September 10, 2004 Mr. Gregg R. Overbeck Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

IMPLEMENTATION STATUS OF INDEPENDENT SPENT FUEL STORAGE INSTALLATION INTERIM COMPENSATORY MEASURES (TAC NO. MC2950, MC2951 AND MC2952)

Dear Mr. Overbeck:

The Nuclear Regulatory Commission (NRC) issued Order (EA-02-104) to all holders of general and specific licenses of Independent Spent Fuel Storage Installations (ISFSIs) on October 16, 2002, requiring implementation of security-related interim compensatory measures (ICMs). Since October 16, 2002, the NRC has issued by Order the same ICMs to six additional facilities. Although the NRC did not require licensees to modify their ISFSI physical protection plans in response to these Orders, the NRC staff reviewed all licensee responses to these Orders and concluded that they were acceptable.

Subsequently, the NRC issued Order (EA-03-086) dated April 29, 2003, to all power reactor licensees that required them to modify their physical security, safeguards contingency, and training and qualification plans mandated by 10 CFR 50.34(c), 50.34(d), and 73.55(b)(4)(ii) to provide protection against the revised Design Basis Threat (DBT). The Order further required that these revised power reactor security plans be submitted to the NRC by April 29, 2004.

Several licensees with ISFSIs included ISFSI-related security provisions in their revised power reactor security plans. However, the NRC does not intend to review ISFSI-related security provisions as part of its review of the revised power reactor security plans submitted in response to the April 29, 2003, Order. The NRC staff at this time, seeks to ensure that ISFSI-related security provisions implemented in response to the ICMs remain unchanged.

To achieve this aim, the NRC is requesting that those licensees who are in receipt of this letter respond in writing, within 10 days from the receipt of this letter, stating whether or not their implementation of ISFSI-related security provisions of the ISFSI ICM Orders have been modified or revised since responding to the ISFSI Orders described above. If no modifications or revisions which decrease the effectiveness of the implementation of ISFSI-related security provisions have been made, a statement to that effect will suffice as an adequate response to this letter. Where modifications or revisions which decrease the effectiveness of the ISFSI-related security provisions are proposed, provide detailed descriptions of those modifications or revisions. NRC review and approval of the proposed modifications or revisions would be required prior to implementation.

If you have any questions concerning this request, please contact me at (301) 415-1460 or by e-mail at BJB@nrc.gov.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, 50-529, and 50-530 cc: See next page

ML042590235 OFC NSIR NSIR NSIR NSIR SFPO OGC SFPO NSIR NAME PKelley MLayton SMorris JShea MRoss-Lee JGoldberg WBrach GTracy (DDorman for)

DATE 8/13/04 8/13/04 8/13/04 8/13/04 8/20/04 8/25/04 9/2/04 9/8/04 OFC SPRT/PM SPRT/SC NAME MChernoff JNakoski DATE 9/10/04 9/10/04 Palo Verde Generating Station, Units 1, 2, and 3 cc:

Mr. Steve Olea Mr. John Taylor Arizona Corporation Commission Public Service Company of New Mexico 1200 W. Washington Street 2401 Aztec NE, MS Z110 Phoenix, AZ 85007 Albuquerque, NM 87107-4224 Douglas Kent Porter Ms. Cheryl Adams Senior Counsel Southern California Edison Company Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN Law Department, Generation Resources San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770 Mr. Robert Henry Salt River Project Senior Resident Inspector 6504 East Thomas Road U.S. Nuclear Regulatory Commission Scottsdale, AZ 85251 P. O. Box 40 Buckeye, AZ 85326 Mr. Jeffrey T. Weikert Assistant General Counsel Regional Administrator, Region IV El Paso Electric Company U.S. Nuclear Regulatory Commission Mail Location 167 Harris Tower & Pavillion 123 W. Mills 611 Ryan Plaza Drive, Suite 400 El Paso, TX 79901 Arlington, TX 76011-8064 Mr. John Schumann Chairman Los Angeles Department of Water & Power Maricopa County Board of Supervisors Southern California Public Power Authority 301 W. Jefferson, 10th Floor P.O. Box 51111, Room 1255-C Phoenix, AZ 85003 Los Angeles, CA 90051-0100 Mr. Aubrey V. Godwin, Director Brian Almon Arizona Radiation Regulatory Agency Public Utility Commission 4814 South 40 Street William B. Travis Building Phoenix, AZ 85040 P. O. Box 13326 1701 North Congress Avenue Mr. M. Dwayne Carnes, Director Austin, TX 78701-3326 Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station David B. Raskin, Esq.

P.O. Box 52034 Steptoe & Johnson LLP Phoenix, AZ 85072-2034 1330 Connecticut Avenue, NW Washington, DC 20036 Mr. Hector R. Puente Vice President, Power Generation Mr. Gregg R. Overbeck El Paso Electric Company Senior Vice President, Nuclear 310 E. Palm Lane, Suite 310 Arizona Public Service Company Phoenix, AZ 85004 P.O. Box 52034 Pheonix, AZ 85072-2034