CPSES-200301530, Response to Request for Additional Information Related to License Amendment Request 03-01, Revision to Technical Specification (TS) Bases

From kanterella
(Redirected from ML032200295)
Jump to navigation Jump to search

Response to Request for Additional Information Related to License Amendment Request 03-01, Revision to Technical Specification (TS) Bases
ML032200295
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/25/2003
From: Walker R
TXU Electric, TXU Generation Co, LP
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200301530, TAC MB7984, TAC MB7985, TXX-03129
Download: ML032200295 (18)


Text

@TxU TXU Energy C.Lance Terry Ref: 10CFR50.90 Comanche Peak Steam Senior Vice President &

Electric Station Principal Nudear Officer P.O. Box 1002 (E01)

Glen Rose,TX 76043 Tel: 254 897 8920 fax 254 897 6652 lance.terry@txu.com CPSES-200301530 Log # TXX-03129 File # 00236 July 25, 2003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST 03-01, REVISION TO TECHNICAL SPECIFICATION (FS) BASES (TAC NOS. MB7984 and MB7985)

REF: 1) TXU Energy Letter, logged TXX-03012, from C. L. Terry to U. S.

Nuclear Regulatory Commission dated March 6, 2003 Gentlemen:

This purpose of this letter is to reply to your Request for Additional Information concerning our submittal of License Amendment Request 03-01. The NRC questions are restated in Enclosure 1 with our responses immediately following each question.

Enclosure 2 provides copies of two Westinghouse Owner's Group (WOG) letters as requested. Enclosure 3 provides tables of proposed bounding response time values as requested.

This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.

I state under penalty of perjury that the foregoing is true and correct.

Executed on July 25, 2003 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak . Diablo Canyon
  • Palo Verde
  • Wolf Creek
IQ u TXX-03129 Page 2 of 2 Sincerely, TXU Generation Company LP By
TXU Generation Management Company LLC, Its General Partner C. L. Terry Senior Vice President and Principal Nuclear Officer By:

Roger Walker

- Regulatory Affairs Manager RAS/gp Enclosures 1. RAI Questions and Responses

2. WOG letters WOG-98-238 and WOG-98-244
3. Bounding Response Time Values c- T. P. Gwynn, Region IV W. D. Johnson, Region IV D. H. Jaffe, NRR Resident Inspectors, CPSES

ENCLOSURE 1 RAI Questions and Responses to TXX-03129 Page 1 of 2 RAI Questions For all questions in this RAI, if the licensee deems it appropriate to reference the Westinghouse topical report(s) or the NRC SER(s) as part of its response please include section number page etc.

I1. TXU Energy refers to WOG letters WOG-98-238 and WOG-98-244 to verify that the FMEA performed by the WOG applies to the 7300 System at CPSES Units I and 2. Please provide these letters, as well as the review process used to verify that the "alternate method" from WOG-98-238 and WOG-98-244 is applicable.

Response

WOG letters WOG-98-238 and WOG-98-244 are attached. As stated in our application dated March 6, 2003, these letters provide a description of the method that can be used to demonstrate compliance with the requirement to verify that the Failure Modes and Effects Analysis in WCAP-14036-P-A, Revision I is applicable to the equipment actually installed in the facility and that the analysis is valid for the versions of the boards used in the protection system.

Attachment I to WOG letter OG-98-086 in Appendix C of the WCAP contains a list of the schematics used for the FMEA that may be used for this verification. WOG letters WOG-98-238 and WOG-98-244 provide methods to comply with this verification requirement These letters also provide an alternate method of verification for the 7300 system. The alternate method described in WOG-98-238 specified verifying the installed cards used in the 7300 System are 4NCH, 7NRA, 6NLP, 4NSA, and 9NAL or older artwork. This list of cards was incorrect and was subsequently corrected in WOG-98-244 which identified the correct list as 7NMD, 4NCH, 4NRA, 6NLP, 4NSA, and 9NAL or older artwork levels.

In order to verify that the FMEA is applicable to the cards actually installed and in use at CPSES, TXU Energy first identified all protection circuitry involved in a Reactor Trip, Safety Injection, Containment Spray Actuation, Steam Line Isolation, Turbine Trip/FW Isolation, RWST Auto Switchover, or Auxiliary Feedwater Pump Start actuation. Each 7300 card involved in each signal path was then identified using plant drawings. A plant walkdown was conducted in which the physical location, tag number, card type, card group, and artwork level for each NMD, NCH, NRA, NLP, NSA, and NAL card was physically verified. Each card was then referenced to WCAP-14036-P-A, Revision 1, section 4.4 on page 4-12, and to WOG letters WOG-98-238 and WOG 244 in order to verify that the FMEA was applicable to the card.

2. Does TXU plan on using the approved bounding response time values listed in table 8-1 of WCAP-14036-P-A Revision 1? If not, then provide the analysis used to determine alternate values. With the elimination of RTT, bounding response time allocations for each protective function must be provided. These protective functions are usually composed of several bounding response times, each of which must be accounted for. Include a table listing the bounding values ofeach component for all RTS and ESF functions. The following tables should serve as a guide:
  • Tables I & 2 in Duke Energy Corporation's RAI response for Catawba Nuclear Station as found in ML020440424

Response

Tables indicating the proposed bounding response time values for the listed CPSES Reactor Trip and ESFAS function protection channel components, exclusive of sensor and final actuating devices, for which CPSES proposes to use allocated response times are attached. The bounding response times for the cards in the protection string were taken from section 4.5 of WCAP-14036-P-A. This method of response time allocation is described in the second paragraph of page 8-2 of WCAP-14036-P-A and on page 13 of the NRC Safety Evaluation Report. Periodic demonstration and measurement of the actual response times of other Reactor Trip or ESFAS protection channel components not listed in the tables, including sensors and final actuating devices, will continue to be performed.

to TXX-03129 Page 2 of 2 RAI Questions

3. TXU Energy states that it is not necessary to perform response time testing for the Power Range Module in the NIS signal path because it does not have dynamic response characteristics. WCAP-14036-P-A Revision I does not provide any basis for the elimination of Power Range Module testing. Provide the analysis that supports elimination of RTI for the Power Range Module, and include the analysis demonstrating that the NIS signal path has no dynamic response.

Response

The schematic drawings depicting the details of the N-16 power measurement system are proprietary to Westinghouse Electric Corporation. In order to facilitate a productive discussion, TXU Energy forwarded copies of the relevant drawings to Ms. Leslie Collins at the Rockville, MD offices of Westinghouse Electric Corporation where they were made available for inspection. TXU Energy conducted a conference call on July 22, 2003 with Mr. Victor Hall of the NRC to discuss these drawings. A simplified block diagram for illustrative purposes only was also provided via facsimile. This simplified drawing was not an approved plant design document and was provided only as an aid to facilitate the review and discussion of the circuit schematics forwarded for review at the Westinghouse offices.

The Power Range Module provides a power range NIS neutron streaming compensation signal to the N-16 instrument For the N-16 signal, the Power Range Module is not in the N-16 protection channel signal path which is subject to response time testing. For the NIS, the Power Range Module is in the NIS signal path which is subject to response time testing, however, the module has no dynamic response characteristics.

Section 4.4 on page 4-12 of WCAP-14036-P-A describes the basis for determining which cards and components were included within the scope of testing for the Failure Modes and Effects Analysis. Those cards not in the protection signal path or which had no dynamic response characteristics, even though part of the protection system, were excluded from testing. Therefore, since the Power Range Module is not in the signal path for the N-16 protection signal and also has no dynamic response characteristics, it is not necessary to perform time response testing for the Power Range Module.

However, since the FMEA documented in WCAP-14036-P-A did not specifically address the Power Range Monitor circuit, TXU Energy agrees with the NRC that a FMEA for the Power Range Monitor is necessary before the conclusions of the WCAP-14036-P-A can be extended to the Power Range Monitor circuit TXU Energy has determined that development of this FMEA would be too time consuming and therefore, TXU Energy requests that the NRC exclude the Power Range Monitor circuit from consideration in the proposed amendment request at this time. TXU Energy's proposed amendment request will continue to apply to the balance of the Westinghouse 7300 System, the Solid State Protection System, and the Nuclear Instrumentation System as described in our original submittal dated March 6, 2003. Periodic demonstration of the actual response time of the Power Range Monitor will continue to be performed.

4. Why don't TXU's proposed amendments use Standard TS wording as per the amendments listed in Appendix A of WCAP 14036-P-A Revision 1?

Response

The proposed Technical Specification Amendments provided in Appendix A of WCAP-14036-P-A, Revision 1 utilized the Standard TS's prior to the conversion to the Improved TS's. When TXU Energy implemented the Improved TS's at CPSES, the accompanying TS Bases already incorporated the majority of those wording changes, as proposed in WCAP-14036-P-A, Revision 1,that TXU Energy believed were necessary and applicable in order to accommodate future elimination of response time testing requirements. The changes proposed in our submittal of March 6, 2003 are those felt necessary to adequately identify that Reactor Trip and ESFAS response times may be verified as described in WCAP-14036-P-A, Revision 1, as opposed to being actually measured.

ENCLOSURE 2 WOG letters WOG-98-238 and WOG-98-244

WOG-98-238 November20, 1998 To: Westinghouse Owners Group Primary Representatives (IL, IA, IR)

Westinghouse Owners Group Licensing Subcommittee Representatives (IL, IA, IR)

Subject:

Westinghouse Owners Group Transmittal of Approved Topical Reports: WCAP-14036-P, Rev. 1 (Proprietary) and WCAP-14037-NP, Rev. 1 (Non-Proprietary), Entitled "Eliminationof Periodic Protection Channel Response Time Tests" (MUHP-3042)

Enclosed is one copy of WCAP-14036-P-A, Rev. 1 (Proprietary) and one copy WCAP-14037-NP-A, Rev.

1 (Non-Proprietary), both entitled "Elimination of Periodic Protection Channel Response Time Tests."

These approved versions, as signified by "-A," incorporate the NRC Safety Evaluation Report (SER), NRC Requests for Additional Information (RAIs) letters and the WOG RAI responses letters to the NRC. These reports provide the approve WOG technical documentation and methodology to support the elimination of periodic response time testing for the electronic signal processing portion of the reactor protection circuitry in Westinghouse NSSS plants. Copies of these approved reports have issued to the NRC (OG-98-115, November 16, 1998).

The following WOG members were exempted from the programs that developed and provided licensing support of WCAP-14036/14037 and therefore will not receive copies of WCAP-14036/14037:

  • Consolidated Edsion
  • Northern States Power
  • Rochester Gas and Electric
  • Wisconsin Public Service The SER states that the licensee must verify that the failure modes and effects analysis (FEMA) performed by the WOG is applicable to the equipment actually installed in the licensees facility, and that the analysis is valid for the versions of the boards used in the protection system. Attachment 1 to OG-98-086 in Appendix C of WCAP-14036-P-A, Revision 1 contains a list of the schematics used for the FMEAs.

Licensees with 7300 systems may use the schematics contained in the WCAP for verification or as an acceptable alternative to using the schematics they may verify that the cards installed are 4NCH, 7NRA, 6NLP, 4NSA, and 9NAL or older artwork levels. For 7100, Eagle 21, Solid State Protection, Nuclear Instrumentation, and Relay Protection, the licensee should use the schematics for verification. In order to satisfy this requirement of the SER, the License Amendment Request (LAR) should contain; 1) a list identifying the equipment installed for those protection system functions that the licensee is requesting to relax the response time testing requirements, 2) a statement that the plant specific circuitry is enveloped by the circuits evaluated by WCAP-14036-P-A, Revision 1, or complete a similar FMEA for any circuits not enveloped by WCAP-14036-P-A, Revision 1. The attached tables provide an example of one function in RTS and ESFAS of what is being proposed by SNC for the Vogtle plant specific submittal. Other plants requesting this relaxation should include similar plant specific information in their LARs. The intent of providing this information is to ensure that the plant specific equipment/components are consistent with the equipment/components that were specifically evaluated in WCAP-14036-P-A, Revision 1.

98wog23M.doc

This report bears a Westinghouse copyright notice. You as a member of the Westinghouse Owners Group are permitted to make the number of copies of the information contained in this report which are necessary for your internal use in connection with your implementation of the report results for your plant(s) in your normal conduct of business. Should implementation of this report involve a third party, you are permitted to make the number of copies of the information contained in this report which are necessary for the third party's use in supporting your implementation at your plant(s) in your normal conduct of business if you have received the prior, written consent of Westinghouse to transmit this information to a third party (or parties), and the appropriate agreements are in place to protect the proprietary information for the proprietary version of the report. All copies made by you must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.

If you have any questions regarding this transmittal please contact Jim Andrachek at (412) 374-5018.

Very truly yours, Ken J. Vavrek, Project Engineer Westinghouse Owners Group attachment/enclosure cc: Westinghouse Owners Group Steering Committee (IL, IA, IR)

A. P. Drake, ECE 5-16 (IL) 98wog23M.doc

WOG-98-xxx November20, 1998 bcc: J. D. Andrachek (IL, IA, IR) ECE 4-07A G. R. Andre' (IL, IA, IR) ECE 4-28 E.A. Dzenis (iL, 1A, IR) ECE 4-01 (IL)

S. B. Fowler (IL) ECE 4-22 C. E. Morgan (IL, IA, IR) ECE 4-07A R. B. Miller (IL, 1A, IR) EC 4-07A H. A. Sepp (IL) ECE 4-07A S. A. Binger (IL) ECE 5-16 S. R. Bemis (IL) ECE 5-16 J. D. Campbell (IL) ECE 5-16 S. M. DiTommaso (IL) ECE 5-16 K J. Vavrek (IL, IA, IR) ECE 5-16 98wog238.doc

Attachment I EXAMPLE PROCESS / FUNCTION / REACTOR TRIP / ALLOCATION / TABLE FUNCTION SENSOR TIME 7300/NIS STRING TIME SSPS RELAYS TIME l PZR.PRESS.HI l Tobar 32PG 200ms NLP+NAL 65ms Input 20ms Veritrak 76PH 200ms l _ _

X_____

_ Rosemount 1154SH9 200ms l

. I~~~~~~~~~~~~~~

(Note 1) Allocated sensor times not used for these variables. These components will continue to be tested as required.

Allocated sensor times are derived from method (3) section (9) WCAP-13632 rev. 2 (Vendor Engineering Specifications). Tobar, Veritrak, and Barton times were provided on Table 9-1. Rosemount times are from Rosemount manuals 4302 and 4631. The Rosemount response time specifications may also be found in NUREG/CR-5383.. Transmitter FMEAs are based upon EPRI report NP-7243 rev 1.

Values for 7300 cards are from tables 4-7 through 4-12 of WCAP-14036 rev. 1. Cards installed are 4NCH, 7NRA, 6NLP, 4NSA, and 9NAL or older artwork levels.

NIS components installed are; Summing and Level Amp (3359C48G01),Isolation Amp (6065D75G01), Rate Circuit Assy (3359C41G01), and Bistable Relay Driver Assy (3359C39G0 1). These were evaluated per NIS FMEA schematic diagram 6065D99.

SSPS Input and Master relays are Potter & Brumfield KH series relays. SSPS Slave relays are Potter & Brumfield MDR relays. Values are tabulated from section 4.8 Westinghouse SSPS FMEA.

98wog238.doc

EXAMPLE PROCESS / FUNCTION / ENGINEERED SAFETY FEATURE / ALLOCATION / TABLE l FUNCTION l SENSOR l TIME l 7300/NIS STRING l TIME l SSPS RELAYS l TME lCONT.PRESS HI-I l Barton 7641351 l1.0sec NLP+NAL 65ms Input + Master + Slave 88ms (Note 1)Allocated sensor times not used for these variables. These components will continue to be tested as required.

Allocated sensor times are derived from method (3) section (9) WCAP-13632 rev. 2 (Vendor Engineering Specifications). Tobar, Veritrak, and Barton times were provided on Table 9-1. Rosemount times are from Rosemount manuals 4302 and 4631. The Rosemount response time specifications may also be found in NUREG/CR-5383. Transmitter FMEAs are based upon EPRI report NP-7243 rev 1.

Values for 7300 cards are from tables 4-7 through 4-12 of WCAP-14036 rev. 1. Cards installed are 4NCH, 7NRA, 6NLP, 4NSA, and 9NAL or older artwork levels.

NIS components installed are; Summing and Level Amp (3359C48G01),Isolation Amp (6065D75G01), Rate Circuit Assy (3359C41G01), and Bistable Relay Driver Assy (3359C39G01). These were evaluated per NIS FMEA schematic diagram 6065D99.

SSPS Input and Master relays are Potter & Brumfield KH series relays. SSPS Slave relays are Potter & Brbmfield MDR relays. Values are tabulated from section 4.8 Westinghouse SSPS FMEA.

98wog238.doc

WOG-98-244 December 2, 1998 To: Westinghouse Owners Group Primary Representatives (LL, IA)

Westinghouse Owners Group Licensing Subcommittee Representatives (IL, IA)

Subject:

Westinghouse Owners Group Correction to WOG-98-238, "Transmittal of Approved Topical Reports: WCAP-14036-P-A, Rev. 1 (Proprietary) and WCAP-14037-NP-A, Rev. 1 (Non-Proprietary), Entitled

'Elimination of Periodic Protection Channel Response Time Tests'," (MUHP-3042' The subject WOG letter transmitted to you one copy of WCAP-14036-P-A, Rev. i (Proprietary) and one copy WCAP-14037-NP-A, Rev. 1 (Non-Proprietary), entitled "Elimination of Periodic Protection Channel Response Time Tests." The subject letter provided information concerning the NRC's Safety Evaluation Report of these topical reports. That information incorrectly identified the list of 7300 cards. The correct list of 7300 cards should be 7NMD, 4NCH, 4NRA, 6NLP, 4NSA, and 9NAL or older artwork levels.

The following WOG members were exempted from the programs that developed and provided licensing support of WCAP-14036/14037 and therefore did not receive copies of WCAP-14036/14037:

  • Consolidated Edsion
  • Northern States Power
  • Rochester Gas and Electric
  • Wisconsin Public Service If you have any questions regarding this correction, please contact Jim Andrachek at (412) 374-5018.

Very truly yours, Ken J. Vavrek, Project Engineer Westinghouse Owners Group attachment cc: Westinghouse Owners Group Steering Committee (IL, IA)

A. P. Drake, ECE 5-16 (IL, IA) 98wog244.doc

WOG-98-244 December 2, 1998 bcc: J. D. Andrachek (1L, 1A) ECE 4-07A G. R. Andre' (IL, IA) ECE 4-28 E.A. Dzenis (IL, IA) ECE 4-1 S. B. Fowler (IL) ECE 4-22 C. E. Morgan (IL, 1A) ECE 4-07A R. B. Miller (IL, IA) ECE 4-07A H. A. Sepp (iL) ECE 4-07A S. A. Binger (IL) ECE 5-16 S. R. Bemis (IL) ECE 5-16 J. D. Campbell (IL) ECE 5-16 S. M. DiTommaso (IL) ECE 5-16 K. J. Vavrek (IL, IA) ECE 5-16 98wog244.doc

Attachment 1 EXAMPLE PROCESS / FUNCTION / REACTOR TRIP / ALLOCATION / TABLE FUNCTION SENSOR TIME 7300/NIS STRING TIME SSPS RELAYS TIME PZR. PRESS. HI Tobar 32PG 200ms NLP+NAL 65ms Input 20ms Veritrak 76PH 200ms Rosemount 200ms 1154SH9 I ----~~~~~~~~~~~~~~~~~~~~

(Note 1) Allocated sensor times not used for these variables. These components will continue to be tested as required.

Allocated sensor times are derived from method (3) section (9) WCAP-13632 rev. 2 (Vendor Engineering Specifications). Tobar, Veritrak, and Barton times were provided on Table 9-1. Rosemount times are from Rosemount manuals 4302 and 4631. The Rosemount response time specifications may also be found in NUREG/CR-5383.. Transmitter FMEAs are based upon EPRI report NP-7243 rev 1.

Values for 7300 cards are from tables 4-7 through 4-12 of WCAP-14036 rev. 1. Cards installed are 4NCH, 4NRA, 6NLP, 4NSA, and 9NAL or older artwork levels. NIS components installed are; Summing and Level Amp (3359C48G01),Isolation Amp (60651)75G01), Rate Circuit Assy (3359C41G01), and Bistable Relay Driver Assy (3359C39G01). These were evaluated per NIS FMEA schematic diagram 6065D99.

SSPS Input and Master relays are Potter & Brumfield KH series relays. SSPS Slave relays are Potter & Brumfield MDR relays. Values are tabulated from section 4.8 Westinghouse SSPS FMEA.

98WOG244.doc

EXAMPLE PROCESS / FUNCTION / ENGINEERED SAFETY FEATURE / ALLOCATION / TABLE FUNCTION SENSOR TIME I 7300/NIS STRING TIME I SSPS RELAYS TIME i CONT. PRESS HI-1 Barton 764/351 1.0sec NLP+NAL 65ms Input + Master+ Slave 88ms I (Note 1) Allocated sensor times not used for these variables. These components will continue to be tested as required.

Allocated sensor times are derived from method (3) section (9) WCAP-13632 rev. 2 (Vendor Engineering Specifications). Tobar, Veritrak, and Barton times were provided on Table 9-1. Rosemount times are from Rosemount manuals 4302 and 4631. The Rosemount response time specifications may also be found in NUREG/CR-5383. Transmitter FMEAs are based upon EPRI report NP-7243 rev 1.

Values for 7300 cards are from tables 4-7 through 4-12 of WCAP-14036 rev. 1. Cards installed are 4NCH, 4NRA, 6NLP, 4NSA, and 9NAL or older artwork levels. NIS components installed are; Summing and Level Amp (3359C48G01),Isolation Amp (6065D75G01), Rate Circuit Assy (3359C41Gl0), and Bistable Relay Driver Assy (3359C39G01). These were evaluated per NIS FMEA schematic diagram 6065D99.

SSPS Input and Master relays are Potter & Brumfield KH series relays. SSPS Slave relays are Potter & Brumfield MDR relays. Values are tabulated from section 4.8 Westinghouse SSPS FMEA.

98WOG244.doc

ENCLOSURE 3 Bounding Response Time Values to TXX-03129 Page 1 of 2 TABLE OF PROPOSH BOUNDI VALUES FOR SES ACTRIP FUNCTONM

-- ---W -St - ----

Ndeff II1MtBbV7U SSPS

_ooms StrIr _ Wich _, _ MAP SSPS Sing b AP ToW VCAP Rrd __ _CAPfeaed ed Pr VcP d Moaft RaweRffMMHwbn fS -t MS 0.065 kwcc 0.(M 0.05 RawRwg Nan Fux LowSeprt MS 0.05. ktLtCOc 0.M0 0.05 2terveNM N-16 (Deta RFLx tW-Lre) NSA.NSSA4NAL 0.119 h.*"c 0A0 0139 O.ffteN1i N-16 (Delta Flux Lo4rIper) b E E 0.119 hptotc 0.0C0 0Q139 O(Nr1mtureN-16(1,) NR1L4SAtNAL 0256 "+i4Lc 0.00 0276 Ot rebj N-16 (Ressurze A'es) QJ*JS&*NSAL 0.141 hkvuLtdc Q 0!20 0.161 Omtwrsbt WN16 (N-16 PbAw) I N 0.29 0.020 0.349 Ompomr N.16 0.39 O_ hpf c 0.20 0.349 Resstirzer Presm Low NfP4NAL 0.065 h 00.02 QOB5 0

Rwxwb_ Rmm ugh NP+NAL 0.065 iLOgi&c .CQ0 0.085

  • Ceoor FhvlLW NMP4NAL 0.065 bktl+LOC 0.02D Q085 U EjvobSw - FR 0das Rgqp" NA N/A bv*LOc O.CQ 0.Q20

'&tt v - Resor odat Ryrps NIA N/A I 0.QOQ0 Q020 Stewn G1(enlr Wter LM LoaLo NLP*NAL 0.065 QQ MD 0.085 NOTES 1 RPelb CPSESTedv* Reqwr , Table 1331-1.

2 Al resm~ s pssed hItistleaspedfe Inseards.

IL, it to TXX-03129 Page 2 of 2 TABLE OF PROPOSED BOUNDING VALUES FOR CPSES ESFAS FUNCTIONS I 7300 System SSPS Process String for which I SPS String for which WCAP ITotal WCAP Function' WCAP times are credited Allocation4 WCAP times are credited Allocatbon4 Alcation4 Safety Injection _________

Containment Pressure High-1 NLP+NAL 0.065 ECCS Input+Logic+Master+Sbve+Slave 0.124 0.189 Reactor Trip lnput+Logic 0.020 0.085 Emergency DG Operation lnput+Logic+Master+Sbve 0.088 0.153 Containment Spray Pump Input+Logic+Master+SIave 0.088 0.153 Pressurizer Pressure Low NLP+NAL 0.065 ECCS Input+Logic+Master+Sbve+Siava 0.124 0.189 Reactor Trip Input+Logic 0.020 0.085 Containment Ventilation Isolation Input+Logic+Master+Slave+Slave 0.124 0.189 Emergency DG Operation lnput+Logic+Master+Sbave 0.088 0.153 Steamline Pressure Low NLP+NAL 0.065 ECCS Input+Logic+Master+Sbve+Slave 0.124 0.189 Reactor Trip Input+Logic 0.020 0.085 Emergency DO Operation Input+Loglc+Master+Slave 0.088 0.153 Containment Spray Containment Pressure High-3 NLP+NAL 0.065 Containment Spray Header Isolation Valves I6 input+Logc+Master+SIave 0.088 0.153 Containment Isolation Phase A Isolation Safety In ection Longest S Si gnal 0.065 Inpu+Logic+Master+Slave+Sbave 0.124 0.189 Steamilne Isolation Containment Pressure High-2 NLP+NAL 0.065 Input+Logic+Master+Slave 0.088 0.153 Steamllne Pressure Steamline Pressure Low NLP+NAL 0.065 Input+Logic+Master+Slave 0.088 0.153 Steamline Pressure Negative Rate NLP+NAL 0.065 Input+Logic.Master+Sbve 0.088 0.153 Turbine Trip and Feedwater Isolation Steam Generator Water Level High-High Safety Injection NLP+NAL Longest Si Signal rl 0.065 0.065 jlnput+Logic+Master+Slave linput+Lcoglc+Master+Slave 0.088 0.088 0.153 0.153 Auxiliary Feedwater Stearn Generator Water Level Low-Low NLP+NAL 0.065 Motor Driven AFW Input+Logic+Master+Slave+Slave 0.124 0.189 Turbine Driven AFW Inp~ut+Logic+Master+Slave+Slave 0.124 l 0.189 Safety Injection Longest SI Signal 0.065 Input+Loglc+Master+Slave+Sbave 0.124 0.189 Loss of Offsite Power 3 Auto Switchover to Containment Sump RWST Level Low-Low Coincident with Safety In ecton I NLP+NAL I 0.065 lln tjt+Lo ic+Master+Slave 0.088 1 0.153 NOTES:

I Reference CPSES Technical Requirements Manual, Table 13.3.2-1.

2 Response time testing Is not required for the Turbine Trip function.

3 The Loss of OffIste Power signal does not pass through the 7300 System or SSPS. This function is induded In this table for completeness.