Re Information Request for NRC Biennial Heat Sink Performance Inspection
ML041600211
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/01/2004
From: Julio Lara
Division of Reactor Safety III
To: Vanmiddlesworth G
Nuclear Management Co
References
IR-04-003
Download: ML041600211 (5)


Text

June 1, 2004 Mr. Gary D. Van Middlesworth Site Vice-President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC BIENNIAL HEAT SINK PERFORMANCE INSPECTION; 05000266/2004003(DRS);

05000301/2004003(DRS)

Dear Mr. Van Middlesworth:

On June 14, 2004, the NRC will begin the Biennial Heat Sink Performance Inspection at your Point Beach Nuclear Plant, Units 1 and 2. This inspection will be performed in accordance with NRC baseline inspection procedure 71111.07. The systems selected for detailed review during this baseline inspection are the Emergency Diesel Generator Coolant Heat Exchanger (G01 and G02) and Component Cooling System Heat Exchanger (HX-12C).

We have enclosed requests for the documents needed for this inspection.

This information can be sent to the following e-mail address: dls3@nrc.com. Please send the information when it becomes available, so that we may start our review of these documents.

The lead inspector for this inspection is Mr. Darrell Schrum. If there are questions about the material requested, or the inspection, please call Mr. Schrum at (630) 829-9741.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice, "a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs

G. Van Middlesworth document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief Electrical Engineering Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Initial Document Request cc w/encl: F. Kuester, President and Chief Executive Officer, We Generation J. Cowan, Executive Vice President Chief Nuclear Officer D. Cooper, Senior Vice President, Group Operations J. McCarthy, Site Director of Operations D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager Site Assessment Manager Site Engineering Director Emergency Planning Manager J. Rogoff, Vice President, Counsel & Secretary K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer

G. Van Middlesworth document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief Electrical Engineering Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Initial Document Request cc w/encl: F. Kuester, President and Chief Executive Officer, We Generation J. Cowan, Executive Vice President Chief Nuclear Officer D. Cooper, Senior Vice President, Group Operations J. McCarthy, Site Director of Operations D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager Site Assessment Manager Site Engineering Director Emergency Planning Manager J. Rogoff, Vice President, Counsel & Secretary K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer DOCUMENT NAME: ML041600211.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII E RIII NAME DSchrum:tr PLouden JLara DATE 06/01/04 06/01/04 06/01/04 OFFICIAL RECORD COPY

G. Van Middlesworth ADAMS Distribution:

WDR DFT HKC RidsNrrDipmIipb GEG HBC PGK1 CAA1 DRPIII DRSIII PLB1 JRK1

BIENNEAL HEAT SINK INSPECTION DOCUMENT REQUEST The systems selected for detailed review during this baseline inspection are the Emergency Diesel Generator Coolant Heat Exchangers (G01 and G02) and Component Cooling System Heat Exchanger (HX-12C).

1. Copy of the two most recently completed tests confirming thermal performance of each HX. Include documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for these tests (e.g., high accuracy ultrasonic flow instruments or temperature instruments).

Include calibration records for the instruments used during these tests.

2. Copy of the evaluations of data for the two most recent completed tests confirming the thermal performance of each HX.
3. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these HXs.
4. Copy of the calculation which correlates surveillance testing results from these HXs with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria).
5. The clean and inspection maintenance schedule for each HX.
6. For the last two clean and inspection activities completed on each HX, provide a copy of the document describing the inspection results.
7. Provide a copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each HX.
8. Provide a copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each HX.
9. Copy of the design specification and heat exchanger data sheets for each HX.
10. Copy of the vendor/component drawing for each HX.
11. Provide a list of issues with a short description documented in your corrective action system associated with these HXs in the past three years.
12. Provide a list of calculations with a short description which currently apply to each HX.
13. Provide HX performance trending data tracked for each HX.
14. Provide the Design Basis Documents for Emergency Diesel Generator/Heat Exchanger and the Component Cooling System/Heat Exchanger.

1 Enclosure

15. System health report(s), maintenance rule system notebooks for these HX(s).
16. Provide a list of CR(s) related to these HX(s) for the past three years (open and closed).
17. List of operability evaluations currently relied upon and those that were previously (past two years) relied upon for operability.
18. List of engineering-related Operator Workarounds for these HX(s).
19. Copy of HX self-assessments and audits for HX(s).
20. Updated Final Safety Analysis Report (UFSAR) pages for these HX(s)
21. Copies of the condition report (open or closed) initiated in the last three years for these HX(s) that required an operability determination (include determination).
22. List of existing temporary modifications for these HX(s).

2 Enclosure