ML062400439
ML062400439 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 10/24/2005 |
From: | Dominion, Dominion Nuclear Connecticut, Stone & Webster Engineering Corp |
To: | Office of Nuclear Reactor Regulation |
References | |
12179-EM-102B, 25212-26902, Rev 20 | |
Download: ML062400439 (1) | |
Text
12179-EM- 102B B C D E F G H I J K L M N FAL A YR45 YUR46 MB4 YAH EM-102A I-2 LPM 1 26902 SH 1 1 HS YR45 MB4 YUR46 MB4
- TR *TE443C EM-102A I-2 433A EM-102E F-2 26902 SH 1 MB4 MB4 MB4 (CO) S S S
- P1C 26902 SH 5 OPEN *MV8002C H-10 PERMIT MV LOW FLOW LOW FLOW LOW FLOW I E-8 SSPS SSPS SSPS TO OPEN HI/LO AUCT REACTOR TRIP REACTOR TRIP REACTOR TRIP
- P1C EM-102A E-2 CLOSED STEAM C C C H-10 26902 SH 1 GENERATOR
- SG1C(C-) MB4 MB4 MB4 ZA M YE NOT FULL C *FT FI *FT FI *FT FI EM-102A F-1 44C1 OMB OMB CLOSED ASP 436 435 434 26902 SH 1 *TI (CB) 436 (CW) 435 OMB (CR) 434
- MV8002C 433C YE OPEN (CO) 44C 2 E-8 2
- V124(C-) *V125(C-)
REACTOR PLANT 433C EM-102F A-4 8060C IMB CL 4 CL 1 8001C 31" 8061C GASEOUS DRAINS (C-) (CR/CO) 26902 SH 6 EM-107A G-2 3-RCS-002-134-1(C-) 31" X 29" *V127(C-)
3-RCS-029-11-1(C-) 3-RCS-029-12-1(C-) RED. ELB 26907 3-RCS-031-13-1(C-) 8062C 3-DGS-500-52-4 *V6(C-)
- V982(C-) *TE *TE *TE *V924(C-)
431A 431C 431D D
- V101(C-) (CB) (CB) (CB) 8079C SV
- V981(C-) NOTE 8 8036C 8077 PI C C C HS *AV 404 S 8036C MB4
- V116(C-) (C-)
CL 1502 A/S 8038C 8086 3 I CHEMICAL & FO LC 3 3-RCS-750-118-2(C-) 3-RCS-006-120-1(C-)
VOLUME CONTROL FC *V99(C-)
CL ICN-9 REACTOR PLANT EM-104A A-3 SAMPLING 26904 SH 1 *V100(C-)
EM-144B H-2 8036C 3-CHS-002-241-2(Z-)
26944 SH 2 3-SIH-006-62-1(B-)
- V102(C-)
3-SSR-375-8-2(C-) HIGH PRESSURE 8949C SAFETY INJECTION 3-RCS-002-136-1(C-)
EM-113B L-9 26913 SH 2 4 4 SSPS TAH EM-102A F-6 MB4 26902 SH 1 LT LS LAH 3-RCS-750-38-1(C-)
477A 477A LAL C I HS- T DEFEAT C TURBINE RUNBACK TR411 OVERTEMP OVERTEMP EM-102A H-4 ROD WITHDRAWAL EM-102A I-7 T TRIP T BLOCK 26902 SH 1 26902 SH 1 STRAINER MB4 MB4 TAH C C NOTE 3 JAH S S EM-102A E-7 EM-102D EM-102A F-6 MB4 MB4 V931 V911C 3RCS-008-35-1(C-) 26902 SH 1 TI 26902 SH 1 S UPPER T 431A SIGHT SET AT RV 5 SSPS T GLASS V935 1200 PSIG 505 5 TR411 V906C EM-102A I-7 LOCAL AIR BLEED TALL OVER POWER CONNECTION VALVE 26902 SH 1 EM-102A D-4 MB4 V908C T TRIP FOR OIL FILL LAH LS 26902 SH 1 I & DRAIN JAH MB4 LAL 477B S LOWER F HS EM-102A D-6 I SSPS SIGHT STM FLO/DUMP BLOCK V907C MB4 26902 SH 1 GLASS V904 V909C C
OIL LIFT PUMP TURBINE RUNBACK OVERPOWER MB4 T V913C I PI P1C1 V912C LO LO TAVG ROD WITHDRAWAL T 501 BLOCK S NOTE 3 MB4 V910C C EM-102D TI HS TR411 ISOLATE V2001C D OIL PUMP P1C1 RUNNING 431C PCS V916 T EM-102A I-7 LOCAL CONNECTION FOR PS HIGH OVERTEMP 26902 SH 1 OIL FILL & DRAIN I T. S. P.
MB4 493 PRESS TI I
PRESS OVERPOWER T. S. P.
431B LOW TAVG 6 I SSPS TAVG LO 6 FWI MB4 MB4 W
TI REACTOR MB4 432 *P1C(C-)
NIS I POWER S
- PT457 REACTOR *P1C I *P1C PRZ C EM-102C F-6 NIS I RUNNING F-10 PRESS POWER 26902 SH 3 HS-TAVG DEFEAT ZA NOT FULL EM-102A C-7 C EM-102A F-2 CLOSED 26902 SH 1 PAL 26902 SH 1 CL 4 MB4 V
- P1C 3/4 " OPEN
- V117(C-) 3-DGS-500-59-4 H-10 DETAIL C 3RCS-029-11-1(C-) NOTE 18 REACTOR COOLANT PUMP 8029C REACTOR PLANT *P1C OIL SYSTEM GASEOUS DRAINS NOT FULL H-10 3-RCS-002-135-1(C-) (VENDOR SUPPLIED)
CL 1 EM-107A G-2 OPEN 7 7 26907 HS M
MB4 3-RCS-008-35-1(C-) *V87(C-)
- V90(C-)
EM-102F A-4 8044C *MV 26902 SH 6 8003C 3-RCS-150-243-1(C-) (C-)
3-RCS-150-37-1(C-) *V88(C-)
3-RCS-008-34-1(C-)
TAH OMB IMB 3-RCS-750-36-1(C-) 8045C MB4
- V946(C-) HS OPEN YAHH 3/4 "X 1/2 "
ZA PERM MB4 NOTE 7 8096C MB4 *TR MB4 (TYP)
V C
- V111(C-) MB4 433B (CP) C C
- FE PERM MV TO OPEN
- SE LOW SPEED 438 *MV8001C YAH SSPS NOTE 17 *V89(C-) 497 8 (C-) PERM MV REACTOR TRIP 8 8043C I C-2 C MB4 TE (CB)
EM-102E F-8 TO OPEN 26902 SH 5
- P1C 489A
- TE443B
- FIS *TE413B, 423B G-10 FOR REACTOR COOLANT HIGH PRESSURE 8041C 485B 489B S 438B *FIS *TE433B, 443B ASP PUMP OIL SYSTEM SAFETY INJECTION *MV8001C (CP) 438A EM-102A G-8 *TI SEE DETAIL C (M-5)
EM-113A M-2 3-SIH-150-143-1(Z-) (CO) D-1 433D TE PERM MV TO OPEN 8095C 26902 SH 1 YE 485A C 26913 SH 1 3-SIL-010-49-1(C-) *P1C (CP)
- V113(C-) M 473A MB3R EM-102A G-9 HI/LO AUCT 26902 SH 1 H-10 SAL CLOSED
- TE413C, 423C NOTE 14 YIS YE EM-102A F-11
- V106(C-) *TE433C, 443C
- V114(C-) 26902 SH 1 MB4 YIS YE LUBE OIL 481A
- V107(C-) SAFETY INJECTION 473C RESERVOIR EM-112B K-9 8097C 473C 3-RCS-150-222-1(C-) 3-DGS-500-53-4 ZA *TE NOTES:
26912 SH 2 NOT FULL 430B/ YE 3-RCS-150-37-1(C-) REACTOR PLANT EM-102A F-1 *TE 1. FOR GENERAL NOTES AND REFERENCE DRAWINGS 431B 473D 3-RCS-010-138-1(C-) GASEOUS DRAINS CLOSED TE
- V91(C-) LO 26902 SH 1 433B (CB) LOCKED C SEE EM-102A (26902 SH 1).
YE 481B 3-RCS-003-139-1(C-) EM-107A H-2 (CW) 8042C ROTOR 473E 9 26907 9 CL 4 CL 1
- V5(C-)
3-RCS-275-15-1(C-) 3-RCS-275-14-1(C-)
- MV REACTOR NUCLEAR SAFETY RELATED 8002C COOLANT 3" LOCAL/REMOTE HS *V980(C-)
LOCAL/REMOTE HS (C-) PUMP QA CAT. I , I I TSPA TSPA *P1C(C-)
3-RCS-031-13-1(C-) LOOP 3
- V108(Z-) *V979(C-)
REACTOR MB3 MB3 LO A 8085 VESSEL A LOCAL CONTROL LOCAL CONTROL *P1C I FSAR FIGURE
- REV1(X-)
3CHS*AV8149A, B, C 3-RCS-003-137-1(Z-) RUNNING CLOSE
- MV8002C OPERATIONS CRITICAL Q.A.
STOP *P1C EM-104A F-1,G-1,H-1 E-8 26904 SH 1 *MV8003C HS HS HS HS PERM *P1C I OPEN F-7 ASP MB3 ASP MB3 TO START PS493 *MV8002C PERM P1C PERM *P1C OPEN 10 VLVS VLVS *LT460/461 M-6 I I E-8 3CHS*AV8149A, B, C *LT459/461 CLOSED CLOSE TO START TO START CLOSED CLOSE I EM-102C N-6 EM-104A F-1,G-1,H-1 I EM-102C N-7 PERM HAND LCV PERM HAND LCV 26902 SH 3 OPEN
- MV8001C CAD 26904 SH 1 26902 SH 3 OPER NOTE:
OPER QA C-2 REV. DATE DESCRIPTION BY CHK CORR APP MANUAL REVISIONS TO THIS DOCUMENT
- SOV EM-102A E-8 C WHEN AS-BUILT ARE PROHIBITED.
- MV8002C REVISIONS DURING CONSTRUCTION P.A. No.
459 26902 SH CLOSE S (ZO) S E-8 10-24 I AFTER 20 INCORP. DCN DM3-00-0440-05 DLW ASK WBZ MP A/S *MV8001C -05 A/S A START STOP CLOSE Dominion Nuclear Connecticut, Inc.
I 5-7 FO MB4 C-2 19 INCORP. DCN DM3-00-0114-01 JCV NJB DLW RJY
- P1C -01 R Millstone Power Station FO HS
- LCV *SOV *MV8003C 459 460 MB4 NOT FULL 3-10 KF N/A 18 INCORP. DCN DM3-00-1072-98 CSJ AJS MP W. SHERMAN/F. FORTINI F-7 C (ZO) (ZO) *P1C -99 TITLE C OPEN MILLSTONE POWER STATION-UNIT NO. 3 STOPPED 3CHS*SV8149A, B, C 3CHS*SV8149A, B, C 7-28 VLV N/A 17 INCORP. DCN DM3-00-0682-98 KF RJK RFL RFL EM-104A G-2,H-2 VLV -98 PIPING & INSTRUMENTATION DIAGRAM CLOSED EM-104A G-2,H-2 OMB IMB CLOSED W.F. KOLAITIS CHEMICAL & 26904 SH 1 26904 SH 1 REACTOR COOLANT SYSTEM 10-29 VOLUME CONTROL N/A 16 INCORP. DCN DM3-00-0941-97 AC MP PAM PAM FC -97 11 FC EM-104A D-1 BY CHKD. APP. APP.
FJE/RTL CEM/WD RNB/DEK/WS RWA
- V110(Z-) 6-25 AJS 26904 SH 1 *V109(Z-) N/A 15 INCORP. DCN DM3-00-0590-97 KF RFL PAM
-97 PAM DATE 3-16-82 DATE 3-26-82 DATE 3-31-82 DATE 4-17-82 3-CHS-003-1-2(Z-) LCV
- V970(Z-) 3-RCS-003-171-1(Z-) V SCALE MICROFILM DATE 460 6-5 DWG. NO. REV AJS NONE NOTE 15 *V971(Z-) N/A 14 INCORP. DCN DM3-00-0637-97 VP RFL PAM (ZO) -97 PAM 25212-26902 SH 2 OF 6 20 RESP. ENGR: DESN. ENGR:
LY 71-156 LT C 2-11 AJS 51C 51C N/A 13 INCORP. DCN DM3-S-0574-96 VP RFL PAM
-97 PAM STONE & WEBSTER ENGINEERING CORPORATION MF P.A.# NO. DATE REVISIONS BY CHK. CORR APP. BOSTON, MASS.
S&W DWG. NO.12179-EM- 102B DRAWN BY: F.J. EVERY CHECKED BY: R.T. LAW/R.C. CARLSON