MONTHYEARML0508404882005-03-11011 March 2005 PGE-1009-2004. Operational Ecological Monitoring Program for the Trojan Nuclear Plant, Annual Report for 2004 ML0504202822005-02-0808 February 2005 PGE- 1006-2004, Trojan Nuclear Plant, Annual Radiological Environmental Monitoring Report for 2004 2005-03-11
[Table view] Category:Letter
MONTHYEARML24229A0472024-08-27027 August 2024 Letter and Safety Evaluation Report for Revision 31 to PGE-8010 Trojan Quality Assurance Program ML24115A2542024-05-13013 May 2024 Request for Additional Information for Trojan Docket No. 72-0017, PGE-8010, Trojan ISFSI Quality Assurance Program, Revision 31 ML24099A1522024-05-0303 May 2024 Trojan Independent Spent Fuel Storage Installation Part 73 Exemption ML23290A1612023-09-25025 September 2023 Portland General Electric Company - Biennial Report of Changes to NRC-Approved Quality Assurance Program ML23272A0322023-09-14014 September 2023 Portland General Electric Company Revision 31 to PGE-8010, Trojan ISFSI Quality Assurance Program IR 07200017/20234022023-08-0101 August 2023 Trojan Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07200017-2023402 (Cover Letter) ML23146A0422023-05-10010 May 2023 Portland General Electric Co., Submittal of Annual Financial Report for Year 2022 ML23124A0992023-03-28028 March 2023 Portland General Electric Company - NRC Service List Changes ML23048A0342023-02-0707 February 2023 PGE-1080, Biennial Report of the Trojan Independent Spent Fuel Storage Installation for 2021 Through 2022 IR 07200017/20224012022-09-22022 September 2022 Trojan Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200017/2022401 ML22115A0362022-04-14014 April 2022 Portland General Electric Co., Annual Financial Report for Year 2021 ML22038A4352022-01-13013 January 2022 Transmittal of Revision 17 to PGE-J0691 Trojan- Independent Spent Fuel Storage Installation (ISFSI) Safety Analysis Report ML21309A1102021-10-26026 October 2021 Portland General Electric Co., Revision 30 to PGE-8010, Trojan Nuclear Quality Assurance Program ML21330A0252021-09-28028 September 2021 Trojan ISFSI Biennial Report of Changes to NRC-Approved Quality Assurance Program ML21132A2582021-05-0707 May 2021 Trojan Independent Spent Fuel Storage Installation (ISFSI) - Trust Agreement Between Pacificorp and the Bank of New York Mellon ML21118A0412021-04-15015 April 2021 Portland General Electric Co., Annual Financial Report for Year 2020 ML21084A1172021-03-0202 March 2021 Portland General Electric Company - Annual Report of Individual Occupational Radiation Dose Monitoring ML21043A2562020-12-21021 December 2020 Portland General Electric Co., NRC Service List Changes ML20280A5212020-12-11011 December 2020 Materials License No. SNM-2509 for the Trojan Independent Spent Fuel Storage Installation ML20280A5192020-12-11011 December 2020 Issuance of Materials License No. SNM-2509 for the Trojan Independent Spent Fuel Storage Installation, Transmittal Letter ML20287A2332020-11-0909 November 2020 Environmental Assessment and Finding of No Significant Impact for Trojan License Amendment Request Transmittal Letter IR 07200017/20200012020-10-27027 October 2020 Trojan Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 07200017/2020001 ML20198M3782020-07-0808 July 2020 Trojan Independent Spent Fuel Storage Installation'S (ISFSI) - Radiological Decommissioning Cost Estimate and Funding Plans Additional Documentation ML20149K6312020-06-12012 June 2020 Letter - Trojan License Amendment Request - Accepted for Review ML20149K4182020-05-28028 May 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, Section I.E. for Trojan ISFSI (COVID-19) ML20147A6062020-05-13013 May 2020 VPN-006-2020 Pge Request for Temporary Exemption ML20115E2832020-04-0909 April 2020 Trojan ISFSI, Transmittal of Annual Financial Report for Year 2019 ML20087J6822020-03-23023 March 2020 Trojan Independent Spent Fuel Storage Installation'S (ISFSI) Radiological Decommissioning Cost Estimate and Funding Plans ML20083G8002020-03-10010 March 2020 Trojan Site-Specific Independent Spent Fuel Storage Installation (ISFSI) License Change Application (Lca) 72-08, Potential Explosion Effects on ISFSI ML19221B6472019-08-0909 August 2019 Letter to B. Nicholson Issuance of Renewed Materials License No. SNM-2509 for the Trojan Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0011 and 000993/L-2017-LNE-0009) IR 07200017/20194012019-07-24024 July 2019 Trojan Independent Spent Fuel Storage Installation, Physical Security Requirements for Independent Spent Fuel Storage Installations Inspection Report 07200017/2019401 ML19035A6102019-02-0404 February 2019 Letter to B. Jenkins Request for Additional Information for the Technical Review of the Application for Renewal of the Trojan Independent Spent Fuel Storage Installation License No. SNM-2509 (CAC No. 001028) ML18113A3412018-04-23023 April 2018 Letter to B. Jenkins Package: Request for Additional Information for the Technical Review of the Application for Renewal of the Trojan Independent Spent Fuel Storage Installation License No. SNM-2509 (CAC No. 001028) ML18094A4892018-04-0303 April 2018 Letter to M. E. Tursa Request for Additional Information Regarding Portland General Electric Company'S Decommissioning Funding Plan Update for Trojan Independent Spent Fuel Storage Installation ML18075A3682018-03-29029 March 2018 Letter to Mr. David Howe, Oregon Health Authority; Review of the Draft EA for the Trojan ISFSI IR 07200017/20170012018-02-16016 February 2018 Trojan Independent Spent Fuel Storage Installation (ISFSI) Inspection Report 07200017/2017001 ML15233A1202015-08-25025 August 2015 Staff Review of Interim Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 ML15149A3762015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) IR 05000346/20140072015-02-17017 February 2015 IR 05000346/2014007; on 11/03/2014 - 01/09/2015; Davis-Besse Nuclear Power Station; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ML15012A5862015-01-12012 January 2015 Confirmation of Initial License Exam ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML1009504462010-04-0101 April 2010 Trojan ISFSI Annual Financial Report for Year 2009 ML0706801312007-03-17017 March 2007 Closure of Nrc'S Review of Firstenergy Nuclear Operating Company'S Response to GL 2006-03 for Beaver Valley, Units 1 and 2; Davis-Besse, Unit and Perry Unit 1 ML0624905312006-08-29029 August 2006 Transmittal of Revision 7 to the Trojan Independent Spent Fuel Storage Installation Emergency Plan, PGE-1075 ML0618403302006-06-22022 June 2006 Trojan ISFSI Annual Financial Reports for Fiscal Year 2005 ML0608303252006-03-21021 March 2006 Consummation of Midamerican Energy Holdings Company Acquisition of Pacificorp Holdings, Inc. as Approved by the Nuclear Regulatory Commission ML0607900742006-03-17017 March 2006 Trojan Independent Spent Fuel Storage, Amendment 6 for Materials License SNM-2509 ML0521503002005-07-21021 July 2005 Application of Pacificorp for Approval of Indirect Transfer of License No. SNM-2509 (Application) ML0516502802005-06-0606 June 2005 PGE-1061, Trojan Nuclear Plant Defueled Safety Analysis Report and License Termination Plan (PGE-1078), Revision 22, and Subsequent Deletion as an Active Topical Report and Licensing Basis Document ML0515902902005-05-31031 May 2005 Trojan Nuclear Plant, ISFSI, Request to Update Service List 2024-08-27
[Table view] |
Text
/PGE Portland General Electric Company Trojan Nuclear Plant 71760 Columbia RiverHwoy RainierOR 97048 (503) 556-3713 March 11, 2005 VPN-01 1-2005 Trojan Nuclear Plant Docket 50-344 License NPF-1 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 PGE-1009-2004. "Operational Ecological Monitoring Program for the Trojan Nuclear Plant."
Annual Report for 2004 In accordance with NPF-1, Appendix B, Environmental Protection Plan, Section 5.4.1, this letter transmits Portland General Electric Company's "Operational Ecological Monitoring Program for the Trojan Nuclear Plant," Annual Report for 2004.
The report includes all existing non-radiological effluents, which are monitored and reported in accordance with the Oregon Department of Environmental Quality's National Pollutant Discharge Elimination System (NPDES) permit and Trojan's Environmental Protection Plan, Section 5.4.1.
Any questions may be directed to Mr. Jerry Reid of my staff at (503) 556-7013.
Sincerely, Stephen M. Quennoz Vice President, Generation Enclosure c: D. Stewart-Smith, ODOE A. Bless, ODOE J. T. Buckley, NRC, NMSS, DWM Director, NRC, Region IV, DNMS ,,--1, ':
Connecting People, Power and Possibilities
Controlled Copy No. 1 PGE-1009-2004 OPERATIONAL ECOLOGICAL MONITORING PROGRAM for the TROJAN NUCLEAR PLANT January through December 2004 March 2005 Prepared by PORTLAND GENERAL ELECTRIC COMPANY Trojan Nuclear Plant Rainier, Oregon
TROJAN NUCLEAR PLANT OPERATIONAL ECOLOGICAL MONITORING PROGRAM ANNUAL REPORT FOR 2004 This report describes the ecological monitoring program for the Trojan Nuclear Plant for the period from January through December 2004. It contains the necessary reporting information to meet the Technical Specification requirements for non-radiological monitoring (Facility Operating License, NPF-1, Appendix B, Section 5.4.1, "Routine Reports"). The current scope of the monitoring program reflects the non-operational status of the plant under the Possession Only License.
Operating License NPF-1, Appendix B, Environmental Protection Plan Requirement:
EPP5.4.1.a: 'The Annual EnvironlmenitalOperatingReport shall also include: a. A list of EPP nonconipliancesand the correctiveactions taken to remedy themn.
2004 Report:
There were no EPP noncompliances reported during 2004.
Operating License NPF-1, Appendix B, Environmental Protection Plan Requirement:
EPP5.4.1.b: 'The Anntal Environimenttal OperatingReport shall also include: b. A list of all changes in station design or operation, tests, and experiments made in accordancewith Subsection 3.1 which involved a potentiallysignificant unreviewed environmental issue.
2004 Report:
No evaluations meeting the criteria in Subsection 3.1 !to identify potentially significant unreviewed environmental issues, were performed during 2004.
1
Operating License NPF-1, Appendix B, Environmental Protection Plan Requirement:
EPP5.4.1.c: 'Tie Annutal EnvironmentalOperatingReport shall also inlcllde: c. A list of nonroutine reportssubmitted in accordance with Subsection 5.4.2."
2004 Report:
There were two non-routine reports as described in Section 5.4.2 of the EPP submitted during the 2004 reporting period as follows.
- A non-routine National Pollution Discharge Elimination System (NPDES) report was filed with the Oregon Department of Environmental Quality for the following occurrence:
The weekly average E. coli limit in the wastewater facility was exceeded with a sample result of 921 per 100 ml on January 29,2004. The high E. coli level was found to result from a dead bird in the chlorine tank and the system was cleaned. An initial re-sample in February also tested high for E.coli. After further cleaning, an additional re-sample on February 4th showed the E. coli levels returned to normal (3 per 100 ml).
- The wastewater facility exceeded the E. coli concentration maximum daily limit on March 4, 2004. The cause of the non-compliance was a dead bird found in the chlorine contact tank at the end of the previous month. The bird was removed and the tanks were cleaned. The E. coli value was brought back down to normal levels by March 5, 2004. A non-routine NPDES report was filed with the Oregon Department of Environmental Qualilty.