ML040340104

From kanterella
Jump to navigation Jump to search
ANO, Unit 1 - January 2004 - Final SRO Written Reference Exam
ML040340104
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/09/2004
From: Gody A
Operations Branch IV
To: Forbes J
Entergy Operations
References
50-313/04-301 50-313/04-301
Download: ML040340104 (9)


Text

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 1 Unit 1 is at 25% power and power escalation is in progress.

An asymmetric rod alarm comes in and control rod 7-3 API indicates 9% lower than the group average.

You are the CBOR and are required to enter the QPT because it has exceeded the allowed value by Technical Specifications and 1015.003A Unit 1 Operations Logs.

Select the equipment listed from the most accurate to obtain QPT.

A. Excore NI QPT, Full Incore System (PMS) QPT, Minimum/Backup Incore Recorders QPT B. Full Incore System (PMS) QPT, Excore NI QPT, Minimum/Backup Incore Recorders QPT C. Full Incore System (PMS) QPT, Minimum/Backup Incore Recorders QPT, Excore NI QPT D. Minimum/Backup Incore Recorders QPT, Full Incore System (PMS) QPT, Excore NI QPT Answer B is the correct answer, Full Incore System (PMS) is the most accurate for QPT, followed by Excore NIs, then last are the Minimum/Backup Incore Recorders.

References 1102.004 Power Operation, page 8, change 041-05-0.

1015.003A Unit 1 Operations Logs, Appendix D, page 65, change 050-04-0.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 00005.K1.02 00005.K1.02 Importance Rating 3.1 3.9 Tier # 1 Group # 1 CFR References 41.8 / 41.10 / 45.3 1

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 2 The following conditions exist:

- Plant power escalation in progress, currently at 75% power.

- The following annunciators alarm:

RCP SEAL INJ FLOW LO (K08-A7)

RCP SEAL COOLING FLOW LO (K08-E7)

RCP BLEED OFF TEMP HI (K08-C7)

- CBOT reports that all above annunciators are caused by one RCP, P-32A.

Which of the following actions is procedurally directed for the above conditions?

A. Trip P-32A RCP and verify proper ICS response.

B. Trip all RCPs, trip reactor, and go to 1202.001, Reactor Trip C. Trip P-32A RCP and isolate seal bleedoff to all RCPs.

D. Verify Letdown isolated and stop RCP Seal Cooling pumps P-114A/B Answer:

A is correct, Trip P-32A RCP and verify proper ICS response.

References:

1203.031, Reactor Coolant Pump and Motor Emergency, change 014-04-0, page 10, step 3.1 TUOI A1LP-RO-AOP, objective 4.3, Created for 2002 SRO exam by S.Pullin Pulled from ANO bank (QID 0452).

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 000015AK2.08 000015AK2.08 Importance Rating 2.6 2.6 Tier # 1 Group # 1 CFR References 41.7 / 45.7 / 43.5 2

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 3 The plant is in a degraded power situation with natural circulation cooldown in progress.

The ERV isolation valve CV-1000 has been closed due to leakage past the ERV. Which of the following best describes the appropriate action concerning operation of CV-1000 during the cooldown?

A. CV-1000 should remain closed during the cooldown until repairs to the ERV are completed.

B. CV-1000 should be cycled open and closed during cooldown to prevent thermal binding of the valve.

C. CV-1000 should be opened to allow the pressurizer to go solid and transition to a HPI Cooldown.

D. CV-1000 should be deenergized and hold carded to prevent operation of the valve during cooldown.

Answer B is correct, CV-1000 should be cycled open and closed during cooldown to prevent thermal binding of the valve.

A is incorrect because the ERV should remain open or cycled approximately every 100

°F during cooldown. C is incorrect because with natural circulation cooling established it would be undesirable to transition to HPI Cooldown. D is incorrect because the ERV should remain open or cycled approximately every 100 °F during cooldown.

References:

1203.015, Pressurizer System Failures, provides guidance for closing CV-1000 due to leakage past the ERV.

1203.013, Natural Circulation Cooldown provides guidance for operation of CV-1000 during cooldown.

Training Objective:TUOI ANO-1-LP-RO-AOP, Objective 4.5 QID:0004, Rev Date:6/10/98 Question Source: Bank # __X___

Modified Bank # ______

New ______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # BW/E09.K3.3 BW/E09.K3.3 Importance Rating 3.8 3.4 Tier # 1 Group # 1 CFR references 41.5 / 41.10, 45.6 / 45.13 3

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 4 Given:

- Reactor is tripped from 100% power

- Four CRDMs fail to insert according to indications in the control room

- The CRS directs you to initiate Emergency Boration in accordance with RT-12 "Emergency Boration" You should set the INITIAL batch setting of the boric acid controller to:

A. The batch size required to maintain make up tank level between 55 and 86 inches while maintaining pressurizer level >100 inches.

B. The batch size required in order to obtain a shutdown margin of 1.5% delta K/K as determined by a reactivity balance calculation.

C. The maximum batch size setting and commence adding boric acid to the make up tank.

D. The batch size determined by the plant computer boron program to offset the reactivity worth of the four stuck rods.

Answer C is the correct answer. RT-12 instructs the operator to commence emergency boration by setting the batch controller to the maximum batch size (999999 gals) and to begin adding boric acid via the batch controller if a boric acid pump is available.

Therefore, answer "C" is correct. Answers "B" and "D" describe actions to determine the exact batch size after commencing emergency boration. The question is asking for the initial setting of the batch controller. Answer "A" uses a variety of setpoints associated with emergency boration incorrectly.

References:

1202.012 (Rev 004-01-0), Repetitive Tasks, RT-12, Emergency Boration.

Used in 2001 RO/SRO Exam, QID 0005, Modified for 2004 RO exam.

Question Source: Bank # _______

Modified Bank # ___X___

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 0024.K1.02 0024.K1.02 Importance Rating 3.6 3.9 Tier # 1 Group # 1 CFR references 41.8 / 41.10 / 45.3 4

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 5 Given:

- Process Radiation Monitor RI-2236, Nuclear ICW, is in alarm.

- Nuclear ICW flow rate is >3100 gpm

- Local reports of Nuclear ICW Surge Tank overflowing A leak in which of the following components would be capable of causing these conditions?

A. RCP Seal Return Coolers B. Spent Fuel Coolers C. Letdown Coolers D. Pressurizer Sample Cooler Answer C is correct, Letdown Coolers. "C" is correct since it is the only component with the piping size and differential pressure to cause the indications given.

All of the other choices have either small piping size or relatively low differential pressures.

References STM 1-43, rev. 3 ch. 1, Intermediate Cooling Water System, page 27, 28 Developed for 1998 SRO Exam. Used in 2001 RO/SRO Exam.

Training Objective: ANO-1-LP-AO-ICW:9 QID 0008, Rev date:7/9/98 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 4 Examination Outline Cross-reference:

Level RO SRO K/A # 0026.A1.05 0026.A1.05 Importance Rating 3.1 3.1 Tier # 1 Group # 1 CFR references 41.7 / 45.5 / 45.6 5

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 6 In which of the following sets of post reactor trip responses is the pressurizer spray valve leaking?

A. RCS temperature is going down, RCS pressure is going down, and pressurizer level is going down.

B. RCS temperature is going up, RCS pressure is going up, and pressurizer level is going up.

C. RCS temperature is stable, RCS pressure is going down, and pressurizer level is going down.

D. RCS temperature is stable, RCS pressure is going down, and pressurizer level is stable.

Answer D is correct, RCS temperature is stable, RCS pressure is going down, and pressurizer level is stable. A leaking PZR spray valve will cause RCS pressure to go down without affecting temperature or level.

"A", "B", and "C" are combinations of these parameters with one parameter moving in the wrong direction."

References 1203.015, Pressurizer Systems Failure, change 010-03-0, page 11, step "Used in 1999 exam.

Direct from ExamBank, QID# 2228 used in class exam Selected for use in 2002 RO/SRO exam.

Training Objective:ANO-1-LP-RO-AOP:1 QID: 0344, REV DATE: 9-7-99 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2.5 Examination Outline Cross-reference:

Level RO SRO K/A # 000027.G2.1.7 027.G2.1.7 Importance Rating 3.7 4.4 Tier # 1 Group # 1 CFR references 43.5/45.12/45.13 6

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 7 Given:

- A reactor trip has occurred.

- RCS pressure is 1800 psig,

- RCS T-cold is 532 degrees F,

- ""A"" OTSG pressure is 650 psig,

- ""B"" OTSG pressure is 970 psig,

- Reactor Building pressure is 6 psig.

Which emergency operating procedure contains the specific steps to mitigate the consequences of this event?

A. ESAS 1202.010 B. Overcooling 1202.003 C. HPI Cooldown 1202.011 D. Loss of Subcooling Margin 1202.002 Answer B is correct, Overcooling 1202.003.

References:

The key to this question is in realizing that T-cold is lower than normal and that one OTSG is <900 psig. Also, RCS pressure is above ESAS actuation pressure but RB pressure is greater than ESAS actuation setpoint. These are three of the five possible entry conditions for 1202.003, the Overcooling EOP, and all of these conditions are indicative of a steam line rupture inside the RB. Also, the floating steps for the Reactor Trip EOP send the user to the Overcooling EOP.1202.010, Rev. 005-00-0, ESAS page 2 Taken from Exam Bank QID # 556, Used in A. Morris 98 RO Re-exam, Used in 2001 RO/SRO Exam. QID:0156, REV DATE:06/28/97 Training Objective: ANO-1-LP-RO-EOP03:7 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # BW/E05.K1.3 BW/E05.K1.3 Importance Rating 3.8 3.8 Tier # 1 Group # 1 CFR references 43.5 / 45.13 7

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 8 Given:

Plant startup in progress with reactor power at 5 %.

Condenser E-11A Vacuum Pressure Switch (PS-2850) fails to 0"" Hg.

What effect will this have on Turbine Bypass Valve (TBV) and Atmospheric Dump Valve (ADV) operations?

A. All TBVs will remain open, both ADV isolations will open and both ADV control valves will remain closed.

B. Only TBVs for E-11A will close, both ADV isolations open and

'A' SG ADV will begin controlling 'A' SG pressure.

C. All TBVs will close, both ADV isolations will open and both ADV control valves control at setpoint D. Only TBVs for E-11A will close, both ADV control valves and both ADV isolations will open."

Answer C is correct, All TBVs will close, both ADV isolations will open and both ADV control valves control at setpoint. With only one vacuum pressure switch made up, all condenser TBVs will close, both ADV isolations will open and both ADV control valves will control Steam Generator pressure at a setpoint of 1020 psig.

References 1106.016, Condensate Feedwater and Steam system Operation, change 039-05-0, page 12, step 6.4 "Developed for use on A. Morris 98 RO Re-exam, Selected for use in 2002 RO/SRO exam. AK3.01 Training Objective: ANO-1-LP-AO-MS:13 QID:0229, REV DATE: 11/20/98 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 4 Examination Outline Cross-reference:

Level RO SRO K/A # 000051.K3.01 000051.K3.01 Importance Rating 2.8 3.1 8

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Tier # 1 Group # 1 CFR references 41.5 / 41.10 / 45.6 / 45.13 Question 9 Unit 1 has been in a station blackout for 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> with battery bank D06 supplying bus D02 with power without a battery charger online for this entire time. If the equipment on bus D02 does NOT change, which one of the following statements describes the batterys discharge rate (in amps) as the battery is expended?

A. The discharge rate will be fairly constant until the design battery capacity is exhausted.

B. The discharge rate will go down steadily until the design battery capacity is exhausted.

C. The discharge rate will go up steadily until the design battery capacity is exhausted.

D. The discharge rate will be fairly constant until the design battery capacity is exhausted and then will rapidly go down.

Answer C The discharge rate will go up steadily until the design battery capacity is exhausted is the correct answer.

References OP 1202.008, Blackout 1203.036 Loss of 125V DC 1107.004 Battery and 125 VDC Distribution Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unclassified Examination Outline Cross-reference:

Level RO SRO K/A # 000055.A1.05 000055.A1.05 Importance Rating 3.3 3.6 Tier # 1 Group # 1 CFR references 41.7 / 45.5 / 45.6 9

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 10 During thunderstorm conditions the reactor trips, and the following conditions are observed:

- NNI X AC and NNI X DC Instrument Power Supply Status lights on C13 are OFF

- NNI Y AC and NNI Y DC Instrument Power Supply Status lights on C13 are ON What is the expected position of CV-1235, the pressurizer level control valve?

A. Indeterminate.

B. Failed 0% open.

C. Failed 50% open.

D. Failed 100% open.

Answer C is correct, Failed 50% open. On a loss of NNI X AC and NNI X DC, CV-1235 fails to 50% open; therefore C is the only correct response. If only NNI X DC had been lost then D would be correct.

References SSSTM 1-69, NNI06, 3.3.12 Pressurizer Temperature and Level, PG 20 OP-1203.015 PRESSURIZER SYSTEMS FAILURE OP-1203.047 LOSS OF NNI POWER Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unclassified Examination Outline Cross-reference:

Level RO SRO K/A # 000057.A2.12 000057.A2.12 Importance Rating 3.5 3.7 Tier # 1 Group # 1 CFR references 43.5/45.13 10

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 11 What should the operator's followup actions be if two SW pump strainers are clogged?

A. Verify proper SW bay level on the standby pump and start it.

B. Realign the standby SW pump to the emergency pond and start it.

C. Start the standby pump when the low SW pressure alarm comes in.

D. Realign the cross-ties to separate the standby pump from the pump with clogged strainers and start the standby pump.

Answer B is correct, Realign the standby SW pump to the emergency pond and start it is the correct answer per the AOP. The standby pump's suction is aligned to the ECP, which should be free of the debris causing problems to the running pumps.

Answer "A" is incorrect; the standby pump's suction will still be from the lake which is causing problems for the running pumps. Answer "C" is incorrect; equipment-cooling problems will occur if this action is taken. Answer "D" is incorrect because with two pumps having clogged strainers, this will not be possible.

References 1203.030, Loss of Service Water, change 012-00-0, page 6, step 3.5 "Direct from regular exam bank QID 1899. Selected for use in 2002 RO/SRO exam."

Training Objective: A1LP-RO-AOP:5 QID: 0418, Rev Date: 4/24/2002 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 000062.G2.1.23 000062.G2.1.23 Importance Rating 3.9 4.0 Tier # 1 Group # 1 CFR references 45.2 / 45.6 11

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 12 Given:

- Alternate shutdown is in progress due to a fire in the Unit 1 Control Room

- All immediate evacuation follow-up actions inside the control room have been completed.

- The CRS, RO #1, and RO#2, have gone out into the field to establish plant control.

Identify the desired OTSG level band and which pump / suction source which will be initially used:

A. SG levels controlled at 300"-320" with Electric EFW Pump (P-7B) and Condensate Storage Tank (T-41)

B. SG levels controlled at 300"-320" with Steam Driven EFW Pump (P-7A) and Q-Condensate Storage Tank (T41B)

C. SG levels controlled at 280"-300" with Steam Driven EFW Pump (P-7A) and Q-Condensate Storage Tank (T41B)

D. SG levels controlled at 280"-300" with Electric EFW Pump (P-7B) and Condensate Storage Tank (T-41)

Answer B is correct, SG levels controlled at 300"-320" with Steam Driven EFW Pump (P-7A) and Q-Condensate Storage Tank (T41B). P-7B is the motor driven EFW pump and is used only if there is enough time to start and line-up and T41 is the tank used when T41B is exhausted, making A and D incorrect. The correct level is 300-320, making C incorrect.

References 1203.002 Alternate Shutdown page 50, 79.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD =

Examination Outline Cross-reference:

Level RO SRO K/A # 000068.K3.07 000068.K3.07 Importance Rating 4.0 4.3 Tier # 1 Group # 1 CFR references 41.5 / 41.10 / 45.6 / 45.13 12

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 13 What type of occurrence would make it necessary to use AOP 1203.005 (Loss of Rx Bld Integrity)?

A. Failure to perform a LLRT on personnel hatch within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after opening during Mode 2 operations.

B. An entry into the RB to repair an inner airlock door component failure during Mode 1 operations.

C. A motor-operated outer containment isolation valve has lost power and has an inner valve that is manually operated and is closed during Mode 5 operations.

D. The interlocks jam on the personnel hatch and both doors are open for < 5 minutes during Mode 2 operations.

Answer D is correct, The interlocks jam on the personnel hatch and both doors are open for < 5 minutes during mode 2 operations. The time given is immaterial, if both doors are inoperable, then a loss of RB integrity exists.

Answer "A" is incorrect, up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> are allowed to perform LLRT.

Answer "B" is incorrect, entry is allowed without AOP entry to repair one airlock door provided the other is operable and closed. Answer "C" is incorrect, the requirements for an inoperable containment isolation valve are only during mode 1-4 operations.

References 1203.005, Loss of Reactor Building Integrity, change 010-01-0, page 1, step 1.1.2 Modified from the regular exam bank QID 737, which was used in the 2002 RO/SRO exam.

Training Objective: A1LP-RO-AOP 4.1 QID: 0419, Rev Date:4/24/2002 Question Source: Bank # _______

Modified Bank # ___X___

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 000069.A1.01 000069.A1.01 Importance Rating 3.5 3.7 Tier # 1 Group # 1 CFR references 41.7 / 45.5 / 45.6 13

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 14 Given:

- Plant tripped from 100% power

- Inadequate Core Cooling conditions exist

- Offsite power is available

- AFW pump, P-75, is inoperable

- Steam Driven EFW pump, P-7A, tripped on overspeed and won't reset

- A3 bus is locked out What is the MAXIMUM steam generator pressure that would allow feeding of the OTSGs to establish primary to secondary heat transfer?

A. 970 psig B. 720 psig C. 590 psig D. 50 psig Answer C is correct, 590 psig.

"A" is incorrect, 970 psig is the minimum normal post trip OTSG pressure band. "B" is incorrect, <720 is the criteria for bypassing MSLI. "D" is incorrect, applicable if only Service Water is available for steam generator feed.

References EOP 1202.005 Inadequate Core Cooling TBD 74-1152414-09, Vol 3, III.F-8.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unclassified Examination Outline Cross-reference:

Level RO SRO K/A # 000074.A2.02 000074.A2.02 Importance Rating 4.3 4.6 Tier # 1 Group # 1 CFR references 43.5 / 45.13 14

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 15 Given:

- A LOCA has occurred.

- All RCPs are running.

- SPDS ATOG display indicates "Loss of Subcooling Margin Elapsed Time 00:04:15" Which of the following actions should be taken?

A. Stop all RCPs.

B. Stop one RCP in each loop.

C. Stop all RCPs except for one RCP in PZR loop.

D. Continue to keep all RCPs running.

Answer B is correct, Stop one RCP in each loop.

Per 1202.002, if subcooling margin is lost and less than two minutes have elapsed, then all RCPs should be stopped. If more than two minutes have elapsed, then one RCP in each loop should be left running. The SPDS indication given shows that 4 minutes and 15 seconds have elapsed since subcooling margin was lost, therefore B is the correct answer. A would be correct if SPDS indication was 00:01:59 or less. C is an action taken during a normal shutdown to cold shutdown. D is totally incorrect, this action could lead to core uncovery with certain size primary system LOCAs.

References 1202.002 (Rev 3) 1105.014 [Rev 6]

Direct from exam bank QID 0159, Modified from Exam Bank QID # 540 Used in A. Morris 98 RO Re-exam.

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # BW/E03.K2.2 BW/E03.K2.2 Importance Rating 4.3 4.3 Tier # 1 Group # 1 CFR references 41.7 / 45.7 15

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 16 Which of the following combinations of NNI power losses DOES NOT require a manual reactor trip?

A. NNI-Y AC and NNI-Y DC B. NNI-X AC and NNI-X DC C. NNI-Y AC and NNI-X DC D. NNI-X AC and NNI-Y DC Answer A is correct, NNI-Y AC and NNI-Y DC.

References 1203.047, change 000-01-0, page 1-9.

Davis-Besse 1 R 06/10/1996 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD =

Examination Outline Cross-reference:

Level RO SRO K/A # BW/A02.A1.2 BW/A02.A1.2 Importance Rating 3.4 3.2 Tier # 1 Group # 1 CFR references 41.7 / 45.5 / 45.6 16

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 17 Given:

- Approach to criticality is in progress.

- Reactor power is in the Source Range.

- The CBOR commences sequential withdrawal of the regulating rods.

The following indications are observed:

- SR count rate rising

- Sustained SUR of 2.5 DPM

- Continued outward rod motion without a command.

The CBOR has attempted to trip the reactor, but all efforts to trip the reactor from the control have failed. The CRS directs performance of Emergency Boration per RT-12.

Which of the following conditions would prevent the shutdown of the reactor by Emergency Boration via the Batch Controller?

A. Loss of power to boric acid pump P39A B. Batch controller stuck on 9999999 C. Loss of Instrument Air to CV-1250 D. Failure of the Aux key on the Boric Acid batch controller Answer C Loss of Instrument air is correct. This will cause the Boric acid batch control outlet valve (essentially the emergency boration valve, CV-1250) to fail shut, preventing emergency boration into the reactor. A is incorrect because there are two pumps that can be used (P39A and P39B). B is incorrect because 9999999 is the max setting for emergency boration and is the value specified in the EOP for the controller setting. D is incorrect because the Aux Keys are not used on the batch controller.

References 1103.004 Soluble Poison Concentration Control, page 4, and EOP 1202.001.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unclassified Examination Outline Cross-reference:

Level RO SRO K/A # 000001.A2.02 000001.A2.02 Importance Rating 4.2 4.2 Tier # 1 Group # 2 CFR references 43.5 / 45.13 17

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 18 Given:

- 100% power, BOL

- Tave 579 degrees F

- RCS Pressure at 2155 psig

- ICS in AUTO K07-B3 "ASYM ROD RUNBACK IN EFFECT" alarms. A runback is now in progress.

RCS Pressure and Tave will (respectively) ___1___, then will ___2___, and finally

___3___ with no operator action.

A. 1. Decrease due to power reduction from rod movement

2. Increase because of negative MTC
3. Level out inside normal bands.

B. 1. Increase due to power reduction from ICS runback to turbine

2. Decrease because of positive MTC
3. Level out inside normal bands.

C. 1. Increase due to load reduction from ICS runback to turbine

2. Decrease due to FW demand matching new lower power at 40%
3. Level out inside normal bands.

D. 1. Decrease due to power reduction from rod movement

2. Increase because of negative MTC
3. Level out at values slightly lower than normal bands due to new lower power of 40%.

Answer A is correct, Decrease due to power reduction, Increase because of negative MTC, level out inside normal bands.

All others are combinations that have incorrect statements in them. MTC is always negative in this range of temperatures, while bands return to normal after this transient. The initial power reduction is caused by the rods driving in due to the runback (turbine load rejection is occurring simultaneously, but is not the cause of Temp/Press decreases).

References 1203.012F, TSB B3.1.4-2, STM 1-3 RCS.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unknown Examination Outline Cross-reference:

Level RO SRO 18

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM K/A # 000003.A1.06 000003.A1.06 Importance Rating 4.0 4.1 Tier # 1 Group # 2 CFR references 41.7 / 45.5 / 45.6 Question 19 Following a reactor trip from 55% power, the following conditions exist:

- Both OTSG pressures are less than 900 psig and LOWERING

- K07-C5 "MSSV OPEN" is in alarm

- SPDS indicates that the open MSSV is on the "B" OTSG.

Which of the following actions should be taken FIRST to stabilize the plant in accordance with 1202.003, OVERCOOLING?

A. Isolate SG B by depressing MSLI manual actuation pushbuttons and ensuring feedwater flow to both OTSGs.

B. Control Turbine Bypass valves (TBVs) to maintain SG pressures and levels constant or slightly rising to stop the overcooling through the MSSV.

C. Isolate BOTH OTSGs by depressing MSLI manual actuation pushbuttons and isolate EFW by closing EFW header isolation valve(s).

D. Control Turbine Bypass valves (TBVs) to quickly reduce SG pressures in an attempt to reseat the MSSV.

Answer D is correct, Control Turbine Bypass valves (TBVs) to quickly reduce SG pressures in an attempt to reseat the MSSV.

References 1202.003 EOP OVERCOOLING, change 005-00-0, page 3.

1203.012F Annunciator K07 Corrective Action, change 026-04-0, page 25.

Question Source: Bank # ______

Modified Bank # ______

New __X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # BW/E10.A1.1 BW/E10.A1.1 Importance Rating 4.0 3.5 Tier # 1 Group # 2 CFR references 41.7 / 45.5 / 45.6 19

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 20 Given the following plant conditions:

- 100% power

- Condensate Pump P-2A OOS

- K06-E7 "COND PUMP MTR WDG TEMP HI" is in alarm

- AO reports fire in Condensate Pump P-2C motor The CRS instructs the CBOT to trip P-2C.

Which of the following describes the correct response?

A. Trip P-2C, perform immediate actions per 1203.027, Loss of Steam Generator Feed and dispatch the fire brigade per 1203.034, Smoke, Fire or Explosion.

B. Trip P-2C, monitor ICS runback to 40% power and dispatch the fire brigade per 1203.034, Smoke, Fire or Explosion.

C. Trip P-2C and reduce power per 1203.045, Rapid Plant Shutdown, to maintain adequate main feed pump suction pressure and dispatch the fire brigade per 1203.034, Smoke, Fire or Explosion.

D. Trip P-2C then trip the turbine and reactor and carry out immediate actions per 1202.001, Reactor Trip and dispatch the fire brigade per 1203.034, Smoke, Fire or Explosion.

Answer B is correct, Trip P-2C, monitor ICS runback to 40% power and dispatch the fire brigade per 1203.034, Smoke, Fire or Explosion. The plant is designed to survive a loss of 2 condensate pumps. ICS will run the plant back at 50%/min to 40% power (360 MWe). Immediate action for fire is to dispatch the fire brigade, therefore (b) is the correct response. A is actions for a loss of a main feedwater pump which should not occur. C main feed pump suction pressure will go down but recover as ICS runs plant back. D a reactor/turbine trip should not be required.

References 1105.004 Rev 014-00-0, Integrated Control System, page 10 step 6.20 1203.034, Rev. 012-03-0, Smoke, Fire, or Explosion, p. 4 Used in 2001 SRO Exam. Selected for use in 2002 SRO exam.

Training Objective: ANO-1-LP-RO-ICS:12 QID: 0062, Rev date:5/6/2002 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 4 Examination Outline Cross-reference:

20

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Level RO SRO K/A # BW/A01.K3.2 BW/A01.K3.2 Importance Rating 3.2 3.6 Tier # 1 Group # 2 CFR references 41.5 / 41.10 / 45.6 / 45.13 Question 21 What is the purpose of the Reactor Protection System (RPS) Main Turbine anticipatory trip?

A. Trip the Reactor when above 43% power in order to limit reactor heat input to the system with no FW flow following a loss of the main feed pumps.

B. Trip the Reactor when above 41% power in those cases where a loss of secondary heat sinks would likely result in a reactor trip based on the primary response to the loss of heat removal capabilities.

C. Trip the Reactor when above 43% power in those cases where a loss of secondary heat sinks would likely result in a reactor trip based on the primary response to the loss of heat removal capabilities.

D. Trip the Reactor when above 41% power in order to limit reactor heat input to the system with no FW flow following a loss of the main feed pumps.

Answer C, Trip the Reactor when above 43% power in those cases where a loss of secondary heat sinks would likely result in a reactor trip based on the primary response to the loss of heat removal capabilities, is the correct answer.

The 41% value is the value that it resets when going down in power (hence B and D incorrect) while the main feed pump(s) have their own ART around 7% power.

References STM 1-63, Rev 5, page 11.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = Unknown Examination Outline Cross-reference:

Level RO SRO K/A # BW/A04.K2.2 BW/A04.K2.2 Importance Rating 3.3 3.5 Tier # 1 Group # 2 CFR references 41.7 / 45.7 21

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 22 A leak exists on the upper tap of a Pressurizer level transmitter sensing line, causing a PZR steam space leak.

Indicated PZR level will ___________ and actual PZR level will _________.

A. Drop, Drop B. Drop, Rise C. Rise, Drop D. Rise, Rise Answer D is correct, rise, rise, D is correct since a leak on the upper tap will cause the differential pressure to go down on the affected transmitter, thus causing indicated level to rise. Likewise a steam space leak will cause actual level to go up.

Answers A thru C are combinations of the correct answer, and could be correct if the leak was elsewhere.

References 1304.022, Rev. 023-00-0, Unit 1 Pressurizer Level & Temperature Channel Calibration, page 6, 7 Created for 2001 RO/SRO Exam, 11/13/00 by J.Cork.

Training Objective: ANO-1-LP-RO-NNI: 4 Modified from Regular exambank QID #5470.

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 000008.A2.27 000008.A2.27 Importance Rating 2.9 3.2 Tier # 1 Group # 2 CFR references 43.5 /45.13 22

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 23 Given:

- A Small Break LOCA has occurred.

- CBOR has tripped the reactor.

- CBOT has tripped the turbine.

- Both OTSG Pressures are at 895 psig

- SCM is 25°F.

- All RCPs are OFF.

The desired final OTSG levels will be maintained with EFW using ___1___ Level instrument(s) and obtained with a fill rate of ___2___.

A. 1. EFIC Low Range

2. 2 to 8/min in manual or 280gpm/SG in Auto B. 1. EFIC High Range
2. 2 to 8/min in Auto or 280gpm/SG in manual C. 1. EFIC Low Range
2. 2 to 8/min in Auto or 280gpm/SG in manual D. 1. EFIC High Range
2. 2 to 8/min in manual or 280gpm/SG in Auto Answer B is correct, EFIC High Range, 2 to 8/min in Auto or 280gpm/SG in manual. EFIC High Range does not cover the 370-410" level required for this EOP/RT. EOP/RT specifies the level and rate and the other three distracters are incorrect combinations of other instruments and manual versus auto modes of control.

Reference 1202.012 Repetitive Tasks, RT 5 for EFW initiation.

Question Source: Bank # _______

Modified Bank # _______

New __ X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD =

Examination Outline Cross-reference:

Level RO SRO K/A # 000009.K2.03 000009.K2.03 Importance Rating 3.0 3.3 Tier # 1 Group # 2 CFR references 41.7 / 45.7 23

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 24 Given:

- Unit 1 is at 100% Power.

- A LOCA occurs with RCS pressure stabilizing at 200 psig

- BWST level is 8 feet.

The purpose of the PIGGYBACK mode during recovery from a LOCA is to:

A. Provide a minimum recirculation flowpath for the LPI pumps.

B. Provide Net Positive Suction Head to the HPI pumps.

C. Provide a low pressure discharge to the RCS when RCS pressure is

<200psig.

D. Provide a means of transferring to long-term core cooling with the LPI pumps and the RB sump when RCS Pressure is <200psig.

Answer "B" is correct, ensures NPSH to HPI pumps prior to transfer to RB sump recirculation.

References STM 1-05, Rev 11, pages 37-38.

Question Source: Bank # _______

Modified Bank # _______

New __X____

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD =unclassified Examination Outline Cross-reference:

Level RO SRO K/A # 000011.K2.02 000011.K2.02 Importance Rating 2.6 2.7 Tier # 1 Group # 2 CFR references 41.7 / 45.7 24

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 25 Given:

- Neither OTSG is available

- RCS CETs are 550°F and lowering

- SCM is 70°F

- HPI Cooldown in progress per 1202.011, HPI Cooldown

- Cooldown rate is 110°F/hr Which of the following will reduce the cooldown rate to an acceptable value?

A. Lower HPI flow / Raise letdown flow B. Lower HPI flow / Lower letdown flow C. Raise HPI flow / Lower letdown flow D. Raise HPI flow / Raise letdown flow Answer B is correct, Lower HPI flow / Lower letdown flow. "A" , "C", "D" provide incorrect combinations to reduce cooldown rate.

References EOP 1202.011 HPI Cooldown Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 4 Examination Outline Cross-reference:

Level RO SRO K/A # BW/E08.A1.3 BW/E08.A1.3 Importance Rating 3.3 3.8 Tier # 1 Group # 2 CFR references 41.7 / 45.5 / 45.6 25

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 26 Following a refueling outage, a plant "Heatup to 800 psig" is in progress.

- RCS temperature is 290°F.

- HPI pump P-36B is out of service for maintenance.

- HPI pump P-36A is in ES standby and P-36C is in service.

After reviewing the surveillance data for P-36C, System Engineering determines that P-36C is inoperable.

Which of the following is allowable in accordance with Unit One Tech Specs?

A. Heatup may continue up to normal operating temperature and pressure.

B. Heatup should be stopped and RCS cooled down to < 200°F.

C. Heatup should be stopped and RCS temp should not exceed 300°F.

D. Heatup may continue up to, but not to exceed, an RCS temp of 350°F.

Answer D is correct, Heatup may continue up to, but not to exceed, an RCS temp of 350°F.

References Unit One Technical Specifications 3.3.2 Created for 2001 SRO Exam. QID # 0380.

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unclassified Examination Outline Cross-reference:

Level RO SRO K/A # 0022.G2.1.12 0022.G2.1.12 Importance Rating 2.9 4.0 Tier # 1 Group # 2 CFR references 43.2 / 43.5 / 45.3 26

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 27 An outage is in progress with the following conditions:

- The RCS is drained to 371.5 feet as indicated by RCS hot leg level.

- Decay heat removal flow becomes erratic.

- Indicated decay heat removal flow is ~2500 gpm.

Which ONE of the following actions is correct?

A. Reduce decay heat removal flow until flow has stablized.

B. Stop the operating decay heat removal pump.

C. Raise RCS level.

D. Raise decay heat removal flow.

Answer A is correct, Reduce decay heat removal flow until flow has stablized. With erratic flow, actions should be taken to stabilize the flow by throttling flow back. B is incorrect.

This is action for a loss of flow not erratic flow. C is incorrect. Although this may be necessary in the long term, the immediate response to the condition is to reduce DH flow. D is incorrect. This will make the condition worse instead of better."

References 1203.028, Loss of Decay Heat Removal, change 016-02-0, page 17, step 3.2. Taken from Exam Bank QID # 3070. Used in A. Morris 98 RO Re-exam. Selected for 2002 RO/SRO exam.

Training Objective: ANO-1-LP-RO-DHR:23 QID: 0164, Rev Date: 05/03/91 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 000025.K1.01 000025.K1.01 Importance Rating 3.9 4.3 Tier # 1 Group # 2 CFR references 41.8 / 41.10 / 45.3 27

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 28 Which one of the following describes the operation of the AMSAC (ATWS Mitigation Safety Actuation Circuit) and the DSS (Diverse Scram System) during an ATWS with a complete loss of Main Feedwater?

A. AMSAC trips the main turbine while DSS trips the regulating rods and starts the EFW pumps.

B. AMSAC trips the regulating rods while DSS trips the main turbine and starts EFW pumps.

C. AMSAC trips the main turbine and starts the EFW pumps while DSS trips the regulating rods.

D. AMSAC starts the EFW pumps and trips the regulating rods while DSS trips the main turbine.

Answer C, AMSAC trips the main turbine and starts the EFW pumps while DSS trips the regulating rods, is the correct answer. The other distracters are incorrect combinations of the 4 items that both sub-systems due as parts of DROPS.

References STM 1-59, Rev 1, page 9-10.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = unclassified Examination Outline Cross-reference:

Level RO SRO K/A # 000029.K2.06 000029.K2.06 Importance Rating 2.9 3.1 Tier # 1 Group # 2 CFR references 41.7 / 45.7 28

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 29 The primary reason the Technical Specifications require one channel of SR NI to be OPERABLE is:

A. 1. To provide for primary power indication at < 1E-8 amp on IR NI

2. To provide the primary means for detecting reactivity transients initiated when RPS is NOT required to be OPERABLE and would require operator action.

B. 1. To provide for primary power indication at < 1E-10 amp on IR NI

2. To provide the primary means for detecting reactivity transients initiated at full power changes that trigger operator actions to anticipate RPS activation.

C. 1. To provide primary power indication at < 1E-8 amp on IR NI

2. To provide the primary means for detecting reactivity transients initiated at full power changes that trigger operator actions to anticipate RPS activation.

D. 1. To provide primary power indication at < 1E-10 amp on IR NI

2. To provide the primary means for detecting reactivity transients initiated when RPS is NOT required to be OPERABLE and would require operator action.

Answer D To provide primary power indication at < 1E-10 amp on IR NI and is the primary means for detecting reactivity changes and triggering operator actions to respond to reactivity transients initiated from conditions in which the Reactor Protection System (RPS) is not required to be OPERABLE, is correct. 1E-8 power is within range for IR NI making answers A and C incorrect. B is incorrect because SR is not used at full power for reactivity transients since power range detectors provide this function.

References TSB 3.3.9 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD =

Examination Outline Cross-reference:

Level RO SRO K/A # 000032.K3.02 000032.K3.02 Importance Rating 3.7 4.1 Tier # 1 Group # 2 29

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM CFR references 41.5 / 41.10 / 45.6 / 45.13 Question 30 Given:

The following are in alarm:

- SG-A N-16 AVG Leakrate GPM (SGALRGPM)

- SG-A N-16 Leakrate ROC (Rate of Change) GPM/HR (SGAROC1)

- A OTSG N-16 TROUBLE (K07-A5)

The crew has just initiated a controlled shutdown from 100% power in accordance with 1203.023, SMALL STEAM GENERATOR TUBE LEAKS. The CBOT reports that SG-A N-16 AVG Leakrate GPM (SGALRGPM) has risen to 11 gpm.

What is the required action to take?

A. Enter EOP for tube rupture (1203.006) because >1gpm B. Continue in AOP 1203.023, attachment 1, to use correlation table for N-16 since power is less than 100% and N-16 detectors are normally set to Gross mode.

C. Continue in AOP 1203.023, attachment 1 to use PMS indications for leak rate and rate of change.

D. Enter EOP for tube rupture, 1203.006 because > 10 gpm.

Answer D Enter EOP for Tube Rupture (1203.006) because > 10 gpm, is the correct answer.

This is an entry condition for the EOP when at power without a reactor trip. A is incorrect because a reactor trip has not occurred (with 1gpm leak rate), while B and C are incorrect because the AOP clearly states that tube leaks are defined as < 10 gpm and when above this value to enter the EOP 1203.006 for Tube Rupture.

References EOP Tube Rupture (1203.006)-entry conditions AOP Small Steam Generator Tube Leaks (1203.023)-entry conditions Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X___

Comprehension or Analysis ______

LOD =

Examination Outline Cross-reference:

Level RO SRO K/A # 000037.A2.06 000037.A2.06 Importance Rating 4.3 4.5 Tier # 1 Group # 2 CFR references 43.5 / 45.13 30

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 31 After a reactor trip, which of the following would indicate a ruptured tube in the "A" Steam Generator?

A. "A" EFIC level is 31 stable "A" MFW Flow is .3 mlb/hr "B" EFIC level is 35 rising "B" MFW Flow is .2 mlb/hr B. "A" EFIC level is 31 stable "A" MFW Flow is .3 mlb/hr "B" EFIC level is 29 rising "B" MFW Flow is .4 mlb/hr C. "A" EFIC level is 28 rising "A" MFW Flow is .5 mlb/hr "B" EFIC level is 31 stable "B" MFW Flow is .3 mlb/hr D. "A" EFIC level is 35 rising "A" MFW Flow is .1 mlb/hr "B" EFIC level is 31 stable "B" MFW Flow is .3 mlb/hr Answer D is correct, "A" EFIC level is 35 rising "A" MFW Flow is .1 mlb/hr "B" EFIC level is 31 stable "B" MFW Flow is .3 mlb/hr "A" would indicate a tube rupture in the "B" OTSG. "B" & "C" choices indicate normal controls for post trip. "D" indicates a tube rupture in the "A" OTSG, i.e., level rising and low feedwater flow rates in "A" OTSG.

Reference 1202.006 Rev 7, 1202.001 Rev 27. Developed for 1999 exam.

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD =

Examination Outline Cross-reference:

Level RO SRO K/A # 000038.A1.02 000038.A1.02 Importance Rating 4.2 4.1 Tier # 1 Group # 2 CFR references 41.7 / 45.5 / 45.6 31

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 32 Given:

- Loss of all Feedwater

- HPI core cooling started What indicates adequate HPI core cooling?

A. CET temperatures stable after 100 minutes.

B. T-cold tracking associated SG T-sat.

C. T-hot tracking CET temperatures.

D. T-hot/T-cold differential temperature dropping.

Answer A CET temperatures stable after 100 minutes. ""A" is correct since the only criteria for evaluation of adequacy of core cooling via HPI is a go down in CET temps. "B", "C",

and "D" are individual indications of adequate primary to secondary heat transfer.

References 1202.004 Rev 3 EOP Technical Bases Document, 074-1152414, Rev. 8 Developed for 1999 exam.

Training Objectives: ANO-1-LP-RO-EOP04: 6 QID: 0335, Rev Date: 9-7-99 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2.5 Examination Outline Cross-reference:

Level RO SRO K/A # BW/E04. A1.3 BW/E04. A1.3 Importance Rating 3.6 3.8 Tier # 1 Group # 2 CFR references 41.7 / 45.5 / 45.6 32

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 33 Given:

- Degraded power event in progress

- K01-D1, "EDG 1 NOT AVAILABLE" is in alarm

- The Inside AO reports that engine DC control power was lost to EDG #1 What will be the expected effect on EDG #1 following a loss of engine DC control power?

A. EDG#1 will NOT start automatically and CANNOT be started manually B. EDG#1 will start and run at idle speed but will NOT accelerate to run speed.

C. EDG#1 will NOT start automatically but may be started manually.

D. EDG#1 will start and run at load rpm speed but CANNOT be placed on its associated 4160 VAC Essential Bus.

Answer C EDG#1 will NOT start automatically but may be started manually. The EDG can be started manually by mechanically overriding the governor run solenoid.

Reference STM 1-31, rev 8, page 18.

Taken from/modified Davis-Besse 1 08/03/1998 Question Source: Bank # _______

Modified Bank # ___X___

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 000058.K3.01 000058.K3.01 Importance Rating 3.4 3.7 Tier # 1 Group # 2 CFR references 41.5, 41.10 / 45.6 / 45.1 33

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 34 What is the lowest instrument air pressure that Unit 1 and Unit 2 instrument air systems should remain cross-connected?

A. 80 psig B. 60 psig C. 55 psig D. 35 psig Answer B 60 psig, is the correct value. "A" is the value at which Breathing Air can be cross-connected with IA. "C" is the value at which the TBV's will fail closed. "D" is the value at which IA is considered lost and the Rx should be tripped."

References 1203.024 Rev 9 PC-2 "Used in 1999 exam. Direct from Exam Bank, QID# 763 used in class exam" Training Objectives: A1LP-RO-FH: 1.4 QID: 0346, Rev date: 9-7-99 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2.5 Examination Outline Cross-reference:

Level RO SRO K/A # 000065.K3.04 000065.K3.04 Importance Rating 3.0 3.2 Tier # 1 Group # 3 CFR references 41.5 / 41.10 / 45.6 / 45.13 34

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 35 Under which of the following conditions would PTS (Pressurized Thermal Shock) limits apply?

A. All RCP's are off, HPI/break flow is causing a cooldown rate of 43 degrees per hour.

B. All RCP's are on, HPI/break flow is causing a cooldown rate of 145 degrees per hour.

C. All RCP's are on, RCS T-cold 480 degrees, cooldown rate is 145 degrees per hour.

D. All RCP's are off, RCS T-cold is 296 degrees, cooldown rate is 43 degrees per hour.

Answer A is correct, All RCP's are off, HPI/break flow is causing a cooldown rate of 43 degrees per hour.

References 1203.041, Rev. 004-02-0, note before step 1 Modified regular exambank QID #3301.

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD=4 Examination Outline Cross-reference:

Level RO SRO K/A # BW/E13. K2.1 BW/E13. K2.1 Importance Rating 3.6 3.4 Tier # 1 Group # 3 CFR references 41.7 / 45.7 35

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 36 Given:

LOCA in progress with Degraded Power conditions EDG #2 did NOT start RCS pressure stabilized at 140 psig SCM is 5 degrees With these accident conditions, which of the following would pose the greatest challenge to core cooling?

A. EDG #1 critical trouble alarm B. Tube Leak in the 'A' Steam Generator C. BWST level at 15 feet D. P-35A Reactor Building, Spray Pump trip Answer A is correct, EDG #1 critical trouble alarm.

References STM 1-31, EDG, Rev 8.

AOP 1203.012A, Annunciator K01 Corrective Actions, change 034-01-0.

EDG OP 1104.036, change 041-09-0.

ANO, Unit 1 RO exam 12/10/1998 Question Source: Bank # __X____

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # BW/A05.A1.3 BW/A05.A1.3 Importance Rating 3.7 3.7 Tier # 1 Group # 3 CFR references 41.7,/ 45.5, 45.6 36

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 37 Given:

- Power escalation to 60% power is in progress.

- Current reactor power is 40%.

- There are 3 RCPs in service.

- "A" RCP is out of service due to an electrical fault in breaker H-11 (Reactor Coolant Pump P-32A).

Which of the following conditions would cause an automatic reactor trip?

A. Annunciator "RCP TRIP" (K08-A6) is clear, RCS flow is lowering and "C" RCP amperage is zero on SPDS.

B. Annunciator "RCP TRIP" (K08-A6) is in alarm, RCS flow is lowering and "H2 L.O.

RELAY TRIP" (K02-A5) in alarm.

C. Breaker B-7146 (ICW Booster Pump P-114A) trips open and P-114B fails to auto start causing a loss of RCP Seal Cooling.

D. Breaker H-21 (Reactor Coolant Pump P-32D) trips open due to an over-current condition causing a loss of the "D" RCP."

Answer B is correct, Annunciator "RCP TRIP" (K08-A6) is in alarm, RCS flow is lowering and "H2 L.O. RELAY TRIP" (K02-A5) in alarm. The indications are for a loss of H2 bus which leaves only one RCP running at power. RPS will trip if no RCPs are running in a loop when greater than 0% power.

A is incorrect because indications are of a sheared shaft which requires a manual reactor trip. C is incorrect because a loss of seal cooling alone will not cause a reactor trip. D is incorrect because a loss of ""D"" RCP would result in one RCP in each loop with reactor power <55% - no automatic reactor trip will result."

References 1203.012G, Rev. 032-03-0, Annunciator K08 Corrective Action, page 35 1105.001, Rev. 019-03-0, NI & RPS Operating Procedure, step 6.1, page 8" Developed for 1998 RO Exam. Modified for use in 2002 RO/SRO exam. QID: 0002.

Training Objectives: ANO-1-LP-RO-AOP: 4.1 Question Source: Bank # __X____

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO 37

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM K/A # 003.K2.01 003.K2.01 Importance Rating 3.1 3.1 Tier # 2 Group # 1 CFR references 41.7,/ 45.5, 45.6 Question 38 The WCO is mixing a batch of acid with a concentration of 6,000 ppmB in accordance with 1104.003, CHEMICAL ADDITION.

Why must this batch be completed in two separate parts, of equal volume, one with boric acid and one without?

A. For this concentration dilution is recommended to prevent exceeding the heat trace capability.

B. For this concentration the required volume of water is greater than the capacity of the BAMT.

C. To ensure the BAMT outlet piping is adequately flushed when the evolution is complete.

D. To zero out the actual level indication on the BAMT (zero on the remote indicator does not actually correspond to empty).

Answer B is correct, For this concentration the required volume of water is greater than the capacity of the BAMT.

"A" is incorrect, the actual concentration where heat trace capability is exceeded is 12,250ppmB. "C" is incorrect, while the BAMT outlet is flushed at the conclusion of dumping operations, it does not answer the questinon. "D" is incorrect because although partly true, water is not added to correct for this issue.

References 1104.003, Chemical Addition, change 034-00-0, page 8-11.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 004.K1.16 004.K1.16 Importance Rating 3.3 3.5 Tier # 2 Group # 1 CFR references 41.2 to 41.9 / 45.7 to 45.8 38

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 39 The plant is operating at 100% power near EOL.

During pre-outage scaffolding construction in Lower North Piping Room (LNPR), the instrument air line to the following valves has been severed:

- CV-1235, Pressurizer Level Control

- CV-1222, Letdown Orifice Block

- CV-1223, Letdown Orifice Bypass

- CV-1207, RCP Seals Total Injection Flow With no operator action, which of the following describes the expected system response?

A. Pressurizer level will rise continuously.

B. Pressurizer level will rise to a higher steady state value.

C. Pressurizer level will drop continuously.

D. Pressurizer level will drop to a lower steady state value.

Answer A Pressurizer level will rise continuously. CV-1235 and CV-1222 fail as-is on a loss of instrument air. CV-1223 fails closed and CV-1207 fails open on a loss of instrument air.

This will result in lower letdown flow and higher seal injection flow resulting in PZR level to continuously rise. All other answers are incorrect and could be chosen if candidate fails to recall failure modes.

References 1203.024, Loss of Instrument Air, change 010-05-0, page 13, Attachment A Developed for use in A. Morris 98 RO Re-exam, Modified for use in 2002 RO/SRO exam.

Training Objectives: A1LP-RO-MU:10 QID: 0189, Rev date: 5/6/2002 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X___

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 004.K3.05 004.K3.05 Importance Rating 3.8 4.2 Tier # 2 Group # 1 CFR references 41.7 / 45.6 39

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 40 Given:

RS-1 is de-energized due to an electrical fault.

Subsequently, the following plant conditions exist:

- Reactor has tripped.

- RCS pressure is 1200 psig, lowering slowly.

- RB pressure is 4.4 psig, and rising slowly.

Which ONE of the following describes the Engineered Safeguards Channels that are expected to actuate?

A. ANALOG CHANNELS 1, 2, and 3; DIGITAL CHANNELS 2, 4, and 6 B. ANALOG CHANNELS 2 and 3; DIGITAL CHANNELS 1 and 2 C. ANALOG CHANNELS 2 and 3; DIGITAL CHANNELS 5 and 6 D. ANALOG CHANNELS 1, 2, and 3; DIGITAL CHANNELS 1, 3, and 5 Answer A is correct, ANALOG CHANNELS 1, 2, and 3; DIGITAL CHANNELS 2, 4, and 6.

RS-1 powers Analog Channel 1 and the Odd Digital Channels (1,3,5,7,9). Analog Channels are denergized to to trip, Digital Channels are energized to trip. With RCS pressure < 1590 psig and RB Pressure > 4 psig, Analog Channels 1, 2, and 3 and Digital Channels 1 through 6 should actuate. The loss of RS-1 will prevent the Odd Digital Channels from actuating.

References STM 1-65, Rev 3, page 5, 8, and 16.

Oconee 1 bank, 12/07/1998 Question Source: Bank # __X____

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X___

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 013.K2.01 013.K2.01 Importance Rating 3.6 3.8 Tier # 2 Group # 1 CFR references 41.7 40

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 41 Under what conditions can the Control Board Operator bypass or defeat a component automatically actuated by ESAS?

A. Bypassing or defeating a component automatically actuated by ESAS is not allowed.

B. The Control Board Operator, after careful consideration, determines that the component is no longer required.

C. ONLY when procedurally directed by the Emergency Operating or the Abnormal Operating procedures.

D. After it is determined that the component is no longer needed and approval is obtained from the SM/CRS.

Answer D is correct, After it is determined that the component is no longer needed and approval is obtained from the SM/CRS.

A is incorrect, provisions are made for this action.B is partially correct, the component must not be needed but the CBO cannot make this decision on his own.C is only one of the directions where a component can be bypassed/reset, CRS/SS permission is the other. D contains all correct elements, lack of need and supervisory (SRO) permission.

References 1015.001, CONDUCT OF OPERATIONS Taken from Exam Bank QID # 4791, Used in A. Morris 98 RO Re-exam.

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 4 Examination Outline Cross-reference:

Level RO SRO K/A # 013.K4.10 013.K4.10 Importance Rating 3.3 3.7 Tier # 2 Group # 1 CFR references 41.7 41

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 42 Given:

- The plant is at 80% power.

- The NI SASS mismatch alarm is bypassed due to a mismatch.

What would be the predicted plant response if NI-6 failed to 125%?

A. Control rods move inward, feedwater flows go up.

B. Control rods move inward, feedwater flows do down.

C. Control rods move outward, feedwater flows go up.

D. Control rods move outward, feedwater flow go down.

Answer A Control rods move inward, feedwater flows go up. The mismatch alarm disables the SASS module automatic operation. When NI-6 fails to 125% power, ICS will see NI-6 as the input power. ICS will generate an error to drive rods in. AT the same time a cross-limit is generated to keep feedwater balanced with reactor power. Feedwater will go up.

Therefore, "B", "C", and "D" are incorrect.

References STM 1-64, Integrated Control System, rev 6, page 33, step 2.6.1, page 43, step 2.7 Used in 1999 exam. Direct from ExamBank, QID# 3723, Selected for 2002 RO exam.

Training Objectives: ANO-1-LP-RO-NI: 10 QID: 0299, Rev date: 9-5-99 Question Source: Bank # __X____

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge ______

Comprehension or Analysis __X___

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 015.K3.04 015.K3.04 Importance Rating 3.4 4.0 Tier # 2 Group # 1 CFR references 41.7 /45.6 42

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 43 Which ONE of the following is an indication that Intermediate Range NI-3 is OVER-compensated during a reactor startup?

A. NI-1 and 2 read 3 E+4 cps, and NI-3 reads 8 E-11 amps B. NI-3 reads 5 E-11 amps, and NI-4 is not on scale C. NI-3 reads 3 E-6 amps, and NI-4 reads 8 E-7 amps D. NI-1 and 2 read 8 E+5 cps, and NI-3 reads 2 E-11 amps Answer D is correct, NI-1 and 2 read 8 E+5 cps and NI-3 reads 2 E-11 amps.

References STM 1-67, Rev 7.

Taken from INPO bank, Davis-Besse, 07/08/1997 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 015.K5.02 015.K5.02 Importance Rating 2.7 2.9 Tier # 2 Group # 1 CFR references 41.7 / 45.7 43

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 44 Which inputs are supplied to the ICCMDS subcooled margin indication?

A. Core Exit Thermocouple and narrow range pressure (1700-2500 psig).

B. Hot Leg Temperature and narrow range pressure (1700-2500 psig).

C. Core Exit Thermocouple and wide range pressure (0-3000 psig).

D. Hot Leg Temperature and wide range pressure (0-3000 psig).

Answer C Core Exit Thermocouple and wide range pressure (0-3000 psig), is the correct answer.

References 1105.008 Rev. 012-05-0 New, QID#2304 for 2004 RO/SRO exam Training Objectives: A1LP-RO-NNI: 25 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 017.K4.01 017.K4.01 Importance Rating 3.4 3.7 Tier # 2 Group # 1 CFR references 41.7 44

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 45 Given:

- Plant is at 100% power

- All CETs indicate 602 °F ICC train ""B"" Core Exit Thermocouple TE-1152 fails to 900 °F.

What is the effect of this failure?

A. Core Exit Thermocouple TE-1152 will be removed from the average.

B. ICC Core Exit Thermocouple indication will go to ~627 °F.

C. "TRAIN B SUBCLG MARG LO" annunciator will alarm.

D. "B" SPDS will switch from ATOG to the ICC display.

Answer A Core Exit Thermocouple TE-1152 will be removed from the average. CETs are averaged together to generate alarms, indication, or action. Therefore, "B", "C", and "D" are incorrect and "A" is correct since ICCMDS will determine that TE-1152 is unreliable and remove it from the average.

References 1105.008 Rev 11 Developed for 1999 exam.

Training Objectives: ANO-1-LP-RO-NNI: 25 QID: 0240, Rev date: 8-17-99 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X___

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 017.K6.01 017.K6.01 Importance Rating 2.7 3.0 Tier # 2 Group # 1 CFR references 41.7 /45.7 45

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 46 Given:

- A 5 square foot LOCA hot leg break has occurred.

- Offsite power has also been lost.

- #1 EDG will not start.

- All other ES systems actuate properly.

Will Reactor Building cooling be sufficient to prevent exceeding Reactor Building design limits?

A. Yes, one Spray train and one Emergency Cooling unit provides 100% cooling.

B. No, it takes two Spray trains to provide 100% cooling.

C. Yes, one Emergency Cooling unit will provide 100% cooling.

D. No, two Spray trains and two Emergency Cooling units provide 100% cooling.

Answer:

A is correct, Yes, one Spray train and one Emergency Cooling unit provides 100%

cooling.

It takes any of the following combinations to provide 100% RB cooling:

Both trains of RB Spray Both Emergency Cooling units One RB Spray train and one Emergency Cooling unit.

The only answer that contains one of the above combinations considering the given conditions (only one ES train available) is "A", all other answers contain incorrect combinations or combinations that are not available with the conditions.

References T.S. 3.6.5.1 STM 1-08, Rev. 7, 2.7 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 022.A1.01 022.A1.01 Importance Rating 3.6 3.7 Tier # 2 Group # 1 CFR references 41.5 / 45.5 46

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 47 Which of the following Reactor Building parameters are trended on the Safety Parameter Display System (SPDS) primary graphic display for Reactor Building Conditions (RB)?

A. RB pressure, RCS pressure, RB flood level B. RB temperature, RB pressure, RB hydrogen concentration C. RB radiation levels, RB pressure, RB humidity D. RB flood level, RCS hot leg level, hydrogen concentration Answer B RB temperature, RB pressure, RB hydrogen concentration is the only correct combination of parameters. A and D are incorrect because no RCS parameters are displayed. C is incorrect because the display does not include RB humidity.

References 1105.014 (Rev 6, PC-1), Safety Parameter Display System Developed for the 1998 SRO exam.

Training Objectives: AA51002-041 10 QID: 0061, Rev date: 7/12/98 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X___

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 022.A4.05 022.A4.05 Importance Rating 3.8 3.8 Tier # 2 Group # 1 CFR references 41.7 /45.5 to 45.8 47

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 48 Given the following plant conditions:

- 100% power

- Condensate Pumps P-2A and P-2C are in service

- Startup Xfmr #2 Feed to A1 (A-111) is inadvertently closed.

What is the expected condensate pump response and necessary operator response to this condition?

A. Condensate Pump P-2A will trip, P-2B will auto start; verify MFW pump suction pressure recovers to normal.

B. Condensate Pump Start/Stop responses are not affected by Startup Transformer operations; no operator action is required.

C. Condensate Pump P-2C will trip leaving only P-2A running; trip reactor and carry out immediate actions of 1202.001, Reactor Trip.

D. Heater Drain Pump P-8A will trip causing P-2B to auto start; verify plant runs back to 40% of 902 MWe.

Answer C Condensate Pump P-2C will trip leaving only P-2A running; trip reactor and carry out immediate actions of 1202.001, Reactor Trip is correct.

B is incorrect. Startup #1 transformer does not affect the start/stop responses of the condensate pump, however, load shed features of Startup #2 transformer do affect the start/stop features of the condensate pumps. A is incorrect. Condensate pump P-2A remains in service if both P-2A and P-2C are running. Also the standby condensate pump will not auto start on load shed. D is incorrect. P-8A will trip due to load shed, however, the standby condensate pump will not auto start on load shed."

References STM1-32 Developed for A. Morris 98 RO Re-exam, QID: 0218.

Training Objective: AA51002-007: 26 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge ______

Comprehension or Analysis __X___

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 056.A2.04 056.A2.04 Importance Rating 2.6 2.8 Tier # 2 Group # 1 CFR references 41.5 / 43.5 / 45.3 / 45.13 48

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 49 Given:

- 100% power

- ICS in full automatic The CBOR places the ICS Delta T-Cold Hand Auto Station meter selection switch in "POS" (position). The meter reads 54%. What does this mean in terms of ICS control of main feed water?

A. The average of feedwater loop A and feedwater loop B demand is 54%.

B. Feedwater loop B demand is greater than feedwater loop A demand.

C. The feedwater loop B demand is being boosted by a 4 °F Delta T-Cold error.

D. Feedwater loop A demand is greater than feedwater loop B demand.

Answer D Feedwater loop A demand is greater than feedwater loop B demand. A reading

>50% indicates that loop A demand is > loop B demand, therefore D is the correct response.

A is incorrect because the meter does not indicate average demand, B is an opposite response, C applies to looking at the MV reading (for which it would still be incorrect).

References STM 1-64, Rev. 6, page 35, step 2.6.2. Developed for the 1998 RO/SRO Exam.

Selected for use in 2002 RO/SRO exam.

Training Objectives: ANO-1-LP-RO-ICS 11 QID: 0063, Rev date: 7/12/98 Question Source: Bank # __X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge ______

Comprehension or Analysis __X___

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 059.A3.07 059.A3.07 Importance Rating 3.4 3.5 Tier # 2 Group # 1 CFR references 41.7 / 45.5 49

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 50 Which of the following contains an OTSG that will have its EFW flowpath ISOLATED by EFIC vector module?

A. "A" = 585 psig, "B" = 495 psig B. "A" = 620 psig, "B" = 582 psig C. "A" = 475 psig, "B" = 565 psig D. "A" = 495 psig, "B" = 590 psig Answer:

B. "A" = 620 psig, "B" = 582 psig Notes:

EFIC Vector isolation occurs only when an OTSG is less than 600 psig or if both are less than 600, one OTSG is 100 psig less than the other. Only answer "B" contains conditions warranting Vector isolation.

References 1105.005, Rev. 027-00-0 Modified from QID #1530 for use in 2004 RO/SRO exam.

Training Objective: A1LP-RO-EFIC:46 Question Source: Bank # _______

Modified Bank # ___X___

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 061.A3.04 061.A3.04 Importance Rating 4.1 4.2 Tier # 2 Group # 1 CFR references 41.7 / 45.5 50

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 51 Which of the following must be performed to release T-16A contents with the Liquid Radwaste Process Monitor (RI-4642) inoperable?

A. Estimate radiation level every four hours during the release B. Have an independent sample obtained and analyzed prior to release C. Estimate flow rate at least once every three hours during release D. T-16A can NOT be released if RI-4642 is inoperable Answer B have an independent sample obtained and analyzed prior to release.

Answer "B" contains the requirement from Att. B1 of 1104.020. The other answers are incorrect.

References 1104.020, Rev. 041-03-0, Att. B1, step 2.8 Modified regular exambank QID #2765 for use in 2004 RO/SRO exam.

Question Source: Bank # _______

Modified Bank # ___X___

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 068.G2.1.23 068.G2.1.23 Importance Rating 3.9 4.0 Tier # 2 Group # 1 CFR references 45.2 / 45.6 51

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 52 Given:

- C-119A H2/O2 Analyzer is OOS with repairs on parts hold

- C-119 H2/O2 Analyzer is aligned to T-17

- T-18C Waste Gas Decay Tank is in service Chemistry has requested Operations to vent the makeup tank to raise hydrogen purity.

Which of the following best describes the proper H2/O2 Analyzer system operation during the makeup tank venting operations?

A. Makeup tank venting is not allowed unless both H2/O2 Analyzers are operable in accordance with Technical Specifications.

B. Keep C119 aligned to T-17 and commence makeup tank venting operations, align C119 to T-18C if high H2/O2 concentrations occur.

C. Align C119 to T-18C and commence makeup tank venting operations while monitoring for high H2/O2 concentrations.

D. Keep C119 aligned to T-17 and have chemistry sample T-18C every 15 mins when venting the makeup tank.

Answer:

B Keep C119 aligned to T-17 and commence makeup tank venting operations, align C119 to T-18C if high H2/O2 concentrations occur.

Notes:

Operating procedure requires at least one analyzer operable to continuously monitor H2/O2 concentrations. 1104.010, Hydrogen-Oxygen Analyzer System, limits and precautions state: If only one analyzer is operable, it shall monitor T-17 except when H2/O2 concentrations in T-17 reaches region B of Attachment A during compressor operation, then it shall monitor waste gas decay tank being filled.

References 1203.010, Rev. 007-03-0, 3.2.4 Caution History:

Developed for 1998 RO/SRO Exam.

Selected for use in 2004 RO/SRO exams.

Training Objectives: A1LP-WCO-GZ01:12 QID: 0067, rev date: 7/13/98 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 52

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Examination Outline Cross-reference:

Level RO SRO K/A # 071.A2.02 071.A2.02 Importance Rating 3.3 3.6 Tier # 2 Group # 1 CFR references 41.5 / 43.5 / 45.3 / 45.13 Question 53 How is it determined which pressurizer relief valve is in alarm?

A. The relief valve position indicator light on C-486 shows which PSV is open.

B. The K09 control room annunciator identifies which relief valve is open.

C. Red light on relief monitor on C-486 will flash on the relief that is open.

D. By checking the analog position indication and Hi-alarm lights on panel C-486.

Answer D By checking the analog position ind. and Hi-alarm lights on panel C-486.

"A" is incorrect because a valve open light does not exist on C-486. "B" is incorrect because a common annunciator is used for all pressurizer relief valves."C" is incorrect because the high alarm will be on for the relief valve that is open.

References 1105.013 Rev 6, 1203.012H Rev 029-02-0 Used in 1999 exam. Direct from ExamBank, QID# 1848 used in class exam Training Objectives: ANO-1-LP-RO-RCS: 17 QID: 0301, Rev Date: 9-5-99 Question Source: Bank # __X____

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 002.K6.12 002.K6.12 Importance Rating 3.0 3.5 Tier # 2 Group # 2 CFR references 41.7 / 45.7 53

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 54 The RCS is solid following an accident.

RCS pressure = 1700 psig.

RCS temperature is stable.

The operators bump an RCP and RCS temperature cooled down 4 degrees F in one minute.

How will RCS pressure respond to this transient?

A. Rise initially and then drop to 1600 psig.

B. Remain stable due to PZR heater operation.

C. Drop below the ESAS actuation setpoint.

D. Rise to greater than 1800 psig.

Answer C Drop below the ESAS actuation setpoint.

Notes:

When solid a 1 degree temperature change can cause a 100 psig pressure change, therefore on a 4 degree temperature drop, pressure will drop 400 psig. Thus the only correct answer is "c", where pressure drops below 1590 psig.

References 1202.011, Rev. 004-02-0, step 17.B History:

Modified from QID 0471 for 2004 RO exam Training Objectives: A1LP-RO-EOP02:10 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 006.K5.05 006.K5.05 Importance Rating 3.4 3.8 Tier # 2 Group # 2 CFR references 41.5 / 45.7 54

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 55 Given:

- Reactor has tripped from 80% power.

- A malfunction of Rapid Feedwater Reduction (RFR) has caused MFW to overfeed both OTSGs.

- All PZR heater banks are in AUTO.

- No other operator actions are taken.

PZR heaters do NOT energize because:

A. The pressurizer spray valve is open.

B. The PORV is open.

C. AN insurge from the pressurizer has occurred.

D. An outsurge from the pressurizer has occurred.

Answer D An outsurge from the pressurizer has occurred (the low level interlock at 55 is met).

References STM 1-03, Rev 9, page 12-13.

Question Source: Bank # _______

Modified Bank # _______

New __X____

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 010.K4.02 010.K4.02 Importance Rating 3.8 4.1 Tier # 2 Group # 2 CFR references 41.7 55

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 56 Given:

- 100% power

- LT-1001, Pressurizer Level Transmitter, is selected for control.

Which of the following statements describe the plant response to LT-1001 failing LOW (assume no operator action)?

The pressurizer level control valve, CV 1235:

A. Position REMAINS THE SAME, actual pressurizer level and RCS pressure GOES UP B. Opens, actual pressurizer level and RCS pressure GOES UP C. Position REMAINS THE SAME, actual pressurizer level and RCS pressure GOES DOWN D. Closes, actual pressurizer level GOES DOWN and pressurizer heaters turn off Answer B Opens, actual pressurizer level and RCS pressure GOES UP.

References STM 1-03, rev 9, page 11-14.

From INPO BW bank, Davis-Besse June 1996, modified stem and distractors to fit ANO application.

Question Source: Bank # _______

Modified Bank # ___X___

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 011.K3.02 011.K3.02 Importance Rating 3.5 3.7 Tier # 2 Group # 2 CFR references 41.7 / 45.6 56

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 57 Given:

-"A" RPS has been placed in Channel Bypass due to RCS pressure transmitter (PT-1021) failed low.

-Plant is at 100% power and stable

-A lightning strike by the Reactor Building has resulted in the trip of 120V Vital AC distribution panel RS-3.

What is the status of the reactor and the RPS following the trip of RS-3?

A. Reactor is at 100% power with one channel of RPS tripped B. Reactor has tripped due to 1 channel of RPS tripped C. Reactor has tripped due to 2 channels of RPS tripped D. Reactor is at 100% power with no RPS channels tripped.

Answer A is the correct answer, Reactor is at 100% power with one channel of RPS tripped.

References STM 1-63, RPS, REV 5, page 16.

ANO, Unit 1 R 12/10/1998 Question Source: Bank # __X___

Modified Bank # ______

New ______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 012.K2.01 012.K2.01 Importance Rating 3.3 3.7 Tier # 2 Group # 2 CFR references 41.7 57

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 58 Given:

- A Large break LOCA has been in progress for 1 minute.

- RCS pressure at 100 psig.

- RB pressure is 48 psig and rising.

- Annunciator K11-C6, RB SPRAY P35A ES FAILURE, is in alarm.

What are the immediate concern(s) for this alarm?

A. P35A spray pump has a high motor winding temperature >300 degrees F.

B. P35A is not supplying spray flow, need to ensure P35B has started and has

>1050gpm flow.

C. P35A NaOH Addition valve CV-1616 is shut while ES signal is present.

D. P35A is supplying too much spray flow, need to take manual control of RB spray block valve (CV-2401) and throttle flow to <1050gpm.

Answer B P35A is not supplying spray flow, need to ensure P35B has started and has

>1050gpm flow.

References 1203.012J, annunciator K11 corrective actions, page 6, 25, 29.

STM 1-65, rev 3 Modified from ANO bank, QID 0401.

Question Source: Bank # _______

Modified Bank # __X____

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 4 Examination Outline Cross-reference:

Level RO SRO K/A # 026.G2.4.4 026.G2.4.4 Importance Rating 4.0 4.3 Tier # 2 Group # 2 CFR references 41.10 / 43.2 / 45.6 58

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 59 Given:

- Unit 1 is in Mode 5.

- All Reactor Building hatches are closed.

- Commencing a Reactor Building Purge per 1104.033, Attachment B.

Why is VEF-15, RB Purge Exhaust Fan, handswitch placed in AUTO prior to starting VSF-2, RB Purge Supply Fan?

A. VEF-15 must be in AUTO for VSF-2 to start.

B. To ensure SPING-1 is properly aligned for monitoring the exhaust duct.

C. To prevent pressurizing containment if VEF-15 fails to start when VSF-2 starts.

D. To ensure VEF-15 starts prior to VSF-2 starting.

Answer C is correct, To prevent pressurizing containment if VEF-15 fails to start when VSF-2 starts because of the interlock between the supply and exhaust fans such that when the supply fan is started the exhaust fan will automatically start. "A" is incorrect because VSF-2 can be started in "override". "B" is incorrect because the SPING suction valve is in the exhaust duct but is not interlocked thru the hand switch for the fan. "D" is incorrect, in "AUTO" VEF-15 starts when VSF-2 is started, not prior to.

References Stm 1-9, Reactor Building Ventilation, rev 3, page 10.

1104.033 Reactor Building Ventilation Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 029.K4.02 029.K4.02 Importance Rating 2.9 3.1 Tier # 2 Group # 2 CFR references 41.7 59

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 60 The WCO reports the Spent Fuel Pool level is +1.5 ft.

What problem could this level pose for Spent Fuel Pool operations or fuel handling in the SFP?

A. SFP minimum water temperature limit will be exceeded.

B. SFP ventilation ducts will be flooded.

C. Area dose rates will rise.

D. SFP must be sampled within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Answer B is correct, SFP ventilation ducts will be flooded. Answer B is correct since normal level is 0 ft with a maximum allowable level of +1.0 ft which prevents water carryover into the ventilation ducts.

Answer A is incorrect because this answer is associated with SF cooling capacity which is largely unaffected by pool level. Answer C is incorrect since this problem is associated with a low water level. Answer D is incorrect but plausible since the time for sampling is correct but level is greater than maximum allowed.

References STM 1-7, Rev. 2 Ch. 1, Spent Fuel Cooling System, page 2 "Developed for 1999 exam. Modified for 2001 RO/SRO Exam."

Training objectives: ANO-1-LP-RO-SFC:2 QID: 0312, Rev Date: 11/16/00:

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 033.K3.01 033.K3.01 Importance Rating 2.6 3.1 Tier # 2 Group # 2 CFR references 41.7 / 45.6 60

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 61 Given:

- Plant tripped from 95% power due to a rapid loss of condenser vacuum.

- Condenser vacuum is at 15 inches Hg.

If the pressure control setpoint for both of the Atmospheric Dump Valves (ADVs) was set at the MAXIMUM value by mistake, which one of the following consequences may occur?

A. The ADV's will maintain a LOWER main steam pressure and prevent lifting of the Main Steam Safety Valves.

B. Main Steam Safety Valves may NOT reseat after operation due to the HIGHER main steam pressure being maintained by the ADV's.

C. The ADV's will remain ISOLATED and the Main Steam Safety Valves will provide main steam pressure control.

D. Main Steam Safety Valves will cycle LESS frequently during the event, minimizing the probability of a release.

Answer B is correct. Main Steam Safety Valves may NOT reseat after operation due to the HIGHER main steam pressure being maintained by the ADV's.

References STM 1-15, rev 7.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 035.K6.02 035.K6.02 Importance Rating 3.1 3.5 Tier # 2 Group # 2 CFR references 41.7 / 45.7 61

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 62 Given:

- A plant startup is in progress with the reactor critical below the point of adding heat.

- "B" OTSG Turbine Bypass Valve (CV-6688) fails full OPEN and is unable to be closed with the handjack.

- Tave 526 degrees and dropping

- Pressurizer level 205 inches and dropping

- RCS pressure 2120 psig and dropping What is the proper course of action?

A. Initiate MSLI for the 'B' SG and maintain the reactor critical using 'A' SG TBV to control RCS temperature and pressure.

B. Continue the reactor startup maintaining startup rate <1 DPM while continuing to monitor primary and secondary plant parameters.

C. Go directly to 1203.003, OVERCOOLING for actions to mitigate the oversteaming of the 'B' SG.

D. Trip the reactor and follow the guidance of 1202.001 REACTOR TRIP.

Answer D is correct, Trip the reactor and follow the guidance of 1202.001 REACTOR TRIP.

A is incorrect. You would not want to isolate a SG and maintain the reactor critical.

B is incorrect. With the reactor below the point of adding heat with a stuck open TBV, this would not be possible. C is incorrect. This will be the ultimate EOP that you will end up in, however, it is necessary to trip the reactor first and progress through the Reactor Trip EOP.

References 1102.008 (Rev 018-00-0), Approach to Criticality, page 4.

Developed for use in A. Morris 98 RO Re-exam, Used in 2001 RO/SRO Exam ANO Bank, QID 0202, 11/23/98,Training Objective: AA51002-008:8.9 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 039.A2.04 039.A2.04 Importance Rating 3.4 3.7 Tier # 2 Group # 2 CFR references 41.5 / 43.5 / 45.3 / 45.13 62

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 63 Given:

- Plant is at 100% power.

- Condenser vacuum is 24.9 in Hg and slowly trending down.

What action would be taken when condenser vacuum reaches ~24.5 in Hg?

A. Trip the operating MFW Pump Turbine.

B. Adjust programmable alarm setpoint to ~23 in Hg C. Continue power operations in accordance with AOP 1203.016 for Loss of Condenser Vacuum.

D. Trip the Reactor and the Main Turbine.

Answer D is correct, Trip the Reactor and the Main Turbine. A manual trip of the turbine is required when vacuum reaches 24.5 in Hg when turbine load is > 270 Mwe.

Answer C is incorrect, continued operation in this condition can lead to turbine blading damage. Answer A is incorrect, this action is not taken until vacuum drops to ~5"" Hg.

Answer B is incorrect, this action would be taken at 25 in Hg (not 23 in Hg) if operating

>270 Mwe to alert operator of approaching trip criteria of 24.5 in Hg.

References 1203.016 rev. 011-00-0, Loss of Condenser Vacuum, page 1 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 055.K3.01 055.K3.01 Importance Rating 2.5 2.7 Tier # 2 Group # 2 CFR references 41.7 / 45.5 63

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 64 The CRS would like you to evaluate load on several buses in accordance with Procedures 1107.001 and 1107.002 for ES and non-ES electrical systems. In order to perform the estimate of loads, you will need to use the ammeters provided for various buses on the primary side of their respective 4160v transformers. Some of these ammeters are:

A. A3 to B3, A4 to B6, and A1 to B3 B. A3 to B5, A4 to B6, and A1 to B3 C. A3 to B5, A2 to B6, and A1 to B3 D. A3 to B3, A4 to B6, and A1 to B5 Answer B is correct, A3 to B5, A4 to B6, and A1 to B3. All other combinations are incorrect.

References STM 1-32, rev 22, page 106, 107, and 116.

OP 1107.001, change 060-03-0, and OP 1107.002 change 019-05-0.

Question Source: Bank # _______

Modified Bank # _______

New __ X____

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 4 Examination Outline Cross-reference:

Level RO SRO K/A # 062.A3.01 062.A3.01 Importance Rating 3.0 3.1 Tier # 2 Group # 2 CFR references 41.7 / 45.5 64

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 65 Given:

- An electrical fault has made the normal supply to D11 inoperable.

- D11 is being powered from it's emergency supply.

Which of the following is a concern in this abnormal configuration?

A. The discharge rate of the battery cannot be monitored in this configuration.

B. The static guard circuit is disabled and could cause inadvertent grounds on the bus.

C. A single fault may disable both trains of safety equipment such as EDGs and ES pumps.

D. It will prevent EDG #2 from starting, should it be required in an emergency situation.

Answer C is correct. A single fault may disable both trains of safety equipment such as EDGs and ES pumps. All others are incorrect distracters for this procedure.

References 1107.004, Section 5.2, page 6, change 012-07-0.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 063.A4.01 063.A4.01 Importance Rating 2.8 3.1 Tier # 2 Group # 2 CFR references 41.7 / 45.5 to 45.8 65

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 66 Given:

- Plant is at 100% power.

- Surveillence test of EDG #1 is in progress.

- EDG # 1 is paralleled to the grid and loaded to 2750 KW.

A grid disturbance causes a complete loss of off-site power.

Which of the following responses should be expected/verified?

A. A1 to A3 tie breaker (A-309) opens, EDG#1 output breaker (A-308) remains closed.

A2 to A4 tie breaker (A-409) opens, EDG#2 starts and it's output breaker (A-408) closes.

B. A1 to A3 tie breaker (A-309) remains closed, EDG#1 output breaker (A-308) opens.

A2 to A4 tie breaker (A-409) opens, EDG#2 starts and it's output breaker (A-408) closes.

C. A1 to A3 tie breaker (A-309) remains closed, EDG#1 output breaker (A-308) opens.

A2 to A4 tie breaker (A-409) remains closed, EDG#2 starts and it's output breaker (A-408) remains open.

D. A1 to A3 tie breaker (A-309) remains closed, EDG#1 output breaker (A-308) remains closed.

A2 to A4 tie breaker (A-409) remains closed, EDG#2 starts and it's output breaker (A-408) remains open.

Answer A is correct, A1 to A3 tie breaker (A-309) opens, EDG#1 output breaker (A-308) remains closed. A2 to A4 tie breaker (A-409) opens, EDG#2 starts and it's output breaker (A-408) closes.

References 1104.036, Section 16.0.

Question Source: Bank # _______

Modified Bank # _______

New __X____

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO 66

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM K/A # 064.A2.16 064.A2.16 Importance Rating 3.3 3.7 Tier # 2 Group # 2 CFR references 41.5 / 43.5 / 45.3 / 45.13 Question 67 Given:

- LOCA inside the Reactor Building.

- RE-3814, Service Water Loop I Radiation Monitor alarms.

- SW Loop II indications are normal.

Which of the conditions below when combined with the above condition would make it necessary to isolate the "A" & "B" RB Emergency Coolers?

A. Loop II Service Water monitor is also in alarm.

B. Instrument Air is lost.

C. Discharge Flume monitor is also in alarm.

D. RB area monitors are also in alarm.

Answer C Discharge Flume monitor is also in alarm is the correct answer. Since Loop II is OK, then the confirmation of an actual release via the Discharge Flume monitor necessitates the isolation of Loop I. A would not corroborate a problem with Loop I coolers and indicate a need to isolate the Loop I coolers. B would have no affect on the ability to isolate or determine the need to isolate Loop I. D sounds logical but the RB area monitors would be in alarm anyway due to the LOCA.

References 1203.012I [Rev 37]

Taken from Exam Bank QID # 2571 (modified), Training Obj: ANO-1-LP-RO-RMS: 2 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 073.K1.01 073.K1.01 Importance Rating 3.6 3.9 Tier # 2 Group # 2 CFR references 41.2-41.9 / 45.7-45.8 67

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 68 During the performance of a plant shutdown, cooldown and depressurization of the RCS, the following valves are required to be closed at one point during these evolutions:

- NaOH to P-34A/P-35A Suction (CA-61)

- NaOH to P-34B/P-35B Suction (CA-62)

- NaOH Storage Tank (T-10) Outlet (CA-49)

What is the reason for this action?

A. Prevent contamination of the NaOH Tank from RCS back leakage during decay heat removal operations.

B. Prevent NaOH from leaking into the DH system and causing chemical contamination of the RCS.

C. To prevent NaOH from being sprayed into containment when access is open to RB.

D. Prevent overpressurizing the NaOH tank outlet piping from backleak during decay heat removal operations.

Answer B Prevent NaOH from leaking into the DH system and causing chemical contamination of the RCS. A and D are incorrect. The normal pressures are such that leakage will go into the decay heat removal system instead of into the NaOH system.

B is correct. The head of the T-10 is sufficient to cause potential leakage into the decay heat system which goes into the RCS. C is incorrect. The NaOH MOV's are deenergized to accomplish this.

References 1102.010 (Rev 49) Developed for use in A. Morris 98 RO Re-exam K1.01 Training Objectives: AA51001-007 7.4 QID:0209, Rev Date: 11/23/98 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 027.K1.01 027.K1.01 Importance Rating 3.4 3.7 Tier # 2 Group # 3 CFR references 41.2 to 41.9 / 45.7 to 45.8 68

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 69 Given:

-A LOCA has occurred.

-Post-LOCA Reactor Building pressure is 26 psia.

-Pre-LOCA RB temperature was 90 degrees F.

What power setting is required when placing hydrogen recombiner M55A in service?

A. 68 KW B. 69 KW C. 70 KW D. 71 KW Answer:

C is correct, 70 KW. Answer "C" is correct from the graph, the other answers are possible misuses of the graph if correct parameters are not applied.

References 1104.031, Rev. 014-02-0 Training Objectives: A1LP-RO-RBVEN:14 MUST SUPPLY STUDENT WITH 1104.031 ATT. B Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 028.A2.01 028.A2.01 Importance Rating 3.4 3.6 Tier # 2 Group # 3 CFR references 41.5 / 43.5 / 45.3 / 45.13 69

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 70 The unit is in a refueling outage. Preparations are being made to fill the Fuel Transfer Canal to remove the core support assembly.

- The fill will be conducted using only P-40A Spent Fuel Cooling Pump.

- P-40A discharge flow rate is 1000 gpm.

- The initial level in the Fuel Transfer Canal is 396.5 ft.

- Total Refueling Canal volume is 21,953 gal/ft.

(includes Spent Fuel Pool, Cask Pit, Tilt Pit, Refueling Canal, and Incore Instrument Tank)

1. The minimum height required in the Fuel Transfer Canal when lifting or pulling the core support assembly is 400 ft. What is the basis for this limit?
2. Estimate how long will it take to fill the Fuel Transfer canal to the minimum level based on the given conditions?

A. 1. To minimize radiation exposure to personnel while lifting or pulling the core support assembly.

2. ~66 minutes B. 1. To ensure adequate water volume remains in the Fuel Transfer Canal after lifting or pulling the core support assembly.
2. ~77 minutes C. 1. To minimize radiation exposure to personnel while lifting or pulling the core support assembly.
2. ~77 minutes D. 1. To ensure adequate water volume remains in the Fuel Transfer Canal after lifting or pulling the core support assembly.
2. ~66 minutes Answer C is correct, C. 1. To minimize radiation exposure to personnel while lifting or pulling the core support assembly.
2. ~77 minutes.

Per Procedure, the height must be at least 400 feet to minimize radiation exposure.

Time for fill = (21,953 gal/ft x 3.5 ft.)/1000 = 76.8 minutes.

References Procedure 1102.015, Filling the Fuel Transfer Canal, change 021-06-0, page 6 and 12.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

70

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Comprehension or Analysis __X__

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 034.A1.02 034.A1.02 Importance Rating 2.9 3.7 Tier # 2 Group # 3 CFR references 41.5 / 45.5 Question 71 Given:

- During a normal startup with reactor power at 10%.

- Main Turbine is in Operator Auto.

- A turbine bypass valve (TBV) fails open.

- The OTSG pressure drops several psig.

Steam header pressure will initially lower, with NO OPERATOR ACTION, what causes steam header pressure to recover?

A. TBVs will compete with turbine governor valves for control of steam header pressure.

B. Primary Coolant Temperature dropping will raise reactor power because of moderator temperature coefficient.

C. Turbine governor valves will modulate to maintain header pressure at 895 psig.

D. The Primary Coolant Pressure drop will raise reactor power because of the moderator pressure coefficient.

Answer B Primary Coolant Temperature dropping will raise reactor power because of moderator temperature coefficient, is the correct answer. A and C are incorrect because prior to placing the turbine in Integ Cont mode, the governor valves are solely controlled by the operator. D is incorrect because pressure has an insignificant effect at power on reactivity.

References STM 1-64, ICS, Revision 7, page 29-30.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

71

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 041.K5.07 041.K5.07 Importance Rating 3.1 3.6 Tier # 2 Group # 3 CFR references 41.5 / 45.7 72

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 72 The main turbine trips from 20% RTP.

Which ONE of the following combinations represents the expected normal responses of the following primary plant parameters during the FIRST 30 SECONDS of the trip?

Neutron Error Tave NR Pressure PZR Level A. Increases Increases Increases Increases B. Increases Increases Decreases Increases C. Decreases Decreases Decreases Decreases D. Decreases Increases Increases Increases Answer "A" is correct. Neutron error becomes a large positive value while Tave increases because of the large heat generation that initially is not removed fast enough to prevent the increase in Tave. Since Tave increases, PZR level will increase (insurge) and this squeezes the bubble, causing NR Pressure to increase as well (making Decreases, Increases, Increases, Increases the correct answer).

References STM 1-3, rev 9, RCS.

OP1203.018 turbine trip below 43% power.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 045.A1.05 045.A1.05 Importance Rating 3.8 4.1 Tier # 2 Group # 3 CFR references 41.5 / 45.5 73

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 73 Following a reactor trip, ES channels 1 through 4 have actuated.

While performing RT-10 to verify proper ES actuation, the CBOT notes the following at C18:

- P4A to P4B Crosstie (CV-3646) has no position indication.

- P4B to P4C Crosstie (CV-3640) has no position indication.

The CBOT suspects that this is due to a loss of power to MCC load center _____ on the

_____ train.

A. B62 /Green B. B52 / Green C. B62 / Red D. B52 / Red Answer D, B52 on Red train is correct. Others are incorrect combinations and choices.

References STM 1-42, Service and Auxiliary Cooling Water, rev 7, page 18.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 076.K2.08 076.K2.08 Importance Rating 3.1 3.3 Tier # 2 Group # 3 CFR references 41.7 74

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 74 Which of the following describes the normal alignment (mode of operation) of the Instrument Air system?

A. Unit 1 and Unit 2 IA systems cross-connected through 2" line 2CV-3015, both units air compressors carrying a portion of the IA loads.

B. Unit 1 IA compressors in Auto with system load carried by Unit 2 IA compressors with system cross-connected via the 3" line 2CV-3004 open.

C. Unit 2 IA compressors in Auto with system load carried by Unit 1 IA compressors with system cross-connected via the 2" 2CV-3015 & 3" line 2CV-3004 open.

D. Unit 1 and Unit 2 IA system are normally split out and only cross-connected during a loss of IA event.

Answer A is correct, Unit 1 and Unit 2 IA systems cross-connected through 2" line 2CV-3015, both units air compressors carrying a portion of the IA loads.

References STM 1-48, and 1104.024, Instrument Air System.

Direct from regular exam bank QID# 4462, Training Obj: ANO-1-LP-RO-AOP:3 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 078.G2.1.28 078.G2.1.28 Importance Rating 3.2 3.3 Tier # 2 Group # 3 CFR references 41.7 75

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 75 Following an ESAS actuation the CBOT is directed to perform RT-10 to verify proper actuation. The RT instructs you to verify each component properly actuated on C16, C18, and C26.

How is this accomplished for containment isolation valves?

A. Verify all containment isolation valve ""closed"" indication lights are illuminated.

B. Compare containment isolation valve positions to positions listed on chart in RT-10.

C. All containment isolation valves have the same color coding for ease of verification.

D. Verify containment isolation valves are in position marked with black tape background.

Answer D Verify containment isolation valves are in position marked with black tape background, is the correct response. A black tape background identifies the proper actuation position of ES components.

A is incorrect because not all containment penetration valves will be closed. B is incorrect because there is no chart of valve positions in RT-10. D is incorrect because color-coding of panel does not identify proper actuation position.

References 1015.018 Plant Labeling, change 006-03-0, page 20. Step 7.5.1 1202.012 Repetitive Tasks, change 004-02-0, page 17 step F Developed for 1998 RO Exam. Selected for use in 2002 RO/SRO exam.

Training Objectives: ANO-1-LP-RO-EOP10 15.5 QID: 0104, Rev date: 7/14/98 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 103.A3.01 103.A3.01 Importance Rating 3.9 4.2 Tier # 2 Group # 3 CFR references 41.7 / 45.5 76

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM NOTE: Questions76-100 are RO Only questions and are included in the RO Exam.

Question 101 A LOCA has occurred and the following conditions exist:

- Core Exit Thermocouples = 800 degrees F (average) and rising.

- RCS pressure = 1400 psig and steady.

- ICC subcooling margin is INOPERABLE.

- RCPs are NOT running.

Which EOP should be performed to mitigate this event?

A. 1202.001, Reactor Trip B. 1202.005, Inadequate Core Cooling C. 1202.010, ESAS D. 1202.004, Overheating Answer B is correct, 1202.005, Inadequate Core Cooling. Region 3 is applicable for the conditions given.

Answer "A" is incorrect, although 1202.001 will be entered initially, it will not be used to mitigate this event. Answer "C" is incorrect, although ESAS systems will have actuated, ICC conditions exist. Answer "D" is incorrect, Overheating entry conditions are met but the ICC procedure is the governing document.

References 1202.005, Inadequate Core Cooling, change 004-00-0, page 1 120.013, EOP Figures, Fig. 4, Rev. 3 Training Objectives: A1LP-RO-EOP05 11 Direct from regular exambank QID 3008.

Selected for use in 2002 RO/SRO exam.

Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 074.EK1.01 Importance Rating 4.7 Tier # 1 Group # 1 CFR references 41.8 / 41.10 / 43.5 / 45.3 77

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 102 ESAS has actuated.

A4 bus is locked out and cannot be re-energized.

LPI/HPI flow rates for the past twenty-five minutes have been as follows:

- "A" LPI flow--3300 gpm

- "A" HPI pump flow throttled to 100 gpm through CV-1220 Which of the following actions are required per the ESAS EOP for these conditions?

A. Restore full HPI flow on "A" HPI pump.

B. Swap to RB sump recirculation.

C. Energize bus B-6 from bus B-5.

D. Secure the "A" HPI pump.

Answer:

D is correct since LPI flow has been greater than 3200 gpm for greater than 20 minutes.

Answer "A" is incorrect, this action would only be taken if LPI flow was inadequate.

Answer "C" is incorrect, this would help to restore electrical alignment but is incorrect for the given conditions. Answer "B" is correct for BWST less than 6 ft. but is not a specific required action for the given conditions.

References 1202.010, Rev. 005-01-0, steps 15 & 16 New for use on 2004 SRO exam.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # 011.EA2.11 Importance Rating 4.3 Tier # 1 Group # 1 CFR references 43.5 / 45.13 78

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 103 What action is required upon receipt of Liquid Radwaste Process Monitor (RI-4642) high alarm?

A. Start another circ water pump to raise dilution flow.

B. Verify no release in progress at Discharge Flow to Flume.

C. The WCO must be contacted to manually stop the release.

D. Have chemistry sample discharge flume for radionuclides.

Answer B Verify no release in progress at Discharge Flow to Flume, is the correct answer (verification that the release was automatically terminated when the rad monitor alarmed.)

"A" may raise dilution flow but is an incorrect response, normally all CW pumps are running anyway. "C" is incorrect, the release is automatically terminated upon closure of CV-4642 by RI-4642. D is incorrect, this will be a waste of time.

References 1203.007, Rev. 8 "Used in 1999 exam.

Direct from ExamBank, QID#1725" Training Objectives: ANO-1-LP-RO-AOP: 3 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # 000059.AK3.04 Importance Rating 4.3 Tier # 1 Group # 1 CFR references 41.5, 41.10 / 43.4 / 43.5 45.6 / 45.13 79

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 104 A fire in the Cable Spreading Room has occurred. Alternate Shutdown, 1203.002, is in progress.

Which monitoring system has indications that will NOT be affected by this fire?

A. Plant Monitoring System B. Plant Data Server C. Safety Parameter Display System D. Dasey Panel Answer C Safety Parameter Display System Only answer "C" has instrumentation that will not be affected by a fire in the cable spreading room, all of the other choices contain cables that are routed through this area.

References 1203.002, Rev. 015-06-0, Att. 9 step 2.5 New, developed for the 2004 SRO exam, QID: 0478 Training Objectives: A1LP-RO-ALTSD Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2.5 Examination Outline Cross-reference:

Level RO SRO K/A # 000067.AA2.17 Importance Rating 4.3 Tier # 1 Group # 1 CFR references 43.5 / 45.13 80

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 105 Given:

- Unit 1 is in the EOP for Inadequate Core Cooling, 1202.005.

- Region 4 of Figure 4 has been entered.

- Fuel damage is suspected.

Which of the following will result in HIGHER radiation exposures to personnel in the Aux Building?

A. Throttling RB spray before initiating sump recirculation B. Initiating long-term cooling with DHR pumps C. Aligning Pressurizer AUX spray to LPI system prior to initiating sump recirculation D. Isolating Letdown by closing letdown orifice block (CV-1222)

Answer B is correct. A, C, and D reduce exposure levels.

References 1202.005 Inadequate Core Cooling, change 004-00-0, 1203.019 High Activity in Reactor Coolant, change 011-01-0.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unknown Examination Outline Cross-reference:

Level RO SRO K/A # 000076.AK3.06 Importance Rating 3.8 Tier # 1 Group # 1 CFR references 41.8 / 41.10 / 43.4 / 43.5 / 45.3 81

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 106 Given:

- Reactor tripped due to loss of both Main Feedwater Pumps.

- Annunciator K02-B6, A3 L.O. RELAY TRIP, is in alarm.

- Steam Driven EFW Pump, P-7A, is tagged out and disassembled for corrective maintenance.

- OTSG levels are at 15 inches and slowly dropping.

Which of the following actions should be performed for the above conditions?

A. Take manual control of the Electric EFW Pump, P-7B, flow control valves and control OTSG levels at 20 to 40 inches.

B. Start Auxiliary Feedwater Pump, P-75, and control OTSG levels at 20 to 40 inches using the Startup Control Valves.

C. Close the MFW Isolation Valves to prevent feeding with a Condensate Pump and allow the OTSGs to boil dry.

D. Lower OTSG pressure to feed the OTSGs using a Condensate Pump to establish primary to secondary Answer B Start Auxiliary Feedwater Pump, P-75, and control OTSG levels at 20 to 40 inches using the Startup.

The initial conditions of the question establish a loss of MFW and EFW following a reactor trip which should be recognized as an entry condition to the Overheating EOP.

Answer (b) is the correct response in accordance with 1202.004, Overheating. Since EFW failed to actuate due to the Steam Driven Pump being OOS and no electrical power available to the Electric EFW Pump, contingency actions allow for starting of the Auxiliary Feedwater Pump, P-75, if OTSG level is >20 inches OR is still dropping. A is incorrect since no power is available to P-7B with the A3 bus lockout relay tripped. C and D are incorrect since P-75 is available and OTSG level is still dropping.

References 1202.004, Rev. 004-01-0, step 3, cont. A Training Objectives: A1LP-RO-EOP04: 3 QID: 0009, Rev date: 10/7/03 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 4 82

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Examination Outline Cross-reference:

Level RO SRO K/A # E04.EA2.2 Importance Rating 4.4 Tier # 1 Group # 2 CFR references 43.5 / 45.13 Question 107 During core offload in a refueling outage, a Spent Fuel Handling Machine (SFHM) operator is moving an irradiated fuel assembly to it's designated storage location in the Spent Fuel Pool (SFP).

Due to a limit switch failure, the bridge makes contact with the SFP level transmitter (LI-2004) on the East wall of the SFP. This also results in the fuel assembly making contact with the wall. LI-2004 fails high and the SFHM operator reports that no bubbles can be seen emerging from the fuel assembly. The SFP Area Radiation Monitor (RE-8009) readings are normal.

What action should be taken?

A. Enter LCO 3.7.13 for SFP level indication B. Enter LCO 3.9.6 for Refueling Canal Water Level C. Enter AOP 1203.042 Refueling Abnormal Operation D. Enter LCO 3.7.13 for SFP level indication and AOP 1203.042 Refueling Abnormal Operation Answer C is correct. Enter AOP 1203.042 Refueling Abnormal Operation. 1203.042 entry conditions include: Failure of electrical and/or mechanical interlocks on fuel handling equipment which may have caused damage to a spent fuel assembly. "A" and "B" are incorrect because these LCO's refer to water level and not level instrumentation. "D" is a plausible incorrect procedure reference.

References 1203.042 Refueling Abnormal Operation, STM 1-51-2 (Rev 4), and TS LCO 3.7.13.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = unknown Examination Outline Cross-reference:

83

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Level RO SRO K/A # 000036.AA2.02 Importance Rating 4.1 Tier # 1 Group # 3 CFR references 43.5 / 43.7 / 45.13 Question 108 A large break LOCA is in progress.

- RCS pressure is ~ 25 psig.

- RB pressure is 45 psia and trending down.

- Shift to RB Sump Suction has just been completed.

Subsequently, annunciator K11-C7, ""RB SPRAY P35B ES FAILURE"" alarms.

Which of the following actions should be taken?

A. Close Decay Heat Supply to Makeup Pump Suction CV-1276.

B. Establish maximum flow through ""A"" RB Spray Pump.

C. Maintain ""A"" RB Spray flow at 1050 to 1200 gpm.

D. Throttle ""B"" LPI Pump flow to 2800 gpm.

Answer C is correct, Maintain ""A"" RB Spray flow at 1050 to 1200 gpm. The indications given are that of ""A"" RB Spray pump suction vortexing on the RB sump.

Answer "A is incorrect, Spray flow will still be too high to alleviate vortexing.

Answer "B" is incorrect, although damage could occur if conditions are maintained, throttling will correct problem and it is desirable to maintain RB Spray flow.

Answer "D" is incorrect, throttling LPI flow to the minimum value could lessen vortexing, no procedural guidance of this kind exists. At one time it was discussed to throttle both RB Spray and LPI flow after swap to RB Suction but only Spray flow is throttled.

References 1202.010, ESAS, change 005-01-0, page 11, step 3 Created for 2002 SRO exam, QID 0454 Training Objectives:A1LP-RO-EOP10 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2 Examination Outline Cross-reference:

84

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Level RO SRO K/A # 026.A2.04 Importance Rating 4.2 Tier # 2 Group # 1 CFR references 41.5 / 43.5 / 45.3 / 45.13 Question 109 On New Year's Eve night shift, the on-duty CRS has a heart attack and must be transported to St. Mary's at 0210.

What is the latest time at which a replacement CRS must be in the Control Room BEFORE the requirement of 1015.001, Conduct of Operations, is violated?

A. 0400 B. 0500 C. 0600 D. 0300 Answer A 0400, is the correct answer since the maximum time the shift can be below the minimum complement is two hours.

Answers B, C, D are one hour increments from the correct answer.

References 1015.001, Rev. 054-02-0, Conduct of Operations, page 33, step 10.3 New created for 2001 SRO Exam.

Selected for use in 2002 SRO exam. 2.1.4 Training Objectives: ANO-S-LP-SRO-ADMIN:3 QID: 0407, Rev Date: 12/1/00 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # G2.1.4 Importance Rating 3.4 Tier # 3 Group # 1 CFR references 41.10 / 43.2 85

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 110 It is 0300 on Saturday morning. A Unit 1 transient started about 3 minutes ago.

The Unit 1 Shift Manager has been injured and rendered unconscious. Conditions are in progress that meet the criteria for declaration of Site Area Emergency.

The person responsible for declaring the SAE and for Emergency Direction and Control is:

A. The Unit 1 Control Room Supervisor.

B. The Unit 2 Shift Manager.

C. The Unit 1 Shift Engineer.

D. The EOF Director (by phone).

Answer:

A is correct, The Unit 1 Control Room Supervisor.

The person responsible for declaration of an Emergency Class is the Shift Manager or the TSC/EOF director if they have responsibility for Emergency Direction and control, and this task can not be delegated. The CRS must assume the Shift managers duties in his absence. This makes "B" the correct answer.

References 1015.001 REV. 054-08-0, step 6.2 1903.010 REV. 037-02-0, step 5.2 New QID#2805 for 2004 SRO exam Training Objectives: ASLP-RO-EPLAN: 1 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2.5 Examination Outline Cross-reference:

Level RO SRO K/A # G2.1.6 Importance Rating 4.3 Tier # 3 Group #

CFR references 43.5 / 45.12 86

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 111 Plant conditions:

-RCS temperature: 615 degrees slowly rising

-RCS pressure: 2400 psig slowly dropping

-ERV: opened in AUTO

-OTSG shell temperature: 552 degrees

-OTSG levels: 20 inches, steady Which of the following actions are required?

A. Initiate HPI Cooling per RT 4 B. Close ERV isolation valve (CV-1000)

C. Select the reflux boiling setpoint D. Initiate Full HPI per RT 3 Answer:

A Initiate HPI Cooling per RT 4.

Reference:

1202.004, Rev. 004-01-0 New QID #3314 for SRO 2004 Exam.

Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # G2.1.7 Importance Rating 4.4 Tier # 3 Group # 1 CFR references 43.5 87

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 112 Why are the Axial Power Imbalance Operating limits NOT applicable below 40% power?

A. Lower power levels cause a rod ejection accident to be of no concern.

B. Lower power levels always result in a more even flux distribution.

C. Lower power levels cause the Incore Detectors to be inaccurate.

D. Lower power levels will not cause sufficiently large linear heat rates.

Answer:

D is correct, Lower power levels will not cause sufficiently large linear heat rates.

Per T.S. the combination of AXIAL POWER IMBALANCE with the maximum allowable THERMAL POWER level will not result in Linear Heat Rates sufficiently large to violate the fuel design limits, therefore answer "D" is correct.

Answer "A" is incorrect since a rod ejection accident is a concern at lower power levels.

Answer "B" is incorrect since flux is primarily shifted toward the lower part of the core at lower powers. Answer "C" is incorrect, incore detectors are not inaccurate at lower levels, nor are they used to measure axial imbalance.

References T.S. Bases 3.2.3 New, developed for 2004 SRO exam.

Training Objectives: A1LP-RO-TS: 4 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # G2.1.10 Importance Rating 3.9 Tier # 3 Group #

CFR references 43.1 / 45.13 88

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 113 The Tech Specs regarding hydrogen recombiner operability (3.6.7) states:

"Two hydrogen recombiners shall be OPERABLE."

The specification is applicable in MODES 1 and 2.

The only condition statement in the ACTIONS section is for "One hydrogen recombiner inoperable."

Which of the following actions would be applicable if BOTH hydrogen recombiners were inoperable at 100% power?

A. Place the plant in Mode 3 within one hour.

B. Action shall be initiated within one hour to place the unit in Mode 3 within the next 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

C. Restore at least one recombiner to operable status in 15 days or be in Mode 3 within 6 hrs.

D. Submit a report outlining the plan for restoring the system to OPERABLE status to the NRC within 7 days.

Answer Answer B is correct. Action shall be initiated within one hour to place the unit in Mode 3 within the next 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

Without an action statement covering two inoperable recombiners, this condition falls under the jurisdiction of T.S. 3.0.3. Answer A is incorrect, although a shutdown must commence in one hour, the plant does not have to be in Mode 3 in one hour. Answer C is incorrect, this is similar to LCO statements where only one train of two redundant trains is inoperable. Answer D is incorrect, the H2 recombiners may not be considered to be essential to plant operations and this statement is similar to action statements for non-ESF equipment.

References Technical Specifications, 3.03 and 3.6.7 Modified from QID 0110. Training Objectives: ANO-S-LP-SRO-ADMIN: 4 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 4 Examination Outline Cross-reference:

Level RO SRO K/A # G2.1.12 Importance Rating 4.0 Tier # 3 89

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Group # 1 CFR references 43.2 / 43.5 / 45.3 90

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 114 Given:

- The RCS is in Mode 5 and drained down.

- RCP P32A seal cartridge has been removed.

- HPI pumps are NOT available.

- The RB Spray Pumps are aligned to provide RCS inventory makeup.

Is this plant condition acceptable? Why?

A. Acceptable. The RCS is open to the RB atmosphere.

B. Acceptable. The HPI pumps are NOT required until the RCS is > 330 degrees F.

C. Unacceptable. RB Spray pumps CANNOT be aligned to pump water to the RCS.

D. Unacceptable. The RCS is intact and required HPI trains are NOT available.

Answer D is correct, Unacceptable. The RCS is intact and required HPI trains are NOT available.

"A" is incorrect - the RCS is not open to atmosphere with just a RCP seal cartridge removed. B" is incorrect - HPI pumps are required for given conditions (RCS Closed).

"C" is incorrect - RB Spray pumps can be aligned as a makeup source to the RCS but only when RCS is open.

References Tech Spec 3.4.11 1015.002, Decay Heat Removal and LTOP Control Direct from regular exam bank QID #2941 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # G2.1.33 Importance Rating 4.0 Tier # 3 Group # 1 CFR references 43.2 / 43.3 / 45.3 91

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 115 The system engineer for the Makeup and Purification System approaches you, the Shift Manager, with a test procedure he wants interim approval of.

The test involves entering the Restricted Operating Region of Exhibit A of 1104.002.

The system engineer believes the curve is too conservative.

Which of the following options should you take?

A. Follow the guidance in 1000.006 and approve the procedure using the Interim Approval process.

B. Approve the procedure in accordance with 1000.006 as a Temporary Instruction.

C. Use the procedure as written using the Procedure Deviation process in 1000.006.

D. Approve the procedure using Standard approval process and a 50.59 Evaluation.

Answer:

D is correct, Approve the procedure using Standard approval process and a 50.59 Evaluation.

Any test or experiment that may or may not be described in the FSAR is required under the Standard Approval process in 1000.006 to undergo a 50.59 review.

Thus Answer "D" is the only correct choice, all other processes listed cannot be used with the test References 1000.006, Rev. 050-03-0 New developed for 2004 SRO exam.

Training Objectives: ASLP-SRO-OPSPR: 6 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # G2.2.7 Importance Rating 3.2 Tier # 3 Group #

92

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM CFR references 43.3 / 45.13 Question 116 During a major outage, who is responsible for tracking a delayed PMT identified as an operability restraint?

A. Outage Desk B. PMT Coordinator C. Work Week Manager D. Responsible shop (e.g., Electrical)

Answer:

B PMT Coordinator, is the correct answer.

References 1025.033, Rev. 008-00-0, note 6.2.8.F New, developed for 2004 SRO exam, Training Objectives: ASLP-SRO-OPSPR: 6 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # G2.2.21 Importance Rating 3.5 Tier # 3 Group #

CFR references 43.2 93

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 117 A number of tools are available to track the status of equipment. Some of these tools are:

1. Inoperable Equipment Checklist
2. System Configuration Controls Tracking Log
3. Maintenance Configuration Tracking Log Sheet
4. Component Out of Position Log
5. Condition Report
6. Safety System Status Board
7. Control Room Log
8. Station Log The Surveillance Coordinator calls you, the Control Room Supervisor, and states that Hydrogen Recombiner, M-55B, surveillance frequency was exceeded.

Which of the above items will you use to document entry of the LCO?

A. 2, 3, 5, 7, & 8 B. 1, 2, 4, 6, & 8 C. 1, 5, 6, 7, & 8 D. 2, 4, 5, 6, & 8 Answer C 1, 5, 6, 7, & 8, is the correct answer. The only answer with all of the items required is answer "C".

References 1015.017, Rev 008-05-0, Step 9.3 1015.001, Rev 054-08-0, Steps 8.4.1.C, 10.7, and 12.7.

Training Objectives: ASLP-SRO-OPSPR: 6 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # G2.2.23 Importance Rating 3.8 Tier # 3 94

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Group #

CFR references 43.2 / 45.13 Question 118 Movement of a fuel assembly that does NOT follow the sequence in the approved fuel shuffle procedure requires prior approval of:

A. SRO in Charge of Fuel Handling and Shift Operations Superintendent B. Shift Operations Superintendent and Reactor Engineer C. Reactor Engineer and SRO in Charge of Fuel Handling D. SRO in Charge of Fuel Handling and Reactor Building Coordinator Answer C Reactor Engineer and SRO in Charge of Fuel Handling. Procedure 1502.004, Control of Unit 1 Refueling, requires any deviations from the fuel shuffle sequence to be approved by the SRO in Charge of Fuel Handling and the Reactor Engineer (NRC commitment). Therefore, "c" is the only correct response.

Answers "A", "B" and "D" are incorrect due to providing the wrong combination supervisory personnel."

References 1502.004, Rev. 031-02-0 "Used in 1999 exam. Direct from ExamBank, QID# 4301" Training Objectives: ANO-1-LP-RO-FH: 14 QID: 0250, Rev date: 9-1-99 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 1.5 Examination Outline Cross-reference:

Level RO SRO K/A # G2.2.27 Importance Rating 3.5 Tier # 3 Group # 2 CFR references 43.6/45.13 95

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 119 A fuel handling accident involving a spent fuel assembly has caused elevated dose rates in the Spent Fuel Pool area.

What Administrative Dose Control Limit (ADCL) would be of the greatest concern to the RP staff during planning for recovery actions from this accident?

A. 5 Rem/year to the skin B. 12 Rem/year to the lens of the eye C. 40 Rem/year to the skin D. 50 Rem/year to the lens of the eye Answer C 40 Rem/year to the skin, is the correct answer. This accident produces isotopes that cause the dose to the skin of the whole body to be the limit that could be exceeded.

Therefore, "B" and "D" are incorrect. "B" is the ADCL for lens of the eye. "D" is the federal limit for a single organ or skin but applied to the lens of the eye. "A" is the whole body federal limit but stated here as the skin limit. "C" is the actual limit as listed in 6.2.2.A.5 of 1012.021.

References 1012.021 Rev 4 "Used in 1999 exam. Modified from ExamBank, QID# 1881" Training Objectives: ANO-S-LP-RO-RADPRO: 15 QID:0249, Rev Date: 9-1-99 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # G2.3.1 Importance Rating 3.0 Tier # 3 Group # 3 CFR references 41.12/43.4 / 45.9/45.10 96

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 120 It is desired to release the contents of Treated Waste Monitoring Tank T-16A.

FI-4642, Discharge Flow to Flume, is OOS.

To comply with Technical Specifications, what must be done in order to complete the release?

A. Repairs must be made and FI-4642 must be operable to conduct releases via that pathway.

B. Take independent samples and conduct independent analyses and valve lineups prior to the release.

C. Estimate release flow rate using pump curves at least every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the release.

D. Verify RI-4642, liquid radwaste process monitor, is operable and proceed with the release.

Answer C is correct. Estimate release flow rate using pump curves at least every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the release. Technical Specifications require that FI-4642 is operable during releases via that pathway. If inoperable, allowance is provided to conduct a release if flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the actual release. Pump curves may be used to estimate flow. Therefore, C is the only correct response.

A is incorrect since it does not take into consideration the allowed exception. B is incorrect because it is describing exceptions if RI-4642 is inoperable. D is incorrect since both FI-4642 and RI-4642 are required during releases (or exceptions satisfied).

References Technical Specifications, Specification 3.5.6, Rad.

Developed for the 1998 SRO Exam.

Training Objectives: AA61002-009 9.6 QID: 0066, Rev Date: 7/13/98 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # G2.3.3 Importance Rating 2.9 Tier # 3 97

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Group # 3 CFR references 43.4 / 45.10 Question 121 Given:

- Plant at 100% power.

- RPS Channel ""C"" inoperable and in the tripped state.

- I&C are performing RPS Channel ""B"" monthly calibration.

- Inverter Y-11 has a fault and the static switch fails to operate.

Which of the following procedures should be in use?

A. Reactor Trip, 1202.001 B. Loss of NNI Power, 1203.047 C. Loss of 125 VDC, 1203.036 D. ESAS, 1202.010 Answer A is correct, Reactor Trip, 1202.001. Answer A is correct since a loss of Y11 will cause a loss of RS-1 which will trip ""A"" RPS channel. This will cause a reactor trip since ""C"" is in the tripped state.

Answer B is incorrect, NNI is powered from RS-1 but will transfer to alternate power.

Answer C is incorrect, although Y11 is normally powered from a DC source, the Rx Trip EOP has the highest priority. Answer D is incorrect, although ESAS is partially powered from RS-1, no actuations will result.

References 1105.001, Rev.019-00-0, NI & RPS Operating Procedure, pages 7,8.

New created for 2001 SRO Exam.

Training Objectives: ANO-1-LP-RO-RPS 6 QID: 0412 Rev Date: 12/5/00 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # G2.4.1 Importance Rating 4.6 Tier # 3 Group # 4 CFR references 41.10 / 43.5 / 45.13 98

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 122 The plant is operating at 100% power, when annunciator K07-C1, REACTOR FEEDWATER LIMITED, alarms. The following conditions exist:

- RCS pressure and temperature are increasing.

- OTSG levels = 60% and decreasing.

- Main feedwater flow is decreasing.

What procedure contains the required mitigating operator actions?

A. 1203.027, "Loss of Steam Generator Feed" B. 1203.001, "ICS Abnormal Operating" C. 1203.018, "Turbine Trip Below 43% Power" D. 1202.001, "Emergency Operations Procedure" Answer A is correct, 1203.027, "Loss of Steam Generator Feed. Only A contains all of the entry conditions, which match the given conditions.

B sounds like a logical procedure since and ICS malfunction may be causing the transient, however there should also be an indication of a loss of ICS power to enter this AOP. C might be chosen if the candidate associates the symptoms of rising RCS pressure and temperature with a Turbine Trip but the key to this procedure is to be below 43% power where a coincident Rx trip will not occur. D the conditions here are similar to some of the conditions of a Rx trip but the annunciator alarm is not.

References 1203.027 [Rev 9].

Taken from Exam Bank QID # 2800 Used in A. Morris 98 RO Re-exam" Training Objectives: ANO-1-LP-RO-FW 18 QID: 0146, Rev date: 05/20/93 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # G2.4.4 Importance Rating 4.3 Tier # 3 99

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Group # 4 CFR references 41.10 / 43.2 / 45.6 Question 123 A plant shutdown is in progress due to a primary-to-secondary tube leak in accordance with 1203.023, Small Steam Generator Tube Leaks.

- Several tubes subsequently fail catastrophically

- RCS pressure drops to 1400 psig

- CET's indicate 560°F

- Reactor Building sump level is trending upward.

Which of the following procedures should be in use?

A. Reactor Trip and Loss of Subcooling Margin B. Tube Rupture and ESAS C. Loss of Subcooling Margin and ESAS D. Reactor Trip and Tube Rupture Answer D Reactor Trip and Tube Rupture, is correct. The Tube Rupture procedure is used in conjunction with Reactor Trip when abnormal conditions other than a SGTR exist, i.e.,

RB sump level rising.

Answer A is incorrect, although a Loss of SCM has occurred, contingency actions for this exist within the Tube Rupture EOP. Answer B is incorrect, although an ESAS would have occurred, it is not entered with a SGTR. Answer C is incorrect, although both ESAS and loss of SCM has occurred, they are not entered with a SGTR.

References 1202.006, Rev. 007-02-0, Tube Rupture, page 1 Created for 2001 SRO Exam.2.4.8 Training Objectives: ANO-1-LP-RO-EOP06 4 QID: 0399, Rev Date: 11/21/00 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # G2.4.8 Importance Rating 3.7 Tier # 3 100

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Group # 4 CFR references 41.10 / 43.5 / 45.13 Question 124 Given:

- A SGTR has occurred coincident with a loss of offsite power.

- Two control rods are stuck out.

- #2 EDG did not start.

- Neither channel of EFIC actuated.

- Pressurizer level is offscale low.

Which of the following operator actions will you establish as the number one priority?

A. Starting and loading the #2 EDG.

B. Initiation of emergency boration.

C. Regaining Pressurizer level.

D. Starting at least one train of EFW.

Answer B is correct, Initiation of emergency boration.

The safety function priorities established in the Emergency Operating Procedures establish Reactivity Control as the safety function with the highest priority. With two stuck rods, answer "B" Emergency Boration should be the highest priority to establish control of Reactivity.

References BWOG EOP TBD Vol. 3, II.C-2, Sec. 2.1 New, developed for 2004 SRO exam.

Training Objectives: A1LP-RO-EOP: 8 Question Source: Bank # _______

Modified Bank # _______

New ___X___

Question Cognitive Level: Memory or Fundamental Knowledge _____

Comprehension or Analysis __X__

LOD = 3 Examination Outline Cross-reference:

Level RO SRO K/A # G2.4.22 Importance Rating 4.0 Tier # 3 Group #

CFR references 43.5 / 45.12 101

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM Question 125 During a declared Alert emergency, the TSC Director may NOT assume responsibility for Emergency Direction and Control until:

A. The next shift's Shift Manager (SM) arrives for shift relief and receives a turnover.

B. The Operations Manager arrives in the Control Room and passes on responsibility for EDC.

C. The TSC Director receives a turnover from the SM and assumes responsibility for EDC.

D. The emergency is terminated by mutual agreement of the appropriate on and off site agencies.

Answer C is correct. The TSC Director receives a turnover from the SM and assumes responsibility for EDC in accordance with 1903.010.

A is incorrect, this will only serve to slow the turnover to the TSCD. B is incorrect, the Ops Manager is not responsible for Emergency Direction and Control. D is incorrect, if this were true, emergency direction and control would never be turned over to the TSCD.

References 1903.064, Rev. 6 Used in 1999 exam. Direct from ExamBank, QID# 2524 Training Objectives: ANO-S-LP-EP-A0082 14 QID:0357, Rev date: 9/7/99 Question Source: Bank # ___X___

Modified Bank # _______

New _______

Question Cognitive Level: Memory or Fundamental Knowledge __X__

Comprehension or Analysis _____

LOD = 2 Examination Outline Cross-reference:

Level RO SRO K/A # G2.4.40 Importance Rating 4.1 Tier # 3 Group # 4 CFR references 45.11 102

SRO_EXAM Q1-75, Q101-125 ANO-1 2004 EXAM 103