|
---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 2024-01-31
[Table view] |
Text
Entergy Operations, Inc.
Entergy 1%4()Echelun Parkwal Jackson. Nlissis.ippi 3921 ;-8298 rel 61)1-68-5-798 F. G. Burford Acting Director Nuclear Safety & lwens~ig SAFEGUARDS INFORMATION CNRO 2004-00048 August 9, 2004 Via Overnight Delivery U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 301-415-7000
SUBJECT:
Entergy Nuclear South Supplemental Responses and Combined Responses for Section 9.4.1 and Contingency Plan Requests for Additional Information Arkansas Nuclear One Waterford 3 Steam Electric Station Units 1 and 2 Docket No. 50-382 Docket Nos. 50-313 and 50-368 License No. NPF-38 License Nos. DPR-51 and NPF-6 Grand Gulf Nuclear Station River Bend Station Docket No. 50-416 Docket No. 50-458 License No. NPF-29 License No. NPF-47
REFERENCES:
- 1. July 23, 2004 letter to Mr. Joseph E. Venable, Waterford Steam Electric Generating Station, Unit 3 - Request for Additional Information Re: Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan (TAC No.
MC2987) received July 26, 2004
- 2. July 23, 2004 letter to Mr. Andre James, River Bend Station, Unit 1 - Request for Additional Information Re: Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan (TAC No. MC2963) received July 26, 2004 NOTICE: Enclosure contains "Safeguards Information." Upon separation of the Enclosure, this letter and the Attachment become >4?
"DECONTROLLED" SAFEGUARDS INFORMATION
' x-
SAFEGUARDS INFORMATION CNRO 2004-00048 Page 2 of 3
- 3. July 23, 2004 letter to Mr. Michael R. Higgins, Arkansas Nuclear One, Units 1 and 2- Request for Additional Information Re: Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan (TAC Nos. MC2886 and MC2887) received July 26, 2004
- 4. July 23, 2004 letter to Mr. Greg D. Brown, Grand Gulf Nuclear Station, Unit 1 -
Request for Additional Information Re: Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan (TAC No. MC2924) received July 26, 2004
Dear Sir or Madam:
Entergy is in receipt of the referenced letters containing requests for additional information (RAls).
In order to standardize our fleet approach with the NRC-approved industry approach, Entergy's April 29, 2004 responses to Order EA-03-086 were strictly based on NEI-03-12, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan" Revision 1 as approved by the staff in a letter from Roy P. Zimmerman to Steven D. Floyd dated June 10, 2003.
Because the NRC questions for our facilities are very similar, Entergy is collectively providing a single combined response for ANO, GGNS, RBS and W3 (hereinafter 'Entergy").
NRC questions either request modifications to the template language (indicated with an
- in the Enclosure) or to licensee-provided details (i.e., bracketed template information). Where template language is involved, Entergy will be adopting revised language that has been agreed to between the industry Security Working Group (SWG) licensee representatives and the staff as described herein. Entergy is an active member of the SWG licensee representatives that will meet with the staff for this purpose. We believe this approach will be the most responsive and will maintain mutually desired consistency. Where agreement has not been achieved as of the writing of this response, Entergy intends to adopt the language that is deemed acceptable to the Commission and responsive to the NRC issues following the industry frequently asked question (FAQ) process and the final disposition of any industry appeals. Responses that rely on this process are discussed in the specific question responses. We believe that sufficient detail is provided here to enable the staff to conclude the issue can be appropriately resolved subject to later submittal of changed pages incorporating known acceptable language (i.e., a revision of the Security Plan that incorporates all required responses). Entergy proposes to provide revised Security Plans or replacement pages later for each site that incorporate all of our required RAI responses on a schedule to be determined with the staff. Entergy understands that generic RAls were discussed in a meeting between the industry and NRC staff on August 3, 2004. Entergy is evaluating the agreements from the August 3, 2004 meeting and will provide a response to generic RAls 5 and 9 by August 17, 2004.
In addition, Entergy is herewith supplementing in the Enclosure its previous related RAI responses to provide the specific language changes updated in accordance with latest NRC and industry agreements.
This letter includes new commitments as summarized in the Attachment. If you have any questions or require additional information, please contact Mr. Les England at 601-368-5766.
NOTICE: Enclosure contains "Safeguards Information." Upon separation of The Enclosure, this letter and the Attachment become "DECONTROLLED" SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION CNRO 2004-00048 Page 3 of 3 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 9th day of August, 2004.
Sincerely, 4K9 FGB/LAE/bal Attachment - List of Regulatory Commitments Enclosure - Supplemental Responses and Combined Responses cc: w/a, w/o Enclosure (except as noted)
Mr. W. R. Campbell (ECH) Mr. N. S. Reynolds (W&S)
Mr. J. P. DeRoy (ECH) Mr. G. J. Taylor (ECH)
Mr. W. A. Eaton (ECH) Mr. J. E. Venable (W3)
Mr. J. S. Forbes (ANO) Mr. Doug Walters (NEI)
Mr. P. D. Hinnenkamp (RBS) Mr. M. J. Wetterhahn (W&S)
Mr. J. R. McGaha (ECH) Mr. G. A. Williams (GGNS)
Mr. T. W. Alexion, NRR Project Manager, ANO-1 Ms. M. H. Chernoff, NRR Project Manager, SPRT w/a and Enclosure Mr. D. G. Holland, NRR Project Manager, ANO-2 Mr. N. Kalyanam, NRR Project Manager, GGNS, WF3 Mr. B. S. Mallett, Administrator, RIV Mr. M. K. Webb, NRR Project Manager, RBS Mr. P. J. Alter, SRI, RBS Mr. R. W. Deese, SRI, ANO Mr. M. C. Hay, SRI, W-3 Mr. T. L. Hoeg, SRI, GGNS (SRls w/a via Company Mail)
NOTICE: Enclosure contains "Safeguards Information." Upon separation of The Enclosure, this letter and the Attachment become "DECONTROLLED" SAFEGUARDS INFORMATION