Letter Sequence Supplement |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-014, E-mail, Meyer, Entergy, to Ennis, NRR, VY EPU, BVY 06-019, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and FIV Effects, BVY 06-031, To Steam Dryer Monitoring Plan, BVY 06-039, Revision 2 to Steam Dryer Monitoring Plan, BVY 06-051, Summary of Reactor Feedwater Pump Trip Analysis, BVY 06-056, Submittal of Vermont Yankee Report on the Results of Steam Dryer Monitoring, BVY 06-080, Extended Power Uprate - License Amendment No. 229 Clarifications to NRCs Final Safety Evaluation, BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis, BVY-06-056, Attachment 1, Vermont Yankee - Steam Dryer Monitoring Plan Rev. 4, ML033140025, ML033160187, ML040080573, ML040090411, ML041810022, ML041810433, ML042180463, ML042650265, ML042680087, ML043020494, ML043150224, ML050060086, ML050280310, ML050450423, ML050940230, ML050940242, ML052080154, ML052630053, ML053490030, ML053530148, ML060330490, ML060390107, ML061290566
|
MONTHYEARML0323403792003-08-31031 August 2003 Technical Assessment of Quad Cities Unit 2, Steam Dryer Failure - Determination of Root Cause & Extent of Condition Project stage: Request ML0325800892003-09-10010 September 2003 Technical Specification Proposed Change No. 263 Extended Power Uprate Project stage: Request ML0328104472003-10-0101 October 2003 Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance Project stage: Request ML0331000472003-10-30030 October 2003 Sign-in Sheet for 10/30/2003 Meeting with ENVY and ENO Re to Discuss Arts/Mellla, Alternate Source Term, and Extended Power Uprate Aplications Project stage: Meeting ML0330403972003-10-30030 October 2003 Meeting Handouts for Meeting with Entergy Re Issues for Alternate Source Term, Power Uprate & Acts/Mellla Application Project stage: Meeting ML0331000232003-11-19019 November 2003 Meeting with Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc Regarding Arts/Mellla, Alternate Source Term, and Extended Power Uprate Applications Project stage: Meeting ML0331800882003-12-15015 December 2003 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0331601872003-12-16016 December 2003 Withholding from Public Disclosure, NEDC-33090P, Revision 0, Project stage: Other ML0430204942003-12-24024 December 2003 NRR Work Request to IEPB-A Project stage: Other ML0336401382003-12-30030 December 2003 Draft Request for Additional Information Project stage: Draft RAI ML0400805732004-01-0707 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other ML0400904112004-01-0909 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other BVY 04-009, Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review2004-01-31031 January 2004 Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review Project stage: Supplement ML0404001612004-02-19019 February 2004 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0405003022004-02-20020 February 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0406306032004-02-27027 February 2004 G20040138/LTR-04-0107 - Sen. James Jeffords & Patrick Leahy Ltr Proposed Power Uprate at Vermont Yankee Project stage: Request ML0408500762004-03-15015 March 2004 G20040206/LTR-04-0168 - Ltr. Rep. Michael Dworkin Independent Safety Asessment of Vermont Yankee Project stage: Request ML0404100222004-03-19019 March 2004 Withholding from Public Disclosure, Responses to Request for Additional Information (Attachment 1 to Letter Bvy 04-008) Project stage: RAI ML0411203582004-03-31031 March 2004 Transcription Meeting Summary, 03/31/2004 Category 3 Meeting with Public to Discuss Proposed Power Uprate, Pages 1-124 Project stage: Meeting ML0411007042004-03-31031 March 2004 Enclosure 1, March 31, 2004, Vermont Yankee Annual Assessment Meeting Power Up-Rate Public Meeting Attendance List Project stage: Meeting ML0411201272004-05-17017 May 2004 Category 3 Public Meeting Summary with Entergy Nuclear Operations Inc. to Discuss Proposed Power Uprate for Vermont Yankee Nuclear Power Station Project stage: Meeting ML0411203682004-05-17017 May 2004 Enclosure 14, 03/31/2004 Meeting Summary for Vermont Yankee. Slides Presentation Proposed Power Uprate Project stage: Meeting ML0410603312004-05-17017 May 2004 Enclosures 3 - 13, 03/31/2004 Meeting Summary for Vermont Yankee Project stage: Meeting ML0414500202004-05-28028 May 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0331400252004-06-25025 June 2004 Vermont, Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0418100222004-06-25025 June 2004 Compliance with NRC Regulatory Compliance Project stage: Other ML0418104332004-06-29029 June 2004 06/29/04 E-mail - Compliance with NRC Regulatory Compliance Project stage: Other ML0420804642004-07-0202 July 2004 Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0417400392004-07-0606 July 2004 Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate. TAC No. MC0761 Project stage: RAI ML0422501402004-07-27027 July 2004 Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope Project stage: Supplement BVY 04-074, Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2,2004-07-30030 July 2004 Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2, Project stage: Supplement BVY 04-081, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information2004-08-12012 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0424305662004-08-25025 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 12, Extended Power Uprate - Revised Grid Impact Study Project stage: Supplement ML0421804632004-08-31031 August 2004 Withholding from Public Disclosure, Project stage: Other ML0424405372004-09-0101 September 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0422200222004-09-0202 September 2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting ML0425103952004-09-0202 September 2004 Attachments 1 Through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting BVY 04-097, Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items2004-09-14014 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items Project stage: Supplement BVY 04-098, Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement BVY 04-100, Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 22004-09-23023 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 2 Project stage: Supplement ML0505901452004-09-29029 September 2004 Attendance List for Sept. 29, 2004 Meeting Steam Dryer Analysis Project stage: Meeting BVY 04-113, Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides2004-09-29029 September 2004 Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides Project stage: Supplement BVY 04-107, Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline2004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline Project stage: Supplement BVY 04-101, Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-52004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5 Project stage: Supplement BVY 04-106, Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin2004-10-0505 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin Project stage: Supplement ML0428904102004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis Project stage: Supplement BVY 04-109, Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program2004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program Project stage: Supplement ML0426800872004-10-13013 October 2004 Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request Project stage: Other ML0426502652004-10-15015 October 2004 Extended Power Uprate Review Schedule Project stage: Other ML0431502242004-11-10010 November 2004 EPU SE Input Section 2.10 Project stage: Other 2004-03-15
[Table View] |
Text
Entergy Nuclear Northeast A k
.Entergy Nuclear Operations, Inc.
-Vermont Yankee PO. Box 0500 Ente ty v185 Old Ferry Road e YBrattleboro, VT 05302-0500 Tel 802 257 5271 November 22, 2005 Docket No. 50-271 BVY 05-103 TAC No. MC0761 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 42 Extended Power Uprate - Steam DrVer Inspection Results
Reference:
- 1) Entergy letter to U.S. Nuclear Regulatory Commission, 'Vermont Yankee Nuclear Power Station, License No. DPR-28 (Docket No. 50-271), Technical Specification Proposed Change No. 263, Extended Power Uprate," BVY 03-80, September 10, 2003
- 2) Entergy letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 -
Supplement 32, Extended Power Uprate -
Additional Information," BVY 05-83, September 10, 2005 This letter provides additional information regarding the application by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Entergy) for a license amendment (Reference 1) to increase the maximum authorized power level of the Vermont Yankee Nuclear Power Station (VYNPS) from 1593 megawatts thermal (MWt) to 1912 MWt.
During the recently completed refueling outage (RFO-25), a visual inspection was conducted of the steam dryer using enhanced visual techniques.
A number of surface indications were detected which have been evaluated as being acceptable for continued operation. Attachment 1 to this letter provides the basis for determining that the indications are acceptable for extended power uprate operation.
Additionally, in Reference 2, it was stated that the plant modifications necessary to support full extended power uprate (i.e., 120% of current licensed thermal power) would be completed during the fall 2005 refueling outage (RFO-25). However, the capacitor banks installed in the switchyard were not placed in service prior to the completion of the outage. It is anticipated that the capacitor banks, which are needed when electrical power operation exceeds 630 MWe (net), will be placed in service prior to January 31, 2006.
There are no new regulatory commitments contained in this submittal.
0oo0
BVY 05-103 Docket No. 50-271 Page 2 of 2 This supplement to the license amendment request provides additional information to clarify Entergy's application for a license amendment and does not change the scope or conclusions in the original application, nor does it change Entergy's determination of no significant hazards consideration.
If you have any questions or require additional information, please contact Mr. James DeVincentis at (802) 258-4236.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on November 2, 2005.
Sincerely, Williamr F. M ure General Maeflant Operations Vermont Y e Nuclear Power Station Attachments (1) cc:
Mr. Samuel J. Collins (w/o attachment)
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Richard B. Ennis, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0 8 B1 Washington, DC 20555 USNRC Resident Inspector (w/o attachment)
Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 05-103 Docket No. 50-271 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 42 Extended Power Uprate Steam Dryer Inspection Results Total number of pages In Attachment 1 (excluding this cover sheet) is 5.
to BVY 05-103 Docket No. 50-271 Page 1 of 5 Introduction During the spring 2004 refueling outage (RFO-24) of the Vermont Yankee Nuclear Power Station (VYNPS), a full scope visual inspection of the steam dryer was conducted in accordance with General Electric SIL 644, Rev. 11.
The inspection was performed in conjunction with a planned dryer modification to support operation under extended power uprate (EPU) conditions.
The results of that inspection, together with the design details of the dryer modification, have previously been provided to the NRC staff.
During the fall 2005 refueling outage (RFO-25), an inspection of the steam dryer was conducted using enhanced visual techniques, revealing 46 additional surface indications. The following provides an evaluation of the indications for operation at EPU conditions.
Vane Bank End Plate Indications During the VYNPS spring 2004 (RFO-24) refueling outage, 16 indications on the VYNPS steam dryer vane bank end plates were documented.
These indications were documented as acceptable for operation at EPU conditions without repair (reference response to VYNPS EPU RAI EMCB-A-1 2). During the VYNPS fall 2005 refueling outage (RFO-25), previous indications on the steam dryer as well as modifications installed during 2004 were re-inspected.
The results of the RFO-25 inspections showed that previously identified steam dryer indications had not grown in size and that no indications were identified on any of the modifications installed during the RFO-24 refueling outage. The dryer design changes implemented during the RFO-24 included modifications to vertical hood plates, reinforcing gussets, upper and lower horizontal cover plates, bracing brackets and tie bars.
During the RFO-25 inspections, additional indications on the steam dryer vane bank end plates and the vane end plate to trough welds were identified.
It is believed that these additional indications were identified due to enhanced visual inspection techniques utilized in the RFO-25 inspections and by positioning the camera closer to the inspection surface. The inspection techniques used for the RFO-24 inspections fully met VT-1 (visual testing, level 1) requirements, while the inspection techniques in RFO-25 more closely met an EVT-1 (enhanced visual testing, level 1) resolution, although a VT-1 inspection method with a 1/32-inch calibration standard was specified. The additional indications identified on the vane bank end plates and vane end plates to vane trough welds are similar to those documented during the RFO-24 refueling outage inspections. The newly identified indications on the dryer vane bank end plates and vane end plate to vane trough welds have been evaluated and are considered acceptable for operation at EPU conditions. Figure 1 shows various views of the type of steam dryer vane bank assembly installed at VYNPS.
'General Electric Service Information Letter, SIL No. 644, Rev. 1, UBWR Steam Dryer Integrity,"
November 9, 2004 2 See Entergy's letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement 8, Extended Power Uprate - Response to Request for Additional Information," BVY 04-058, July 2, 2004 to BVY 05-103 Docket No. 50-271 Page 2 of 5 The assessment of the vane bank end plates for EPU conditions is based on the following factors: (1) it is a highly redundant structure and there is no structural consequence of the flaw indication and (2) a postulated significant indication extending through the full section of the channel geometry would not cause a structural concern or create the opportunity for loose parts.
Operating experience since RFO-24 supports this "leave-as-is" decision since the indications will be re-inspected at the next refueling outage.
Indications identified during RFO-24 are essentially unchanged, and the indications identified during RFO-25 are not expected to propagate significantly under EPU conditions.
The dryer unit end plates, with indications, are securely attached and captured within the structure of the steam dryer bank assembly.
The vertical edges of these end plates are attached to the dryer assembly with 3/16-inch fillet welds (each weld approximately 48-inches long). There were no relevant indications reported in these vertical welds.
The geometric configuration of unit end plates is such that the upper and lower edges are mechanically captured by the steam dryer assembly as shown in Figures 2 and 3. The reported horizontal indications were seen in the 1.25-inch inlet side end plate flange. The vanes prevent inspection of the central end plate surface, but inspection of the outlet side end plate flanges found no indications. If it is conservatively postulated that the end plate horizontal indications propagate across the entire 8.75-inch unit end plate width including both the inlet and outlet side flange, as shown in Figure 3, such full-width, through-thickness indications would have no impact due to structural redundancy, nor is there any concern for generating loose parts. The postulated separated end plate sections, as shown in Figure 3, are still attached and will continue to function. Therefore, operation at EPU conditions with these non-structural indications is also acceptable.
Conclusion The assessment of the steam dryer end plates indications is based on the following factors:
It is a highly redundant structure;
- There is no structural consequence of the indications; and Postulated indications extending the full section of the channel geometry would not create a loose part.
Based on these factors, it is concluded that repair is not warranted and the indications are acceptable for operation at EPU conditions. Operating experience since RFO-24 supports the conclusion that the indications may be left as is, in the context that the indications will be re-inspected during the next refueling outage.
to BVY 05-103 Docket No. 50-271 Page 3 of 5 IB 0.25 Typ 0.5Typ 1.5 Tp T
- 1..Typ.
I ii 4J idi Left Side iII j-1; I:
I1' 4BTyp 3Typ Right Side Erd Ftwo fA4d.c"O r0un.
Area of indications VIENV A -A Figure 1 Steam Dryer Vane Bank Assembly to BVY 05-103 Docket No. 50-271 Page 4 of 5 Outer Bank Hood (112 Thk)
AL V
.5 x I Upper Rail and.5 x 1.5 Upper Rail Capture Top of Vanes 4
\\UFI I Atw '% 7
' )
x I-a 0
E 0-02 1.
0
0 x
Co S~o a
U (U
L)
(0 3-a 4-(U 0 C)
(U (U Ifl (U
0 4--8 la00 c
I2-0 tn C a-o 0
OM c
0
_ o o
=
0 o
@2-L.
a(U C
M co ov.~
L) i W
(U tL
.v L.
.4-.
3 -
O.
.C
- 0
..z I
.I 4-
=0a m.
I I
.I
.5 Thk Trough Side Pieces Capture and Support Bottom End of Vanes Dri Pipo DraiPie Figure 2 Cross-section through Banks Showing Vane Capturing Features to BVY 05-103 Docket No. 50-271 Page 5 of 5 Tvvicnl vane end plate indications F',7..,;iv_77 Indication 17-lypical or4 vane end platc to trough indications Figure 3 Cut-away of Bank Showing Unit End Plate