Technical Specifications, Increasing Flexibility in Mode Restraints
ML060620215
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/22/2006
From: Martin R
NRC/NRR/ADRO/DORL/LPLC
To: Stinson L
Southern Nuclear Operating Co
Martin R, NRR/DORL, 415-1493
References
TAC MC8923, TAC MC8924
Download: ML060620215 (20)


Text

Frequency 1.4 1.4 Frequency EXAMPLES EXAMPLE 1.4-1 (continued)

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered iin the Technical Specifications (TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the stated Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the unit is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the unit is in a MODE or other specified condition in the Applicability of the LCO, and the performance of the Surveillance is not otherwise modified (refer to Example 1.4-3), then SR 3.0.3 becomes applicable.

If the interval as specified by SR 3.0.2 is exceeded while the unit is not in a MODE or other specified condition in the Applicability of the L-CO for which performance of the SR is required, then SR 3.0.4 becomes applicable. The Surveillance must be performed within the Frequency requirements of SR 3.0.2, as modified by SR 3.0.3, prior to entry into the MODE or other specified condition or the LCO is considered not met (in accordance with SR 3.0.1) and LCO 3.0.4 becomes applicable.

(continued)

Farley Units 1 and 2 1.4-2 Amendment No. 170(Unit 1)

Amendment No. 153(Unit 2)

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and 3.0.7.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an LCO is riot met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; (continued)

Farley Units 1 and 2 3.0-1 Amendment No. 170(Unk 1)

Amendment No. 163(Unt 2)

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing inoperable (continued) systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.

Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with specification 5.5.15, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.

LCO 3.0.7 Test Exception LCO 3.1.8 allows specified Technical Specification (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Test Exception LCOs is optional. When a Test Exception LCO is desired to be met but is not met, the ACTIONS of the Test Exception LCO shall be met. When a Test Exception LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.

Farley Units 1 and 2 3.0-2 Amendment No.1 70 (Unit 1)

Amendment No.163 (Unit 2)

SR Applicability l 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the lrequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per....

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is nol: met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

(continued)

Farley Units 1 and 2 3.0-3 Amendment No. 170 (Unit 1)

Amendment No. 163 (Unit 2)

SR Applicability 3.0 3.0 SR APPLICABILITY SR 3.0.4 This provision shall not prevent entry into MODES or other specified (continued) conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit. I Farley Units 1 and 2 3.0-4 Amendment No.1 70 (Unit 1)

Amendment No.1 63 (Unit 2)

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS Separate Condition entry is allowed for each Function. I

_ _ _ _ _ _ ___ A __ _ _ _ _ -_-- _- _--_-_

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required channel 30 days with one required lo OPERABLE status.

channel inoperable.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.8.

not met.

C. One or more Functions C.1 Restore one channel to 7 days with two required OPERABLE status.

channels inoperable.

Farley Units 1 and 2 3.3.3-1 Amendment No. 170 (Unit 1)

Amendment No. 163 (Unit 2)

Remote Shutdown System 3.3.4 3.3 INSTRUMENTATION 3.3.4 Remote Shutdown System LCO 3.3.4 The Remote Shutdown System Functions in Table 3.3.4-1 shall be OPERABLE.

APPLICABILITY: MODES 1,2, and 3.

ACTIONS SeparateConditonentryisale------- - ------

e-NOTE--

Separate Condition entry is allowed for each Function.


- ---- - --- - ---- -- I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required Function 30 days Functions inoperable. lo OPERABLE status.

B. ----- NOTE------ B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Not applicable to Source Range Neutron AND Flux function.

--- -------- B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action and associated Completion Time not met.

Farley Units 1 and 2 3.3.4-1 Amendment NoD. 170 (Unit 1)

Amendment No. 16 3(Unit 2)

Pressurizer PORVs 3.4.11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 Pressurizer Power Operated Relief Valves (PORVs)

LCO 3.4.11 Each PORV and associated block valve shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS

---NOTE----

eparate Separate Condition entry is allowed for each PORV. I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more PORVs A.1 Close and maintain 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable of power to associated being manually cycled. block valve.

B. One PORV inoperable and B.1 Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not capable of being valve.

manually cycled.

AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve.

ANDQ B.3 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

Farley Units 1 and 2 :3.4.11-1 Amendment No. 17 0 (Unit 1)

Amendment No. 163(Unit 2)

LTOP System 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Low Temperature Overpressure Protection (LTOP) System LCO 3.4.12 An LTOP System shall be OPERABLE with a maximum of one charging pump capable of injecting into the RCS and the accumulators isolated and either a or b below.

a. Two residual heat removal (RHR) suction relief valves with setpoints S 450 psig.
b. The RCS depiressurized and an RCS vent of 2 2.85 square inches.

APPLICABILITY: MODE 4 when the temperature of one or more RCS cold legs is 5 3250F, MODE 5, MODE 6 when the reactor vessel head is on.

KI.aT-r-r

-- ---------- .-- -- ----- -- IMIIJ I tti -- ----- -

The requirement to have only one charging pump capable of injecting into the RCS is only applicable when one or more of the RCS cold legs is

  • 180eF; however, while in this condition, two charging pumps may be capable of injecting into the RCS during pump swap operations for a period of no more than 15 minutes provided that the RCS is in a non-water solid condition and both RHR relief valves are OPERABLE or the RCS is vented via an opening of no less than 5.7 square inches in area.
2. Accumulator isolation is only required when accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.

I Farley Units 1 and 2 3.4.12-1 Amendment No. 170 (Unit 1)

Amendment No. 163 (Unit 2)

LTC)P System 3.4.12 ACTIONS

_ _- - ---- -N-- I : ---- ---------- _ _

LCO 3.0.4b is not applicable when entering MODE 4.

CONDITION REQUIRED ACTION COMPLETION TIME A. Two or more charging A.1 ----- NOTE--------

pumps capable of TWO charging pumps injecting into the may be capable of RCS. injecting into the RCS during pump swap operation for 515 minutes.

Initiate action to verify a Immediately maximum of one charging pump is capable of injecting into the RCS.

B. An accumulator not B.1 Isolate affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolated when the accumulator.

accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.

C. Required Action and C.1 Increase RCS cold leg 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion temperature to > 3250 F.

Time of Condition B not OR met.

C.2 Depressurize affected 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.

Farley Units 1 and 2 3.4.12-2 Amendment No. 170 (Unit 1)

Amendment No. 163(Unit 2)

RCS Leakage Detection Instrumentation 3.4.15 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 The following RCS leakage detection instrumentation shall be!

OPERABLE:

a. One containment atmosphere particulate radioactivity monitor; and
b. One containmenti air cooler condensate level monitor or one containment atmosphere gaseous radioactivity monitor.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS I

CONDITION REQUIRED ACTION COMPLETION TIME A. Containment atmosphere A.1.1 Analyze grab samples of Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> particulate radioactivity the containment monitor inoperable. atmosphere.

OR A.1.2 Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.2 Restore the containment 30 days atmosphere particulate radioactivity monitor to OPERABLE status.

Farley Units 1and 2 :3.4.15-1 Amendment No.170 (Unit 1)

Amendment No.163 (Unit 2)

RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCSI 3.4.16 RCS Specific Activity LCO 3.4.16 The specific activity of the reactor coolant shall be within limits.

APPLICABILITY: MODES 1 and 2, MODE 3 with RCS average temperature (Tavg) !500'F.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT ------ -Note---

1-131 > 0.5 pCi/gm. LCO 3.0.4c is applicable. I A.1 Verify DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 within the acceptable region of Figure 3.4.16-1.

AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limit.

B. Gross specific activity of B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> the reactor coolant not Tavg < 500'F.

within limit.

Farley Units 1 and 2 3.4.16-1 Amendment No. 170 (Unit 1)

Amendment No. 163 (Unit 2)

ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS-Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.


- ---------------- NOTES-------------- -

1. An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
2. Upon entry into MODE 4 from MODE 3, the breaker or disconnect device to the valve operators for MOVs 8706A and 870i3B may be closed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to allow for repositioning from MODE 3 requirements.

APPLICABILITY: MODE 4.

ACTIONS a Aderr f-I1JI r- --

LCO 3.0.4b is not applicable to ECCS centrifugal charging subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A.1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable. subsystem to OPERABLE status.

B. Required ECCS centrifugal B.1 Restore required ECCS 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> charging subsystem centrifugal charging inoperable. subsystem to OPERABLE status.

AND At least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available.

Farley Units I and 2 3.5.3-1 Amendment No. 170(Unit 1)

Amendment No. 163 (Unit 2)

HMS 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Hydrogen Mixing System (HMS)

LCO 3.6.8 Two HMS trains shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One HMS train A.1 Restore HMS train to 30 days I inoperable. OPERABLE status.

B. Two HMS trains B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. means that the hydrogen control function is AND maintained.

Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one HMS train to 7 days OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

. .a Farley Units 1 and 2 3.6.8-1 Amendment No. 170 (Unit 1)

Amendment No. 163(Unit 2)

Reactor Cavity Hydrogen Dilution System 3.6.9 3.6 CONTAINMENT SYSTEMS 3.6.9 Reactor Cavity Hydrogen Dilution System LCO 3.6.9 Two Reactor Cavity Hydrogen Dilution trains shall be OPERABLE.

APPLICABILITY: MODES I and 2.

ACTIONS = ._.____._

CONDITION REQUIRED ACTION COMPLETION TIME A. One Reactor Cavity A. 1 Restore the train to 30 days I Hydrogen Dilution train OPERABLE status.

inoperable.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.9.1 Operate each Reactor Cavity Hydrogen Dilution train 92 days for : 15 minutes.

SR 3.6.9.2 Verify each Reactor Cavity Hydrogen Dilution train 18 months starts on an actual or simulated actuation signal.

Farley Units 1 and 2 3.6.9-1 Amendment No.1 70 (Unit 1)

Amendment No.1 63 (Unit 2)

ARVs 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Atmospheric Relief Valves (ARVs)

LCO 3.7.4 Three ARV lines shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required ARV line A. 1 Restore required ARV line 7 days I inoperable. to OPERABLE status.

B. Two or more required B.1 Restore all but one ARV 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ARV lines inoperable. line to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND C.2 Be in MODE 4. 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> Farley Units 1 and 2 3.7.4-1 Amendment No 1 70 (Unit 1)

Amendment No.1 63 (Unit 2)

AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS LCO 3.0.4b is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW OPERABLE status.

pump inoperable. AND 10 days from discovery of failure to meet the LCO B. One AFW train B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons OPERABLE status.

other than Condition A. AND 10 days from discovery of failure to meet the LCO C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A or B AND not met.

C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable.

Farley Units 1 and 2 3.7.5-1 Amendment No.1 70 (Unit 1)

Amendment ND.1 63 (Unit 2)

AC Sources -Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a. Two qualified circuits between the offsite transmission network and the onsite Class I E AC Electrical Power Distribution System; and
b. Two diesel generator (DG) sets capable of supplying the onsite Class 1E power distribution subsystem(s); and
c. Automatic load sequencers for Train A and Train B.

APPLICABILITY: MODES 1,2, 3, and 4.

ACTIONS t- - - --- -- -- - - - - --

LCO 3.0.4b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A. One required offsite circuit A.1 Perform SR 3.8.1.1 for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. required OPERABLE offsite circuit. AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite offsite power available power to one train inoperable when its concurrent with redundant required inoperability of feature(s) is inoperable. redundant required featunr(s)

AND (continued)

Farley Units 1 and 2 3.8.1-1 Amendment No. 170 (Unit 1)

Amendment No. 163 (Unit 2)

AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3 Restore required offsite 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> circuit to OPERABLE status. AND 13 days from discovery of failure to meet LCO B. One DG set inoperable.

LCO 3.0.4c is applicable when I only one of the three DGs is inoperable.

B.1 Perform SR 3.8.1.1 for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> the required offsite cilrcuit(s). AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s) supported by discovery of the inoperable DG set Condition B inoperable when its concurrent with required redundant inoperability of feature(s) is inoperable. redundant required feature(s)

AND 8.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG set is not inoperable dLie to common cause fahlure.

OR (continued)

L -4.

Farley Units 1 and 2 3.8.1-2 Amendment No. 1 ~' 0 (Unit 1)

Amendment No. 1(3(Unit 2)