ML062400434

From kanterella
Jump to navigation Jump to search
Drawing 25212-26902, Rev 25 and 12179-EM-102A, Piping & Instrumentation Diagram, Reactor Coolant System . Sheet 1 of 6
ML062400434
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/24/2005
From:
Dominion, Dominion Nuclear Connecticut, Stone & Webster Engineering Corp
To:
Office of Nuclear Reactor Regulation
References
12179-EM-102A, 25212-26902, Rev 25
Download: ML062400434 (1)


Text

12179-EM- 102A B C D E F G H I J K L M N A

  • MV8002A YAH G-9 LPM 1 *MV8002B *MV8001B *MV8003B 1 EM-102D F-9 TA T HOT EM-102D I-2 EM-102D G-6 I

26902 SH 4 MB4 NORMAL 26902 SH 4 26902 SH 4 YE

  • MV8001C I 40
  • MV8002C *PCV455A *TE443C *MV8002B EM-102B C-2 YE44B1 LO AUCT EM-102B D-9 EM-102C C-7 EM-102D G-10 HI AUCT EM-102E F-1 YAH T HOT T HOT 26902 SH 2 VALVE T HOT 26902 SH 2 26902 SH 3 26902 SH 4 EM-102D E-1 NORMAL 26902 SH 5 *MV8002C OPEN LPM ZA 26902 SH 4 TAL *TE433C TA EM-102B E-9 I YE44B
  • MV8002D MB4 MB4 EM-102B E-2 MB4 26902 SH 2 EM-102D F-2 EM-102E D-9 *MV8001D 26902 SH 2 *MV8003C 26902 SH 4 26902 SH 5 I I EM-102E C-2 YE EM-102B F-7 YE44C 41 26902 SH 5 3-RCS-001-226-1(Z-)

26902 SH 2 I EM-102B F-1 MB4 *MV8002D EM-102E E-9 26902 SH 2 YAH EM-102F-J-3 S *MV8002A MB4 REACTOR CONTAINMENT *TE423C 26902 SH 5 HS YE44C1 LPM 1 26902 SH 6 FAL I-10 2 EM-102D F-1 EM-102B G-1 2 S *MV8003D MB4 MB4 MB4 YAH 26902 SH 4 EM-102E F-6 26902 SH 2 3-RCS-001-225-1(Z-)

S LPM *V956(Z-)

LO FLOW 26902 SH 5 NOT FULL YE44D *V153(Z-) 1" CONNECTORS (TYP)

LO FLOW I V SSPS SSPS YE LO REACTOR TRIP LO FLOW STEAM TR *MV8002A CLOSED EM-102E F-1 REACTOR TRIP SSPS 42 MB4 REACTOR TRIP GENERATOR 413A PERM MV *MV8003A 26902 SH 5 8070 MB4 *FT FI *FT MB4 *FT H-9 I *P1A FI FI *SG1A(A-) TO OPEN E-8 LPM 414 415 416 YE YE44D1 YAH 414 (AR) 415 (AW) 416 E-9 YR OMB OMB OMB (AB) 44A1 EM-102E G-1

  • MV8002A LPM 3-RCS-029-2-1(A-) M OPEN 26902 SH 5 45 REACTOR I-9 C *V47(A-) C *V48(A-) C VESSEL
  • V49(A-)

YE 3-RCS-002-126-1(A-) *P1A 3-RCS-001-077-1(Z-)

IMB IMB IMB *MV CLOSED REACTOR PLANT *REV1(X-)

8061A 8060A 8059A 44A

  • TE MB2 ASP C 8001A D-9 GASEOUS DRAINS 413C (A-) LPM YE 31" (AR)(AO) *TI *TI EM-107A K-2 YUR 43 EM-102F A-2 31" X 29" 413A 413C 3-DGS-500-56-4 26907
  • V46(A-) (AO) (AO) 26902 SH 6 CL 1 46 3-RCS-031-3-1(A-) RED. ELB CL 4 3-RCS-029-1-1(A-)

8062A 1"

  • V2(A-)

3 1/2 X 3/8 RED. 3

  • V992(A-) INADEQUATE CORE
  • V922(A-) *TE *TE *TE 8056 COOLING SYSTEM 411A 411C 411D *PCV455A 8079A (AR) (AR) (AR) *V25(A-) 3-RCS-750-110-2(A-) EM-102C C-8 D

NOTE 8 C C C CL 1502 26902 SH 3 LO LO T AVG *V991(A-)

SSPS I 3RHS*MV8701A STM FLOW/DUMP BLOCK PR403 3RHS*MV8702A HI/LO EM-102E C-4 EM-112A A-8, E-3 I CL ICN-9 PRESS 26902 SH 5

  • TE441A/B *TE421A/B 3-SSR-375-7-2(A-)

TALL EM-102E H-5 EM-102D B-4 C ISOLATE MB4 MB4 REACTOR PLANT HS 26902 SH 5 26902 SH 4 MB4 TI SAMPLING C MB4 MB4 PSC 412 EM-144B H-2 ASP *PI *PI PI

  • TE431A/B S 26944 SH 2 405B 405 405A I I/V EM-102B H-5 (AO) (AO)

LO T AVG 26902 SH 2 TAVG T LY SSPS I I I C *PT *PT 51A 4 FWI 405 405A MB4 4 C *PI *PT (AR) (AR) LT LS LAH MB4 T 475A 475A LAL REACTOR *TE421A/B 49 49 NIS I MB4 DEFEAT T LOCAL 3" C HS (AO) (AO)

S POWER TI EM-102D E-4 CONNECTION C MB4 LT 411A 26902 SH 4 FOR OIL 51A FILL &

NOTE 14 PT *V51(A-)

E-10 DRAIN

  • TE431A/B 405B NOTE 16 STRAINER SV T 8071A 8036A TR411 EM-102B I-4 LP SAFETY INJECTION NOTE 3 OVERPOWER MB4 T S.P.

HS I-5 26902 SH 2 EM-112A H-2 S TI EM-102D EM-102F A-2 MB4 I 3-RCS-012-123-1(A-) 3-RCS-750-252-2(A-)

  • AV 411B 26912 SH 1 V927 V911A 26902 SH 6 LO LO 8036A A/S *TE441A/B T AUCT T HIGH PRESSURE 3-RCS-006-124-1(A-) T T UPPER SET AT RV (A-) EM-102E I-4 DEVIATION SAFETY INJECTION *V969(A-) 3RCS* SIGHT 3-RCS-002-127-1(A-) TR411 V937 1,200 PSIG 503 FO 26902 SH 5 EM-113B L-10 V2003(A-) GLASS V906A HI AUCT CHEMICAL & I-5 TDA I AIR BLEED LC VOLUME CONTROL MB4 26913 SH 2 *V26(A-)
  • V23(A-) T VALVE C CL CL MB4 V908A EM-104A A-4 8949A 3-SIH-006-59-1(B-) RESIDUAL 1502 ICN9 LAH LS FC C HEAT REMOVAL 5 *V24(A-) 26904 SH 1 LAL 475B 5 EM-112A H-2 LOWER F HS 8038A SIGHT 3-CHS-002-239-2(Z-) 26912 SH 1 V907A GLASS MB4 V902 V909A 3-RCS-002-128-1(A-) I 3-RCS-500-251-2(A-) OIL LIFT PUMP T V913A PI REACTOR OVERTEMP *TE411A/B V912A P1A1 LOOP 1 499 NIS I I NOTE 3 POWER T S.P. *TE421A/B F-4 V910A T EM-102D MB4 OVERPOWER OVERPOWER EM-102D E-5 I V2001A D OIL PUMP P1A1 RUNNING TURB RUNBACK/ SSPS *TE421A/B T T TRIP *TE411A/B LOOP 2 V914 T ROD INSERT LMT TI ROD WITHDRAWAL 26902 SH 4 LOOP 1 OVERPOWER EM-102D E-3 LOCAL CONNECTION T

BANK A,B,C,D 411C BLOCK MB4 C D-5 FOR OIL FILL & DRAIN PS HIGH

  • PT455 T S.P. 26902 SH 4 I 491 PRESS PRZ *TE431A/B PRESS LOW EM-102C I-4 MB4 JAH *TE421A/B S S LOOP 2 OVERPOWER PRESS EM-102B G-5 *TE411A/B 26902 SH 3 MB4 LOOP 1 OVERTEMP EM-102D C-4 TR411 26902 SH 2 D-6 T S.P.

T S.P. 26902 SH 4 MB4 W I-6 *TE441A/B *TE421A/B JAH *TE421A/B I EM-102E G-5 EM-102D E-5 *TE441A/B T LOOP 2 OVERTEMP MB4 EM-102D D-5 P1A(A-)

26902 SH 5 26902 SH 4 EM-102E G-5 T S.P.

C 26902 SH 4 PAL

  • TE431A/B 26902 SH 5 6 MB4 MB4 6 EM-102B G-5 MB4 TR OVERPOWER LOOP SELECT *P1A ZR HS RUNNING *P1A 26902 SH 2 411 T S.P. I MB4 DET A C-9
  • TE421A/B 412 3-RCS-750-28-1(A-)

(REACTOR COOLANT PUMP OIL SYSTEM)

  • TE421A/B T AVG EM-102D B-5 OVERPOWER (VENDOR SUPPLIED)

EM-102D C-3 NOTES:

OVERTEMP 26902 SH 4 26902 SH 4 SSPS T S.P. 1. ALL INSTRUMENT AND EQUIPMENT NUMBERS FOR REACTOR COOLANT T TRIP

  • TE431A/B SYSTEM TO BE PREFIXED WITH "3RCS-" EXCEPT WHERE A DIFFERENT TAH *TE431A/B LOOP 3 PREFIX IS SHOWN.

EM-102B E-4 EM-102B I-5 MB4 ROD BANK A,B,C,D T AN ASTERISK ( ) WILL REPLACE THE DASH (-) IN THE PREFIX FOR 26902 SH 2 ROD CONTROL I 26902 SH 2 EQUIPMENT OR INSTRUMENTS WHICH ARE A PART OF NUCLEAR SAFETY SYSTEM POSITION LO LO

  • TE431A/B FEATURES SYSTEM.

LIMIT LIMIT T AVG T AVG C MB4 *TE441A/B *TE431A/B AUCT T AVG EM-102B I-6 LO LOOP 3 OVERPOWER 2. ALL VENT, DRAIN AND TEST CONNECTIONS ARE 3/4", UNLESS EM-102E E-4 HS EM-102B G-6 DEVIATION S T S.P. OTHERWISE NOTED.

TDA 26902 SH 2 26902 SH 5 MB4 26902 SH 2

3. ALL VENT, DRAIN AND TEST CONNECTIONS ARE SAFETY CLASS 4 MB4 *TE441A/B *TE421A/B ZA ZA *TE431A/B DOWNSTREAM OF FIRST VALVE, UNLESS OTHERWISE NOTED.

T AVG LOOP 3 OVERTEMP EM-102E I-6 TURB RUNBACK/ EM-102D E-5 MB4 MB4 EM-102B F-5 4. FLOW RESTRICTORS NOT REQUIRED. FULL SIZE SPACERS TO BE 3-DGS-500-61-4 T S.P.

26902 SH 5 ROD WITHDRAWAL 26902 SH 2 PROVIDED.

OVERTEMP 26902 SH 4 REACTOR PLANT 7 C BLOCK 5. HEAD GASKET LEAK DETECTOR. 7 T M GASEOUS DRAINS 3/4 "

I I *TE431A/B V *TE441A/B 6. PLUG FOR CHANGE OVER TO APPENDIX "R" TRANSMITTER.

TAH EM-107A J-2 *V50(A-) LOOP 4 LR459 EM-102B F-5 EM-102E I-4 7. SIX IDENTICAL RTDS, TWO FOR EACH PHASE OF STATOR WINDINGS, LC459 MB4 26907 NOTE 18 T T AVG 26902 SH 2 ONLY ARE SHOWN, HOTTEST ONE FOR ANNUNCIATOR, SECOND PZR PROG LVL HS CL 4 CL 1 26902 SH 5 EM-102C L-8 DEFEAT 8029A HOTTEST FOR COMPUTER INPUT.

SET POINT HI AUCT MB4 *TE441A/B 26906 SH 3 MB4 *TE441A/B LOOP 4 OVERPOWER 8. HOSE INSTALLED AT THIS CONNECTION FOR DRAINING T AVG *V9(A-) EM-102E G-6 MB4 EM-102E F-5 THE BOTTOM CHANNEL HEAD TO CONTAINMENT SUMP AFTER S T S.P.

TDA TR 3-RCS-008-25-1(A-) 26902 SH 5 REACTOR COOLANT SYSTEM HAS BEEN DRAINED BELOW STEAM I 26902 SH 5 *MV *V12(A-)

MB4 412 GENERATOR NOZZLES. CLASS 2 TO CLASS 4 TRANSITION AT 8003A *TE441A/B 8044A LOOP 4 OVERTEMP DRAIN VALVE.

LO AUCT (A-) EM-102E F-5

9. DELETED T AVG TAH T S.P.
  • P1A 26902 SH 5 MB4 OPEN 10. DETECTORS ARE PLACED AT THE BOTTOM OF PIPE SURFACE MOUNT.

E-9 *V10(A-)

C IMB OMB 11. HOSE TO BE INSTALLED BETWEEN THESE CONNS TO VENT C 8045A 3/4 " X 1/2 " (TYP) D ZA 3-RCS-150-241-1(A-) 3-SIH-150-141-1(Z-) *V968(A-) PRESSURE DURING DRAINING AND FILLING WITH A 3MSS-TC500A/D 3MSS-PT505/506 NOT FULL 8097A *V29(A-) PRESSURE RATING ABOVE 150 PSIG AND A TEMPERATURE T REF H-2 HIGH PRESSURE MB4 CLOSED *V948(A-) *V36(A-) RATING ABOVE 170^ F.

EM-123F B-9 EM-123C D-6 I 3-RCS-150-27-1(A-) SAFETY INJECTION 8900A HI AUCT TI 12. MISCELLANEOUS ABBREVIATIONS AND SYMBOLS T AVG 26923 SH 6 *MV8002C EM-113A M-4 V IMB - INSIDE MISSILE BARRIER 8 ROD BANK 412A 8 MB4 C EM-102B D-8 26913 SH 1 3-RCS-150-220-1(A-) OMB - OUTSIDE MISSILE BARRIER HS SELECT 26902 SH 2 3-CHS-003-661-2(Z-) - SAFETY CLASS CHANGE POINT MB4 S TAL *V11(A-) 8095A

  • P1B *MV8002D 3-RCS-003-121-1(A-)

AUCT NUC TURBINE LO T ERROR MB4 8043A *V37(A-) *FIS CHEMICAL & 13. SPOOL PIECE FOR CONTAINMENT ISOLATION VALVE TESTING.

  • FIS NOT FULL OPEN NIS I EM-102D E-8 EM-102E D-8 VOLUME CONTROL POWER LOAD 418A 418B 26902 SH 4 14. PLUG FOR CHANGE OVER TO APPENDIX "R" TRANSMITTERS.

26902 SH 5 *FE *V38(A-) (AO) (AP) EM-104A A-2 3FWS-LC550, 560 LOW T STOP TURBINE AUTO TA T COLD 418 15. OPEN ISOLATION VALVE *V970 TO MONITOR LEVEL VIA 3FWS-LC570, 580 ERROR LOADING TRIP *P1C MB4 NORMAL (A-) 8041A 26904 SH 1 *V31(A-) *V32(A-)

LT51C DURING REACTOR VESSEL DRAINDOWN.

EM-130C F-5, F-10 QA *MV8002B 3-SIL-010-45-1(A-)

EM-102B F-10 NOTE 17 8378B 8378A MB4 EM-102D G-9 16. 3RCS-LT51A AND 3RCS-LT51B SHALL BE ISOLATED AT THE 26902 SH 2 LOW PRESSURE 3-RCS-003-149-1(A-) ASSOCIATED INSTRUMENT MANIFOLD DURING PLANT OPERATION.

ROD CONTROL ROD MB4 26902 SH 4 SAFETY INJECTION

  • P1A TA TRANSMITTERS MAY BE FUNCTIONAL AT SHUTDOWN TO SYSTEM DIRECTION I HS A C *P1D STOPPED EM-112B E-10 MONITOR LEVEL DURING RCS DRAINDOWN.

MB4 MB4 *V39(A-)

EM-102E F-10 26912 SH 2 *V30(A-)

8096A 17. 3RCS*FIS418 A/B, 3RCS*FIS428 A/B, 3RCS*FIS438 A/B AND OPEN MB4 MV8002A 26902 SH 5 3RCS*FIS448 A/B ARE ABANDONED IN PLACE.

SI PERM 8948A PERM 1A CLOSE HS ZA 412 I I-10 18. VALVES 3RCS*V50, 3RCS*V117, 3RCS*V86 AND 3RCS*V156 ARE TO START MV8003A I MB4 MB4 3-RCS-010-122-1(A-)

OPEN LOCKED OPEN IN MODE 5 ONLY.

LO AUCT PS-491 E-8 MV8001A PERM MV T COLD ROD PERM P1A PERM 1A OPEN *TE443B 9 ROD CONTROL N-6 I I I-10 TO OPEN 9 SYSTEM SPEED TO START TO START MV8002A EM-102E F-8 *TE413C,423C N0TES CONTINUED:

OPEN *TE433C,443C *MV8001A J-9 26902 SH5 PERM MV PERM MV 19. THE SYSTEM OPERATIONS PROCEDURE GOVERNS THE HI AUCT STOP NOT FULL OPEN T COLD I B-1 I H-2 TO OPEN TO OPEN POSITIONING OF VALVES AND DAMPERS (OPEN/ CLOSED/

P1A MV8001A *TE433B *MV8001A LOCKED). VALVE/ DAMPER POSITIONS DEPICTED ON THE CLOSE H-2 EM-102B F-9 P&ID ARE FOR GUIDANCE ONLY. REFER TO THE SPECIFIC NUCLEAR SAFETY RELATED G-2 PROCEDURE FOR VERIFICATION OF VALVE/ DAMPER POSITION.

26902 SH2 TAH MV8002A I I QA CAT. I , I I CLOSE ZA MB4 I-10 M MB4 FSAR FIGURE Q.A.

NOTE 7

  • TE423B EM-102D E-9 *P1A C CLOSED STOP C C HI HI VIBRATION DANGER YAHH MB4 MB2 26902 SH4 D-9 *P1A OPERATIONS CRITICAL
  • P1A TR *TI E-9 MB4 413B TAL TE 413B (AP) ZA 487A HI VIBRATION ALERT MB4 NOT FULL CLOSED 3-RCS-004-21-1(A-)

TE TE YAH H-2 E-4 487B 483B OPEN 3-RCS-002-170-1(A-)

  • P1A TE C MB4 *PCV 456 10 I 483A CL 153 CL 1502 RUNNING EM-102C A-5 8057 YE REACTOR PLANT 8058 471A MB3R 26902 SH3 GASEOUS DRAINS *V33(Z-) CAD
  • V34(Z-) NOTE:

YE YIS EM-107A J-4 REV. DATE DESCRIPTION BY CHK CORR APP MANUAL REVISIONS TO THIS DOCUMENT LOCKED YE 471B 471A C MB3R 26907 WHEN AS-BUILT ARE PROHIBITED.

ROTOR 471E 3-RCS-002-23-1(Z-) REVISIONS DURING CONSTRUCTION P.A. No.

UPPER YE YIS 3-RCS-750-116-2(Z-)

BEARING *TE 3-DGS-002-33-4 10-24 TE 471C 3-RCS-008-24-1(A-) 25 INCORP DCN DM3-00-0440-05 DLW ASK WBZ MP C LUBE OIL 471C 413B *V35(Z-)

479A -05 RESERVOIR (AW) Dominion Nuclear Connecticut, Inc.

  • TE 8083 FOR REACTOR COOLANT YE *TI 5-7 410B/ REACTOR PLANT 3-RCS-150-27-1(A-) 24 INCORP DCN DM3-00-0114-01 JCV NJB DLW RJY R Millstone Power Station PUMP OIL SYSTEM 471D 413D *V13(A-) -01 411B *MV GASEOUS DRAINS SEE DETAIL A (M-6) *SE (AP) LO 3-RCS-750-117-4 (AR) 8002A EM-107A J-2 8042A HOSE CONN 495 C 11-2 N/A 23 INCORP DCN DM3-00-0394-00 RFL MP AJS PFL W.SHERMAN/ F.FORTINI TITLE (AR) (A-) 26907 EM-102C N-4 -00 MILLSTONE POWER STATION-UNIT NO. 3 NOTE 14 TE 3-DGS-500-57-4 26902 SH 3 C 6-14 479B N/A 22

-99 INCORP DCN DM3-00-0004-99 KF RFL DLW MP PIPING & INSTRUMENTATION DIAGRAM REACTOR *SE496 *V1(A-)

3-RCS-275-4-1(A-) 3-RCS-275-5-1(A-) REACTOR COOLANT SYSTEM COOLANT 4-1 W.F.KOLAITIS EM-102D F-11 *V989(A-) N/A 21 INCORP DCN DM3-01-0168-99 JSC MP TJU RFL PUMP 3-RCS-750-26-1(A-) -99 11 26902 SH 4 BY CHKD. APP. APP.

  • P1A(A-) SSPS FJE/ RTL CEM/ WD RNB/DEK/WS RWA N/A 20 3-10 INCORP DCN DM3-00-1072-98 KF CJS AJS MP 3-RCS-031-3-1(A-) LOOP 1 *SE497 -98 DATE 3-16-82 DATE 3-26-82 DATE 6-11-82 DATE 4-7-82 LOW SPEED SAL *V990(A-)

EM-102B I-9 SCALE MICROFILM DATE DISC PRESSURIZATION DWG. NO. REV REACTOR TRIP MB4 7-28 NONE 26902 SH 2 N/A 19 INCORP DCN DM3-00-0682-98 KF RJK RFL RFL CONNECTION (TYP) -98 25212-26902 SH 1 OF 6 25 RESP. ENGR: DESN. ENGR:

71-156 MB4 *SE498 AJS C 11-10 N/A 18 INCORP DCN DM3-00-0551-97 AC MP PAM EM-102E I-9 -97 PAM STONE & WEBSTER ENGINEERING CORPORATION 26902 SH 5 MF P.A.# NO. DATE REVISIONS BY CHK. CORR APP. BOSTON, MASS.

S&W DWG. NO.12179-EM- 102A DRAWN BY: F.J. EVERY CHECKED BY: R.T.LAW/ T.LOW