ML062400424

From kanterella
Jump to navigation Jump to search
Drawing 25203-26014, Rev 32, Piping and Instrumentation Diagram, Reactor Coolant System. Sheet 1 of 3
ML062400424
Person / Time
Site: Millstone 
Issue date: 05/15/2005
From:
Dominion, Dominion Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
References
25203-26014, Rev 32
Download: ML062400424 (1)


Text

OPERATIONS CRITICAL NOTES:

1.

FOR NOTES, SYMBOLS AND UNIT #2 FOR ALL OTHER ABBREVIATIONS SEE ANSI STANDARD Y1.1.

PIPING AND INSTRUMENTATION DIAGRAM MILLSTONE NUCLEAR POWER STATION - UNIT 2 REACTOR COOLANT SYSTEM NONE M. R. BIBISI 84-024 S

S S

S S

S SPEC CHG SPEC CHG SPEC CHG 25203-29199 SH.2 SPEC CHG SPEC CHG SPEC CHG S

SPEC CHG SPEC CHG SPEC CHG SPEC CHG S

I I

S HY 9844 FO X-25 NE 9823 NY 9822 NY 9823 NT 9822 NT 9823 C-24 C-24 NJS 9833 NQR 9833 C-24 C-24 C-24 NE 9824 NY 9824 NT 9824 C-24 NE 9826 NY 9826 NT 9826 C-24 NE 9825 NY 9825 NT 9825 C-24 NE 9827 NY 9827 NT 9827 C-24 NAH 9836 NJS 9830 C-24 SPEAKER RC-24 NQR 9835 C-24 LOOSE PARTS MONITOR C-24 C-24 NQR 9833 2

NJS 9832 NT 9829 C-24 C-24 NT 9828 NY 9829 NY 9828 LOOSE PARTS SENSORS LOOSE PARTS SENSORS NE 9829 X-26 HY 9845 FO H-1 2-RC-211 2-RC-406 SPEC CHG FO ZS 406 2RC406 A/S HY 406 HS 406 TE 117 TT 117 TS 117 TAH 117 TI 117 2-RC-038 PRIMARY DRAIN HEADER 3/4 "-HSC-2 2-RC-245 PI 117 2-RC-246 12"-CCA-5 12"-CCA-5 THERMAL SLEEVE THERMAL SLEEVE SAFETY INJECTION &

SHUTDOWN COOLING SAFETY INJECTION &

SHUTDOWN COOLING C03 C03 C03 C03 1"-ECD-5 TE 420 2-RC-419 3/4 "-HRC-6 SPARGER 12"-CCA-10 SHUTDOWN COOLING TE 122 HA TE 122 HB TE 122 HC TE 122 HD T. AVG. CALCULATOR REFER TO DRAWING 26002

& 26005 FOR SECONDARY SIDE INSTRUMENTATION STEAM GENERATOR 2 3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

2-RC-228 2-RC-229 2-RC-224 2-RC-225 2-RC-226 2-RC-227 2-RC-230 2-RC-231 PDT 121A PDT 121B PDT 121C PDT 121D 30"I.D.-CCA-2 30"I.D.-CCA-2 2"-CCA-16 LETDOWN LINE PDT 122 PDT 124Z P40D TE 121 Y

T. AVG. CALCULATOR TE 122 CB TE 122 CD 30" I.D.-CCA-3 THERMAL SLEEVE LOOP 2B 12"-CCA-5 SAFETY INJECTION &

SHUTDOWN COOLING REACTOR VESSEL PRIMARY DRAIN HEADER 2"-HSC-2 2-RC-035D 2"-CCA-14 2-RC-232 PRIMARY DRAIN HEADER 2"-HSC-2 2"-CCA-14 2-RC-233 2-RC-035C P40C 3/8 " S.S.-TUBING 2-RC-84 2-RC-90 2-RC-93 3/8 " S.S.-TUBING 3/8 " S.S.-TUBING 3/8 " S.S.-TUBING 2-RC-89 2-RC-92 2-RC-83 PDT 120 PDT 124Y 2"-CCA-13 CHARGING LINE THERMAL SLEEVE PD120 PDI 120 PDI 122 PDI 124Y PD124Y PDI 124Z PD122 PD124Z T. AVG. CALCULATOR TE 125 TE 122 CA TE 122 CC 30" I.D.-CCA-3 LOOP 1B LOOP 2A 42" I.D.-CCA-1 TE 111 X

T. AVG. CALCULATION TE 112 HA TE 112 HB TE 112 HD TE 112 HC AN 9780 TE 105 INDICATION & ALARM 12"-BCA-1 PRESSURIZER SURGE LINE AN 9781 SPEC CHG 3/4 "-CCB-10 T.C.

SPEC CHG 3/4 "-CCB-10 FC FO A/S CIAS CLOSES 2-RC-210 2-RC-061 2-RC-002 HV 1062 ZS 1062 HY 1062 HS 1062 2RC002 SPEC CHG 2-RC-213 2-RC-244 3/4 "-CCB-10 T.C.

2-RC-060 3/8 "-S.S. TUBING 3/4 "-CCB-10 2-RC-001 FC HV 1064 SPEC CHG 3/4 "-CCB-10 3/8 "-S.S. TUBING ZS 1064 2RC001 FO HY 1064 A/S CIAS CLOSES HS 1064 3/4 "

2-RC-214 2-RC-433 2-RC-215 2-RC-040 SPEC CHG 2"-HSC-2 PRIMARY DRAIN HEADER REFER TO DRAWING 26002

& 26005 FOR SECONDARY SIDE INSTRUMENTATION SPEC CHG SPEC CHG SPEC CHG SPEC CHG 3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

3/4 "

30"I.D.-CCA-2 30"I.D.-CCA-2 PRIMARY DRAIN HEADER 2"-HSC-2 2"-CCA-14 PRIMARY DRAIN HEADER 2"-HSC-2 2"-CCA-14 3/8 " S.S.-TUBING 3/8 " S.S.-TUBING 2-RC-216 2-RC-217 2-RC-218 2-RC-219 PDT 111A PDT 111B PDT 111C PDT 111D 2-RC-220 2-RC-221 2-RC-222 2-RC-223 1"

1" 1"

1" 1"

1" 1"

1" STEAM GENERATOR 1 2-RC-234 2-RC-035A REACTOR COOLANT PDT PDT 2-RC-96 110 PD110 PDI 110 PDI 112 PDI PDI 2-RC-94 124W 124X 124W PD124W P40A THERMAL SLEEVE 2"-CCA-13 CHARGING LINE TE 111 Y

T. AVG. CALCULATOR TE 112 CA TE 112 CC LOOP 1A 12"-CCA-5 30" I.D.-CCA-3 SAFETY INJECTION &

SHUTDOWN COOLING 3"-CCA-11 30" I.D.-CCA-3 T. AVG. CALCULATOR TE 115 TE 112 CD TE 112 CB 3"-CCA-11 REACTOR COOLANT P40B 2-RC-82 3/8 "S.S.

2-RC-88 2-RC-91 PDT 124X PD124X PD112 PDT 112 2-RC-035B 2-RC-235 TE 103 INDICATION & ALARM TE 104 3"-CCA-11 2-RC-251 2-RC-237 3/4 "

FC 2-RC-100F PRESSURIZER PRESSURE CONTROL FC 2-RC-100E ZS 100E 2-RC-033 3"-CCA-11 3/4 "-HSC-4 2-RC-252 4"-CCA-11 3/4 "-HSC-4 2-RC-036B 2-RC-037B PRIMARY DRAIN HEADER 2-RC-037A 2-RC-036A 3/4 "-HSC-2 2-RC-034 ZS 100F 3/4 "

2-RC-236 2-RC-250 2-RC-253 3"-CCA-11 3/4 "-HRC-6 SYSTEM VENT 3/4 "

2-RC-014 VENT SPEC CHG SPEC CHG 3/4 "-CCA-11 2-RC-030 2-GAN-242 3/4 "-GCD-5 N SUPPLY 2

6-26-87 6-26-87 S. REINHARDT 26015 SH. 3 (G-5) 2-IA-59 26024 SH. 1 (D-10) 26024 SH. 1 (D-10) 26017 SH. 2 (J-13)

REACTOR COOLANT PUMP 2B (SH. 3)

TM/LPT SETPOINT & lT POWER REFERENCE CALCULATORS TM/LPT SETPOINT & lT POWER REFERENCE CALCULATORS NQR 9834 26015 SH. 3 (A-12)

TE 121 X

TI 121X T121X C-03 NARROW RANGE TT 121X WIDE RANGE TI C-10 121X-1 3"-CCA-11 3/4 "-CCA-11 1/2 "-HSC-4 26024 SH. 1 (C-10) 3/4 "-CCD-1 26017 SH. 1 (H-13)

REACTOR COOLANT PUMP 2A (SH. 3)

TI 125-1 TT 125 TM/LPT SETPOINT & lT POWER REFERENCE CALCULATORS 26015 SH. 3 (C-12) 26024 SH. 1 (C-10)

FC PUMP 1A (SH. 3) 26017 SH. 1 (J-13) 26024 SH. 1 (D-10) 26015 SH. 3 (H-12)

TM/LPT SETPOINT & lT POWER REFERENCE CALCULATORS TT 111X TI 111X TW111X WR NR 26024 SH. 1 (D-10) 3/8 "S.S. TUBE 26015 SH. 3 (E-12) 2-IA-58 PUMP 1B (SH. 3)

TUBING 3/4 "-BCA-1 TM/LPT SETPOINT & lT POWER REFERENCE CALCULATORS FC FC SH. 2 (H-3)

SH. 2 (F-6) 1"-ECD-6 PRESSURIZER SPRAY LINE TE420 2-RC-43 2-RC-97 TT 122 CB TT 122 CD TI 122 CD TI 122 CB TT 121 Y

TI 121 Y

TT 122 CA TT 122 CC TI 122 HB TT 122 HB TI 122 HD TT 122 HD TT 122 HA TI 122 HC TT 122 HC TT 112 CB TI 112 CB TT 112 CD TI 112 CD TT 115 TI 112 HB TT 112 HB TT 112 HC TI 112 HC TT 112 HD TT 112 HA TI 112 HD TI 112 HA TT 112 CA TT 112 CC TM/LPT SETPOINT & lT POWER REFERENCE CALCULATORS TI 112 CA TI 112 CC TT 111 Y

SUPERSEDES 25203-26014 THRU REVISION 22 THERMAL SLEEVE 42"I.D.-CCA-1 GC/FAD SBR 11-12-87 11-12-87 INADEQUATE CORE COOLING MONITOR TR 125 C10 C09 TI 125 C03 C21 TA 125 26014 SH. 2 (F-11)

C03 C03 TI 122 CA TI 122 CC C03 C03 C03 C09 INADEQUATE CORE COOLING MONITOR TA 121X FW REG SYS.

TA 121Y NE 9828 CO3 CO3 CO3 CO3 INADEQUATE CORE COOLING MONITOR 26014 SH. 2 (F-12)

TI 115 TR 115 CO3 C21 TA 115 INADEQUATE CORE COOLING MONITOR TA 111X CO3 T112HC CO3 CO3 CO3 T112CC CO3 CO3 TI 111Y CO3 FW REG SYS.

TA 111Y C03 C03 T111Y T121Y 2-RC-439 26020 SH. 5 (F-9) 26028 SH. 3 (E-4)

SPEC.

CHG.

(J-11)

(J-12)

(F-10)

(F-10)

LE 112 LT 112 PCA-3 C04 C-262 LE 122 LT 122 122 LY L-122 LAL 122 C04 PCA-3 3"ECD INSTR.

CL. C-4 LI 112 DRAIN FROM LE-112 TO LE-112 1/2 "S.S. TUBE SPEC.

CHG.

INSTR.

CL. C-4 INSTR.

CL. C-4 122 C04 LALL LAL 112 C04 112 112 1/2 "

LALL 1/2 "S.S. TUBE 2-RC-442 2-RC-441 2-RC-443 2-RC-445 2-RC-444 2-RC-450 2-RC-449 2-RC-446 2-RC-451 TI 122 HA C03 I

Q.A.

HS 122 C03R 2.

THIS SECTION OF 3/4 " -HRC-6 WILL BE REMOVED AS AN INTERFERENCE WHEN CACS/CONTAINMENT PURGE SYSTEM CROSS CONNECT DUCTWORK IS INSTALLED DURING MODES 5 OR 6.

SEE NOTE 2 C03R C03R WATERFORD, CT 2-SI-237 3/4 "

3/8 " SST 3/8 " SST 3/8 " SST 3/8 " SST ABBREVIATIONS SEE 26001 SH. 1, 2 & 3.

2-SI-247 SPEC CHG 3/8 " SST 3/4 "

3/4 "

3/8 " SST 3/8 " SST 3/8 " SST 3/8 " SST 2"

3/4 "

SPEC CHG SH.2 (J-10) 26024 SH.1 (E-10)

SH.2 (J-10) 3/8 " O.D. CU.

3/8 " O.D. CU.

3/8 " O.D. CU.

25203-29199 SH.2 25203-29199 SH.2 25203-29199 SH.2 25203-29199 SH.2 25203-29199 SH.2 25203-29199 SH.8 25203-29199 SH.5 SH. 2 (H-13) 25203-29199 SH.1 25203-29199 SH.1 25203-29199 SH.8 2-SI-227 25203-29199 SH.1 25203-29199 SH.1 25203-29199 SH.1 25203-29199 SH.1 2-SI-217 FLOW INDICATION &

LOW FLOW TRIP 25203-28500 SH. 72, 76, 77, 78 FLOW INDICATION &

LOW FLOW TRIP 25203-28500 SH. 72, 76, 77, 78 T122CB T122CD T122HC T122HA T122HD TW121X T122HB

=

T122CA T125 2RC100F #

=

2RC100E #

=

L112 T112CB T112CD T115

=

T111X T112HB T112HA T112HD T112CA

=

T122CC 3/4 "-CCA-11 SPEC CHG CCA HSC SPEC CHG CCA HSC 3/4 "-CCA-15 1"-CCA-21 1"-CCA-21 1"-CCA-21 1"-CCA-21 1"-CCA-21 1"-CCA-21 1"-CCA-21 1"-CCA-21 THE PRESSURIZER SURGE LINE MATERIAL IS 12" SCH. 160, 3.

STAINLESS STEEL, TYPE 316, SEAMLESS ASTM-A-351, GR CF8M NOTE 3 L.O.

L.C.

2-RC-015 L.C.

LOOSE PARTS SENSORS NE 9822 LOOSE PARTS SENSORS CCA (TYP. 8 PLCS)

C-2 INSTR.

CL. 2 CCA C-2 INSTR.

CL. 2 (TYP. 8 PLCS)

CCD CCA ECD CCD FSAR FIGURE SAFETY EVALUATION MAYBE REQUIRED PRIOR TO CHANGES 3/4 " S.S. TUBE 28 INC. DCN DM2-00-0752-00 JCV DLW RJY MP 3-7

-02 DRIP PAN TO CONTAINMENT BUILDING DRAINS 26024 SH.1 (D-5) 3/4 " TYGON TUBE SPARGER 29 INC. DCN DM2-00-0415-01 3-13

-02 JTD SCM LJC JGR CHANGES MADE TO THIS P&ID MUST ALSO BE REFLECTED ON THE INSERVICE INSPECTION PROGRAM DRAWING 25203-26700 SH. 9 30 INC. DCN DM2-00-0544-01 BLM 5-03

-02 TP SBB CAM 25203-26014 SH. 1 OF 3 32 31 INC. DCN DM2-00-0278-04 3/4 "-CCB-13 MP WBZ ASK DLW 4-17

-05 3/4 " O.D.

INSTR.

CL. C-4 HRC INSTR.

CL. C-4 3/4 " O.D.

DR.

2-RC-473 2-RC-448 2-RC-447 1" O.D.

3/4 " O.D.

2-RC-472 DR.

FLEXIBLE HOSE PRESSURIZER VENT 26014 SH. 2 (K-8) 1" O.D.

3/4 " X 1" O.D.

INSTR.

CL. C-4 FG 413 HCD 3/4 "-HCD-152 1"x 3/4 "

CCA HCD 2-RC-039 2-RC-413 2-RC-427 2-RC-426 1"

DR.

2-RC-212 L.O.

1"-CCA-4 S.S.

CCA S.S. &

INCONEL (VENDOR FURNISHED WITH REACTOR HEAD)

INCONEL 3/4 "

1"-CCA-4 1"-CCA-18 1"-CCA-4 HS 1417 ZS 1417 HS 1416 ZS 1416 L.O.

2-RC-470 2-RC-414 2-RC-415 FC HS 1415 ZS 1415 HS 1414 ZS 1414 INSTR.

CL.C-4 ECD 1"-CCD-1 1"-CCD-1 2-RC-417 FC 2-RC-416 2-RC-471 L.O.

1"-CCA-4 32 EAL INC. DCN DM2-00-0103-04

& DM2-03-0103-04 1"-CCA-4 1"-CCA-4 CCA CCD HRC 5-15

-05 WBZ RFL MP REV w:\\mpcad\\cadadmin\\users\\mich652-it\\pdf\\Batch_1\\C260141.DGN 10/31/2005 A

C E

D F

G H

J 3

4 1

2 5

6 7

8 9

10 11 12 13 K

B NO.

DATE REVISIONS BY CHK.

APP.

APP.

REVISIONS DURING CONSTRUCTION BY DATE SCALE CHKD.

DATE APP.

DATE DWG. NO.

APP.

DATE TITLE A

C E

D F

G H

J K

B 5

6 7

8 9

10 11 12 13 NOTE:

MANUAL REVISIONS TO THIS DOCUMENT WHEN AS-BUILT ARE PROHIBITED.

CAD Dominion Nuclear Connecticut, Inc.

Millstone Power Station R