Reactor Operation Inconsistent with the Updated Final Safety Analysis Report| ML031210459 |
| Person / Time |
|---|
| Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000268, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane  |
|---|
| Issue date: |
03/18/1996 |
|---|
| From: |
Crutchfield D Office of Nuclear Reactor Regulation |
|---|
| To: |
|
|---|
| References |
|---|
| IN-96-017, NUDOCS 9603150213 |
| Download: ML031210459 (3) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000268, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane |
|---|
Category:NRC Information Notice
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000268]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] OR [[:Crane]] </code>. |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C.
20555-0001
March 18, 1996
NRC INFORMATION NOTICE 96-17:
REACTOR OPERATION INCONSISTENT WITH THE UPDATED
FINAL SAFETY ANALYSIS REPORT
Addressees
All holders of operating licenses or construction permits for nuclear power
reactors.
Purpose
The U.S. Nuclear Regulatory Comniission (NRC) is issuing this information
notice to alert addressees to instances of reactor operation that may not
conform to the licensing basis. It is expected that recipients will review
the information for applicability to their facilities and consider actions, as
appropriate, to avoid similar problems. However, suggestions contained in
this information notice are not NRC requirements; therefore, no specific
action or written response is required.
Description of Circumstances
On August 21, 1995, the NRC received a petition under 10 CFR 2.206 which was
supplemented on August 28, 1995, that requested NRC to shut down Millstone
Unit I and take enforcement action based upon alleged violations of licensed
activities related to operation of spent fuel pool cooling systems and
refueling practices.
Followup of the issues raised in the 2.206 petition, including the findings from investigations conducted by the Office of the
Inspector General, found that certain activities at Millstone Unit I may have
been conducted in violation of license requirements and that refueling
activities may not have been conducted consistent with the Updated Final
Safety Analysis Report (UFSAR).
In a letter dated December 13, 1995,
[Accession No 9512150278], NRC subsequently required that the licensee submit
additional information under oath or affirmation pursuant to Section 182a of
the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f). Specifically, the licensee was required to report on actions taken to ensure that future
operation of Millstone Unit 1 will be conducted in accordance with the terms
and conditions of the Millstone Unit 1 operating license, the Commission
regulations, including 10 CFR 50.59, and the Millstone Unit 1 UFSAR.
Discussion
As one element of its response to the letter of December 13, 1995, Northeast
Utilities Service Companies, the licensee for Millstone Unit 1. established an
Event Response Team to determine the causes for inaccuracies contained in the
Millstone Unit 1 UFSAR. A copy of the Executive Summary and of the text of
the resulting licensee report is attached.
The complete document, including
PDR 96031
502t13e-01e
03(
.
9603150213,
-1
)(
_1919 I
IN 96-17 March i8, 1996 attachments, has been placed in the NRC Public Document Room (PDR) in
Washington, D.C. and the local public document rooms (LPDRs) (Accession No.
9603150021).
The Report identifies a number of fundamental factors that led to an
Inaccurate UFSAR for Millstone Unit 1. The Report states that because of the
nature of the causes that the team has identified, the potential exists for
similar configuration management conditions at Haddam Neck and Millstone
Units 2 and 3. As a result, the NRC issued two letters dated March 7, 1996, that are similar to the letter of December 13, 1995.
Because of a number of
operability and design concerns involving Millstone Unit 2, one letter (which
!s attached) required the licensee to submit to the NRC no later than 7 days
before restarting Unit 2 from its current outage the actions taken to ensure
that future operation of Unit 2 will be conducted in accordance with the
license, regulations, and UFSAR. The second letter from NRC requested
Information from the licensee within 30 days regarding actions taken to date
and futire plans to address the conclusions expressed in the 7007 report at
Mill-torqe Unit 3 and Haddam Neck.
This letter is available in the NRC PDR and
the LFias (Accession No. 9603120179).
This informaticn notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate Office of
Nuclear Reactor Regulation (NRR) project manager.
ens M. rutch e
Division of Reactor rogram Management
Office of Nuclear Reactor Regulation
Technical contacts:
Phillip F. McKee, NRR
(301) 415-2040
Internet:pfn.nrc.gov
T. Jerrell Carter, NRR
(301) 415-1153 Internet:tjc~nrc.qov
Attachments:
1. NU Report ACR 7007
2. March 7, 1996, Millstone 2 Letter
3. List of Recently Issued NRC Information Notices
- -
--
-
--
---
-
-
IN 96-17 March 18, 1996 attachments, has been placed in the NRC Public Document Room (PDR) in
Washington, D.C. and the local public document rooms (LPDRs) (Accession No.
9603150021).
The Report identifies a number of fundamental factors that led to an
inaccurate UFSAR for Millstone Unit 1. The Report states that because of the
nature of the causes that the team has identified, the potential exists for
similar configuration management conditions at Haddam Neck and Millstone
Un.ts 2 and 3. As a result, the NRC issued two letters dated March 7, 1996, that are similar to the letter of December 13. 1995.
Because of a number of
operability and design concerns involving Millstone Unit 2, one letter (which
is attached) required the licensee to submit to the NRC no later than 7 days
before restarting Unit 2 from its current outage the actions taken to ensure
that future operation of Unit 2 will be conducted in accordance with the
license, regulations, and UFSAR. The second letter from NRC requested
information from the licensee within 30 days regarding actions taken to date
and future plans to address the conclusions expressed in the 7007 report at
Millstone Unit 3 and Haddam Neck. This letter is available in the NRC PDR and
the LPDRs (Accession No. 9603120179).
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate Office of
Nuclear Reactor Regulation (NRR) project manager.
original siqned by
Dennis M. Crutcfifield, Director
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical contacts:
Phillip F. McKee, NRR
(301) 4;5-2040
Internet:pfm~nrc.gov
T. Jerrell Carter, NRR
(301) 415-1153 Internet:tjcenrc.gov
Attachments:
1. NU Report ACR 7007
2. March 7. 1996, Millstone 2 Letter
3. List of Recently Issued NRC Information Notices
Tech Editor has review. and concurred 3/14/96 DOCUMENT NAME:
96-17.IN
Ta receive a copy of this document, indicate in the bow: 'C'
Copy withoutJfc
s 'E'
Copy wifro
'N' . No copy
__
OFFICE
SEChMP14 I PI) I 3DRK I E I
C :EtQMlI
I /
UD PD4P
ZA-c--" _
NAME
IER TM er
IPMcKee }
t
1AU9affef/ Betay tc~ftield
DATE
/03//!6/96
103/f
/96
_
0/
96
9 OFFICIAL RECORD COPY
|
|---|
|
| list | - Information Notice 1996-01, Potential For High Post-Accident Closed-Cycle Cooling Water Temperatures to Disable Equipment Important to Safety (3 January 1996)
- Information Notice 1996-01, Potential for High Post-Accident Closed-Cycle Cooling Water Temperatures to Disable Equipment Important to Safety (3 January 1996)
- Information Notice 1996-02, Inoperability of Power-Operated Relief Valves Masked by Downstream Indications During Testing (5 January 1996, Topic: Stroke time)
- Information Notice 1996-03, Main Steam Safety Valve Setpoint Variation as a Result of Thermal Effects (5 January 1996)
- Information Notice 1996-03, Main Steam Safety Valve Setpoint Variation As a Result of Thermal Effects (5 January 1996)
- Information Notice 1996-04, Incident Reporting Requirements for Radiography Licensees (10 January 1996, Topic: Overexposure, Depleted uranium)
- Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel (18 January 1996, Topic: Reactor Vessel Water Level)
- Information Notice 1996-06, Design & Testing Deficiencies of Tornado Dampers at Nuclear Power Plants (25 January 1996, Topic: Loss of Offsite Power)
- Information Notice 1996-07, Slow Five Percent Scram Insertion Times Caused by Viton Diaphragms in Scram Solenoid Pilot Valves (26 January 1996)
- Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve (5 February 1996, Topic: Anchor Darling, Cold shutdown justification)
- Information Notice 1996-09, Damage in Foreign Steam Generator Internals (12 February 1996, Topic: Eddy Current Testing, Earthquake)
- Information Notice 1996-10, Potential Blockage by Debris of Safety System Piping Which Is Not Used During Normal Operation or Tested During Surveillances (13 February 1996)
- Information Notice 1996-10, Potential Blockage by Debris of Safety System Piping Which is Not Used During Normal Operation or Tested During Surveillances (13 February 1996)
- Information Notice 1996-11, Ingress of Demineralizer Resins Increases Potential For Stress Corrosion Cracking of Control Rod Drive Mechanism Penetrations (14 February 1996, Topic: Intergranular Stress Corrosion Cracking, Stress corrosion cracking)
- Information Notice 1996-11, Ingress of Demineralizer Resins Increases Potential for Stress Corrosion Cracking of Control Rod Drive Mechanism Penetrations (14 February 1996, Topic: Intergranular Stress Corrosion Cracking, Stress corrosion cracking)
- Information Notice 1996-12, Control Rod Insertion Problems (15 February 1996)
- Information Notice 1996-13, Potential Containment Leak Paths Through Hydrogen Analysis (26 February 1996, Topic: Integrated leak rate test)
- Information Notice 1996-14, Degradation of Radwaste Facility Equipment at Millstone Nuclear Power Station, Unit 1 (1 March 1996)
- Information Notice 1996-15, Unexpected Plant Performance During Performance of New Surveillance (8 March 1996)
- Information Notice 1996-16, BWR Operation with Indicated Flow Less than Natural Circulation (14 March 1996)
- Information Notice 1996-17, Reactor Operation Inconsistent with the Updated Final Safety Analysis Report (18 March 1996)
- Information Notice 1996-18, Compliance with 10 CFR Part 20 for Airborne Thorium (25 March 1996)
- Information Notice 1996-19, Failure of Tone Alert Radios to Activate When Receiving a Shortened Activation Signal (2 April 1996, Topic: Tone Alert Radio, Siren)
- Information Notice 1996-20, Demonstration of Associated Equipment Compliance with 10 CFR 34.20 (4 April 1996)
- Information Notice 1996-21, Safety Concerns Related to the Design of the Door Interlock Circuit on Nucletron High-Dose Rate and Pulsed Dose Rate Remote Afterloading Brachytherapy Devices (10 April 1996, Topic: Brachytherapy)
- Information Notice 1996-22, Improper Equipment Settings Due to Use of Nontemperature-Compensated Test Equipment (11 April 1996, Topic: Brachytherapy)
- Information Notice 1996-23, Fires in Emergency Diesel Generator Exciters During Operation Following Undetected Fuse Blowing (22 April 1996, Topic: Brachytherapy, Overspeed trip, Overspeed)
- Information Notice 1996-24, Preconditioning of Molded-Case Circuit Breakers Before Surveillance Testing (25 April 1996, Topic: Brachytherapy)
- Information Notice 1996-25, Traversing In-Core Probe Overwithdrawn at Lasalle County Station, Unit 1 (30 April 1996, Topic: Brachytherapy)
- Information Notice 1996-26, Recent Problems with Overhead Cranes (30 April 1996, Topic: Brachytherapy)
- Information Notice 1996-26, Recent Problems With Overhead Cranes (30 April 1996)
- Information Notice 1996-27, Potential Clogging of High Pressure Safety Injection Throttle Valves During Recirculation (1 May 1996, Topic: Brachytherapy)
- Information Notice 1996-28, Suggested Guidance Relating to Development and Implementation of Corrective Action (1 May 1996, Topic: Notice of Violation)
- Information Notice 1996-29, Requirements in 10 CFR Part 21 for Reporting and Evaluating Software Errors (20 May 1996, Topic: Brachytherapy, Basic Component)
- Information Notice 1996-30, Inaccuracy of Diagnostic Equipment for Motor-Operated Butterfly Valves (21 May 1996)
- Information Notice 1996-31, Cross-Tied Safety Injection Accumulators (22 May 1996)
- Information Notice 1996-32, Implementation of 10 CFR 50.55a(g) (6) (II) (A), Augmented Examination of Reactor Vessel (5 June 1996, Topic: Non-Destructive Examination)
- Information Notice 1996-32, Implementation of 10 CFR 50.55a(g) (6) (ii) (A), Augmented Examination of Reactor Vessel (5 June 1996, Topic: Non-Destructive Examination)
- Information Notice 1996-33, Erroneous Data From Defective Thermocouple Results in a Fire (24 May 1996, Topic: Reverse polarity)
- Information Notice 1996-33, Erroneous Data from Defective Thermocouple Results in a Fire (24 May 1996, Topic: Reverse polarity)
- Information Notice 1996-34, Hydrogen Gas Ignition During Closure Welding of a VSC-24 Multi-Assembly Sealed Basket (31 May 1996)
- Information Notice 1996-35, Failure of Safety Systems on Self-Shielded Irradiators Because of Inadequate Maintenance and Training (11 June 1996)
- Information Notice 1996-36, Degradation of Cooling Water Systems Due to Icing (12 June 1996, Topic: Ultimate heat sink, Frazil ice)
- Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown (18 June 1996, Topic: Reactor Vessel Water Level)
- Information Notice 1996-38, Results of Steam Generator Tube Examinations (21 June 1996, Topic: Stress corrosion cracking)
- Information Notice 1996-39, Estimates of Decay Heat Using ANS 5.1 Decay Heat Standard May Vary Significantly (5 July 1996)
- Information Notice 1996-40, Defciencies in Material Dedication and Procurement Practices and in Audits of Vendors (7 October 1996, Topic: Coatings, Commercial Grade, Troxler)
- Information Notice 1996-41, Effects of a Decrease in Feedwater Temperature on Nuclear Instrumentation (26 July 1996, Topic: Feedwater Heater)
- Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves (5 August 1996, Topic: Reactor Vessel Water Level)
- Information Notice 1996-43, Failures of General Electric Magne-Blast Circuit Breakers (2 August 1996, Topic: Hardened grease)
... further results |
|---|