIL H-10 YE 474C RESERVOIR 8096D 474C TE 3-DGS-500-51-4 ZA *TE C NOTES:

YE 482A 3-RCS-150-42-1(D-) REACTOR PLANT NOT FULL 440B/

EM-102A G-2 *TE 441B 474D 1. FOR GENERAL NOTES AND REFERENCE DRAWINGS GASEOUS DRAINS CLOSED 443B SEE EM-102A (26902 SH 1).

  • V132(D-) 26902 SH 1 (DY) LOCKED YE LO EM-107A K-2 (DW) 8042D ROTOR 474E 9 26907 9
  • V7(D-)

3-RCS-275-19-1(D-)

  • MV REACTOR
  • V975(D-)

8002D COOLANT 3" NUCLEAR SAFETY RELATED 3-RCS-750-43-1(D-) (D-)

  • P1D I PUMP RUNNING *P1D(D-) 3-RCS-031-18-1(D-) LOOP 4 QA CAT. I , I I
  • V974(D-)
  • MV8002D CLOSE STOP *P1D FSAR FIGURE E-9 3-RCS-002-143-1(D-)

PERM*P1D TO START I

OPEN

  • MV8003D F-7 3-RCS-002-144-1(D-) EM-102F A-5 OPERATIONS CRITICAL Q.A.

26902 SH 6

  • PS494 *MV8002D PERM *P1D I PERM*P1D OPEN N-8 I E-9 TO START TO START SV
  • MV8001D 8036D OPEN 10 C-1 QA *AV HS EM-102A E-9 C 8036D S CLOSE
  • MV8001D (D-)

MB4 CAD 26902 SH 1 NOTE:

I C-2 A/S REV. DATE DESCRIPTION BY CHK CORR APP MANUAL REVISIONS TO THIS DOCUMENT I AFTER FO WHEN AS-BUILT ARE PROHIBITED.

A START *MV8002D CHEMICAL & REVISIONS DURING CONSTRUCTION P.A. No.

CLOSE LC VOLUME CONTROL MB4 E-8 FC 10-24 EM-104A A-4 N/A 20 INCORP. DCN DM3-00-0440-05 DLW ASK WBZ MP HS *MV8003D *V141(D-) -05 NOT FULL OPEN *V140(D-) 26904 SH 1 Dominion Nuclear Connecticut, Inc.

MB4 F-7 5-7

  • P1D 8038D 3-CHS-002-242-2(Z-)

N/A 19

-01 INCORP. DCN DM3-00-0114-01 JCV NJB DLW RJY R Millstone Power Station STOPPED 6-14 N/A 18 INCORP. DCN DM3-00-0004-99 KF RFL DLW MP

-99 TITLE MILLSTONE POWER STATION-UNIT NO. 3 3-10 N/A 17 INCORP. DCN DM3-00-1072-98 KF CSJ AJS MP PIPING & INSTRUMENTATION DIAGRAM

-99 7-28 REACTOR COOLANT SYSTEM N/A 16 INCORP. DCN DM3-00-0682-98 KF RJK RFL RFL

-98 11 BY CHKD. APP. APP.

AFF / SBR RSH / GMO DAS / DRJ FJL 10-29 N/A 15 INCORP. DCN DM3-00-0941-97 AC MP PAM PAM

-97 DATE DATE DATE DATE 2-2-88 2-11-88 2-11-88 2-11-88 SCALE MICROFILM DATE DWG. NO. REV 10-22 INCORP. DCNS DM3-00-1005-97 MP PAM NONE N/A 14 AC

-97 & DM3-00-1037-97 TJY TJY PAM 25212-26902 SH 5 OF 6 20 RESP. ENGR: DESN. ENGR:

71-156 6-25 AJS N/A 13 INCORP. DCN DM3-00-0590-97 KF RFL PAM

-97 PAM STONE & WEBSTER ENGINEERING CORPORATION MF P.A.# NO. DATE REVISIONS BY CHK. CORR APP. BOSTON, MASS.

S&W DWG. NO.12179-EM- 102E