June 16, 2004
Mr. William R. Kanda
Vice President - Nuclear, Perry
FirstEnergy Nuclear Operating Company
P. O. Box 97, A210
10 Center Road
Perry, OH 44081
SUBJECT: PERRY NUCLEAR POWER PLANT, UNIT 1
INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS
AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS
INSPECTION 05000440/2004010(DRS)
Dear Mr. Kanda:
On August 9, 2004, the NRC will begin the required biennial permanent plant modifications and
evaluation of changes, tests, and experiments inspection (MOD/50.59) at your Perry Nuclear
Power Plant, Unit 1. This inspection will be performed in accordance with NRC baseline
inspection procedures 71111.02 and 71111.17. The MOD/50.59 will be performed concurrent
with the biennial safety system design and performance capability inspection (SSD&PC). The
SSD&PC notification and information request was previously sent to you in a separate
correspondence dated May 20, 2004.
Experience has shown that these baseline inspections are extremely resource intensive for both
the NRC inspectors and the licensees staff. In order to minimize the inspection impact on the
site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed to effectively plan and implement this inspection.
The documents requested for the MOD/50.59 have been divided into three groups. The first
group is necessary to ensure that the inspection team is adequately prepared for the
inspection. This information should be available to the Regional Office by no later than
July 19, 2004. The inspection team will review this information and, by August 4, 2004, will
request specific items that should be available for review when the team arrives on-site. The
second group of requested documents contains additional items that the team will review, or
need access to, during the inspection. Certain documents in Group II.(1) will be requested for
review in the Regional Office the week prior to the inspection. The remaining documents
should be available by the first day of the on-site inspection, August 9, 2004. The third group
lists information necessary to aid the inspection team in tracking issues identified as a result of
the inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. It is important that all of these documents are
up to date and complete in order to minimize the number of additional documents requested
during the preparation and/or the on-site portions of the inspection.
W. Kanda -2-
The lead inspector for this inspection is Mr. George M. Hausman. If there are questions about
the material requested, or the inspection, please contact Mr. Hausman at (630) 829-9743 or via
e-mail at gmh1@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Julio F. Lara, Chief
Electrical Engineering Branch
Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure: Information Request for NRC Permanent Plant Modifications
and Evaluation of Changes, Tests, and Experiments
Inspection 05000440/2004010(DRS)
cc w/encl: G. Leidich, President - FENOC
L. Myers, Chief Operating Officer, FENOC
J. Hagan, Senior Vice President Engineering
and Services, FENOC
W. OMalley, Director, Maintenance Department
V. Higaki, Manager, Regulatory Affairs
J. Messina, Director, Nuclear
Services Department
T. Lentz, Director, Nuclear
Engineering Department
T. Rausch, Plant Manager,
Nuclear Power Plant Department
M. OReilly, Attorney, First Energy
Public Utilities Commission of Ohio
Ohio State Liaison Officer
R. Owen, Ohio Department of Health
W. Kanda -2-
The lead inspector for this inspection is Mr. George M. Hausman. If there are questions about
the material requested, or the inspection, please contact Mr. Hausman at (630) 829-9743 or via
e-mail at gmh1@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Julio F. Lara, Chief
Electrical Engineering Branch
Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure: Information Request for NRC Permanent Plant Modifications
and Evaluation of Changes, Tests, and Experiments
Inspection 05000440/2004010(DRS)
cc w/encl: G. Leidich, President - FENOC
L. Myers, Chief Operating Officer, FENOC
J. Hagan, Senior Vice President Engineering
and Services, FENOC
W. OMalley, Director, Maintenance Department
V. Higaki, Manager, Regulatory Affairs
J. Messina, Director, Nuclear
Services Department
T. Lentz, Director, Nuclear
Engineering Department
T. Rausch, Plant Manager,
Nuclear Power Plant Department
M. OReilly, Attorney, First Energy
Public Utilities Commission of Ohio
Ohio State Liaison Officer
R. Owen, Ohio Department of Health
DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041690021.wpd
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE RIII E RIII
NAME GHausman:tr JLara
DATE 06/16/04 06/16/04
OFFICIAL RECORD COPY
W. Kanda -3-
ADAMS Distribution:
AJM
SPS1
RidsNrrDipmIipb
GEG
RJP
CAA1
C. Pederson, DRS (hard copy - IRs only)
DRPIII
DRSIII
PLB1
JRK1
ROPreports@nrc.gov
INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS
AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS
INSPECTION 05000440/2004010(DRS)
I. Information Requested for In-Office Preparation Week
The following information is requested by July 19, 2004, or sooner, to facilitate the
selection of specific items that will be reviewed during the on-site inspection week. The
team will select specific items from the information requested below and submit a list to
your staff by August 4, 2004. We will request that certain items be made available to
the regional office during the week prior to the inspection. We request that the
remaining items selected from the lists be available and ready for review on the first day
of inspection. All requested information should cover the time frame from the last
permanent plant modification inspection exit (February 2003) to the present. If you have
any questions regarding this information, please call the team leader as soon as
possible. All information should be sent electronically, if at all possible to
gmh1@nrc.gov.
(1) List of "permanent plant modifications" to risk significant systems, structures or
components. (For the purpose of this inspection, permanent plant modifications
include permanent: plant changes, design changes, set point changes,
equivalency evaluations, suitability analyses, and commercial grade dedications.)
The list should contain the number of each document, the title, the revision (or
date), the affected system, and how significant the modification was to reduce
risk (if at all possible). In addition to the list, please provide a brief (one
paragraph) description of each modification and a list of associated calculations
and affected procedures.
(2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations;
(b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine
operating configurations; or (e) departures in methods of analyses.
The list should contain the number and a descriptive title of each document, and
the corresponding number and type of the affected document (i.e., the
modification or procedure to which the evaluation applies). The list should NOT
include any evaluations in which prior NRC approval was sought and obtained.
(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a
full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to
the facility (modifications); (d) non-routine operating configurations; or
(e) departures in methods of analyses.
The list should contain the number and a descriptive title of each document and
the corresponding number and type of the affected document (i.e., the
modification or procedure to which the evaluation applies).
1 Enclosure
INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS
AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS
INSPECTION 05000440/2004010(DRS)
(4) List of any modifications, procedure revisions, or UFSAR changes where it was
determined that 10 CFR 50.59 did not apply.
(5) List of corrective action documents (open and closed) that address plant
permanent modification or 10 CFR 50.59 issues, concerns, or processes.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should
be sorted in order of significance.
(6) List of At-Risk Modifications performed.
(7) Copies of licensee procedures addressing the following: modifications, design
changes, set point changes, equivalency evaluations or suitability analyses,
commercial grade dedications, post-modification testing, 10 CFR 50.59
evaluation and screenings and UFSAR updates.
(8) Name(s) and phone numbers for the regulatory and technical contacts.
II. Information Requested to be Available the Week Prior to Inspection or on First
Day of Inspection (August 9, 2004)
(1) Copies of all selected items from Section I. This includes copies of associated
documents such as calculations, post-modification test packages, 10 CFR 50.59
evaluations or screenings and any corrective action documents.
(2) Copies of these documents do not need to be solely available to the team as
long as the inspectors have easy and unrestrained access to them.
- Technical Specifications;
- Latest IPE/PRA Report;
- Vendor Manuals; and
- The Latest 10 CFR 50.59 FSAR Update Submittal.
(3) Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the team will likely be requesting these
documents during the inspections. Examples of supporting documents are:
- Drawings supporting the modifications;
- Procedures affected by the modifications; and
- UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4) Current management and engineering organizational chart.
2 Enclosure
INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS
AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS
INSPECTION 05000440/2004010(DRS)
III. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
(2) Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
If you have questions regarding the information requested, please contact the team leader.
3 Enclosure