June 16, 2004

Mr. William R. Kanda

Vice President - Nuclear, Perry

FirstEnergy Nuclear Operating Company

P. O. Box 97, A210

10 Center Road

Perry, OH 44081

SUBJECT: PERRY NUCLEAR POWER PLANT, UNIT 1

INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS

AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS

INSPECTION 05000440/2004010(DRS)

Dear Mr. Kanda:

On August 9, 2004, the NRC will begin the required biennial permanent plant modifications and

evaluation of changes, tests, and experiments inspection (MOD/50.59) at your Perry Nuclear

Power Plant, Unit 1. This inspection will be performed in accordance with NRC baseline

inspection procedures 71111.02 and 71111.17. The MOD/50.59 will be performed concurrent

with the biennial safety system design and performance capability inspection (SSD&PC). The

SSD&PC notification and information request was previously sent to you in a separate

correspondence dated May 20, 2004.

Experience has shown that these baseline inspections are extremely resource intensive for both

the NRC inspectors and the licensees staff. In order to minimize the inspection impact on the

site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed to effectively plan and implement this inspection.

The documents requested for the MOD/50.59 have been divided into three groups. The first

group is necessary to ensure that the inspection team is adequately prepared for the

inspection. This information should be available to the Regional Office by no later than

July 19, 2004. The inspection team will review this information and, by August 4, 2004, will

request specific items that should be available for review when the team arrives on-site. The

second group of requested documents contains additional items that the team will review, or

need access to, during the inspection. Certain documents in Group II.(1) will be requested for

review in the Regional Office the week prior to the inspection. The remaining documents

should be available by the first day of the on-site inspection, August 9, 2004. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the on-site portions of the inspection.

W. Kanda -2-

The lead inspector for this inspection is Mr. George M. Hausman. If there are questions about

the material requested, or the inspection, please contact Mr. Hausman at (630) 829-9743 or via

e-mail at gmh1@nrc.gov.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Electrical Engineering Branch

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure: Information Request for NRC Permanent Plant Modifications

and Evaluation of Changes, Tests, and Experiments

Inspection 05000440/2004010(DRS)

cc w/encl: G. Leidich, President - FENOC

L. Myers, Chief Operating Officer, FENOC

J. Hagan, Senior Vice President Engineering

and Services, FENOC

W. OMalley, Director, Maintenance Department

V. Higaki, Manager, Regulatory Affairs

J. Messina, Director, Nuclear

Services Department

T. Lentz, Director, Nuclear

Engineering Department

T. Rausch, Plant Manager,

Nuclear Power Plant Department

M. OReilly, Attorney, First Energy

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

W. Kanda -2-

The lead inspector for this inspection is Mr. George M. Hausman. If there are questions about

the material requested, or the inspection, please contact Mr. Hausman at (630) 829-9743 or via

e-mail at gmh1@nrc.gov.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Electrical Engineering Branch

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure: Information Request for NRC Permanent Plant Modifications

and Evaluation of Changes, Tests, and Experiments

Inspection 05000440/2004010(DRS)

cc w/encl: G. Leidich, President - FENOC

L. Myers, Chief Operating Officer, FENOC

J. Hagan, Senior Vice President Engineering

and Services, FENOC

W. OMalley, Director, Maintenance Department

V. Higaki, Manager, Regulatory Affairs

J. Messina, Director, Nuclear

Services Department

T. Lentz, Director, Nuclear

Engineering Department

T. Rausch, Plant Manager,

Nuclear Power Plant Department

M. OReilly, Attorney, First Energy

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041690021.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE RIII E RIII

NAME GHausman:tr JLara

DATE 06/16/04 06/16/04

OFFICIAL RECORD COPY

W. Kanda -3-

ADAMS Distribution:

AJM

DFT

SPS1

RidsNrrDipmIipb

GEG

HBC

RJP

CAA1

C. Pederson, DRS (hard copy - IRs only)

DRPIII

DRSIII

PLB1

JRK1

ROPreports@nrc.gov

INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS

AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS

INSPECTION 05000440/2004010(DRS)

I. Information Requested for In-Office Preparation Week

The following information is requested by July 19, 2004, or sooner, to facilitate the

selection of specific items that will be reviewed during the on-site inspection week. The

team will select specific items from the information requested below and submit a list to

your staff by August 4, 2004. We will request that certain items be made available to

the regional office during the week prior to the inspection. We request that the

remaining items selected from the lists be available and ready for review on the first day

of inspection. All requested information should cover the time frame from the last

permanent plant modification inspection exit (February 2003) to the present. If you have

any questions regarding this information, please call the team leader as soon as

possible. All information should be sent electronically, if at all possible to

gmh1@nrc.gov.

(1) List of "permanent plant modifications" to risk significant systems, structures or

components. (For the purpose of this inspection, permanent plant modifications

include permanent: plant changes, design changes, set point changes,

equivalency evaluations, suitability analyses, and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or

date), the affected system, and how significant the modification was to reduce

risk (if at all possible). In addition to the list, please provide a brief (one

paragraph) description of each modification and a list of associated calculations

and affected procedures.

(2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations;

(b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine

operating configurations; or (e) departures in methods of analyses.

The list should contain the number and a descriptive title of each document, and

the corresponding number and type of the affected document (i.e., the

modification or procedure to which the evaluation applies). The list should NOT

include any evaluations in which prior NRC approval was sought and obtained.

(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a

full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to

the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses.

The list should contain the number and a descriptive title of each document and

the corresponding number and type of the affected document (i.e., the

modification or procedure to which the evaluation applies).

1 Enclosure

INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS

AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS

INSPECTION 05000440/2004010(DRS)

(4) List of any modifications, procedure revisions, or UFSAR changes where it was

determined that 10 CFR 50.59 did not apply.

(5) List of corrective action documents (open and closed) that address plant

permanent modification or 10 CFR 50.59 issues, concerns, or processes.

The list should contain the number, title and revision (or date) of each document,

the affected system and corresponding documentation (if applicable), and should

be sorted in order of significance.

(6) List of At-Risk Modifications performed.

(7) Copies of licensee procedures addressing the following: modifications, design

changes, set point changes, equivalency evaluations or suitability analyses,

commercial grade dedications, post-modification testing, 10 CFR 50.59

evaluation and screenings and UFSAR updates.

(8) Name(s) and phone numbers for the regulatory and technical contacts.

II. Information Requested to be Available the Week Prior to Inspection or on First

Day of Inspection (August 9, 2004)

(1) Copies of all selected items from Section I. This includes copies of associated

documents such as calculations, post-modification test packages, 10 CFR 50.59

evaluations or screenings and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the team as

long as the inspectors have easy and unrestrained access to them.

  • Technical Specifications;
  • Latest IPE/PRA Report;
  • Vendor Manuals; and

(3) Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the team will likely be requesting these

documents during the inspections. Examples of supporting documents are:

  • Drawings supporting the modifications;
  • Procedures affected by the modifications; and

(4) Current management and engineering organizational chart.

2 Enclosure

INFORMATION REQUEST FOR NRC PERMANENT PLANT MODIFICATIONS

AND EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS

INSPECTION 05000440/2004010(DRS)

III. Information Requested to be provided throughout the inspection

(1) Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

(2) Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

If you have questions regarding the information requested, please contact the team leader.

3 Enclosure