DCL-05-022, Inservice Inspection Report Twelfth Refueling Outage

From kanterella
(Redirected from ML050830318)
Jump to navigation Jump to search
Inservice Inspection Report Twelfth Refueling Outage
ML050830318
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/11/2005
From: Jacobs D
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-05-022
Download: ML050830318 (52)


Text

Pacific Gas and ElectricCompany Donna Jacobs Diablo Canyon Power Plant Vice President P.0. Box 56 Nuclear Services Avila Beach, CA 93424 805.545.4600 March 11, 2005 Fax: 805.545.4234 PG&E Letter DCL-05-022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Unit 2 Inservice Inspection Report for Unit 2 Twelfth Refueling Outage

Dear Commissioners and Staff:

In accordance with ASME Section Xi, paragraph IWA 6230, enclosed is the Diablo Canyon Power Plant Inservice Inspection Report. This report provides the results of the Unit 2 twelfth refueling outage inservice inspections of Class 1 and 2 components and supports.

Sincerely, Do a Jacobs ddm/469/R0248063 Enclosure cc: Diablo Distribution cc/enc: Bruce S. Mallett David L. Proux Girija S. Shukla State of California, Pressure Vessel Unit A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway

  • Comanche Peak
  • Diablo Canyon
  • PaloVerde
  • SouthTexas Project
  • Wolf Creek

Enclosure PG&E Letter DCL-05-022 INSERVICE INSPECTION REPORT FOR DCPP UNIT 2 TWELFTH REFUELING OUTAGE

Diablo Canyon Power Plant Unit 2 USNRC Docket No. 50-323 Operating License No. DPR-82 Commercial Operation Date, March 13, 1986 Prepared By:

ISI Specialists: Thomas L. Alcott / Chriyl*Beard 6if '-l"A Reviewed By: Os .H L J~hes E. Hill, Lead ISI Specialist I/

Approved By:

Patrick Nugent, Engineering This report is submitted as required by ASME Boiler and Pressure Vessel Code,Section XI, to the United States Nuclear Regulatory Commission.

TABLE OF CONTENTS SECTION TITLE A. Introduction B. ASME Code Report Form NIS-l (Basis of Summary)

1. Class 1
2. Class 2 C. Class 1 Components
1. Vessels
a. Reactor Vessel
b. Pressurizer
c. Steam Generators
2. Pumps
3. Piping
4. Integral Attachments
5. Supports D. Class 2 Components
1. Vessels
a. Heat Exchangers
2. Integral Attachments
3. Piping
4. Supports E. System Pressure Tests F. Preservice Inspection Items G. Repairs and Replacements I. ASME Code Report Form NIS-2 (Indexed by System)

H. Containment Examinations

SECTION A INTRODUCTION

SECTION A INTRODUCTION Inservice inspection (ISI) of scheduled ASME Section XI Class 1 and 2 components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP)

Unit 2 was completed during the twelfth refueling outage from October through December, 2004. The DCPP Unit 2 twelfth refueling outage (2R12) was the first outage in the third period within the second 10-year ISI interval.

In addition to the ASME Code examinations reported here, a 100% ultrasonic examination and bare metal visual examination was conducted on the reactor vessel top head penetration nozzles. The reactor bottom head penetration nozzles also received a 100 % bare metal visual examination. No evidence of boric acid leakage was found.

These examinations were reviewed by regional NRC staff, and results are on file at the plant site.

This report is submitted as required by ASME Section XI, paragraph IWA-6220, and is organized in several sections. This introduction is Section A. Section B contains the completed ASME Code Report Form NIS-I for Class 1 and 2 components. Sections C and D detail the Class 1 and 2 examinations performed, date of examination (for group items or for more than one type of examination performed, the date provided is the most recent examination date), any unusual conditions noted, corrective actions if required, and explanatory remarks.

System pressure tests on Class 1 and 2 systems conducted during the period following 2R1., and up to and including 2R12, are reported in Section E.

Preservice inspections were performed on certain components, as required after repairs or replacements. These items are detailed in Section F.

Section G of this report, Repairs and Replacements, contains the completed ASME Code Report Form NIS-2 for those 2R12 work packages closed prior to or on January 16, 2005 and for any pre-2R12 work packages closed after April 25, 2003. NIS-2 reports for 2R12 work packages that are closed after January 16, 2005 will be included in the next outage report. Corrective actions and work order package documentation are on file at DCPP and are referenced by work order number in the NIS-2 reports.

Containment exams are reported in Section H.

SECTION B ASME CODE REPORT FORM NIS-1

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner Pacific Gas & Electric Company. 77 Beale St., San Francisco, CA 94106
2. Plant Diablo Canyon Power Plant. P.O. Box 56. Avila Beach. CA 93424
3. Plant Unit Two 4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date 03113/86 6. National Board Number for Unit N/A
7. Component Inspected ASME Code Class I Items Component or Manufacturer or Installer Manufacturer or State or Province National Board Appurtenance Installer Serial No. No. No.

Reactor Vessel Combustion Engineering/ CE 68101 12962-85 21359 Westinghouse Pressurizer Westinghouse 1171 N/A 68-106 Steam Gen 2-1 Westinghouse 1161 N/A 68-89 Steam Gen 2-2 Westinghouse 1162 N/A 68-90 Steam Gen 2-3 Westinghouse 1163 N/A 68-91 Steam Gen 2-4 Westinghouse 1164 N/A 68-92 RCP 2-1 Westinghouse 711 N/A N/A RCP 2-4 Westinghouse 714 N/A N/A Class I Valves Various N/A N/A N/A Class I Supports Various N/A N/A N/A

'Class I Piping M.W. Kellogg/ Pullman N/A N/A N/A Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 I/ in. x 11 in., (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORMNI NS-l (back)

8. Examination Dates 10/04 to 12/04
9. Inspection Period Identification: _Third
10. Inspection Interval Identification: Second
11. Applicable Edition of Section XI 1989 Addenda None
12. Date/Revision of Inspection Plan: December 2002. Revision 2
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for current interval. Refer to IS Report
14. Abstract of Results of Examinations and Tests. Refer to ISI Report
15. Abstract of Corrective Measures. Refer to IST Report We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and, c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) N/A Expiration D t N/A Date Mc& I 20 C)% Signed Engineering ManacerBy Owner Patricvqugent CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California and employed by H. S. B. 1. & 1. Co. of Harford, CT have inspected the components described in this Owners' Report during the period 10/04 to 12/04 , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners' Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and tests, and corrective measures described in this Owners' Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/P 4 Commissions CA 1828, NB 9990 A.N.I.C.

'Inspector'/ Signature/Kenny Kim National Board, State, Province and, endorsements.

BV I late ~aAcJ- I 20 At

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner Pacific Gas & Electric Company. 77 Beale St., San Francisco, CA 94106
2. Plant Diablo Canyon Power Plant. P.O. Box 56. Avila Beach, CA 93424
3. Plant Unit Two 4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date 03/13/86 6. National Board Number for Unit N/A
7. Components Inspected ASME Code Class 2 Items Component or Manufacturer or Installer Manufacturer or State or Province National Board Appurtenance Installer Serial No. No. No.

RHR Heat Engineers and Fabricators S-15588-C N/A 1112 Exchanger 2-1 Company Class 2 Piping Various N/A N/A N/A Supports Class 2 Piping M.W. Kellog/ Pullman N/A N/A N/A

__ __ ___ __ __ __ P o wer__ _ _ _ _ _ __ _ _ _ _ _ _ _ _

Note: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (1) size is 8 1/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORMI NIS-1 (back)

8. Examination Dates 10/04 to 12/04
9. Inspection Period Identification: Third
10. Inspection Interval Identification: Second
11. Applicable Edition of Section XI 1989 Addenda None
12. Date/Revision of Inspection Plan: December 2002. Revision 2
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for current interval. Refer to IS! Report
14. Abstract of Results of Examinations and Tests. Refer to ISI Report
15. Abstract of Corrective Measures. Refer to IS! Report We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and, c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) N/A Expiration Date N/A Date __ i 20 0 5-Signed Encineerinc Mananer By Owner Patrick 'ent CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California and employed by H. S. B. I. & 1. Co. of Harford. CT have inspected the components described in this Owners' Report during the period 10/04 to 12/04 , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners' Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and tests, and corrective measures described in this Owners' Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

A Inspecler's Signature/Kenny Kim

- Commissions CA 1828. NB 9990 A.N.I.C.

National Board, State, Province and, endorsements.

X Date.Ma1C4e 1 I 2005..

  • 1 SECTION C CLASS ONE COMPONENTS

PG&E DIABLO CANYON POWER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: REACTOR VESSEL ASME SECTION XI SYSTEMS - CLASS 1 PAGE 1 of 1 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS B-G-1 B6.10 RPV2 Closure RPV Bolting RPV2 Nuts 37 to 54 MT 11-18-04 NRI Head Nuts > 2" dia.

B6.30 RPV2 Closure RPV Bolting RPV2 Studs 37 to 54 MT 11-17-04 NRI Head Studs > 2" dia.

(Removed)

RPV2 Closure RPV Bolting RPV2 Studs 37 to 54 UT 11-17-04 NRI Head Studs > 2" dia.

(Removed)

B6.50 RPV2 Closure RPV Bolting RPV2 Washer 37 to VT-I 11-18-04 NRI Washers > 2" dia. 54

PG&E DIABLO CANYON POWVER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PRESSURIZER ASME SECTION XI SYSTEMS - CLASS 1 PAGE 1 of 2 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS B-B B2. 1 Shell to Bottom Pressurizer 2 Girth I - one third UT 11-5-04 NRI Head Circ Weld (1/3)

Shell to Upper Pressurizer 2 Girth 5 - one third UT 10-30-04 NRI Head Circ Weld (1/3)

B-D B3.1 I0 Pzr 2 Safety Line Pzr 2 to 2S6-727- WIB-358 (N-V) UT 11-4-04 NRI Nozzle to Vessel 6SPL Weld Pzr 2 Relief Line Pzr 2 to 2S6-730- WIB-379 (N-V) UT 11-16-04 NRI Nozzle to Vessel 6SPL Weld B3.110 Pzr 2 Safety Line Pzr 2 to 2S6-728- Inside Radius UT 11-4-04 Nozzle Inside NRI 6SPL Section Radius

PG&E DIABLO CANYON PONVER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PRESSURIZER ASME SECTION XI SYSTEMS - CLASS 1 PAGE 2 of 2 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS B-H B8.20 Support Skirt Pressurizer 2 Girth 10 - one third MT 11-5-04 NRI.

Weld (1/3)

Support Skirt Pressurizer 2 Girth 10 - one third UT 11-10-04 NRI Weld (1/3)

PG&E DIABLO CANYON POWER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: STEAM GENERATORS ASME SECTION XI SYSTEMS - CLASS 1 CAT STEAM GENERATOR TUBING PAGE 1 of 1 B16.20 The following percenta s apply to inservice tubes.

SCOPE PROBE TYPE SG 21 SG 22 SG 23 SG 24 Full length (except Rows Bobbin 100% 100% 100% 100%

I and 2 U-bends)

Rows I to 10 U-bends Plus Point 100% 100% 100% 100%

Repeat PWSCC Plus Point 100% 100% 100% 100%

indications at dents and top of tubesheet Hot Leg top-of tubesheet Plus Point 100% 100% 100% 100%

> 5 volt dented TSP Plus Point 100% 100% 100% 100%

intersections

> 2 and < 5 volt dented Plus Point 20% at I H 100% at IH to 5H, 20% at 100% at IH to 311, 20% at 100% at IH to 3H, 20% at TSP intersections (Note-1) 6H 4H 4H Distorted OD bobbin Plus Point 100% 100% of DOS greater than 100% of DOS greater than 100% of DOS greater than signals (DOS) at TSP 1.7 bobbin volts 1.7 bobbin volts 1.7 bobbin volts intersections Distorted ID bobbin Plus Point 100% 100% 100% 100%

signals (DIS) at TSP intersections

> 5 volt free span dings Plus Point 20% 20% 20% 20%

> 2 volt dings at AVB Plus Point 20% 20% 20% 20%

stuctures Baseline TSP ligament Plus Point 100% 100% 100% 100%

indications Deplugged tube plug Plus Point 100% 100% 100% 100%

exapansion zone (PEZ)

Tubes unplugged 10 19 5 17 Note 1: For each 20% sample, inspected at least 50 dents, or else inspected 100% if there were less than 50 dents.

PG&E DIABLO CANYON POWER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PIPING, PUMPS ASME SECTION XI SYSTEMS - CLASS 1 PAGE 1 of 1 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS B-J See RI-ISI B-L-I B12.10 RCPump24: RCP 2-4 Girth RCP 2-4 Girth Weld VT-I 11-10-04 CodeCaseN-481. VT-2examperformed with Pump Casing Weld (external) system pressure test. WCAP-13044 and WCAP-Weld 13045 demonstrate compliance to Code Case N-481 for Westinghouse primary loop pump casings.

PG&E DIABLO CANYON POWVER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PIPING ASME SECTION XI SYSTEMS - CLASS 1 PAGE 1 of 2 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS .RESULTS RI-ISI Reac Coolant Out 2*-2-29SPL Wm-RC-2-3 UT 11-12-04 Substitution for WI-RC-2-8 NRI Loop 2 Reac Coolant Pp 2*-10-27-1/2SPL WIB-RC-2-13 UT 11-8-04 Substitution for WIB-RC-2-9 Disch Loop 2 Pressurizer RV 2S64081-4SPL WIB-393 UT 114-04 NRI PCV455C In Pressurizer RV 2S6-408 t4SPL WIB-394 UT 11-4-04 NRI.

PCV-455C In Pressurizer RV 2S6-727-6SPL+ WIB-360 UT 10-30-04 NRI 80 1OC Inlet Reac Cool Pp I 2S6-54-2 WIB-848 PT 11-2-04 NRI Seal Wtr In Reac Cool Pp 2 2S6-55-2 WIB-864 PT 10-29-04 NRI Seal Wtr In Reac Cool Pp 2 2S6-5398-1-1/2 WIB-858N PT 10-29-04 NRI Seal Wtr In Reac Cool Pp 2 2S6-5398-1-1/2 WIB-8581 PT 10-29-04 NRI Seal Wtr In Reac Cool Pp 3 2S6-56-2 WIB-875 PT 10-29-04 NRI Seal Wtr In

PG&E DIABLO CANYON POWVER PLANT - UNIT 2 SECOND INTERVAL, SECOND PERIOD, SECOND REFUELING OUTAGE REPORT MAJOR ITENM: PIPING (2R1 1)

ASME SECTION XI SYSTEMS - CLASS I PAGE 2 of 2 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS RI-ISI Reac Cool Pp 3 2S6-56-2 WIB-870W PT 10-29-04 NRI Seal Wtr In Reac Cool Pp 3 2S6-56-1-1/2 WIB-870S PT 10-29-04 NRI Seal Wtr In Reac Cool Pp 3 2S6-56-1-1/2 WIB-870J PT 10-29-04 NR.

Seal Wtr In Reac Cool Pp 4 2S6-57-1-1/2 WIB-883K PT 11-4-04 Seal Wtr In Hot Leg Recirc 2S6-109-14SPL WIB-245 UT 11-20-04 Substitution due to WIB-246 Obstruction NR.I' Before V-8702 Hot Leg Recirc 2S6-109-14SPL WIB-248 UT 11-3-04 Substitution due to WIB-249 Obstruction ENR Before V-8702

PG&E DIABLO CANYON PONVE R PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: INTEGRAL ATTACHMENTS ASME SECTION XI SYSTEMS - CLASS 1 PAGE 1 of 1 CATEGORY COMPONENT/ WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS B-K-I B310.10 Accumulator 2S6-255-IOSPL 7-4V PT 11-12-04 NRI Injection Lp 3:

Welded Attachment Accumulator 2S6-256-IOSPL 7-2V PT 11-12-04 NRI Injection Lp 4:

Welded Attachment RHR Pp 2-1 Inj 2S6-3845-6SPL 92-44V PT 11-2-04 NRI Cold Leg 2:

Welded B 10.20 RC Pump 2-1: RCP 2-1 Support Lug Weld No.3 PT 11-19-04 NRI Welded Lug Attachment

PG&E DIAB3LO CANYON POWVER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST MAJOR ITEM: PIPING SUPPORTS REFUELING OUTAGE REPORT (2R12)

ASME SECTION XI SYSTEMS - CLASS I PAGE 1 of 1 CATEGORY F-A SUPPORTS F1.10 TO F1.70 SUPPORT COMPONENTS The required Inservice inspections were performed on 68 Class 1 hangers during the twelfth refueling outage between the dates of 10/25/04 and 12/16/04. All supports found acceptable. Data reports are on file.

LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT 16 70-27SL 109 6-7V 13 2-15V 51 2212-28V 16 70-59SL 109 6.8V 13 92-70R 51 2212-91V 109 72-20SL 1665 6-4R 15 412-83R 51 898-4 1665 72-23SL 253 2-23V 15 92-5R 51 2212-87 1665 72-95SL 253 2-22V 15 93-IR 51 2212-90 253 70-58SL 235 70-62R 15 71-19R 54 2730-72V 255 72-84SL 235 412-130 15 92-75R 1140 326-270R 3854 71-8SL 3844 92-59R 1995 7-34R 1991 2734-23 3854 71-6SL 3844 71-72R 24 2-9V 1991 2734-39 729 71-12SL 729 414-591R 24 412-1IIR 1991 2217-32 13 70-26SL 729 989-IR 24 412-116R 1991 2734-37 24 412-113SL 13 2-14V 1172 989-28R 1991 2734-41 1171 412-171SL 13 92-73R 51 2212-21 1991 2734-22 1172 412-168SL 13 2-32R 51 2212-22 1991 273442 1195 412.153SL 13 412-lIOR 51 2212-25 1195 412-154SL 13 412-45R 51 2212-29 3858 78-77SL 13 92-lR 51 2212-88 prssurz2-1 Supp Sir 13 92-9R 51 2212-24

SECTION D CLASS TWO COMPONENTS

PG&E DIABLO CANYON POWVER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: HEAT EXCHANGERS ASME SECTION XI SYSTEMS - CLASS 2 PAGE 1 of 1 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS C-A C1.20 Head RHR Heat Girth Weld Item 22 PT 10-20-04 Surface examinations performed in-lieu of 100%

Circumferential NRI Exchanger 2-1 (Head-to-Shell) volumetric as specified in Relief Request NDE#17, Welds RI C-B C2.21 Nozzles in Vessels RHR HX 2-1 to Outlet Nozzle-to- PT 10-20-04 Surface examinations performed in-lieu of 100%

>1/2" wall: NRI 2SI-3551-14 Shell Weld Item 23 volumetric as specified in Relief Request NDEN118, Nozzle-to-Shell Rl Weld I

PG&E DIABLO CANYON POWVER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: INTEGRAL ATTACHMENTS ASME SECTION XI SYSTEMS - CLASS 2 PAGE I of I CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS C-C C3.20 RHR Pp 2-1 Inj Line 2S6-508-8I 8-52A Attachment PT 114-04 NRI Cold Leg 1&2:

Welded Attachment RHR Pp 2-1 Inj Line 2S6-508-811I 8-49R Attachment PT 114-04 NRI Cold Leg 1&2:

Welded Attachment Recip Chg Pp 2-3 Line 2S647-3 23-SOR Attachment PT 10-27-04 NRI Disch: Welded Lugs Attachment

PG&E DIABLO CANYON POWER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PIPING, PUMPS ASME SECTION XI SYSTEMS - CLASS 2 PAGE 1 of 1 CATEGORY COMPONENT/ *WELDOR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS C-F-2 See RI-ISI C-F-I See RI-ISI RI-ISI RHR Injection to 2SI-985-12111P WIC-127 UT 10-21-0 4 NRI Hot Leg 1&2 RHR Injection to 2SI-985-121IIP WIC-128 UT 10-21-0 4 NRI Hot Leg I&2 ResHtExchanger 2SI-118-811I WIC-68 UT 11-19-0 4 NRI I Outlet

PG&E DIABLO CANYON SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: SUPPORTS ASME SECTION XI SYSTEMS - CLASS 2 PAGE 1 of 1 CATEGORY F-A SUPPORTS F1.10 TO F1.70 SUPPORT COMPONENTS The required Inservice inspections were performed on 50 Class 2 hangers during the twelfth refueling outage betveen the dates of 10/25/04 and 12/16/04.

Results were found acceptable. Data reports are on file.

LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT SG 2-3 SG-02-03-NE RHR PP 2-2 Motor 77-18SL 508 413-213SL 1066 2033-25SL SG 2-3 SG-02-03-NW RHR PP 2-2 Motor 77-19SL 509 413-204SL 557 2049-13SL SG 2-3 SG-02-03-SE 927 72.77SL 282 413-1 ISL 557 2049-2SL SG 2-3 SG-02-03-SW 110 413-IOISL 746 413-533SL 556 2049-14SL SG 2-4 SG-02-04-NE 110 413-281 SL 55 78-395SL 927 412-78R SG 2-4 SG-02-04-NW 985 412-127SL 226 2033-1 SL 927 6-1V SG 2-4 SG-02-04-SE. 985 412-92SL 225 2033-2SL 3551 414-563R SG2-4 SG-02-04-SW 985 72-75SL 1066 2033-16SL 110 22-13V 110 413-IOOR 110 47-141A 512 413-4R 512 22-12R 985 49-12V 985 412-98R 985 9046A 985 90-SOR 508 8-49R 508 8-52A 508 8-53R 508 6-120R 508 8-51R 508 92-SIR 508 6-122R 508 92-49R 1454 23-41R 1454 46-18R , . _ _______________

SECTION E SYSTEM PRESSURE TESTS

PG&E DIABLO CANYON POWVER PLANT -

UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PRESSURE TESTS ASME SECTION XI SYSTEMS - CLASS 1 & 2 PAGE 1 of 3 TEST CLASS DESCRIPTION EXAM COMMENTS NO. DATE RESULTS I l Reactor Coolant System and Connected Piping 12/8/04 STP R-8A NRI 6 1 Charging Injection Inside Containment 12/8/04 STP R-8A and P-SI-12 NRI 7 1 Safety Injection Inside Containment, From 8905A-D to 8949A-D 12/8/04 STP R-8A and P-ST-22 NRI 1 2 Steam Generators and Connected Piping 12/14/04 NRI 2 2 Auxiliary Feedwater Pumps X-2 & X-3 12/10/04 NRI 3 2 Auxiliary Feedwater Pump X-l Discharge 12/16/04 NRI 11 2 Charging Injection 8803A & B to 8801A & B 11/23/04 NRI 12 2 Charging Injection 8801A & B to 8820 12/8/04 NRI 13 2 Charging Pumps & Suction Piping 11/22/04 NRI

PG&E DIABLO CANYON PONVER PLANT -

UNIT 2 .

SECOND INTERVAL, TIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PRESSURE TESTS ASME SECTION XI SYSTEMS - CLASS 1 & 2 PAGE 2 of 3 TEST CLASS DESCRIPTION EXAM COMMENTS NO. DATE RESULTS 17 2 Accumulator Injection Loops 1-4, Sample Lines to 9352A-D, Test 12/8/04 NRI

& Fill lines to 8878A-D 18 2 Accumulator, RHR, and Charging Test Line 10/28/04 NRI 19 2 RWST & Supply to RHR, Cont Spray, SI, Refueling Wtr 12/2/04 Purification Pumps & Recirc Line to RHR HX NRI 20 2 RWST Supply to Charging Pump Suction, 8805A & B to 8924 10/28/04 NR 22 2 Safety Injection Pumps Discharge to Hot Legs from 8802A & B to 12/8/04 NRI 8904A-D 23 2 RHR Pumps and Discharge Piping 12/1/04 NRI 26 2 RWST Supply to Eductors 12/2/04 NRI 27 2 Containment Spray Discharge Piping to 9015A & B 11/30/04 NRI

SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PRESSURE TESTS ASME SECTION XI SYSTEMS - CLASS I & 2 PAGE 3 of 3 TEST CLASS DESCRIPTION EXAM COMMENTS NO. DATE RESULTS 28 2 Containment Spray Pump Discharge Piping from 9015A & B to 11/30/04NR 9006A & B 29 2 Containment Spray Ring Piping, Spec S3 11/20/04 NRI 30 2 CCW Supply & Return to Heat Fan Coolers, RCPs and XS Cont Exchanger 12/8/04

/° NRI Letdown 35 2 Primary Water Supply to PZR Relief Tank (pen 52) 11/30/04 NRI 40 2 Firewater Supply Before Containment (pen 79) 11/17/04 .NRI 41 2 Refueling Canal Water Inlet (pen 46) 11/2/04 NRI 44 2 Inside Cont Inst Air Supply Header. (pen 54) 11/2/04 NRI 45 2 Service Air (pen 56) 11/2/04 NRI

SECTION F PRESERVICE INSPECTION ITEMS

PG&E DIABLO CANYON POWER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: PSI ASME SECTION XI SYSTEMS - CLASS 1 & 2 PRESERVICE INSPECTION ITEMS PAGE 1 of 1 The required preservice inspections were performed on 9 components and 3 supports during the twelfth refueling outage.

Other CATEGORY Namepof System Exam Type Work Order Ident.

Component Sytm Ea yeNo. Line No B-G -2 _ _ _ _ _ _ _ _ _ _ _ _ _

(B7.70) RCS-1-8010A 7 VT-I R0245222-2 729 RCS-1-8010B 7 VT-i R0245224-2 728 RCS-1-8010C 7 VT-i R0245225-2 727 B-J (9.20) WIB-563-04 9 PT C0191724-1 1992 WIB-564-04 9 PT C0191724-1 1992 WIB-565-04 9 PT C0191724-1 1992 WIB-736-04 9 PT C0191726-1 1994 WIB-737-04 9 PT C0191726-1 1994 WIB-738-04 9 PT C0191726-1 1994 F-A (Fl.10 - Fl.70) 413-418R VT-3 C0182773 575 2033-25SL VT-3 C0188604 1066 78-99SL VT-3 C0188398 55

SECTION G REPAIRS AND REPLACEMENTS

FORM NIS-2 OWNVER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200' 77 Beale Street, San Francisco, CA 94106 Sheet I of I
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Feedwater System (03)
5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases IN/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASMNE Name of Nameof Manufacturer National orkOrder Year Repaired Code Component Manufacturer Serial Board No. Identification Built Replaced, or Stamped No. No. Line No Replacement r (Yes or

_ _ _ _ __ _ __ _ __ _ _ _ _ _ _ _ _ _ _N o)

FW-2-380 Anchor Darling E6871-6-3 N/A R0224247 Line-572 N/A Replace (I) 0 Yes

7. Description of Work (I) Replaced Internals
8. Tests Conducted: Hydrostatic O Pneumatic El Nominal Operating Pressure El Other Pressure PSIG Test Temp. _ _ 'F Cl Pressure Test Conducted 1AW Code Case N4 16-1
9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this re re his Replacement comforms to Section XI of the ASME Code. Signed EngineeringManager 1 (Owner or Owner's Designee) Patrick*gent (Title) (Date)

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on a .20 06 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any persoinal injury~propet dl iiage or loss of any kind arising from or connegted with this inspection.

/- -, 2 t Inspector /¶?hJZ  :

1. c; 5 Commissions CA 1828-NB9990 A.N.I.C

/ Kenny D. kim (Title) (Datey (State or Province, National Board)

Note:,pplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

I FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200' 77 Beale Street, San Francisco, CA 94106 Sheet 1 of I
2. Plant Diablo Canyon Power Plant Unit 2

.P.O. Box 56, Avila Beach, CA 93424

3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., ctc.
4. Identification of System Feedwater System (03)
5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASME Manufacturer National VordOther Yer Repaired Code Name of Name of SeWor k Order No.rIdentirecataon Component ManufacturerSN o. o No No. LIne Ln NooReplacementBuilt Replacedor Stamped (Yes or

_ __ __ _ __ _ __ __ __ __ __ _ _ _ _ _ _ _ _ _ _ _N o) 413-418R PG&E N/A N/A C0192478 Line-575 NIA Replaced(1) 0 No

7. Description of Work (I) Modified Support
8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure ED Other Pressure PSIG Test Temp. _F E Pressure Test Conducted IAW Code Case N4 16-1
9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repyrt are E dthis Replacement comforms to Section XI of the ASME Code. Signed S9 Engineering Manager V I/aS (Owner or Owner's Designee) Patrickfugent (Title) (Date)

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on Z I 20 65 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement des ribed in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perso)la.njury oriaope rnge or loss of any kind arising from or connected with this inspection.

L , '1-i.- Inspector MIt I/ 0co.5 Commissions CA 1828 - NB 9990 A.N.I.C enny D. Kim (Title) (Date) . (State or Province, National Board)

Note:,pplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I th gh 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200' 77 Beale Street, San Francisco, CA 94106 Sheet I of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner.

See Above Repair Org. P.O. No., Job No., etc.

4. Identification of System Turbine Steam Supply System (04)
5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASME Manfatue Nationl Other Rpie Name of Name of anaue oa Work Order Y'ear Rearer Code Com ent nac Serial Board No. Identification Built Replaced, or d Stamped Component Manufacturer. No. No. Line No Replacement (Yes or

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _N o)

SG 2-1 Westinghouse PEGT-1161 68-89 C0181199-2 N/A 1968 Replaced (3) 0 Yes SG 2-2 Westinghouse PEGT-1162 68-90 C0181199-3 N/A 1968 Replaced (3) 0 Yes SG 2-4 Westinghouse PEGT-1 164 68-92 C0181199-1 N/A 1968 Replaced (3) _ Yes MS-2-FCV-43 Scutte &

K oerting _

N690556 N/A C0181324 226 N/A Repair (4) 0 No MS-2-5398 Velan Valve 901105-1 N/A C0182814 227 N/A Replaced (5) 0 Yes

7. Description of Work (3) Welded Tube Plugs, (4) Weld Build Up on Disc, (5) Replaced Valve
8. Tests Conducted: Hydrostatic E1 Pneumatic El Nominal Operating Pressure E Other Pressure PSIG Test Temp. _F CD_ PressureTestConductedJAWCodeCaseNA16-1
9. Remarks CERTIFIVATE OF COMPLIANCE We certify that the statements made in this rep~t are c til this Repair/ Replacement comforms to Section 1 of the ASME Code. Signed Engineering Manager 3// O5 (Owner or Owner's Designee) Patrick vlugent (Title) 4(Date)

CERITIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Califomia, employed by HSBCT of Hartford, CT have inspected the Repair / Replacement described in this Report on ,Aate eII , 20 C.5 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personayjpjury or pryppeta 3e or loss of any kind arising from or connected with this inspection.

- r Inspector A/V/4ah-/, Ha; Commissions CA 1828 -NB 9990 A.N.I.C

)Cenny D. KAi (Title) (Date) (State or Province, National Board)

Note: Supplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

I FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 2005 77 Beale Street, San Francisco, CA 94106 Sheet 2 of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Turbine Steam Supply System (04
5. (a) Applicable Construction Code See Work Order 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

Manufacturer National Other Repaired

  • ASME Name of Name of Sial Board Work Order Identifleation Y re a Code Component Manufacturer Soa No. No. o. No Line No. LinBuilt Replacement I Stamped StamorpNo MS-2-FCV-44 Schutte K oertin g

& N690557 _

N/A _ _

C0192530 . 225 N/A Replaced (6) 0 Yes MS-2-PCV-21 Copes - Vulcan 6910.95009 N/A C0183520 226 N/A Replaced (7) E No

___ ___ _ __ _ __ -O__ _h

.Ell

7. Remarks (6) Removed Excess Matierial from Tail Link, (7) Replaced Internals

FORM NIS-2 OWVNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200' 77 Beale Street, San Francisco, CA 94106 Sheet I of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Reactor Coolant System (07)
5. (a) Applicable Construction Code (See Work Order) 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - I 989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

-4 ASME Manufacturer National Other Yer Repaired Code Name of Name of SerialOBdardYNo.

Component Copnn l afWcturcr auatrrNo.

Board No.

kerial NOrder Identification Line No Built Replaced, or Replacement a Stamped (Yes or

____ ____ ___N o)

Masoneilan RCS-2-PCV-456 International NF N/A C0187710 Line-I 195 N/A Replace (1) No Seal Table Westinghouse N/A N/A C0 192893 L-13 N/A Replace (2) 0 No RCS-2-8000C Velan Valve NF N/A C0192523 Line-I 195 N/A Replace (3) E Yes RCS-2-8000A Vclan Valve NF N/A C0192521 1171 N/A Replace (3) Y Ys

7. Description of Work (1) Replaced Internals, (2) Removed 5" of Thimble Tube.

(3) Seal Welded Body to Bonnet

8. Tests Conducted: Hydrostatic El Pneumatic O Nominal Operating Pressure El Other Pressure PSIG TestTemp. °F E PressureTestConductedlAWCodeCaseN416-1
9. Remarks U CERTIFICATE OF COMPLIANCE We certify that the statements made in this r tar e nd this Replacement comforms to Section XI ofthe ASME Code. Signed I Engineering Manager V }o<

(Owner or Owner's Designee) Patric4ugent (Title) (Date)

CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement describedin thisReport on /_14a cAjl ,200 5 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any persoMhlnjuiyorypfprty ze or loss of any kind arising from or connected with this inspection.

I 1 ___ Inspector . A1444CA1,_2-,e'O T Commissions CA 1828 -NB 9990 A.N.I.C enny D. Kin (Title) (Date) (State or Province, National Board)

Note: Su emental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I throug4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 2004 77 Beale Street, San Francisco, CA 94106 Sheet 2 of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Reactor Coolant System (07)
5. (a) Applicable Construction Code See Work Order 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

Na eorN meo anufacturer National Work Other Yer Repaired ASCoe Component ldsnau Serial No. Board No. Ordek No. Identification Line No Byui Replaced, Replacement or (esoCae N)

RCS-2-O000B Velan Valve NF N/A C0192522 Line-1 172 N/A Replace (3) a Yes RCS-2-RV-801 OA Crosby Valve U 12S N/A R0245222 Line-729 1998 Replace (4) Q Yes RCS-2-RV-801 OB Crosby Valve U2B N/A R0245224 Line-728 1998 Replace (4) Q Yes RCS-2-RV-SOIOCl Crosby Valve UIA N/A R0245225 Line-727 1998 Replace (4) 0 Yes

= _ -50

___ _=_ _ . -0_

___ _ .'__ _ ____ O ___

. _ _ -0

7. Remarks (3) Sea] Welded Body to Bonnet, (4) Replaced valve

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200' 77 Beale Street, San Francisco, CA 94106 Sheet I of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Chemical and Volume Control System (08)
5. (a) Applicable Construction Code (See Work Order) 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASNIE of Manufacturer National Other Yer Repaired Code Name of Name auatrr o fSerial Sra Batonalr or k Wopnn Oid llNBRpaeor.

ork lme Odr Identification Built Replaced~or Stamped Component Manufacturer No. No. Une No Replacement r (Yes or

____ ____ ___N o)

CVCS-2-8387C Anchor Darling EB312-1-3 N/A C0184027 Line-1475 N/A Replaced (I) - Yes BATP2 Westinghouse 7002 N/A C0187002 N/A N/A Replaced (2) Q No CVCS-2-8446A fIT Grinnell NF N/A C0192334 Line-73 N/A Replaced (3) 0 No

____ _ _ _ _ _ _ _ _ _ _ _ _ V eV a lve __ 19 _ _Li _ _ _2 9 34 n e - 2 46 _ _ _ _ _ _ _ _ ( ) _ _Ye CVCS-2-8379B Velan Valve NF N/A C0 192934 Line-246 N/A Repair (4) 0 Yes CVCS-2-8379B IVelan Valve NI/A CO0192962 Line-246 TN-/A Rpae 3 e

7. Description of Work (1) Replaced Valve, (2) Installed Jacking Bolt Plates By Welding, (3) Replaced Bolting (4) Repaired Disc by Machining
8. Tests Conducted: Hydrostatic 5 Pneumatic 5 Nominal Operating Pressure 5 Other Pressure PSIG Test Temp. _F 3 Pressure Test Conducted IAW Code Case NA416-1
9. Remarks CERTIFICATE OF COMPLIANCE of the ASME Code. Signed (Owner or Owner's Designee)

It We certify that the statements made in this repit are cq(C}d this

/

Patrick hugent Repair / Replacement Engineering Manager

([itle) comforms to Section XI

? / J /

(Date) s5 CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Repair / Replacement described in this Report on CA / 20 c5 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any maimer for any person 1' jury or prs ! a'e or loss of any kind arising from or connected with this inspection.

'A Inspector /VaC/j /, son Commissions CA 1828-NB9990 A.N.I.C Yenny D. Kim (Title) (Date) (State or Province, National Board)

Note: Supp emental sheets in the form of lists, sketches, or drawings may be used provided (I) size is 8 1/2 x 11 in., (2) information in items I through 4 anthis data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section Xi

1. Owner Pacific Gas and Electric Company Date January 16, 2005 77 Beale Street, San Francisco, CA 94106 Sheet 2 of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Chemical and Volume Control System (08)
5. (a) Applicable Construction Code See Work Order 19 _ Edition Addenda. Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

Manutacturer National Work Other Repaired - ASIME Name or Name or Serial Board Order Identification Year i Code Component Manuacturero. No. No. Llne No Built Replacedoent _ Stamped Centrifugal Pacific Pumps 49189 N/A C0192981 Line-45 N/A Repair (5) 0 No Charging Pump 2-1 CVCS-2-8394B Anchor Darling 6817-9 N/A C0193101 Line-43 N/A Replace (3) 3 No CVCS-2-RV-81 17 Crosby Valve N69972 N/A R0223093 Line-4002 N/A Replace (l) 0 No

_________0005 _ _ _

CVCS-2-RV-8121 Crosby Valve RV-2-8121- N/A R0223094 Line-883 N/A Replace (1) 0 No

_ _ __ __ __ _ _ _ __P

_ G E_ _ _ __ _ _ _ _ __ _ _ _ _

ELDHE 2-1 Atlas Industrial 854 705 C0189864 ELDHE 2-1 Unk Replace (3) E Yes Centrifugal Pacific Pumps 49189 N/A C0190969 Line-42/45 N/A Replace (6) 0 No Charging Pump 2-1 _ _

a

_ _- a

__ __ _ __ =___ _ __

-_ =

._ _ no

_7. Remarks (l) Replaced Valve, (3) Replaced Bolting, (5) Repaired Flange By Machining, (6) Installed Spool Pieces

FORM NIS-2 OWNINER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI I. Owner Pacific Gas and Electric Company Date January 16, 2004 77 Beale Street, San Francisco, CA 94106 Sheet 1 of I

2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Chemical and Volume Control System (8)
5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

IV ASME Manufacturer National Other 'er Repaired Code Name of ompent OWaok Name of SerrklOBderdYNo. Barder Board N Onufacturer Identification Built Replaced, or Stamped Component Manufacturer No. No. Line No Replacement (Yes or

_ _ _ _ __ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _N o) 78-99SL Darling 118 N/A C0 187297 Line-55 N/A Replace (1) 0 Yes78-139SL Anchor Dar l in g _ _ _ _

136 N/A C0192409 Line=44 N/A Replace (1) 0 Yes

7. Description of Work (1) Replaced Snubber
8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure a Other Pressure PSIG Test Temp. _ F El Pressure Test Conducted lAW Code Case N416-1
9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repgare cvort4h this Replacement comforms to Section Xl of the ASME Code. Signed I /t Engineering Manager . A /0 (Owner or Owner's Designee) Patrick Nigent (ritle) (Date)

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on _A5 20 40 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any person Onjury o r . r$amnage or loss of any kind arising from or connected with this inspection.

te tt' yfenny D.Kim vC.i, _ - Inspector (Title)

/WatA (Date)

Ckb ZLtV5 Commissions CA 1828 - NB 9990 A.N.I.C (State or Province, National Board)

Note: Suplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORMNI S-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200O 77 Beale Street, San Francisco, CA 94106 Sheet 1 of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Safety Injection System (09)
5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

NameNeof NIerNmo anufacture Component Manufacturer Manufacturer Serial No.

National Board No.

JWork No.Order Ide Other Idn~iain ta Line No Year Built Reaied ReardSEor Replaced, Replacement a

i Code Stamped (Yes or RO Skid Spool 1

PGE 1J N/A N/A C0182886 11 Line-3136 N/A Replace (1) 01 No)

No Pieces SI-2-8923A Aloyco 72N2784 N/A C0190615 Line-1982 N/A Replace (2) D Yes SI-2-8923B

__ __ __ __ _ _ _ _ _ _ j Alocyco W alw o rth j _ _

72N2786 N/A C0182975' _

Line-1983 N/A Replaced (2) 0 _

Yes

7. Description of Work (1) Installed Temporary Sect XI Spool Pieces, (2) Replaced Bonnet Bolting,
8. Tests Conducted: Hydrostatic El Pneumatic a Nominal Operating Pressure E] Other Pressure PSIG Test Temp. _ F E Pressure Test Conducted IAW Code Case N-416-1
9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this rep 9 9are copcrt1-4 Replacement comforms to Section XI of the ASME Code. Signed (Owner or Owner's Designee)

/ c Patrick Nqkent Engineering Manager (Title) 3/, //,

(Date)

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT, of Hartford, CT have inspected the Replacement described in this Report on J% Ai.. ,20 of5 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement describld in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any persoo ury or pre4 ,r r loss of any kind arising from or connected with this inspection.

/ 7q Inspector z&AC,1, gCO Commissions CA 1828-NB9990 A.N.1.C K ny D.Kim (Title) (Date) (State or Province, National Board)

Note: Suppjdnental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 1I1 in., (2) information in items I through 4, n this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16,2005 77 Beale Street, San Francisco, CA 94106 Sheet 2 of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Safety Injection System (09)
5. (a) Applicable Construction Code See Work Order 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

Manufacturer National Other Yer Repaired -q ASNIE NameOf NameOf Serial Board Work Order OCtode Year Repaced a Code Component Na eofN M%1anufacturer meo.Sra No. No.

Boar.o No. dinIcon Line No Built Replacemno Replacement ft Stamped (Yes or No)

SI-2-RV-8856B Crosby Valve 0010 N/A C0192876 Line-I 19 N/A Replace (2) 0 No SI-2-RV-8856B Crosby Valve N69971 N/A R0223077 Line- 1l9 N/A Replace (3) 0 Yes

_________________ Velan Va 89120010 N/A C0191635 Line-1297 ___elae() __e SI-2-8954D Velan Valve 891210-6 N/A C0191635 Line-1297 N/A Replace (3) 0 Yes SI-2-8954D Velan Valve 891210-6 N/A C0191635 Line-1297 N/A Replace (4) Yes SI-2-8982A Anchor NF N/A C0170233 Line-512 N/A Replace (2) 0 No

_ __ __ __ __ __ _ _ __ _ _ D a r l in g_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

SI-2-8982A DAnhrig NF N/A C0170233 Line-512 N/A Replace (5) 0 No SD-2-8900B Rockwell NF N/A C0191724 Line-1992 N/A Replace (3) _ Yes SI-2-8900B Rockwell NF NIA C0191724 Line-1992 N/A Replace (4) 0 Yes SI-2-8900D Rockwell NF N/A C0191726 Line-1994 N/A Replace (3) 0 Yes SI-2-8900D Rockwell NF N/A C0191726 Line-1994 N/A Replace (4) 0 Yes

__ __ ___ =__ -O_

7. Remarks (2) Replaced Bonnet Bolting, (3) Replaced Valve, (4) Replaced Piping, (5) Replaced Internals

FORAM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200' 77 Beale Street, San Francisco, CA 94106 Sheet I of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Safety Injection System (09)
5. (a) Applicable Construction Code (Sec Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASME Manufacturer National Other ' Repaired Code Component o Nam Serial NWork Order Identification Built Replaced, or z Stamped Component Manufacturer No. No. Une No Replacement a (Yes or

._ No) 2213-18 PGE N/A N/A C0191595 Line-3856 N/A Replace (1) I N 2217-69 PGE N/A N/A C0191599 Line-3858 N/A Replace (1) 0 N 78-342R PGE N/A N/A C0191600 Line-3858 N/A Replace (1) 0 N 2217-33 PGE N/A N/A C0191601 Line-1991 N/A Replace (I) 0 N 2217-11 PGE N/A N/A C0191603 Line-1993 N/A Replace (I) Q N

7. Description of Work (1) Deleted Support
8. Tests Conducted: Hydrostatic E] Pneumatic E Nominal Operating Pressure al Other Pressure PSIG Test Temp. O_

F fl Pressure Test Conducted IAW Code Case N-416-1

9. Remarks CERTIFIC OF COMPLIANCE We certify that the statements made in this repd are c this Replacement comforms to Section Xl of the ASME Code. Signed (Owner or Owner's Designee)

IF ,

Patrick Nuge'ntWj EngineeringManager (Title) 3/ /i) 5 (Date)

CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described inthis Report on _AI&Tez I 20 0-5 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement desc .bed in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personay iury or opert damage or loss of any kind arising from or connected with this inspection.

! Inspector Mac 1 aeCr Commissions CA 1828 - NB 9990 A.N.I.C

,XKenny D. Kim (Title) (Date) (State or Province, National Board)

Note: S lemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16,2005 77 Beale Street, San Francisco, CA 94106 Sheet 2 of 2
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Safety Injection System (09)
5. (a) Applicable Construction Code See Work Order 19 _ Edition Addenda, Code Cases D N 4A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

NameOf Manufacturer National Work Other Year Repaired n Code NaefSerial Board Order Identilicat'on . Replaced, or Component Manufacturer Noao.N.LieN Built Rp ce nt Stamped No.__No._No._LineNoReplacement (Yes or No) 2217-61 PGE N/A N/A C0191604 Line-1992 N/A Replace (2) a N 2734-19 PGE N/A N/A C0191606 Line-1993 N/A Replace (I) 0 N 2734-55 PGE N/A N/A C0191611 Line-1992 N/A Replace (2) 0 N 564-72 PGE NIA N/A C0191612 Line-3856 N/A Replace (2) 0 N

=_ _ -0

_ _ _ _ _ _ _ _ _ 0 _ _ _

7. Remars _ _ _ ( _

_ _ _ _ __ __ __ _ _ __ _ _ _ Th _ _ _

_ _ _ _ _ _ _ _ __ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 0 _ _

_ _ _ _ __ _ __ _ _ _ __ _ _ _ _ .5 _ _ _

_______=-___

_ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ .5 _ _ _

_ .5

.5 _

7. Remarks (1) Deleted Support, (2) Modified Support

FORM NIS-2 ONVNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200:

77 Beale Street, San Francisco, CA 94106 Sheet I of I

2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Residual Heat Removal System (10)
5. (a) Applicable Construction Code (See Work Order) 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

_ ASNIE NManufacturer National Other Repaired E Code Coment nac Serial Board No. Identification Built Replaced, or > Stamped Component Manufacturer . No. No.No N.Lie Line NooReplacement ulReacmn Yo (Yes or RHR Pump 2-2 Ingersoll-Rand ______

2S-70 N/A C0192591 RHRP2 N/A Replace (1) 0 No RHR-2-RV-8707 Crosby 62327 N/A R0223078 Line-I 167 N/A Replace (2)m Yes

7. Description of Work (1) Replaced Stuffing Box Extension and Seal Plate, (2) Replaced Valve
8. Tests Conducted: Hydrostatic El Pneumatic O Nominal Operating Pressure 5 Other Pressure PSIG Test Temp. :F El Pressure Test Conducted 1AW Code Case N-416-1
9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repoq are corr Replacement comforms to Section X of the ASME Code. Signed = z Engineering Manager 3/l (Owner or Owner's Designee) Patrick Nuge#) (Title) (Date)

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on _JA 4L. 20 05 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement desc ibed in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal y or prpperty dame or loss of any kind arising from or connected with this inspection.

LII .4 7< Inspector ik k/L 1, ec5 Commissions CA 1828 - NB 9990 A.N.I.C

,Ienny D.Kim (Title) (Date) (State or Province, National Board)

Note: plemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 OWN'NER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16,200O
  • 77 Beale Street, San Francisco, CA 94106 Sheet 1 of I
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Component Cooling Water System (14)
5. (a) Applicable Construction Code (See Work Order) 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASNIE Nameor Nameof Manuracturcr National Other Year Repaired Code Component Manufacturer Serial Board ork Order Identification Built Replaced, or z Stamped No.N No. Line No Replacement (Yes or

_ No) 414-258BSL Pacific Scientific 13637 N/A C0178277 Line-321 N/A Replaced (1) Q Y

7. Description of Work (1) Replaced Snubber
8. Tests Conducted: Hydrostatic El Pneumatic E NominalOperatingPressure E Other Pressure PSIG Test Temp. 'F E Pressure Test Conducted IAW Code Case NA 16-1
9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repoae correA aZIIdhis- Replacement comforms to Section wI of the ASME Code. Signed A= t Engineering Manager . -3 , //o (OwnerorOwner's Designee) Patrick Nugen.J1 (Title) (Date)

CERTIFfCATE OF INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT,, of Hartford, CT have inspected the Replacement described in this Report on .i 4hJ/ ,20 C 5 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement desc 'bed in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any persona tury or ppe da ge or loss of any kind arising from or connected with this inspection.

- Inspector 4a4Ic/LA lI - 2.c Commissions CA 1828-NB9990 A.N.I.C Kenny D. Kim (Title) (Date) (State or Province, National Board)

Note: S lemental sheets in the form of lists, sketches, or drawings may be used provided (I) size is 8 1/2 x 11 in., (2) information in items 1 through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date Januray 16, 200' 77 Beale Street, San Francisco, CA 94106 Sheet I of 1
2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Containment Structure (45)
5. (a) Applicable Construction Code (See Work Order) 19 _ Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - 1989, No Addenda, Code Case N.416-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASNIE N m oN me fWork Manufacturer National Order Other YdniectoaBit Repaired Relcdor 8 Code Nampoenof Namefatore Serial Board No.Ietfcto BIt Rpl ed orarStamped Component Manufacturer No. No. Line No Replacement (Yes or

_ _ __ _ _ _ _ _ _ __ _ _ __ __ _ _ _ _ _ _N o)

Containment Liner NIA N/A N/A C0191012 N/A N/A Replace (I) 0 No QO'ITC (Pen-64) PG&E NF N/A C0189389 FTCI N/A Replace (2) 0 No

7. Description of Work (1)Welded Angle Assembly to Containment Liner - 8 Places, (2) Replaced Bolting
8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure Q Other Pressure PSIG Test Temp. _ _ 'F El Pressure Test Conducted IAW Code Case N416-1
9. Remarks CERTIFICATE F COMPLIANCE We certify that the statements made in thist ar Replacement comforms to Section XI of the ASME Code. Signed Ai/ Engineering Manager 3/q5 (Owner or Owner's Designee) Patrick Nug9'l OFiSETO (Date)

CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of

- Hartford, CT have inspected the Replacement described in this Report on A142j w , 20 CS, and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal 'ur or prere Vd.Anage or loss of any kind arising from or connected with this inspection.

iInspector w /4t C/L 1,~2005 Commissions CA 1828 - NB 9990 A.N.I.C Zeainy D. Kim (Title) (Date) (State or Province, National Board)

Note: Suppfemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2)information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-2 ONVNER'S REPORT OF REPAIR OR REPLACEMENT As Rcquired by the Provisions of ASME Code Section XI

1. Owner Pacific Gas and Electric Company Date January 16, 200.

77 Beale Street, San Francisco, CA 94106 Sheet I of I

2. Plant Diablo Canyon Power Plant Unit 2 P.O. Box 56, Avila Beach, CA 93424
3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
4. Identification of System Warehouse Spare Parts (85)
5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements - I; 989, No Addenda, Code Case N-41 6-1
6. Identification of components Repaired or Replaced, and Replacement Components.

ASME MnfcueNainlOther Yer Repaired Code Name of Name or Manur cturer atn Work Order Ideeiration BI Replaced, E or Stmped Component Manufacturer Serial Board No.Idticton Blt RpaerSamd No. No. Line No Replacement t (Yes or

_ _ _ _ _ _ _ _No)

RHR Pump Spare Ingersoll- 037049 N/A C0191936 N/A N/A Replace (I) 0 No SC 95-5443 Schutte and Koerting _ _ _ _ _ _ _ _1.

N/A C0179922 N/A N/A Replaced (2) 0 No FisherjI SC 95-7244 Controls NF N/A C0 190222 N/A N/A Replaced (3) 0 No

7. Description of Work (1) Modified Stuffing Box Extension (2) Refurbish Trim Set and Return to Stock (3) Rebuild Valve and Return to Stock
8. Tests Conducted: Hydrostatic El Pneumatic El NominalOperatingPressure D Other Pressure PSIG Test Temp. _ _ 'F El Pressure Test Conducted IAW Code Case NA 16-1
9. Remarks CERTIFICATE OF COMPLIANCE -------------------------------------------

We certify that the statements made in this r9p)t are jreptiinthje\ Replacement comforms to Section XI, of the ASME Code. Signed 4 i- Engineering Ma nager 3/J (Owner or Owner's Designee) Patrick Nugeql (Title) (Date)

CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the ecReplacement described in this Report on 20 C and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement descried in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personajlipuryorpr ert e or loss of any kind arising from or connected with this inspection.

b2 -y 2-- _ Inspector 1a4&Ac-, I 2ecp{;' Commissions CA 1828-NB9990 A.N.I.C J (nny D. Kim (Title) (Date) ' (State or Province, National Board)

Note: Supmental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

SECTION H CONTAINMENT EXAMINATIONS

PG&E DIABLO CANYON POWER PLANT - UNIT 2 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (2R12) MAJOR ITEM: CONTAINMENT EXAMINATIONS CONTAINMENT EXAMS (LINER)

PAGE 1 of 1 CATEGORY COMPONENT / WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS E-G E8.10 Containment Liner Bolted Penetration #63 VT-I 11-24-04 NRI Connections (Vacuum Pressure Relief) (1/3)

Bolted Penetration 164 (Fuel VT-I 11-30-04 NRI Connections Transfer Tube) (1/3)

Bolted Equipment Hatch VT-1 12-16-04 NRI Connections (1/3)