ML030700163

From kanterella
Jump to navigation Jump to search
Revision 40 to Emergency Equipment & Supplies.
ML030700163
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/28/2003
From: Hudspeth J
Southern Nuclear Operating Co
To: Mcknight J
Document Control Desk, Office of Nuclear Reactor Regulation
References
FNP-193-DC FNP-0-EIP-16.0 Rev 40
Download: ML030700163 (103)


Text

Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Date: February 28, 2003 4k Energ, to Serve Your World" FNP-193-DC Director, Office of NRC Att: Document Control Desk C/O Jim McKnight US Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

ENCLOSED IS THE LATEST REVISION FOR FARLEY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE.

FNP-0-EIP-16.0 REVISION 40 EMERGENCY EQUIPMENT & SUPPLIES PLEASE REPLACE YOUR COPIES WITH THE ATTACHED REVISED COPIES.

IF YOU HAVE ANY QUESTIONS, PLEASE CALL ME AT 334-899-5156 EXTENSION 3439.

Sincerely, Joey Hudspeth Document Control Supervisor A01(5 CD/001 Rtype:A4.19

02/14/03 9:39:42 ,

  • S.-February V FNP-0-EP-16.0 10, 2003 Version 40 FARLEY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE FNP-0-EIP- 16.0 S

A F

E T

Y EMERGENCY EQUIPMENT AND SUPPLIES R

E L

A T

E D

SECTIONS PROCEDURE USAGE REQUIREMENTS - PER FNP-0-AP-6 Continuous Use All Checklist Reference Use Procedure Body Information Use pp.1-11 Approved:

Nuclear Plant General Manager Date Issued , 7 03 UNCONTROLLED COPY CAUTION: copy i wt maintied, current Do not use in a Safety Related Alivity.

FNP-0-EIP-16.0 02/14/03 9: 02/14/039:39:42 P

LIST OF EFFECTIVE PAGES PROCEDURE CONTAINS NUMBER OF PAGES B ody ............................................................................................................................................... 11 C hecklist A .......................................................................................................................................

4 C hecklist B .......................................................................................................................................

1 Checklist C .....................................................................................................................

C hecklist D ........................................................................................................................

Checklist E ....................................................................................................................

Checklist ............................................................

C hecklist H.......................................................................................................................................

3 Checklist H .......................................................................................................................................

1 C hecklist I ........................................................................................................................................

3 Checklist K............................................................

C hecklist ....... ..............................................................................................................

Checklist M.............................................................................................. 2...

Checklist N..................................................................................................

Checklist 0............................................................................................... 1..

Checklist P..................................................................................................

Checklist P..................................................................................................I Checklist R............................................................................................... 1..

Checklist S............................................................................................... 2...

Checklist T.................................................................................................. 1)

Check-list TU...............................................................................................1..

Check-list V...............................................................................................1..

Checklist W................................................................................................. I Checklist C hecklist O WX...............................................................................................1..

111 .................................................................................................................................... I Chcls XY...............................................................................................1..

Checklist II.. ............................. *..................*...*...*.............................1..

Checklist YZ...............................................................................................1..

Check-list AA.................................................................................................. I Checklist AA..............................................................................................4..

Checklist ................................................................................................................

Checklist E E ..................................................................................................................................... 1 C hecklist .. ..................................................................................................................................... 1 Check-list GG............................................................................................... 2 Checklist Checklist Q...................................................................................................................................... 2 Checklist KK.................................................................... 2 Checklist ..............................................................................................................

"Page 1of 2 Version 40

02/14/03 9:39:42 C ~FNP-0-EIP-16.0 LIST OF EFFECTIVE PAGES PROCEDURE CONTAINS NUMBER OF PAGES 1

Checklist M... ......................................................................................................................

Checklist NN.. ....................................................................................................................

Checklist ...................................................................................................................

0 Checklist PP Checklist QQ . ..................................................................................................................

Checklist RR .................................................................................................................

I Checklist SS ................................................................................................................

Checklist .T Checklist U U.....................................................................................................................................

X.................................................................................................................................... 4 Checklist VV .................................................................................................................................... 4 1

Checklist W W.......................................................................................................................

Checklist XX. ....................................................................................................................... I Checklist YY .................................................................................................................................... I Checklist 7Z7 .....................................................................................................................................

Page 2 of 2 Version 40

FNP-0-EIP- 16.0 02/14/03 9:39:42 EMERGENCY EQUIPMENT AND SUPPLIES TABLE OF CONTENTS Page Section Title 1

1.0 Purpose 1

2.0 References 1

3.0 General 3.1 This procedure applies only to equipment and supplies stored for 1 emergency use 1

3.2 Any person utilizing emergency equipment 1

3.3 The Emergency Planning Coordinator is responsible for 1

3.4 The Emergency Planning Coordinator is responsible for 1

3.5 Operability of equipment that is tested by FNP-0-STP-60.0, 60.11, 60.12 3.6 All emergency plan equipment storage locations should have inventory checklists 2

3.7 The Maintenance Manager is responsible for 2

3.8 The Fire Marshal is responsible for 2

3.9 The Security (Site) Manager 3.10 The Chemistry Superintendent is responsible for 3.11 The Operations Unit Superintendent is responsible for 3

3.12 The Material Department is responsible for 3

3.13 DELETED 3

3.14 Safety and Health is responsible for 3

3.15 The Maintenance Manager is responsible for 3 3.16 The Emergency Planning Coordinator is responsible for Page 1 of 4 Version 40

02/14/03 9:39:42 FNP-0-EIP-16.0 5

4.0 An inventory shall be performed:

6 5.0 The following actions are to be performed daily 6

6.0 The following actions are to be performed weekly 6

7.0 Semi-annually, perform the following 6

8.0 Annually, perform the following 7

9.0 Expiration and Calibration Due dates 7

10.0 Respiratory Protection Equipment Requirements 8

11.0 Portable instrumentation requirements 9

12.0 Other battery operated devices requirements 9

13.0 Verify operability of the State of Alabama and Georgia RMT radios at the EOF, as follows:

9 14.0 Verify operability of the portable RMT electric generators at the EOF as follows:

9 15.0 Checklist Completion 10 16.0 Desk Pack Contents 11 17.0 Personnel Emergency Equipment Checklist A - Control Room (EP)

Checklist B - Operations Support Center (EP)

Checklist C - Central Security Control Building, Fire Department (EP)

Checklist D - Aux Bldg, El 155, Unit 2, Rad Side, By Laundry (EP)

(EP)

Checklist E - Auxiliary Building, El. 121, Unit 2, Rad Side, Near East Stairwell Checklist F - Auxiliary Building, El. 83, Unit 1, Rad Side, West Stairwell (EP)

Checklist G - Plant Emergency Vehicle Equipment (SH)

Checklist H - FNP Stretcher Cabinets (SH)

Checklist I - Central Security Control Building Ambulance Kit (SH)

Checklist J - Nurses Station (SH)

Page 2 of 4 Version 40

P-16.0 02/14/03 9:39:42 C", *"E" IFNP-0-E Checklist K - EOF Air Compressor Shed, Radiation Monitoring Team Kits (EP)

Checklist L - Emergency Operations Facility (EP)

Checklist M - Southeast Alabama Medical Center (EP)

Checklist N - Control Room Emergency Food Supply (EP)

Checklist 0 - Assembly Areas (EP)

Checklist P - Chemistry Vehicle (CHEM)

Checklist Q - Auxiliary Building Entrance West, Non-Rad Hallway, Unit 1 (EP)

Checklist R - Service Bldg. Maintenance Shop (EP)

Checklist S - Satellite Telephone (EP)

Checklist T - HVAC System EOF (EP)

Room (EP)

Checklist U - Auxiliary Building, El. 139, Unit 1, Rad Side Hallway by Counting Checklist V - Auxiliary Building, El. 100, Unit 1, Rad Side Hallway (EP)

Checklist W - Auxiliary Building, El. 83, Unit 2, Rad Side Hallway (EP)

Checklist X - Hot Shutdown Panels, Unit 1 (EP)

Checklist Y - Hot Shutdown Panels, Unit 2 (EP)

Checklist Z - CSC Guard Tower Emergency Cellular Telephone (EP)

Checklist AA - Auxiliary Building, El. 83, Unit 2, Rad Side West Stairwell (EP)

Checklist BB - Technical Support Center (EP)

Checklist CC - Fire Fighting Equipment (FM)

Checklist DD - Plant Emergency Vehicle (SEC)

Checklist EE - Chemisty Eyewash/Shower Stations (CHM)

Checklist FF - Training Center Vehicle (EP)

Checklist GG - Fire Brigade Equipment (FM)

Checklist HH - Fire Brigade Van (SEC)

Checklist II - Environmental Vehicle (ENV)

Page 3 of 4 Version 40

02/14/03 9:39:42

  • __ FNP-0-EIP-16.0 Checklist JJ - Unit 1 Cable Spreading Room Fire Emergency Equipment (OPS)

Checklist KK - Unit 2 Cable Spreading Room Fire Emergency Equipment (OPS)

Checklist LL - Canister Respirators Checklist MM - Visitor Center Vehicle (EP)

Checklist NN - Auxiliary Building, El. 139, Unit 1 Rad Side Outside Elevator (EP)

Checklist 00 - Auxiliary Building, El. 139, Unit 2, Rad Side Pass Sample Area (EP)

Side (EP)

Checklist PP - Post Accident Sample Area, Auxiliary Building, El. 139, Unit 1 Rad Side (EP)

Checklist QQ - Post Accident Sample Area, Auxiliary Building, El. 139, Unit 2 Rad Checklist RR - RMT Southern Linc and Kenwood Radios (EP)

Checklist SS - Fire Tanker Truck Equipment (FM)

Checklist TIT - Fire Tanker Truck (SEC)

Checklist UU - Smoke Removal Equipment (FM)

Checklist VV - Alternate EOF Headland (EP) be Found on Key Checklist WW - Maintenance Vehicle Designated for EP Support, Identification # Can in EP TSC /EOF Key Lockers (MM)

Checklist XX - Fire Fighting Equipment SCBAs (EP)

Checklist YY - Intentionally Blank Checklist ZZ - Material Department Eyewash/Shower Stations (STR)

Page 4 of 4 Version 40

02/14/03 9:39:42 07 1'

_F_ FNP-0-EIP-16.0 EMERGENCY EQUIPMENT AND SUPPLIES 1.0 Purpose This procedure establishes the actions to be taken to ensure the operational readiness of emergency equipment and supplies.

2.0 References 2.1 Joseph M. Farley Nuclear Plant Emergency Plan 2.2 FNP Response (FNP-88-0442) to NRC Information Notice 88-15 Concerning Use of Potassium Iodide as a Thyroid Blocking Agent 2.3 FNP-0-CCP-333 Inspection of Safety Showers and Eye Wash.

2.4 FNP-0-EMP-1802.1, Battery Equipment Safety Check.

2.5 FNP-0-RCP-107, Use and Operation of Self Contained Breathing Apparatus (Pressure Tank Type) 3.0 General 3.1 This procedure applies only to equipment and supplies stored for emergency use and specifically listed in this procedure.

3.2 Any person utilizing emergency equipment stored in emergency lockers or cabinets shall promptly notify the Emergency Planning Coordinator of such use.

Users of such items are to return non-expendable items to designated storage locations and properly dispose of expendable items.

3.3 The Emergency Planning Coordinator is responsible for ensuring that the Document Control procedure and drawing inventory sheets that are specified in the checklists contain the required procedures for the individual at the specified location to perform the required tasks during an emergency or emergency drill.

3.4 The Emergency Planning Coordinator is responsible for ensuring that any group that is required to perform a checklist due to drill or emergency use, a broken seal, routine inventory or other reasons has been informed.

3.5 Operability of equipment that is tested by FNP-0-STP-60.0, 60.11, 60.12 is verified during the performance of the STP on a monthly basis.

-I- Version 40

ANP-0-EIP 16.0 02114/(1)39:39:42 All emergency plan equipment storage locations should have inventory checklists 3.6 displayed. Checklists H, 0, P, Q, S, T, Z, DD, EE, FF, HH, I-I, LL, MM, RR, UU, I WW, XX, YY, and ZZ are specifically excluded from this requirement.

3.7 The Maintenance Manager is responsible for preventive maintenance activities of the automotive portions of the vehicles specified in checklists P, DD, FF, HH, II, MM, TT, and WW.

3.8 The Fire Marshal is responsible for completion of the following checklists:

3.8.1 Checklist CC - Fire Fighting Equipment (FM) 3.8.2 Checklist GG - Fire Brigade Equipment (FM) 3.8.3 Checklist SS - Fire Tanker Truck Equipment (FM) 3.8.4 Checklist UU - Smoke Removal Equipment (FM) 3.9 The Security (Site) Manager is responsible for the following checklists and daily and weekly responsibilities:

3.9.1 Checklist DD - Plant Emergency Vehicle (PEV) (SEC) 3.9.2 Checklist HH - Fire Brigade Van (FBV) (SEC) 3.9.3 Checklist TT - Fire Tanker Truck (FTT) (SEC) 3.9.4 Daily test drive and general visual inspection of the PEV and FBV.

3.9.5 Daily perform general inspection of the Fire Tanker Truck.

3.9.6 Weekly test drive the Fire Tanker Truck.

3.9.7 Weekly perform a 20 to 30 minute test drive of the PEV.

3.10 The Chemistry Superintendent is responsible for completion of the following checklist:

3.10.1 Checklist P - Chemistry Vehicle (CHEM) 3.10.2 Checklist EE - Chemistry Eyewash/Shower Stations (CHEM) 3.10.3 Checklist II - Environmental Vehicle (ENV) 3.11 The Operations Unit Superintendent is responsible for completion of the following checklists:

Version 40

02/14/03 9:39:42 F A

/ Th FNP-0-EIP-16.0 3.11.1 Checklist JJ - Unit 1 Cable Spreading Room Fire Emergency Equipment (OPS) 3.11.2 Checklist KK - Unit 2 Cable Spreading Room Fire Emergency Equipment (OPS) 3.12 The Material Department is responsible for completion of the following checklists:

3.12.1 Checklist ZZ - Material Department Eyewash/Shower Stations (STR) 3.13 This step intentionally left blank.

3.14 Safety and Health is responsible for completion of the following checklists:

3.14.1 Checklist G - Plant Emergency Vehicle Equipment (SH) 3.14.2 Checklist H - FNP Stretcher Cabinets (SH) 3.14.3 Checklist I - Central Security Control Building, Ambulance Kit (SH) 3.14.4 Checklist J - Nurses Station (SH) 3.15 The Maintenance Manager is responsible for completion of the following checklists:

3.15.1 Checklist WW - Maintenance Vehicle Designated for EP Support, Identification # Can be Found on Key in EP TSC /EOF Key Lockers (MM) 3.16 The Emergency Planning Coordinator is responsible for completion of the following checklists and for tracking the completion of all checklists:

3.16.1 Checklist A - Control Room (EP) 3.16.2 Checklist B - Operations Support Center (EP) 3.16.3 Checklist C - Central Security Control Building, Fire Department (EP) 3.16.4 Checklist D - Aux Bldg El 155, Unit 2 Rad Side Near East Stairwell (EP) 3.16.5 Checklist E - Auxiliary Building, El. 121, Unit 2 Rad Side Near East Stairwell (EP)

Version 40

02/14/03 9:39: 42 7 / <TJ ->,FNP-0-EIP-16.0 3.16.6 Checklist F - Auxiliary Building, El. 83, Unit 1 Rad Side West Stairwell (EP) 3.16.7 Checklist K - EOF Air Compressor Shed, Radiation Monitoring Team Kits (EP) 3.16.8 Checklist L - Emergency Operations Facility (EP) 3.16.9 Checklist M - Southeast Alabama Medical Center (EP) 3.16.10 Checklist N - Control Room Emergency Food Supply (EP) 3.16.11 Checklist 0 - Assembly Areas (EP) 3.16.12 Checklist Q - Auxiliary Building Entrance West, Non-Rad Hallway, Unit 1 (EP) 3.16.13 Checklist R - Service Bldg. Maintenance Shop (EP) 3.16.14 Checklist S - Satellite Telephone (EP) 3.16.15 Checklist T - HVAC System EOF (EP) 3.16.16 Checklist U - Auxiliary Building, El. 139, Unit I Rad Side Hallway by Counting Room (EP)

(EP) 3.16.17 Checklist V - Auxiliary Building, El. 100, Unit I Rad Side Hallway 3.16.18 Checklist W - Auxiliary Bldg., El. 83, Unit 2 Rad Side Hallway (EP) 3.16.19 Checklist X - Hot Shutdown Panels, Unit 1 (EP) 3.16.20 Checklist Y - Hot Shutdown Panels, Unit 2 (EP) 3.16.21 Checklist Z - CSC Guard Tower Emergency Cellular Telephone (EP) 3.16.22 Checklist AA - Auxiliary Building, El. 83, Unit 2 Rad Side West Stairwell (EP) 3.16.23 Checklist BB - Technical Support Center (EP) 3.16.24 Checklist FF - Training Center Vehicle (EP) 3.16.25 Checklist LL - Canister Respirators I 3.16.26 Checklist MM - Visitor Center Vehicle (EP)

Version 40

02/14/03 9:39:42 Ly FNP-0-EIP-16.0 "3.16.27 Checklist NN - Auxiliary Bldg., El. 139, Unit 1 Rad Side Outside Elevator (EP) 3.16.28 Checklist 00 - Auxiliary Building, El. 139, Unit 2 Rad Side Pass Sample Area (EP) 3.16.29 Checklist PP - Post Accident Sample Area Auxiliary Building, El. 139, Unit 1 Radside (EP) 3.16.30 Checklist QQ - Post Accident Sample Area Auxiliary Building, El. 139 Unit 2 Radside (EP) 3.16.31 Checklist RR - RMT Southern Linc and Kenwood Radios (EP) 3.16.32 Checklist VV - Alternate EOF, Headland (EP) 3.16.33 Checklist XX - Fire Fighting Equipment SCBAs (EP) 4.0 An inventory shall be performed:

4.1 Weekly for the following checklists:

"DD,HH and TT 4.2 Monthly for the following checklists:

F, P, Q, S, AA, EE, FF, II, LL, MM, NN, 00, RR, WW, XX, and ZZ 4.3 Quarterly for the following checklists:

A, B, C, D, E, G, H, I, J, K, L, M, N, 0, R, S, T, U, V, W, X, Y, Z, BB, CC, GG, JJ, KK, PP, QQ, SS, UU and VV 4.4 Semi-annually for the following checklist:

NONE 4.5 Yearly for the following checklist:

NONE 4.6 After each emergency or drill during which the emergency equipment storage location is opened or equipment used.

Version 40

02/14/03 9:39:42 ,- FNP-0-EIP-16.0 NOTE: THE EMERGENCY PLAN SEALS ARE RED IN COLOR AND ARE STAMPED AS FOLLOWS: E. P. EXT. 6100. THIS IS AN ANSWERING HAS MACHINE EXTENSION. LEAVE A MESSAGE AS TO WHICH SEAL BEEN BROKEN.

by 4.7 Any time the seal on a storage location is found to be broken or tampered with persons other than Emergency Planning personnel.

5.0 The following actions are to be performed daily.

5.1 Conduct a minimum five minute test drive of the PEV and FBV.

5.2 Perform a general visual inspection of the PEV and FBV and FIT to include:

5.2.1 Adequate tire inflation 5.2.2 Gas tank over 3/4 full 5.2.3 Verify that external compartment doors are properly latched.

5.2.4 Initiate appropriate corrective action to eliminate any identified deficiencies.

6.0 The following actions are to be performed weekly:

The 6.1 Test drive the PEV for a minimum of 20 to 30 minutes at highway speeds.

PEV may be driven off-site to facilitate driving at highway speeds.

6.2 Test drive the Fire Tanker Truck.

7.0 Semi-annually, perform the following:

7.1 Insure pocket dosimeters are within calibration and replace as required.

7.2 Ensure that each pocket dosimeter is zeroed.

8.0 Annually, perform the following:

8.1 Replace all thermoluminescent dosimeters.

8.2 Replace all tape, pens and latex gloves with fresh stock.

Version 40

02/14/03 9:39:42 1-- T-1 FNP-0-EIP-16.0 9.0 Expiration and Calibration Due dates When an inventory is performed, the expiration date on consumables and the calibration due date shall be verified to be valid until the next scheduled inventory or other arrangements are made to replace or calibrate the equipment. A list of the expiration to dates and calibration due dates may be posted on the outside of the storage location expedite future inventories.

10.0 Respiratory Protection Equipment Requirements 10.1 Canister type respirators 10.1.1 Monthly, check the expiration date on the filter cartridge. Ensure that the filter's expiration date is at least beyond the last day of the next inventory period. (NUREG-0041, 29CFRI910) 10.1.2 Monthly, ensure that the seal of the protective bag containing the respirator is not broken. If the seal is broken, have the respirator recertified or replaced. The seal serves to verify that the respirator has not been worn since certification. (NUREG-0041, 29CFR1910) 10.1.3 If the above are acceptable, initial and date the respirator certification tag.

10.1.4 Fully inspect the respirators during the last month of each quarter.

Remove the respirator from the bag, inspect it, place it in a bag, and seal the bag. (I OCFR20 and Reg. Guide 8.15 for Respiratory Protection) 10.1.5 Ensure that the respirators are stored in a manner that they cannot be damaged by heat or twisted out of their normal configuration.

Respirators should be stored with their sealing surface up to prevent deformation of the sealing surface. (NUREG-004 1) 10.2 Self-Contained Breathing Apparatus (SCBA) 10.2.1 Check the pressure in the air tank. If the tank pressure is less than 2000 psig, initiate corrective action.

10.2.2 Ensure that the seal of the protective bag containing the SCBA mask is not broken. The seal serves to verify that the mask has not been worn since certification. If the above are acceptable, initial and date the respirator certification tag. If the seal is broken, have the mask recertified or replaced.

10.2.3 Fully inspect the respirators for SCBAs during the last month of each quarter. Remove the respirator from the bag, inspect it, place it in a bag Version 40

02/14/03 9:39:42 ( " A FNP-0-EIP-16.0 and seal the bag. (10CFR20 and Reg. Guide 8.15 for Respiratory Protection) 10.2.4 Verify the regulator main-line (yellow) valve is closed.

10.2.5 Verify the regulator bypass (red) valve is closed.

10.2.6 Open cylinder valve to pressurize regulator and hose.

10.2.7 Place hand over the regulator outlet to block it leaktight.

10.2.8 Open the regulator main-line (yellow) valve and check that the regulator pressure gauge does not rapidly drop indicating a leak in the regulator.

10.2.9 Compare the cylinder pressure gauge to the regulator pressure gauge, the allowable tolerance is plus or minus 10% and both gauges greater than 2000 psi.

does 10.2.10 Close the cylinder valve and check that the regulator pressure gauge not rapidly drop, indicating a leak in the hose or regulator.

10.2.11 Take hand from regulator outlet and check the alarm as pressure goes down below approximately 500 psig.

10.2.12 Cycle the regulator bypass (red) valve, to ensure proper operation.

10.2.13 Verify the regulator main-line (yellow) valve is closed.

10.2.14 Verify the regulator bypass (red) valve is closed.

11.0 Portable instrumentation requirements 11.1 Insure portable radiological survey instruments and air samplers are within calibration, using manufacturer's recommendations as guidelines.

11.1.1 A calibration schedule shall be maintained with all of the Emergency Planning portable instruments, air samplers, digital alarming dosimeters, self reading pocket dosimeter and any other equipment that requires periodic calibration.

11.2 Pocket dosimeter charger 11.2.1 Check battery compartment for leakage from batteries. If leakage is found, clean compartment and replace batteries.

Version 40

02/14/03 9:39:42 7 i FNP-0-EIP-16.0 11.2.2 Rezero at least one pocket dosimeter to ensure that the charger is functional. If unit is not functional, replace it.

12.0 Other battery operated device requirements 12.1 Check the battery compartment for leakage from batteries. If leakage is found, clean compartment and replace batteries.

12.2 Operate the device. If the device is not functional, replace it.

radio at the 13.0 Verify operability of the State of Alabama RMT radio and State of Georgia EOF as follows:

13.1 Establish communication with the appropriate Emergency Management (EM) office on all state radios.

14.0 Verify operability of the portable RMT electric generators at the EOF, as follows:

NOTE: GASOLINE IS TO BE STORED IN THE GENERATORS AND STORAGE CONTAINERS WHEN PLACED IN THE EOF STORAGE CABINET.

TREAT GASOLINE WITH A STABILIZER PER THE STABILIZER MANUFACTURER'S INSTRUCTIONS.

m 14.1 Relocate the RMT generators and air samplers to an outdoor area.

14.2 Operate generators and air samplers (not less than 5 minutes).

14.3 Place the generators and air samplers back into the EOF storage area.

15.0 Checklist Completion Personnel performing functions controlled by designated checklists are to:

15.1 Check all supplies for deterioration.

the 15.2 Replace any non-serviceable items. Generic replacements are acceptable if intended use or function of the item is not compromised.

15.3 The quantity listed on the checklists is the minimum amount required.

15.4 Indicate the reason for the inspection on the checklist.

the 15.5 Initial in the designated blanks all items found to be in accordance with checklist.

Version 40

  • FNP-0-EIP-16.0 02/14/03 9:39:42 _

15.6 Utilize the "COMMENTS" section to provide appropriate information regarding checklist items.

notify the 15.7 Whenever thyroid blocking drugs (Potassium Iodide) are found missing, Emergency Planning Coordinator who will immediately notify the Assistant General Manager - Operations.

15.8 Initiate needed corrective action.

15.9 Notify the Emergency Planning Coordinator of any missing or inoperable equipment. (Ext. 6100).

placed at the storage 15.10 The Emergency Planning Coordinator shall have a placard steps being taken location indicating what equipment is missing or inoperable and to return equipment back to operable status.

door, if so 15.11 Upon closing the storage location, affix a seal or a lock to the equipped.

15.12 Sign and date the checklist.

(EPNS).

15.13 Route the checklist to the Emergency Planning Nuclear Specialist Planning 15.14 The EPNS is to review the checklist and route them to the Emergency Coordinator.

and route them 15.15 The Emergency Planning Coordinator is to review the checklists to Document Control.

16.0 Desk Pack Contents been 16.1 Each location that has a need for desk or administrative materials has assigned a desk pack. Each desk pack will normally contain the minimum red following materials: clip board, lined paper, phone memo pad, black pens, liquid pen, pencils, hi-liters, paper clips, stapler, staple puller, ruler tape dispenser, paper.

and 16.2 Desk packs listed for status board keepers will, in addition, include markers cleaner for status boards.

pens, will be 16.3 The supplies in desk packs that could deteriorate with time, such as replaced annually.

Version 40

r  : T--N,*" FNP-0-EIP- 16.0 02/14/03 9:39:42 It FNP-0-ELP-16.O 17.0 Personnel Emergency Equipment 17.1 The following personnel emergency equipment will be maintained in accordance with the applicable checklist:

Checklist H - FNP Stretcher Cabinets Checklist EE - Chemistry Eyewash/Shower Stations Checklist ZZ - Material Department Eyewash/Shower Stations program.

17.2 The Maintenance controlled eyewash stations are covered under the PM The PM TPNS for this system is NSR4250002, "Battery Safety Equipment Check." This is performed and documented monthly.

17.3 Routine inspections performed using the checklist will include the following items as applicable:

Operability - Maintained per the checklist be Accessibility - Clear access to the equipment will be verified to ensure it can reached for emergency use. To aid in maintaining clear access, a floor marking or sign may be used.

Location - Placement of the emergency equipment in the designated location specified by the checklist will be verified.

Posting - Each location will be marked to help locate it in an emergency and to aid in returning portable equipment to the proper location if it has been moved.

Version 40

  • V

- ."*%FNP-0-EIP-1.

I V S*-

Tj /* Y F - 16.0 02/14/03 9:39:42 -r

  • Y £ *CHECKLIST A EMERGENCY EQUIPMENT AND SUPPLIES LARGE STORAGE LOCKER AND SOUND POWERED PHONE CABINET.....(EP)

DESCRIPTION QUANTITY IQTIALS Air sampler filter paper (box) 1 Silver Zeolite, individual cartridge (OR-1-99-383) 25 Expiration Date Expiration after next inventory Yes No Potassium Iodide, Bottle (OR-1-99-383) 150 Expiration Date Expiration after next inventory Yes No If thyroid blocking drugs (Potassium Iodide) are found missing, notify the Emergency Planning Coordinator. The Emergency Planning Coordinator will then immediately notify the Asst.

General Manager - Operations Twirl Packs (box) 1 Polybags 20 Polysheets, package 1 Absorbent wipes, package 1 Knife, Razor 1 2

Scissors

____Flashlights...Battery Compartment Operational 10 Tape, Electrical 2 2

Tape, Masking Coveralls, Work Type 4 Gloves, disposable package 1 Tool Kit containing: 1 channel locks, hacksaw, carpenters hammer, sledge hammer, pliers, screwdriver set, side cutters, pipe wrench, large adjustable wrench, small adjustable wrench First Aid Kit 1 KenwoodRadio with Charger: 3 Cord, sound powered phone, 600' 1 Electrical jumper for FRP-H.I (ea) 6 Hose couplings for fire water supply to DG's (ref: FNP-0-AOP-49) 4 Page 1 of 2 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST A EMERGENCY EQUIPMENT AND SUPPLIES LARGE STORAGE LOCKER AND SOUND POWERED PHONE CABINET.....(EP)

DESCRIPTION QUANTITY INITIALS CONTROL ROOM SOUND POWERED PHONE CABINETS Headsets, Sound Powered Phone .... Operational PORTABLE SURVEY INSTRUMENTS Verify the following portable instruments per calibration schedule.

Dose rate meter 1 Contamination meter I 1

_Air sampler ENN CR FNP SOUTHERN LINC RADIO Shift Foreman's Office.....Operational 1 U-2 Shift Supervisor Desk.....Operational 1 NOTES:

the next If the Silver Zeolite cartridges, Iodine canisters or Potassium Iodide expire before inventory, change them out at this time.

by heat or twisted Ensure that the respirators are stored in a manner that they cannot be damaged surface up to out of their normal configuration. Respirators should be stored with their sealing prevent deformation of the sealing surface. (NUREG-0041)

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 2 of 2 Version 40

02/14/03 9:39:42 C FNP-0-EIP-16.0

'~J ~CHECKLIST B EMERGENCY EQUIPMENT AND SUPPLIES OPERATIONS SUPPORT CENTER ....(EP)

DESCRIPTION QUANTITY INITIALS PROCEDURES AND DRAWINGS Obtain the following Document Control procedure and drawing inventory sheets. Verify procedures per the DC inventory EP-OSC-OSC MANAGER EP-OSC-P.A.S.S. CABINET HEALTH PHYSICS/HP SUPPORT CABINET First Aid 1 2

Flashlights ....Battery Compartment Operable Gloves, Disposable, package 1 Absorbent wipes, package 1 Radiation barrier tape or rope 100 ft Scissors, pr. I Airborne Radioactivity Area signs 3 Contaminated Area signs 3 High Radiation Area signs 3 Radiation Area signs 3 2

Tape, Masking, roll 2

Tape, Duct, roll 2

Detergent, package Extension cord for chemistry lab 1 Applicators, Cotton Tufted, package I Bags, plastic 20 2

Brushes, Hand Clippers, Hair 1 2

CST flange, tygon, tie wraps, 1 1/4" wrench (ea)

Swabs, Nasal 20 2

Tweezers Wristbands 10 Digital Alarming Dosimeters listed below check fast entry mode Fast entry settings and count for OSC DAD'S Leak search/Re-Entry disconnects: 100R/hr dose rate; 10 Rem dose 20 Drawing PASS: 20R/hr dose rate; 5 Rem dose 10 Relocation sample prep/disconnects: 5R/hr dose rate; 1 Rem dose 14 Area monitors: 40 mrem/hr dose rate; 100mrem dose 6 Verify that the labeling is legible and correct on all chemical products, per SHP-26 Twist-Lock Adapter (Construction Male/Household Female) 3 Page 1 of 4 Version 40

02/14/03 9:39:42 I' / F? T> FNP-0-EIP-16.0

-j: J t*j~ : Y,* i2 I CHECKLIST B EMERGENCY EQUIPMENT AND SUPPLIES OPERATIONS SUPPORT CENTER ....(EP)

INITIALS DESCRIPTION QUANTITY POST ACCIDENT SAMPLE CABINET 6

Gaseous Effluent Sample Bags..Each bag contains 2-14 mv glass vials with rubber septums, syringe with needle, filter paper and 3' tygon tubing, silver zeolite cartridge (OR-1-99-383)

Expiration Date Expiration after next inventory Yes No 6

RCS Sample Bags ... Each bag contains 2 sample bottles, 2-14 mv vials with rubber septums, 4 planchets, syringe with needle 5 cc gas syringe 10 10cc gas syringe 5 2

1 cc gas syringe 0.5 cc gas syringe 30 Needles for gas syringe 21 Particulate filters 200 Labels for gas release samples 100 14 mv vials 50 14 mv septa 100 Plastic bags 50 Petri dishes 60 Forceps 3 75 ml Plastic Vials 24 Plastic funnels (small) 24 30 ml Plastic bottles 28 Planchets (2" x 5/16") 75 Latex gloves (package) 1 2

Safety glasses 1 liter Marinelli (liquid) 1 1 liter Marinelli (gas) 6 250 ml bottles 12 2'

Charcoal Cartridge (box) (OR-1-99-383)

Expiration Date Expiration after next inventory Yes No Silver Zeolite, individual cartridge (OR- 1-99-383) 50 Expiration Date Expiration after next inventory Yes_ No Small bags 20 Air sample labels 20 Microprobe pH electrodes 2 Stirring bar, magnetic 1 Buret, piston 2 Page 2 of 4 Version 40

02/14/03 9:39:42

  • T T / *" - FNP-0-EIP-16.0 3L CHECKLIST B EMERGENCY EQUIPMENT AND SUPPLIES OPERATIONS SUPPORT CENTER ....(EP)

INITIALS DESCRIPTION QUANTITY POST ACCIDENT SAMPLE CABINET 1 ea.

-Pipets, 1, 2, 5, 10 mls Flexible arm electrode holder 1 Stirring rods 4 Shortened 10 ml graduated cylinder 1 Labels for sample containers 1 pack Logbook I Electrode extensions 1 1/4" tygon tubing 20 ft 15 ml vials 3 3/8" tygon tubing 40 ft Tie wraps (bag) 1 2

Knife (razor)

RE-ENTRY CABINET Extremity TLDs.....annual replacement 60 ea.

2

_____Coveralls, plastic (box)

Plastic Shoe Covers (CS) 1 Tape, Masking (roll) 5 Coveralls, disposable, white (CS) 3 Latex "Steeleboot" or Rubber Shoe Covers (CS) I Hood, Tyvek (CS) 1 Surgeon's cap, Tyvek (CS) I Surgeon's gloves (CS) 1 Glove liners (CS) I Rubber gloves (CS) I OSC MANAGER'S DESK Re-entry log book ....contents per cover sheet 1 Portable PA system...operation ....battery compartment O.K. 1 Desk pack I flashlights...operational...battery compartment OK 2 TSC intercom Gaitronics...operational 1 Phone.. .6074...operational 1 Phone...2448...operational 1 Phone...2416...operational 1 Page 3 of 4 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST B EMERGENCY EQUIPMENT AND SUPPLIES OPERATIONS SUPPORT CENTER ....(EP)

DESCRIPTION QUANTITY INITIALS PORTABLE SURVEY INSTRUMENTS Verify the following portable instruments per calibration schedule.

Pole detector-dose rate meter 35 Low range dose rate meter 1 High range dose rate meter 5 Contamination meter 5

_Air sampler HP OFFICE AREA 1 Portable Trauma Kit 1 First Aid Supplies, set NOTES:

If the Silver Zeolite cartridges or charcoal cartridges expire before the next inventory, change them out at this time.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 4 of 4 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST C EMERGENCY EQUIPMENT AND SUPPLIES CENTRAL SECURITY CONTROL BUILDING, FIRE DEPARTMENT ....(EP)

DESCRIPTION QUANTITY INITIALS 1

Charger, Dosimeter...Battery Compartment Operational 5 Dosimeters, Pocket (5R) ....Calibration O.K. 1 Fire Rescue Suit 5

-Gloves, pr 12 TLDs...3 background/9 for use...annual replacement 1 Gloves, Disposable, package 5 Safety Glasses (pr)

PORTABLE SURVEY INSTRUMENTS Verify the following portable instruments per calibration schedule. 1 Dose rate meter 1 Contamination meter 1

_Air sampler 2 I

RMT's DAD's (fast entry mode) 1R/hr dose rate; 1 Rem dose COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 1 of 1 Version 40

02/14/03 9:39:42 T A > FNP-O-EIP-16.O

. -____< CHECKLIST D EMERGENCY EQUIPMENT AND SUPPLIES AUX BLDG EL 155 UNIT 2 RAD SIDE BY LAUNDRY ....(EP)

INITIALS DESCRIPTION QUANTITY Blankets 2 Bucket 1 Decon. Solution (bottle) 1 First Aid Kit 1 Gloves, Disposable, package 1 Absorbent wipes, package 1 Mop 1 Polysheets, package 1 Coveralls, disposable, white 3 Surgeon Gloves, pr 6 3

Latex "Steeleboot" or Rubber Shoe Covers, pr Plastic Shoe Covers, pr 6 Hood 3 Surgeon's cap 3 Radiation barrier tape or tope 100 ft 1

Scissors, pr Airborne Radioactivity Area signs 3 Contaminated Area signs 3 High Radiation Area signs 3 Radiation Area signs 3 2

Tape, Masking, roll 1

Flashlight ....battery compartment operable Verify that the labeling is legible and correct on all chemical products, per SHP-26.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

[*A t ,1..0*

  • *-* FNP-0 EI

.FNP-0-EIP-16.0 02/14/03 9:39:42

  • .J.J. L iL \: * *CHECKLIST E EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING, EL. 121 UNIT 2 RAD SIDE NEAR EAST STAIRWELL...(EP)

INITIALS DESCRIPTION QUANTITY 2

Blankets Bucket 1 Decon. Solution (bottle) 1 First Aid Kit I Gloves, Disposable, package 1 Absorbent wipes, package 1 Mop 1 Polysheets, package 1 Coveralls 3 Cloth Gloves, pr 3 Rubber Gloves, pr 3 Cloth Shoe Covers, pr 3 Rubber Shoe covers, pr 3 Hood 3 Surgeon's cap 3 Radiation barrier tape or rope 100 ft Airborne Radioactivity Area sign 3 Contaminated Area sign 3 High Radiation Area sign 3 Radiation Area sign 3 2

Tape, Masking, roll 1

-Flashlight ...battery compartment operational Scissors (pr) 1 Verify that the labeling is legible and correct on all chemical products, per SHP-26.

COMMENTS REASON FOR INSPECTION CHECKED BY:__

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST F EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING, EL. 83 UNIT 1 RAD SIDE WEST STAIRWELL ....(EP)

DESCRIPTION QUANTITY INITIALS Self Contained Breathing Apparatus 1 Verify that the SCBA unit is operational per step 10 of the EIP.

COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Monthly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST G EMERGENCY EQUIPMENT AND SUPPLIES PLANT EMERGENCY VEHICLE EQUIPMENT ....(SH)

DESCRIPTION QUANTITY RNýAL 4

Oxygen masks 4 Suction catheter, each 2 Gauze bandage 4" x 5 yards, boxes 2 Large eye pads, boxes 4 Rescue mask, each 6 Penlights, each 2 Non-adhering dressing 3" x 8", boxes 2 Bandage scissors, each 2 Hypo-allergenic tape, boxes 2 Band aids, boxes 4 Gauze sponges 4" x 4", packs 4 Gauze sponges 3" x 3", packs 2 Butterfly closures, boxes 5 Burn sheets, each 2 Airway kits, each 2 Air splint kits, each 4 Trauma dressing 30" x 10", each 6 Elastic bandage, each 1 Sodium Chloride solution, bottle (OR-1-99-383)

Expiration Date Expiration after next inventory Yes No 4 Neck collars, each 3 Wound wipes, boxes 1 Gauze scissors, each 10 Surgipads, each I CPR board, each 1 Laerdal portal suction unit, each 1 Portable oxygen kit, each...tank pressure >1/4 full scale 1 1/2" hypo-allergenic cloth tape, boxes 8 Cold packs, each 1 Long back board, each 1 Short back board, each 2 Stretcher, each 1 Scoop stretcher, each 1 Breathing air bottle, each ...tank pressure >50 psig SAT/UNSAT Hospital radio operability check, circle one 1 Blood pressure kit, each 1 Ambu Bag 1 Trauma kit Page 1 of 3 Version 40

02/14/03 9:39:42 T 7Th FNP-0-EIP-16.0 L LCHECKLIST G EMERGENCY EQUIPMENT AND SUPPLIES PLANT EMERGENCY VEHICLE EQUIPMENT ....(SH)

IDESCRIPTION QUANTITY Bags, Plastic 10 2

Blankets Charger, Dosimeter...Battery Compartment Operational 1 2

Dosimeters, Pocket (5R)...calibration O.K.

First Aid Kit 1 Gloves, disposable, package 1 Labels, "CAUTION RADIOACTIVE MATERIAL" (roll) 1 Lead Covering Material, sheet 1 Coveralls, disposable, white 4 Surgeon gloves, pr 8 Latex "Steeleboot" or Rubber Shoe Covers, pr 4 Plastic Shoe Covers, pr. 12 Hood, Tyvek 4 Surgeon cap, Tyvek 4 Decon Solution (bottle) 1 Airborne Radioactivity Area signs 4 Radiation Area signs 4 Contaminated Area signs 4 Radioactive Materials signs 4 Tape, Masking, roll I 12 TLDs...3 background/9 for use...annual replacement Wristbands 10 Absorbent wipes, package 1 Flashlight...Battery compartment operable I PORTABLE SURVEY INSTRUMENTS Verify the following portable instruments per calibration schedule.

Contamination meter I NOTES:

If the Sodium Chloride Solution expires before the next inventory, change it out at this time.

COMMENTS Page 2 of 3 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST G EMERGENCY EQUIPMENT AND SUPPLIES PLANT EMERGENCY VEHICLE EQUIPMENT ....(SH)

CHECKED BY:

REASON FOR INSPECTION Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 3 of 3 Version 40

7 -\,F FNP U-N-ETP-16.

02/14/03 9:39:42 CHI7,CKLIST H r

EMERGENCY EQUIPMENT AND SUPPLIES FNP STRETCHER CABINETS ....(SH)

NOTE: Inspection includes verifying accessibility and posting per step 18.0.

QUANTiTY INITIALS DESCRIPTION UTILTY BUILDING 1 Pole Stretcher...Blanket WATER TREATMENT PLANT 1 Stretcher, basket...with 4-point sling, 4 body straps, 2 blankets SRV.BLDG.MAINTENANCE SHOP 1 Stretcher, basket...with 4-point sling, 4 body straps, 2 blankets C.S.C. BUILDING 1 Pole Stretcher...Blanket SWITCHHOUSE 1 Pole Stretcher....Blanket CONTROL ROOM 1 Pole Stretcher... .Blanket UNIT I AUX-RCA 155' W. STAIRS 1 Stretcher, basket ....with 4 point sling, 4 body straps, 2 blankets UNIT 1 AUX-RCA 139' W. STAIRS 1 Pole Stretcher...Blanket UNIT 1 AUX-RCA 121' E. HALL 1 Pole Stretcher...Blanket UNIT 1 AUX-RCA 100' W. STAIRS 1 Pole Stretcher.. .Blanket UNIT 1 AUX-RCA 83' W STAIRS I Stretcher, basket...with 4-point sling, 4 body straps, 2 blankets UNIT 1 AUX NON-RAD 139' STAIRS 1 Pole Stretcher...Blanket UNIT 1 AUX-NON-RAD 121' STAIRS I Pole Stretcher....Blanket Page 1 of 3 Version 40

02/14/03 9:39:42 -v FNP-0-EIP-16.0

ý--A ILLCHECKLIST H EMERGENCY EQUIPMENT AND SUPPLIES FNP STRETCHER CABINETS...(SH)

INITIALS DESCRIPTION QUANTITY UNIT 1 AUX-NON-RAD 100' STAIRS Pole Stretcher....Blanket UNIT 1 TURB BLDG 189' W. STAIRS Pole Stretcher....Blanket UNIT 1 TURB BLDG 137' S. STAIRS Pole Stretcher....Blanket SRV.WTR. NE ENTRANCE Pole Stretcher....Blanket RIVER WTR. S. COMPARTMENT Pole Stretcher....Blanket DIESEL GEN BLDG W. ENTRANCE Pole Stretcher....Blanket FIRE PROTECTION BUILDING Stretcher, Basket ....with 4-Point Sling, 4 Body Straps, 2 Blankets UNIT II TURBINE BLDG EL. 155' Stretcher, Basket ....with 4-Point Sling, 4 Body Straps, 2 Blankets UNIT I[ AUX-RAD 155" E.

Stretcher Basket ..... Blanket UNIT II TURBINE BLDG. 189' N. STAIRS Pole Stretcher....Blanket UNIT 11 AUX-NON-RAD 139' STAIRS Pole Stretcher....Blanket 1 UNIT RIAUX-NON-RAD 121' STAIRS Pole Stretcher....Blanket UNIT II TURBINE BLDG. 137' N. STAIRS Pole Stretcher....Blanket Page 2 of 3 Version 40

r A FNP-0-EIP-16.0 02/14/03 9:39:42

  • CHECKLIST H EMERGENCY EQUIPMENT AND SUPPLIES FNP STRETCHER CABINETS...(SH)

QUANTITY INITIALS DESCRIPTION UNIT II AUX-NON-RAD 100' STAIRS Pole Stretcher....Blanket UNIT 11 AUX RAD 139' E. STAIRS Pole Stretcher....Blanket UNIT II AUX RAD 121' E. STAIRS Pole Stretcher....Blanket UNIT 1I AUX RAD 100' E. STAIRS Pole Stretcher....Blanket UNIT II AUX RAD 83" W. STAIRS Pole Stretcher... .Blanket UNIT II CL 2 HOUSE/COOLING TOWER Pole Stretcher....Blanket EOF Pole Stretcher....Blanket COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 3 of 3 Version 40

02/14/03 9:39:42 1 .1

  • 7 T! FNP-0-EIP-16.0 CHECKLIST I EMERGENCY EQUIPMENT AND SUPPLIES

....(SH)

CENTRAL SECURITY CONTROL BUILDING, AMBULANCE KIT (Stored in Fire Protection Cabinet)

DESCRIPTION QUANTITY INITIALS 10 Bags, Plastic Blanket I 1

Charger, Dosimeter ...Battery Compartment Operational Dosimeters, Pocket (5R)...Calibration O.K. 4 Labels, "CAUTION RADIOACTIVE MATERIAL"(roll) 1 1

Lead Covering Material, sheet Desk pack 1 Lab Coats 4 Cloth Gloves, pr 4 Rubber Gloves, pr 4 Cloth Shoe Covers, pr 4 Rubber Shoe Covers, pr 4 Hood 4 4

Surgeons Caps Airborne Radioactive Area signs 4 Radiation Area signs 4 Contaminated Area signs 4 Radioactive Materials signs 4 2

Tape, Masking, roll TLDs ....3 background/4 for use ..... annual replacement 7 Gloves, disposable, package 1 Wristbands 10 COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST J EMERGENCY EQUIPMENT AND SUPPLIES NURSES STATION...(SH)

DESCRIPTION QUANTITY INITIALS Decon solution (bottle) 1 Detergent (package) 1 Hand brushes 2 Verify that the labeling is legible and correct on all chemical products, per SHP-26 COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 1 of 1 Version 40

E FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST K EMERGENCY EQUIPMENT AND SUPPLIES EOF AIR COMPRESSOR SHED, RADIATION MONITORING TEAM KITS...(EP)

DESCRIPTION QUANTITY INITIALS Kit_I Kit_2 Kit.3 PROCEDURES AND DRAWINGS Obtain the following Document Control procedure and drawing inventory sheets.

Verify procedures per the DC inventory.

EP-EOF-RMT KIT I EP-EOF-RMT KIT 2 EP-EOF-RMT KIT 3 SMALL CASE:

Air Sampling Package (Silver Zeolite) (OR-1-99-383) 6 Expiration Date Expiration after next inventory Yes_ No 1 Compass 2 Flashlight...Battery Compartment Operational 1 RMT Keys (set) 1 Desk pack 5 Survey Forms (EIP-4, Fig. 4) 7 TLDs...3 background /4 for use...replace annually (Background TLD's in Cabinet and are not in each case) 1 Tweezers Safety Glasses (pr)...clear 2 Safety Glasses (pr) ...tinted 1 Smears, box 1 Radio Area Coverage Map 1 Gloves, disposable, package 1 Tape, masking (roll) 1 Labels, "Caution-Radioactive Material" (roll) 15 each Filters for Environmental Air Samplers Page 1 of 3 Version 40

02/14/03 9:39:42 / " FNP-O-EIP-16.0 S& . _z

  • _CHECKLIST K EMERGENCY EQUIPMENT AND SUPPLIES KITS...(EP)

EOF AIR COMPRESSOR SHED, RADIATION MONITORING TEAM DESCRIPTION QUANTITY INITIALS KitI Kit2 Kit3 LARGE CASE Absorbent Paper (package) 1 Bags, plastic 10 Flashlights (spotlights)..Battery compartment operational 2 Coveralls (disposable) 4 Rubber Gloves (pr) (disposable) 8 Latex "Steeleboot" or Rubber Shoe Covers , pr (disposable) 4 Hood (disposable) 4 RMT Vehicle Signs (Stored in Room 118) 3 Gloves, package (disposable) 1 Cubitainer (at least 1 gal. capacity) 3 Grass clippers (pr) 1 Small shovel 1 Tape, duct (roll) 1 Weighted Sample Bottle and Rope I Sample Pump and Tubing I EOF RMT CABINET:

Plot Board 1 Rain Coats 2 Rain Pants 2 Rain Boots 2 EOF RMT GENERATOR CABINET:

Portable electric generator.. .Operable 1 1/2 gallon gas can...(empty or treated) 1 Funnel 1 Hand pump for gas removal NOTES:

inventory, change If the Silver Zeolite cartridges or charcoal cartridges expire before the next them out at this time.

Page 2 of 3 Version 40

I FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST K

/ I EMERGENCY EQUIPMENT AN]) SUPPLIES EOF AIR COMPRESSOR SHED, RADIATION MONITORING TEAM KITS...(EP)

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 3 of 3 Version 40

02/14/03 9:39:42

  • jUi A F 7 T FNP-0-EIP-16.0 CHECKLIST L EMERGENCY EQUIPMENT AND SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

INITIALS DESCRIPTION QUANTITY PROCEDURES Obtain the following Document Control procedure. Verify procedures per the DC inventory.

EP-EOF-RECOVERY MANAGER EP-EOF-REC. MGR. ASSISTANT EP-EOF-ENV. SUPERVISOR EP-EOF-REACTOR ENGINEER EP-EOF-COMP SERV SUPPORT EP-EOF-QC SUPPORT EP-EOF-DAD EP-EOF-ACCESS CONTROL EP-EOF-STATUS BD KEEPER EP-EOF-RMT CONTROLLER EP-EOF-KEY LOCKER EP-EOF-GOP-RECOVERY MANAGER EP-EOF-GOP-REC. MGR ASSISTANT CABINET IL DESK TSC/EOF Gaitronics 1 Telephone... 1611 ...operational 1 Telephone...6156...operational I FNP RMA Southern Linc Radio.....operational 1 CABINET IL DRAWER A - RECOVERY MANAGER 1 Log Book In Boxes I Desk Pack 1 CABINET IL DRAWER B 10CFR parts 0-99 S.R.O.O.I.R.A.P. 1 Nureg - 0845 1 Page 1 of 8 Version 40

02/14/03 9:39:42 [ FNP-0-EIP-16.0

  • J )-. CHECKLIST L EMERGENCY EQUIPMENT AND SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

INITIALS DESCRIPTION QUANTITY CABINET IL DRAWER C/D - RECOVERY MANAGERS ASSISTANT Desk Pack 1 Loud Speaker 1 CABINET 2L DESK FTS Phone.. .HPN 1 FTS Phone...RSCL 1 FTS Phone...ENS 1 Tone Alert Radio...operational 1 CABINET 2L DRAWER A - DOSE ASSESSMENT DIRECTOR Log Book 1 Desk Pack 1 CABINET 2L DRAWER B Dothan telephone book I Birmingham telephone book 1 CABINET 2L DRAWER C - ENVIRONMENTAL SUPERVISOR 1 Log Book Solar Calculator I Desk Pack 1 CABINET 2L DRAWER D.. .no inventoried items CABINET 3L DESK 2 FTS phone...HPN 2

FTS phone...PMCL Wireless Headset 1 CABINET 3L DRAWER A - STATUS BOARD KEEPER 2 Wipe-alls (pkg)

Markers 4 Marker Board Cleaner (bottles) 3 Page 2 of 8 Version 40

0214039:39:42-EIP-16.

02/1/03 C

3942 IPT {~)CHECKLIST L EMERGENCY EQUIPMENT AND SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

DESCRIPTION QUANTITY INITIALS CABINET 3L DRAWER A - STATUS BOARD KEEPER NOUE sign 1 Alert sign I Site sign 1 General sign 1 Unit 1 sign 1 Unit 2 sign 1 Unit 1, 2 sign 1 Desk Pack 1 CABINET 3L - DRAWER B...no inventoried items CABINET 4L - COMMUNICATION AREAS GEMA Fleet Southern Linc Radio.. .Operational AEMA Fleet Southern Linc Radio.. .Operational ENN EOF FNP Southern Linc Radio ... Operational CABINET 5L COMMUNICATIONS AREA ENN 1 Telephone...6154...Operational 1 Telephone...4659...Operational 1 CABINET 6L COMMUNICATIONS AREA

_Telephone.. 4662 (GA call-in)..Operational 1 Telephone...4663 (AL call-in).. .Operational 1 Desk Pack 2 FAX Instruction Book 1 CABINET 7L Extension Cords 6 Ground Fault Interrupter I Phone Extension Cords 9 CABINET 8L - FORMS DRAWER Verify correct forms per drawer index CABINET 9L....No inventoried items Page 3 of 8 Version 40

02/14/03 9:39:42 A FNP-0-EIP-16.0

,**- 1'-* .Je CHECKLIST L EMERGENCY EQUIPMENT AND SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

INITIALS DESCRIPTION QUANTITY CABINET 10L - COMMUNICATION AREA Fax Machine (Ga.Fax) 814-4653 1 Fax Machine (Ala.Fax) 257-1035 1 Log Book 1 Telephone...6200 ...operational 1 TLDs...3 background/50 for use..replaced annually 53 Digital Alarming Dosimeters listed below.. .check fast entry mode Fast entry settings and count for EOF DADs EOF staff and area monitors: 40 mrem/hr dose rate; 100 mrem dose 42 RMTs (Rm. 118): 1R/hr dose rate; 1 rem dose 6 Printer Paper (8-1/2 x 11) (pks) 8 Printer Cartridge (ERDS/ARDAIRMDA printer) 1 2

Printer Cartridge, black ink (Midas/EIP29/30)

Printer Cartridge, color ink (EIP29/30) 1 Printer Cartridges, color ink (Midas) 1 2

Printer Cartridge (Fax Machines)

DOSE ASSESSMENT AREA MIDAS Computer 1 MIDAS Printer I ERDS Computer 1 ERDS Printer 1 EIP-29/30 Computer 1 EIP-29/30 Printer 1 2

Desk Packs Telephone...6130...operational Telephone ...6121 ...operational ROOM 118 Potassium Iodide, bottle (OR- 1-99-383) 150 Expiration Date Expiration after next inventory Yes No If thyroid blocking drugs (Potassium Iodide) are found missing, notify the Emergency Planning Coordinator. The Emergency Planning Coordinator will then immediately notify the Assistant General Manager-Operations. n/a Page 4 of 8 Version 40

02/14/03 9:39:42 C, ~.* FNP-0-EIP-16.O

,*:,. .ILLY--

  • CHECKLIST L EMERGENCY EQUIPMENT AND SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

INITIALS DESCRIPTION QUANTITY ROOM 118 ROOM_118_Flashlights 2 First Aid Kit 1 Tool Kit...containing channel locks, hacksaw, carpenters hammer, 1 pliers, screwdriver set, pipe wrench, large adjustable wrench, small adjustable wrench Telephone...6120...operational I EOF RMT Control Southern Linc Radio.....operational Alabama radio base station.....operational 1 Georgia radio base station.....operational 1 Desk Pack 1 EOF RMT Control Kenwood portable radio 1 PORTABLE SURVEY INSTRUMENTS Verify the following portable instruments per calibration schedule.

Dose rate meter 4 Contamination meter 4

________Air sampler 4 ROOM 118 KEY CABINET Key 1 EOF master...MD-23 1 Key 2 EOF master...MD-22 1 Key 3 EOF master...MD-21 I Key 4 EOF master ...MD-25 I Key I1 Vis. Center Storage Rm. 263...VIS 3 1 Key 12 Comm. Rm. 108...2GC-600 1 Key set Chemistry Truck I set Key set Maintenance Vehicle I set Key set Env. Truck 1 set Key set Training Center Van 1 set Key set Visitor Center Van 1 set Side Cutters (for cutting red seals) pr 1 Page 5 of 8 Version 40

02/14/03 9:39:42 FNP--EIP-16.0

, -CHECKLIST L EMERGENCY EQUIPMENT AND SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

INITIALS DESCRIPTION QUANTITY NRC CART 105 Telephone...4660...operational 1 Telephone...MCL...FTS 1 Telephone...ENS...FTS 1 Logbook 1 Desk Pack 1 Telephone.. .6119 (room 103).. .operational 1 Telephone.. .6122 (room 104).. .operational 1 Telephone...6131 (room 105)...operational 1 PHONE CART 1 AND 2 Telephone...6135...operational 1 Telephone... 8-257-1603...operational 1 Telephone...6145/6156...operational 1 Telephone...8-257-1 6 11...operational 1 Telephone...4678 ...operational I Telephone...4658...operational I

____Telephone...4676.. .operational 1 Telephone...6155...operational 1 Telephone...4677...operational 1 Telephone...4657 ...operational 1 Telephone...4656.. .operational 1 Telephone...6133...operational 1 Telephone ...4203 ...operational 1 Telephone.. .4204...operational 1 Telephone...3355...operational I Telephone...3387...operational I HP CABINET #L- 11 HALLWAY ACROSS FROM RM 119 Safety Glasses (20 pr) I pk Plastic Booties (20 pr) I pk Tyvek Hoods (15 each) 1 pk Latex "Steeleboot" or Rubber Shoe Covers (5 pr) 1 pk Coveralls (5 pr) 3 pk 2

Surgeon's gloves (box)

Silver Zeolite ....individual cartridge (OR-1-99-383) 20 pk Expiration Date_

Expiration after next inventory Yes No Page 6 of 8 Version 40

02/14/03 9:39:42 ~~ T7 Y FNP-O-EIP-16.O CHECKLIST L EMERGENCY EQUIPMENT AND SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

DESCRIPTION QUANTITY INITIALS HP CABINET #L-11 HALLWAY ACROSS FROM RM 119 2 Masking Tape (roll)

HP CABINET #L-12 HALLWAY ACROSS FROM JANITOR'S CLOSET 2 Decon Solution (bottle) 2 Tape, electrical (roll) 2 Lead pigs 2

Smears (box)

Rope, Radiation 100 ft Sample bottle 1 ltr (small mouth) 4 Sample Bottle 9 ltr (large mouth) 4 Petri dish (20/pk) 5 Planchettes (100/pk) 1 Step-off pads 5 Wipe Alls (pk) 1 Marinelli 1 ltr w/lids 8 Marinelli 4 ltr w/lids 8 Sample bottle, 30 ml. (20/pk) 1 Lab paper 50ft Signs "Caution Radiation Controlled Area" 3 Rad. Area, sign 6 Rad. Materials sign 6 Contaminated Area sign 6 Verify that the labeling is legible and correct on all chemical products, per SHP-26 MECHANICAL EQUIPMENT ROOM 113 - NRC CABINET NRC Trainer Extension Cords (30') 3 SIMULATOR ENN Sim FNP Southern Linc Radio.....Operational I NOTES:

change them If the Silver Zeolite cartridges or Potassium Iodide expire before the next inventory, out at this time.

Page 7 of 8 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST L EMERGENCY EQUIPMENT AN]) SUPPLIES EMERGENCY OPERATIONS FACILITY...(EP)

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 8 of 8 Version 40

02/1403 9:39:42 T 9:39:42 FNP-0-EIP-16.0M

  • CHECKLIST 02/14/03 EMERGENCY EQUIPMENT AND SUPPLIES SOUTHEAST ALABAMA MEDICAL CENTER.. .(EP)

DESCRIPTION QUANTITY INITIALS PROCEDURES AND DRAWINGS Obtain the following Document Control procedure and drawing inventory sheets. Verify procedures per the DC inventory.

EP-MORGUE-S.A.M.C.

20 Bags, Plastic Charger,Dosimeter.. .Battery compartment operational I Dosimeter, Pocket (5R)...Calibration O.K. 10 Dosimeter, Pocket (200 mrem)...Calibration O.K. 20 Clippers, Hair 1 Decon. Solution (bottle) I Detergent Soap, package 1 Drums, Waste 3 2

Filter Paper, Package Charcoal Cartridge (OR-1-99-383) 10 Expiration Date Expiration after next inventory Yes No Labels, "CAUTION RADIOACTIVE MATERIAL" (roll) I 1

_Lead pig Paper, Absorbent, package 1 Rubber Gloves, pr 20 Surgeon's gloves, pr 8 20 Plastic shoe covers, pr Desk Pack 1 Survey Forms (set) 1 Radiation rope or barrier tape 100 ft Radiation Area signs 10 Contaminated Area signs 10 Radioactive Materials signs 10 High Radiation Area signs 5 I

Smears, box Negative Pressure Unit 1 Tape, duct, roll 6 TLDs...3 background/l 8 for use..replace annually 21 Extremity TLDs, pr.....replace annually 5 Rad bags 4 2

Step-off pads Herculite I Tyveks coveralls (white) case 2 Sample bucket 1 Sample bottle 4 Page 1 of 2 Version 40

02/14/03 9:39:42 ' FNP-0-EIP-16.0 CHECKLIST M EMERGENCY EQUIPMENT AND SUPPLIES SOUTHEAST ALABAMA MEDICAL CENTER...(EP)

INITIALS DESCRIPTION QUANTITY Scotch Brite pads (or similar product) 10 Hospital decontamination table I 20 gal. container for hospital decontamination table 4 2

Portable hospital decontamination table 5 gal. container for portable hospital decontamination table 4 Verify that the labeling is legible and correct on all chemical products, per SHP-26 PORTABLE SURVEY INSTRUMENTS Verify the following portable instruments per calibration schedule.

Dose rate meter 1 Contamination meter 2 Air sampler 1 NOTES:

time.

If the Charcoal cartridges expire before the next inventory, change them out at this COMMENTS REASON FOR INSPECTION CHECKED BY:

Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 2 of 2 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST N EMERGENCY EQUIPMENT AND SUPPLIES CONTROL ROOM EMERGENCY FOOD SUPPLY ....(EP)

DESCRIPTION QUANTITY INfIALS Case #1 of 16 Accessary Kit Case #2 of 16 Miscellaneous Foods Case #3 of 16 Milk Case #4 of 16 Meat Substitutes Case #5 of 16 Miscellaneous Foods Case #6 of 16 Milk Case #7 of 16 Cooking Aids Case #8 of 16 Vegetables Case #9 of 16 Vegetables Case #10 of 16 Fruits Case #11 of 16 Miscellaneous Grains Case #12 of 16 Miscellaneous Grains Case #13 of 16 Miscellaneous Grains Case #14 of 16 Miscellaneous Grains Case #15 of 16 Miscellaneous Grains Case #16 of 16 Miscellaneous Grains Case #1 of 3 Starter Kits Case #2 of 3 Starter Kits Case #3 of 3 Starter Kits COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST 0 EMERGENCY EQUIPMENT AND SUPPLIES ASSEMBLY AREAS...(EP)

DESCRIPTION QUANTITY INITIALS PROCEDURES AND DRAWINGS Obtain the following Document Control procedure and drawing inventory sheets. Verify procedures per the DC inventory.

EP-ASSEMBLY AREA-VCA EP-ASSEMBLY AREA-SBA EP-ASSEMBLY AREA-FABRICATION SHOP EP-ASSEMBLY AREA-WAREHOUSE EP-ASSEMBLY AREA-OSB COMMENTS CHECKED BY:

REASON FOR INSPECTION TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST P EMERGENCY EQUIPMENT AND SUPPLIES CHEMISTRY VEHICLE...(CHEM)

CIRCLE ONE INMALS DESCRIPTION sat / unsat Engine coolant, hoses and clamps sat / unsat Engine oil level sat / unsat Engine belts (condition and tightness) sat / unsat Tires (proper inflation, wear acceptable) sat / unsat Dents and noticeable new body damage sat / unsat Windows and mirrors (cracks and/or breaks) sat / unsat

_Spare tire and jack (proper inflation) sat / unsat Cigarette lighter (radio power supply) sat / unsat All vehicle driveability lights sat / unsat Windshield wipers and washers sat / unsat Clutch or transmission fluid (as applicable) sat / unsat Brakes (fluid) sat / unsat Steering (fluid) sat / u'nsat Seat belts sat / unsat

_Battery (corrosion) sat / unsat Drive vehicle for at least five minutes sat / unsat Interior clean NOTES:

1) Deficiencies should be reported to Shift Supervisor and appropriate group supervisor.
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist.

COMMENTS CHECKED BY:_

REASON FOR INSPECTION TITLE:

Monthly DATE:

Other Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST Q EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING ENTRANCE WEST NON-RAD HALLWAY UNIT 1...(EP)

QUANTITY INITIALS DESCRIPTION Self Contained Breathing Apparatus air bottles (upper rack), pressure >2000 psig 48 48 Self Contained Breathing Apparatus air bottles (lower rack), pressure >2000 psig COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Monthly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 7 A F % T--1 FNP-0-EIP-16.0 0 0 I.9 L , i *CHECKLIST

'!*; R EMERGENCY EQUIPMENT AND SUPPLIES SERVICE BUILDING MAINTENANCE SHOP ....(EP)

INTIALS DESCRIPTION QUANTITY Applicators, cotton tufted, package 1 Bags, plastic 20 Blankets 4 2

Brushes, hand Clippers, hair 1 2

Decon. Solution, bottle Detergent Soap package 1 First Aid Kit I 2)

Cold Packs Pen 1 Coveralls disposable 25 Surgeon Gloves, pr 25 Latex "Steeleboot" or Rubber Shoe Covers , pr 25 Plastic Shoe covers 25 Hood, Tyvek 25 Surgeon Cap, Tyvek 25 Scissors I 2

Splints, Air, kit 2

Splints, arm Smears, package 1 20 Swabs, nasal Tape, masking, roll 6 2

Tweezers Wristbands 10 Absorbent wipes, package 1 Flashlight...Battery Compartment, Operable I Verify that the labeling is legible and correct per SHP-26 on all chemical products.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST S EMERGENCY EQUIPMENT AND SUPPLIES SATELLITE TELEPHONE...(EP)

INITIALS DESCRIPTION NOTE: Steps 1, 2, 3 and 11 marked with a M are to be performed on a monthly basis. The remaining steps marked with a Q are to be performed during the first month of each quarter.

1M. Setup the phone by performing step 18.2 of FNP-0-EIP-8.3.

2M. Place a call from the satellite phone per step 18.3 of FNP-0-EIP-8.3 to any convenient telephone number to verify operability and voice quality.

3M. Place a call to the satellite phone (888-863-3170) from any convenient telephone to verify operability and voice quality.

4Q. Leave phone turned on in standby for eight hours or until a low battery indication is received.

5Q. Refer to satellite telephone users manual in the accessories case pages 89 to 100 for specific instructions on maintaining and charging the batteries.

6Q. While the installed battery is being discharged, charge the spare battery for approximately four hours using the rapid charging funciton of the battery charger.

7Q. After eight hours or a low battery indication, turn off the phone per step 18.4 of FNP-0-EIP-8.3.

SQ. Remove the installed battery and install the freshly charged spare battery.

9Q. Set up the phone by performing step 18.2 of FNP-0-EIP-8.3 and check function 51 to verify the newly installed battery is operating properly.

_10Q. Charge the depleted battery for at least four hours but less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> usning the rapid charging function of the battery charger.

_liM. Verify that the phone is turned off per step 18.4 of FNP-0-EIP-8.3. Return the phone and accessories to the storage location in the EP office storeroom, ensuring that the batteries are stored in the proper long term storage position per the users manual illustration page 89.

Page 1 of 2 Version 40

02/14/03 9:39:42 FNP-0-EIP-16.0

,-

  • il

, I.J: CHECKLISTS EMERGENCY EQUIPMENT AND SUPPLIES SATELLITE TELEPHONE... (EP)

COMMENTS CHECKED BY:

REASON FOR INSPECTION TITLE:

Monthly Quarterly Post Drill Emergency Use DATE:

Other Page 2 of 2 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST T EMERGENCY EQUIPMENT AND SUPPLIES HVAC SYSTEM - EOF....(EP)

DESCRIPTION QUANTITY INITIALS Align and operate EOF HVAC system in Outside Air Filtration Mode per FNP-0-EIP-27.0, Attachment 3, for 30 minutes Align and operate EOF HVAC system in Isolation Mode per FNP-0-EIP-27.0, Attachment 3, for 30 minutes Restore EOF HVAC system to Normal Mode per FNP-0-EIP-27.0, Attachment 3 COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page I of I Version 40

FNP-O-EIP-16.O r / F 02/14/03 9:39:42 T - FNP-0-EIP-16.0 t-a% 2* Lv o* CHECKLIST U EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING, EL. 139 UNIT 1 RAD SIDE HALLWAY BY COUNTING ROOM ..... (EP)

INITIALS DESCRIPTION QUANTITY 2

Blanket Bucket I Decon. Solution, (bottle) 1 First Aid Kit 1 Absorbent wipes, package 1 Mop 1 Polysheets, package 1 Coveralls, disposable 3 Rubber Gloves, pr. 3 Latex "Steeleboot" or Rubber Shoe Covers, pr. 3 Plastic Shoe Covers, pr. 3 Hood, Tyvec 3 Surgeons Cap, Tyvek 3 Radiation barrier tape or rope 100 ft Scissors, pr 1 Airborne Radioactivity Area signs 3 Contaminated Area signs 3 High Radiation Area signs 3 Radiation Area signs 3 Tape, Masking, roll 2 Flashlight...Battery compartment, operable 1 Verify that the labeling is legible and correct on all chemical products, per SHP-26 COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

02/14/03 9:39:42 YY*7*.

SL!NP-CHECKIST x**-*

    • .*3.*JCHECKLIST FNP-0-EIP-16.0V V

EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING, EL. 100 UNIT 1 RAD SIDE HALLWAY ....(EP)

INITIALS DESCRIPTION QUANTITY 2

Blanket Bucket 1 Decon. Solution (bottle) 1 First Aid Kit 1 Absorbent wipes, package 1 Mop 1 Polysheets, package 1 Coveralls, disposable 3 3

_Rubber gloves, pr.

Latex "Steeleboot" or Rubber Shoe Covers, pr 3 Plastic shoe covers, pr 3 Hood, Tyvek 3 Surgeons Cap, Tyvek 3 Radiation barrier, tape or tope 100 ft Scissors, pr. 1 Airborne Radioactivity Area signs 3 Contaminated Area signs 3 High Radiation Area signs 3 Radiation Area signs 3 2

Tape, masking, roll Flashlight...battery compartment, operable I Verify that the labeling is legible and correct on all chemical products, per SHP-26 COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:_

Page 1 of 1 Version 40

02/14/03 9:39:42 t4 * *;1 ¢ T', I_,*,- --*' T-p , P 0E P 1 .W FNP--EIP-16.

F H0/! t K CHECKLIST EMERGENCY EQUIPMENT AND SUPPLES AUXILIARY BUILDING, EL. 83 UNIT 2 RAD SIDE HALLWAY ....(EP)

INITIALS DESCRIPTION QUANTITY 2

Blanket Bucket 1 Decon. Solution (bottle) 1 First Aid kit 1 Absorbent wipes, package 1 Mop 1 Polysheets, package 1 Coveralls, disposable 3 Rubber Gloves, pr. 3 Latex "Steeleboot" or Rubber Shoe Covers, pr. 3 Plastic shoe covers, pr 3 Hood, Tyvek 3 Surgeons cap, Tyvek 3 Radiation Barrier Tape or Rope 100 ft Scissors, pr 1 Airborne Radioactivity Area signs 3 Contaminated Area signs 3 High Radiation Area signs 3 Radiation Area signs 3 Tape, masking, roll 2 Flashlight...battery compartment, operable 1 Verify that the labeling is legible and correct on all chemical products, per SHP-26 COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:_

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST X EMERGENCY EQUIPMENT AND SUPPLIES HOT SHUTDOWN PANELS UNIT 1....(EP)

DESCRIPTION QUANTITY INITIALS PROCEDURES AND DRAWINGS Obtain the following Document Control procedure and drawing inventory sheets. Verify procedures per the DC inventory.

EP-UNIT 1-HOT SHUT DOWN PANEL HOT SHUTDOWN PANEL CORRIDOR UNIT 1 1

Sound powered headset ....operational 1 Sound powered extension cord 3 Flashlight.. .battery compartment, operational 1 12 inch adjustable wrench HOT SHUTDOWN PANEL COMMUNICATIONS ROOM UNIT 1 1 Sound powered headset .... operational 1 Sound powered extension cord 3 Flashlight...battery compartment, operational COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 0 Y 7 A T'

\CH '_:7*

  • FNP-0-EIP-16.0YIST Y

EMERGENCY EQUIPMENT AND SUPPLIES HOT SHUTDOWN PANELS UNIT 2 .... (EP)

DESCRIPTION QUANTITY INITIALS PROCEDURES AND DRAWINGS Obtain the following Document Control procedure and drawing inventory sheets. Verify procedures per the DC inventory.

EP-UNIT 2-HOT SHUT DOWN PANEL HOT SHUTDOWN PANEL COMMUNICATIONS ROOM UNIT 2 1

Sound powered headset ....operational 1

Sound powered extension cord 3

Flashlight...battery compartment, operational I

12 inch adjustable wrench HOT SHUTDOWN PANEL CORRIDOR UNIT 2 1

Sound powered headset ....operational I

Sound powered extension cord 3

Flashlight...battery compartment, operational COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 .

___£ *, * .CHECKLIST Z EMERGENCY EQUIPMENT AND SUPPLIES CSC GUARD TOWER EMERGENCY CELLULAR TELEPHONE ....(EP)

DESCRIPTION QUANTITY INITIALS Verify phone can place a call on System B (334-797-4336)

Verify phone can receive a call on System B (334-797-4336)

Verify phone can place a call on System A (334-790-3381)

Verify phone can receive a call on System A (334-790-3381)

Disconnect phone from power supply with the phone on for six hours to discharge battery Re-connect phone to power supply INSTRUCTIONS FOR SWAPPING PHONE FROM A to B:

The number (1) To display the system on which the phone is operating, press "recall" and #.

should appear. Press end/clear to clear the number.

should (2) To swap to the other system, press "recall", # and "store". The new number appear.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST AA EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING, EL. 83 UNIT 2 RAD SIDE WEST STAIRWELL.. .(EP)

DESCRIPTION QUANTITY INITIALS 1

Self Contained Breathing Apparatus Verify that the SCBA unit is operational per step 10 of the EIP COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Monthly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

02/14/0 9:39:42 Tr FNP-0-EIP-16.0 02/4/0 - 9:9:4

DESCRIPTION QUANTITY INITIALS PROCEDURES AND DRAWINGS Obtain the following Document Control procedure and drawing inventory sheets. Verify procedures per the DC inventory.

EP-TSC-EMERGENCY DIRECTOR EP-TSC-TECHNICAL MANAGER EP-TSC-OPS MANAGER EP-TSC-MAINTENANCE MANAGER EP-TSC-HP MANAGER EP-TSC-CHEM. SUPERVISOR EP-TSC-SHIFT RADIO CHEMIST EP-TSC-RMT CONTROLLER EP-TSC-LICENSING ENGINEER EP-TSC-SYSTEMS ENGINEER EP-TSC-NRC EP-TSC-DOCUMENT ROOM-DRAWINGS EP-TSC-GOP-EMERGENCY DIRECTOR (obtain from B'ham DC)

_______ EP-TSC-GOP-TECHNICAL MANAGER (obtain from B'ham DC)

COMMUNICATIONS AREA Ericsson portable phone (ext. 4988) 1 Fax Machine (Ga. Fax) (814-4665) 1 Fax Machine (Al. Fax) (257-1155) 1 General Emergency sign 1 Site Area Emergency sign 1 I

_Alert sign NOUE sign 1 Unit I sign Unit 2 sign Unit l and 2 sign 2

Headsets, sound powered phone operational Forms book...verify forms in book per index Desk Pack 2 2)

Printer cartridge...AIJGA FAX machine...

Printer cartridge...Back up MIDAS 1 Printer cartridge...SPDS/PPC/ERDS/ARDA 1 8 1/2 x I1 paper...packs 8 Printer cartridges...MIDAS, color cartridges l ea.

Page 1 of 4 Version 40

02/14/03 9:39:42 - 1 FNP--EIP-16.

I. iJ7 *\ -j., *CHECKLIST BB EMERGENCY EQUIPMENT AND SUPPLIES TECHNICAL SUPPORT CENTER.. .(EP)

DESCRIPTION QUANTITY INITIALS TSC KEY LOCKER ENN 1 Telephone 814-4666...operable 1 Telephone 257-1601...operable 1 Telephone FTS ENS 1 Telephone FTS HPN 1 TSC Radio Cabinet key 1 Emergency Director Desk key 1 Technical Manager Desk key 1 OPS Manager Desk key 1 Maintenance Manager Desk key 1 MIDAS Computer Cabinet key 1 RMT Controller Desk key 1 NRC Desk key 1 Document Room key 1 RMT Radio Cabinet key 1 TSC Southern Linc ENN key 1 Control Room Remote Southern Linc key 1 Southern Linc Radio Cabinet 1 Key set Chemistry Truck 1 Key set Maintenance Vehicle 1 Key set Env. Truck 1 Key set Training Center van 1 Key set Visitor Center van 1 TSC RADIO CABINET Kenwood handheld radio and charger I SOUTHERN LINC RADIOS TSC RMT Control.. .Operational Southern Linc Radio ENN TSC... FNP Operational Southern Linc Radio FNP ED/EDA Southern Linc Radio.. .Operational GEMA Fleet Southern Linc Radio ... Operational AEMA Fleet Southern Linc Radio ... Operational Page 2 of 4 Version 40

02/14/03 9:39:42 T .T7*"'"** 4FP0EP1.

T[ FNP-0-EIP-16.0 0 / 3Z- _ , /,., CHECKLIST BB EMERGENCY EQUIPMENT AND SUPPLIES TECHNICAL SUPPORT CENTER...(EP)

QUANTITY INITIALS DESCRIPTION EMERGENCY DIRECTOR DESK 1

Portable public address Telephone 6016...Emergency Director...operable 1 Telephone 4662...Alabama Liaison...operable 1 Telephone 4663...Georgia Liaison...operable 1 Desk Pack 1 S.R.O.O.I.R.A.P. 1 TECHNICAL MANAGER DESK Telephone 6010...Operable 1 Nureg - 0845 1 Desk Pack 1 OPS MANAGER DESK Telephone 6017...Operable 1 Desk Pack 1 MAINTENANCE MANAGER DESK Telephone 6018...Operable 1 Desk Pack 2 MIDAS COMPUTER CABINET MIDAS computer 1 Calculators 2 Desk Pack 1 Telephone 6011 ...Operable 1 HP MANAGER DESK Telephone 6012...Operable 1 Telephone FTS HPN 1

_ IOCFR parts 0-99 1 Desk Pack 1 RMT CONTROLLER DESK Telephone 6013...Operable 1 Desk Pack 1 Page 3 of 4 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST BB EMERGENCY EQUIPMENT AND SUPPLIES TECHNICAL SUPPORT CENTER...(EP)

DESCRIPTION QUANTITY INITIALS NRC DESK 1 Telephone 4664...Operable 1 Telephone FTS ENS I Telephone FTS RSCL 1 Telephone FIS PMCL 1 Telephone FTS MCL 1 Desk Pack DOCUMENT ROOM First Aid Kit OSC)

Visually inspect the door seals of door 453 (TSC to Control Room) and door 2480 (TSC to for deterioration or other signs of leakage such as abnormal high noise levels. A Deficiency Report will be written if problems are found.

DR#

Door #453 TSC to Control Room Door #2480 TSC to OSC COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 4 of 4 Version 40

02/14/03 9:39:42 T * -- * * *A *,-"**!FNP-0-EIP-16.0 it, FNPO-IP- .

-4, . :* CHECKLIST CC EMERGENCY EQUIPMENT AND SUPPLIES FIRE FIGHTING EQUIPMENT...(FM)

INITIALS DESCRIPTION QUANTITY UNIT #1 AUX BLDG. HALLWAY OUTSIDE OF HEALTH PHYSICS OFFICE There are five lockers in which the following are distributed:

Crowbar 1 Fire Axes 2 Fire Rescue Suit 1 Hand Lantern...battery compartment, operable 1 Rope (1/2 dia.) 100'coil Coat 5 Helmet 5 Gloves (pr) 5 Boots (pr) 5 Trousers 5 UNIT #1 TURBINE BLDG. EL-155' NORTH WALL AT ENTRANCE TO UNIT #2 TURBINE BLDG.

This storage location has 5 lockers in which the following are distributed:

Coat 5 Helmet 5 Gloves (pr) 5 Boots (PR) 5 Hand Lantern...battery compartment, operable 1 Foam cart with foam (stored adjacent to the lockers) 1 Trousers 5 Page 1 of 2 Version 40

0/14/03 9:39:42 FNP-0-EIP-16.0 02/14/03 9:39:42 :CHECKLIST CC EMERGENCY EQUIPMENT AND SUPPLIES FIRE FIGHTING EQUIPMENT ....(FM)

INITIALS DESCRIPTION QUANTITY DIESEL GENERATOR BUILDING This location has 2 lockers in which the following are distributed:

Coat 2 Helmet 2 Gloves (pr) 2 Boots (pr) 2 Foam cart with foam is stored outside Diesel Generator Room 2B 1 NOTE: Return checklist to Emergency Planning Nuclear Specialist COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 2 of 2 Version 40

02/14/03 9:39:42 FNP-0-EIP-16.0 J- CHECKLIST DD EMERGENCY EQUIPMENT AND SUPPLIES PLANT EMERGENCY VEHICLE ....(SEC)

INITIALS DESCRIPTION CIRCLE ONE Encine coolant, hoses and clamps sat / unsat Enoine oil level sat / unsat Engne belts (condition and tightness sat unsat Tires (proper inflation, wear acceptable) sat / unsat Dents and noticeable new body damage sat / unsat Windows and mirrors (cracks and/or breaks) sat / unsat Spare tire and jack (proper inflation) sat / unsat Radio communications sat / unsat All vehicle driveability lights sat / unsat All vehicle emergency lights sat / unsat Emergency sound equipment sat / unsat Windshield wipers and washers sat / unsat Clutch or transmission fluid (as applicable) sat / unsat Brakes (fluid) sat I unsat Steering (fluid) sat / unsat Seat belts sat / unsat Dual batteries (corrosion) sat / unsat Drive vehicle for at least five minutes sat / unsat Interior clean, patient compartment clean, cot made up sat / unsat First Aid kit present sat / unsat Trauma kit present sat / unsat Dual fuel tanks near full sat / unsat NOTES:

1) Deficiencies should be reported to Shift Supervisor and appropriate group supervisor.
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist the CSC
4) Plant Emergency Vehicle to be parked near CSC when not in use, with the keys in key locker.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Weekly Post Drill TITLE:

Emergency Use Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST EE EMERGENCY EQUIPMENT AND SUPPLIES CHEMISTRY EYEWASH/SHOWER STATIONS...(CHEM)

LOCATIONS:

See list in FNP-0-CCP-333 INITIALS DESCRIPTION Verify operability of station per FNP-0-CCP-333 Verify accessibility per FNP-0-CCP-333 Verify equipment is in the proper location per FNP-0-CCP-333 Verify the location is posted as an emergency location per FNP-0-CCP-333 COMMENTS REASON FOR INSPECTION CHECKED BY:_

TITLE:

MONTHLY DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 LJA Q -- 4 K FNP-0-EIP-16.0 CHECKLIST FF EMERGENCY EQUIPMENT AND SUPPLIES TRAINING CENTER VEHICLE ..... (EP)

DESCRIPTION CIRCLE ONE INITIALS sat / unsat Engine coolant, hoses and clamps sat / unsat Engine oil level sat / unsat Engine belts (condition and tightness sat / unsat Tires (proper inflation, wear acceptable) sat / unsat Dents and noticeable new body damage sat / unsat Windows and mirrors (cracks and/or breaks) sat / unsat Spare tire and jack (proper inflation) sat / unsat Cigarette lighter (radio power supply) sat I unsat All vehicle driveability lights sat / unsat Windshield wipers and washers sat / unsat Clutch or transmission fluid (as applicable) sat / unsat Brakes (fluid) sat / unsat Steering (fluid) sat / unsat Seat belts sat I unsat Battery (corrosion) sat / unsat Drive vehicle for at least five minutes sat / unsat Interior clean NOTES:

1) Deficiencies should be reported to Shift Supervisor and appropriate group supervisor.
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Monthly TITLE:

DATE:

Other Page 1 of 1 Version 40

02/141403 9:394Q W fY'- FNP-O-EIP-16.O EMERGENCY H A.I EQUIPMENT J* IJ AND SUPPLIES CHECKLIST GG FIRE BRIGADE EQUIPMENT ....(FM)

DESCRIPTION QUANTITY INITIALS FIRE BRIGADE VAN VEHICLE 2 CO2 fire extinguishers Dry chemical fire extinguishers 3 5 pr boots helmet 5 5

coats 5 pr gloves Trousers 5 1 1/2" hose (100 ft. section) 1 1 1/2" hose nozzle 1 2

Pressurized water fire extinguisher First Aid Kit (Burn Kit) 1 Hand Lantern ...battery compartment, operable 1 2 1/2 inch hose (50 ft. section) 20 1 1/2 inch hose (50 ft. section) 8

_Spanner wrench 16 Hydrant wrench 12

_Foam Eductor I AFFF Foam container 3 Fire hose clamp I Fire axes 5 Pry bar 5 2 1/2 in. nozzle 10 1 1/2 in. nozzle 10 2 1/2 in. to 1 1/2 in. gated wye 5 2 1/2 in. 1 1/2 inch reducers 5 2 1/2 in. double male 1 2 1/2 in. double female 1 HELIPORT CABINET Dry chemical fire extinguishers 1 boots 1 pr helmet 1 coats 1 1 pr gloves Pry bar I Page 1 of 2 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CZrYYLb CHECKLIST GG EMERGENCY EQUIPMENT AND SUPPLIES FIRE BRIGADE EQUIPMENT ....(FM) stored in I) Fire Brigade Van is to be parked near the CSC when not in use, with the keys the CSC keylocker.

Supervisor.

2) Discrepancies should be promptly reported to the Fire Marshal or Shift
3) Return complete checklists to the Emergency Planning Nuclear Specialist.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 2 of 2 Version 40

02/14/03 9:39:42 FNP-0-EIP-16.0 CHECKLIST HH EMERGENCY EQUIPMENT AND SUPPLIES FIRE BRIGADE VAN ....(SEC)

CIRCLE ONE INITIALS DESCRIPTION sat / unsat Engine coolant, hoses and clamps sat I unsat Engine oil level sat / unsat Engine belts (condition and tightness sat / unsat Tires (proper inflation, wear acceptable) sat / unsat Dents and noticeable new body damage sat / unsat Windows and mirrors (cracks and/or breaks) sat / unsat Spare tire and jack (proper inflation) sat / unsat Radio communications sat I unsat All vehicle driveability lights sat / unsat All vehicle emergency lights sat / unsat Windshield wipers and washers sat / unsat Clutch or transmission fluid (as applicable) sat / unsat Brakes (fluid) sat / unsat Steering (fluid) sat / unsat Seat belts sat / unsat Battery (corrosion) sat I unsat Drive vehicle for at least five minutes sat / unsat Interior clean sat / unsat First Aid kit present sat / unsat Fuel tank near full NOTES:

1) Deficiencies should be reported to Shift Supervisor and appropriate group supervisor.
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist.
4) Fire Brigade van is to be parked near CSC when not in use, with the keys stored in the CSC key locker.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Weekly TITTTF.

Post Drill Emergency Use Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST II EMERGENCY EQUIPMENT AND SUPPLIES ENVIRONMENTAL VEHICLE ....(ENV)

DESCRIPTION CIRCLE ONE INITIALS sat I unsat Engine coolant, hoses and clamps sat / unsat Engine oil level sat / unsat Engine belts (condition and tightness sat / unsat Tires (proper inflation, wear acceptable) sat / unsat Dents and noticeable new body damage sat / unsat Windows and mirrors (cracks and/or breaks) sat / unsat Spare tire and jack (proper inflation) sat I unsat Cigarette lighter (radio power supply) sat / unsat All vehicle driveability lights sat / unsat Windshield wipers and washers sat I unsat Clutch or transmission fluid (as applicable) sat / unsat Brakes (fluid) sat I unsat Steering (fluid) sat / unsat Seat belts sat I unsat Battery (corrosion) sat / unsat Drive vehicle for at least five minutes sat / unsat Interior clean NOTES:

supervisor.

1) Deficiencies should be reported to Shift Supervisor and appropriate group
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist.

COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Monthly DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 T T rlý FNP-0-EIP-16.0

  • \4>-A' CHECKLIST JJ EMERGENCY EQUIPMENT AND SUPPLIES UNIT 1 CABLE SPREADING ROOM FIRE EMERGENCY EQUIPMENT...(OPS)

INITIALS DESCRIPTION QUANTITY Gang Box, Mechanical Maint. Cage, Unit 1 155' Turbine Bldg.. Obtain key QA-01 and DA3 from Ops.

Tool Bag 6" Screw Starter 1 Phillips Head Screwdriver 1 Clutch Head Screwdriver 2 Flatblade Screwdriver 4 Wrench Adjustable 10" 1 Nutdriver 5/16" Insulated I Fuse Puller 1 Channel Locks I Side Cutting Pliers 1 Diagonal Cutting Pliers 1 Needle Nose Pliers 1 Wire Stripper 1 Flashlight...battery compartment, operational 5 2

Electrical Tape (roll) 2 AMP Control Power Fuse 5 3 AMP Control Power Fuse 10 JUMPERS 3 inch 4 6 inch 3 12 inch 1 2

16 inch 22 inch 2 CABLES 100 foot 2 125 foot 4 200 foot 1 220 foot 1 Page 1 of 2 Version 40

02/14/03 9:39:42 FNP-0-EIP-16.0 CHECKLIST JJ EMERGENCY EQUIPMENT AND SUPPLIES UNIT 1 CABLE SPREADING ROOM FIRE EMERGENCY EQUIPMENT...(OPS)

INITIALS DESCRIPTION QUANTITY MISCELLANEOUS Emergency Switch Box with cable attached 1

1 RHR HX AOV Airline Rig Power cords for battery room exhaust fans 1 Nitrogen bottle tank...pressure 1000psig (located on the 155 foot in the Turbine Building)

NOTES:

Return completed checklist to the Emergency Planning Nuclear Specialist via the Operations Unit Supervisor.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use Other DATE:

Page 2 of 2 Version 40

irt MA 02/14/03 9:39:42 PP T 1I..`

FNP-O-EIP-16.O CHECKLIST KK EMERGENCY EQUIPMENT AND SUPPLIES UNIT 2 CABLE SPREADING ROOM FIRE EMERGENCY EQUIPMENT...(OPS)

INiTIALS DESCRIPTION QUANTITY from Ops.

Gang Box, Mechanical Maint. Cage, Unit 2 155' Turbine Bldg. Obtain key QA-01 Tool Bag 6" Screw Starter I Phillips Head Screwdriver 1 2

Clutch Head Screwdriver Flatblade Screwdriver 4 Wrench Adjustable 10" 1 Nutdriver 5/16" Insulated I Fuse Puller 1 Channel Locks 1 Side Cutting Pliers 1 Diagonal Cutting Pliers 1 Needle Nose Pliers 1 Wire Stripper 1 Flashlight...Battery compartment, operational 5 2

Electrical Tape (Roll) 2 AMP Control Power Fuse 5 3 AMP Control Power Fuse 10 JUMPERS 4inch 4 30 inch 4 60 inch 4 CABLES 50 foot 1 100 foot 5 160 foot 1 200 foot 1 Page 1 of 2 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST KK EMERGENCY EQUIPMENT AND SUPPLIES UNIT 2 CABLE SPREADING ROOM FIRE EMERGENCY EQUIPMENT...(OPS)

INITIALS DESCRIPTION QUANTITY MISCELLANEOUS Emergency Switch Box with cable attached 11 RHR HX AOV Airline Rig 2 Power Cords for Battery Room Exhaust Fans 1 Nitrogen bottle Tank...pressure >1000 psig (located on the 155 foot in the Turbine Building)

NOTES:

Return completed checklist to the Emergency Planning Nuclear Specialist via the Operations Unit Supervisor.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 2 of 2 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST LL EMERGENCY EQUIPMENT AND SUPPLIES CANISTER RESPIRATORS CANISTER RESPIRATORS IN ROOM 118 AT THE EOF

/"it T"A NT'TT'J INITIALS DESCRIPTION SuJ 6 Half Face Respirators with Filter Cartridges 8 Full Face Respirators 8 Iodine Canister (Full Face)-Protective Seal Unbroken (OR-1-99-383)

Expiration Date_

Expiration after next inventory Yes No 6

Potassium Iodide, Bottle (OR-1-99-383)

Expiration Date Expiration after next inventory Yes No If thyroid blocking drugs (Potassium Iodide) are found missing, notify the Emergency Planning Coordinator. The Emergency Planning Coordinator will then immediately notify the Asst.

General Manager - Operations.

LOCKER CANISTER RESPIRATORS IN THE CONTROL ROOM LARGE EP STORAGE Full Face Respirators 2 Iodine Canister---Protective Seal Unbroken (OR-1-99-383) 2 Expiration Date Expiration after next inventory Yes No NOTES:

by heat or twisted Ensure that the respirators are stored in a manner that they cannot be damaged sealing surface up to out of their normal configuration. Respirators should be stored with their prevent deformation of the sealing surface. (NUREG-004 1) change them If the Silver Iodine canisters or Potassium Iodide expire before the next inventory, out at this time.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Monthly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST MM EMERGENCY EQUIPMENT AND SUPPLIES VISITOR CENTER VEHICLE ....(EP)

DESCRIPTION CIRCLE ONE INITIALS sat I unsat Engine coolant, hoses and clamps sat / unsat Engine oil level sat / unsat Engine belts (condition and tightness sat / unsat Tires (proper inflation, wear acceptable) sat / unsat Dents and noticeable new body damage sat / unsat Windows and mirrors (cracks and/or breaks) sat / unsat Spare tire and jack (proper inflation) sat / unsat Cigarette lighter (radio power supply) sat / unsat All vehicle driveability lights sat / unsat Windshield wipers and washers sat / unsat Clutch or transmission fluid (as applicable) sat / unsat Brakes (fluid) sat / unsat Steering (fluid) sat / unsat Seat belts sat / unsat Battery (corrosion) sat / unsat Drive vehicle for at least five minutes sat / unsat Interior clean NOTES:

1) Deficiencies should be reported to Shift Supervisor and appropriate group supervisor.
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist.

COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Monthly DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 (S __ A* V* F FNP-0-EIP 16.0 T NN r-E - I CHECKLIS EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING, EL. 139 UNIT 1 RAD SIDE OUTSIDE ELEVATOR...(EP)

DESCRIPTION QUANTITY INITIALS psig

_Breathing Air bottle with regulator...pressure > 2000 Perform visual inspection of airline hoses in drum COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Monthly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 r1 & -t FNP-.-EIP -16.0 3T OO

.i .CI-ECKLI, EMERGENCY EQUIPMENT AND SUPPLIES AUXILIARY BUILDING, EL. 139 UNIT 2 RAD SIDE PASS SAMPLE AREA...(EP)

QUANTITY INITIALS DESCRIPTION 1

Breathing Air bottle with regulator....pressure >2000 psig 2 Perform visual inspection of airline hoses in drum COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Monthly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 FNP-0-EIP-16.0 CHECKLIST PP EMERGENCY EQUIPMENT AND SUPPLIES POST ACCIDENT SAMPLE AREA AUXILIARY BUILDING EL 139 UNIT 1 RADSIDE ....(EP)

INITIALS DESCRIPTION QUANTITY Post Accident Cart (proper location) 1 1

Lead pig in place (in transfer tunnel) 1 Sample vial in lead pig 1 Syringe shield in place 1 Shielded transport pig (proper location) 1 Table Top lead glass shield (in place in RCL)

COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 1 of 1 Version 40

02/14/03 9:39:42 FNP-0-EIP-16.0 CHECKLIST QQ EMERGENCY EQUIPMENT AND SUPPLIES POST ACCIDENT SAMPLE AREA AUXILIARY BUILDING EL 139 UNIT 2 RADSIDE ...(EP)

INITIALS DESCRIPTION 1

Post Accident Cart (proper location) 1 Lead pig in place (in transfer tunnel) 1 Sample vial in lead pig 1 Syringe shield in place 1 Shielded transport pig (proper location) 1 Table Top lead glass shield (in place in RCL)

COMMENTS REASON FOR INSPECTION CHECKED BY:

Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST RR EMERGENCY EQUIPMENT AND SUPPLIES RMT SOUTHERN LINC AND KENWOOD RADIOS... (EP)

Check te operability of each RMT portable radio.

Notify IR Customer Support for the radios that are inoperable.

RMT KENWOOD SUITCASE RADIOS INITIALS DESCRIPTION RMT 1 sat/unsat sat/unsat RMT2 sat/unsat RMT3 RMT Southern Linc Portable Radios FNP RMT 1-1321 sat/unsat sat/unsat FNP RMT 2-1322 sat/unsat FNP RMT 3-1323 sat/unsat FNP RMT SPARE-1324 sat/unsat FNP VEHICLE-1325 at lower FNP RMT 1 and FNP VEHICLE Southern LINCS are located in the fire cabinet located Southern level security. All Kenwoods and FNP RMT 2, FNP RMT 3 and FNP RMT SPARE LINCS are located in room 118 at the EOF.

COMMENTS CHECKED BY:

REASON FOR INSPECTION TITLE:

Monthly DATE:

Other, Page 1 of 1 Version 40

021/14/03 9:39:42 TI P, FNP-0-EIP-16.O

.L LCHECKLIST SS EMERGENCY EQUIPMENT AND SUPPLIES FIRE TANKER TRUCK EQUIPMENT ....(FM)

INITIALS DESCRIPTION QUANTITY 1 1/2" x 50' Fire Hose 3 1 1/2" x 100' Fire Hose 1 2

2 1/2" x 50' Fire Hose 1 1/2" Nozzle 1 2 1/2" Nozzle 1 1" Booster Nozzle 1 1" x 100' Booster Nozzle 1 2 1/2" x 1 1/2" x 1 1/2 Gated Wye 1 2 1/2" x 15' Double Female Fill Hose 1 2 1/2" Double Female 1 Hose Clamp 1 Pry Bar I Fire Ax 1 2 1/2" x 1 1/2" Reducer 1 2

Fire Flaps Hydrant Wrench 2 2

_Spanner Wrench 3/4" x 100' Life Rope 1 2

Chock Blocks (sets)

Fire coat 1 Fire boots (pr) 1 Fire helmet I Gloves (pr) I Foam Eductor I 2

Foam Can COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken Quarterly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST TT EMERGENCY EQUIPMENT AND SUPPLIES FIRE TANK TRUCK .... (SEC)

INITIALS DESCRIPTION CIRCLE ONE TRUCK PUMP sat / unsat sat / unsat Engine coolant, hoses and clamps sat / unsat sat / unsat Engine oil level sat / unsat sat / unsat Engine belts (condition and tightness) sat /unsat n/a Tires (proper inflation, wear acceptable) sat /unsat n/a Dents and noticeable new body damage sat / unsat n/a Windows and mirrors (cracks and/or breaks) sat / unsat n/a All vehicle driveability lights sat / unsat n/a Windshield wipers and washers sat /unsat n/a Clutch or transmission fluid (as applicable) sat /unsat n/a Steering (fluid) sat / unsat n/a Seat belts sat / unsat sat / unsat Batteries (corrosion) sat / unsat sat / unsat Check overall cleanliness sat / unsat n/a Start truck and ensure air pressure alarm and brake light clears at =75 psig n/a sat / unsat Start pump and ensure air and oil alarm clears after running (note 5) sat / unsat sat / unsat After engine is running, check for an unusual noises sat / unsat n/a Drive vehicle for at least five minutes sat / unsat sat / unsat Fuel tanks near full NOTES:

1) Deficiencies should be reported to Shift Supervisor and appropriate group supervisor.
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist.
4) Fire Tank Truck to be parked on the west side of the service water road between the railroad track and bridge when not in use, with the keys in the CSC key locker.
5) Fire Tank Truck pump starting instructions posted at the pump controls area must be followed.

COMMENTS REASON FOR INSPECTION CHECKED BY:

Weekly TITLE:

Post Drill Emergency Use Other DATE:

Page 1 of 1 Version 40

02/14/03 9:39:42 ("1 T.AA FNP-O-EIP-16.v IJ~i'kJ~LLJCHIMCKLIST UU EMERGENCY EQUIPMENT AND SUPPLIES SMOKE REMOVAL EQUIPMENT ..... (FM)

INITIALS DESCRIPTION QUANTITY UNIT 1 SMOKE REMOVAL EOUIPMENT AUXILIARY BUILDING 155F ELEVATION NON-RAD WEST CORRIDOR, NEAR ELEVATOR

_Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 1 1/2" fire hose 1 AUXILIARY BUILDING 155' ELEV. RCA NORTH CORRIDOR, NEAR DEMIN HATCHES Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 11/2" fire hose 1 AUXILIARY BUILDING 139' ELEV. NON-RAD WEST CORRIDOR, NEAR ELEVATOR Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 1 1/2" fire hose 1 AUXILIARY BUILDING 139' ELEV. RCA-NORTH CORRIDOR, NEAR SAMPLE ROOM Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 1 1/2" fire hose I AUXILIARY BUILDING 121' ELEV. NON-RAD WEST CORRIDOR, NEAR ELEVATOR Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 1 /" fire hose 1 AUXILIARY BUILDING 12 I"ELEV. RCA-NORTH CORRIDOR Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 1 11/2" fire hose 1 Page 1 of 4 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 021403992 I 1 ,J CHECKLIST UU EMERGENCY EQUIPMENT AND SUPPLIES SMOKE REMOVAL EQUIPMENT ..... (FM[)

INITIALS DESCRIPTION QUANTITY UNIT 1 SMOKE REMOVAL EQUIPMENT AUXILIARY BUILDING 100" ELEV. NON-RAD CCW AREA, NEAR ELEVATOR Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 1 1/2" fire hose 1 AUXILIARY BUILDING 100' ELEVATION RCA - NORTH CORRIDOR Electric driven smoke blower 1 16" x 20' collapsible air hose I 50' extension cord 1 50' of 1 '"fire hose 1 AUXILIARY BUILDING 77' ELEV. RCA, IN STAIRWELL Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 50' of 1 1/2" fire hose I UNIT 2 SMOKE REMOVAL EQUIPMENT ELEVATOR AUXILIARY BUILDING 155' ELEV. NON-PAD WEST CORRIDOR, NEAR Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 HATCHES AUXILIARY BUILDING 155' ELEV. RCA-NORTH CORRIDOR, NEAR DEMIN Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 ELEVATOR AUXILIARY BUILDING 139' ELEV. NON-PAD WEST CORRIDOR, NEAR Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 RCA - SOUTH CORRIDOR, NEAR SAMPLE ROOM Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 Page 2 of 4 Version 40

f"VF:iFNP-0-EIP-16.0 02/14/03 9:39:42 EMERGENCY IA.

EQUIPMENT R AND SUPPLIES CHECKLIST UU

'" SMOKE REMOVAL EQUIPMENT .... (FM)

DESCRIPTION QUANTITY INITIALS UNIT 2 SMOKE REMOVAL EQUIPMENT AUXILIARY BUILDING 121' ELEV. NON-RAD WEST CORRIDOR, NEAR ELEVATOR

_Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 AUXILIARY BUILDING 121' ELEVATION RCA - SOUTH CORRIDOR Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord 1 AUXILIARY BUILDING 100' ELEV. NON-RAD CCW AREA, NEAR ELEVATOR Electric driven smoke blower 1 16" x 20' collapsible air hose I 50' extension cord 1 AUXILIARY BUILDING 100' ELEV. RCA - SOUTH CORRIDOR

___..-Electric driven smoke blower 1 1

16" x 20' collapsible air hose 50' extension cord 1 AUXILIARY BUILDING 83' ELEV. RCA ROOM 2110 Electric driven smoke blower I 16" x 20' collapsible air hose 50' extension cord 1 UNIT 1 & 2 SHARED SMOKE REMOVAL EQUIPMENT DIESEL BUILDING FOYER, OUTSIDE 2B GENERATOR ROOM Electric driven smoke blower 1 16" x 20' collapsible air hose I

_ 50" extension cord I 50' of 1 1/22" fire hose 1 Page 3 of 4 Version 40

02/14/03 9:39:42 .A FNP-0-EIP-16.0

  • -,CHECKLIST UU EMERGENCY EQUIPMENT AND SUPPLIES SMOKE REMOVAL EQUIPMENT ..... (FM)

DESCRIPTION QUANTITY IN1TIALS UNIT 1 AND 2 SHARED SMOKE REMOVAL EQUIPMENT SERVICE WATER INTAKE STRUCTURE - EAST STAIRWELL 1

_Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50" extension cord 1 50' of 1 1/22" fire hose RIVER WATER INTAKE STRUCTURE SOUTH STAIRWELL 1 Electric driven smoke blower 1 16" x 20' collapsible air hose 1 50' extension cord UTILITY BUILDING WEST END 4

_Gasoline blowers NOTES:

\.; j Discrepancies should be promptly reported to the Fire Marshal or Shift Supervisor Return complete checklist to the Emergency Planning Nuclear Specialist COMMENTS REASON FOR INSPECTION CHECKED BY:

Seal Broken TITLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 4 of 4 Version 40

02/14/03 9:39:42 /1T h T FNP-0-EIP-16.0 1J K-A' CHECKLIST WV EMERGENCY EQUIPMENT AND SUPPLIES ALTERNATE EOF HEADLAND ..... (EP)

DESCRIPTION QUANTITY INITIALS PROCEDURES ROOM 114 Obtain the following Document Control procedure inventory sheets. Each listed position has are a file storage box located in room 114 that contains a desk pack and the procedures that the DC inventory and that the desk pack and particular to that position. Verify procedures per other equipment listed for that position are adequate.

EP-ALT EOF-RECOVERY MANAGER(Emergency Plan in Misc. Cabinet)

EP- ALT EOF-REC. MGR. ASSISTANT EP- ALT EOF-ENV. SUPERVISOR(Tech Specifications in Misc. Cabinet)

EP- ALT EOF-REACTOR ENGINEER EP- ALT EOF-COMP SERV SUPPORT EP- ALT EOF-QC SUPPORT(Fax instruction book)

EP- ALT EOF-DAD EP- ALT EOF-ACCESS CONTROL(badging Supplies)

EP- ALT EOF-STATUS BD KEEPER EP- ALT EOF-RMT CONTROLLER EP-ALT EOF-GOP-RECOVERY MANAGER (Located in Misc. Cabinet)

_ _ NRC (no procedures)

HEADLAND OFFICE KEY MAINTAINED AT HEADLAND POLICE DEPT.

Verify key, location, and operability. (Key 7, Alt. EOF Set.. .Storage Cabinet (MM I11), Front Door)

COMMUNICATIONS CABINET ROOM 112 actually in the cabinet.

Each time this checklist is performed, verify that the phones and radio listed below are In the fourth quarter, check the operation of the phones and radio listed below. This requirement will be met if the Alternate EOF is setup and used for a drill exercise or tabletop at any other time during the year. Indicate the activity type and date. Activity type DATE_

(10CFR50 App. E section IV, E, 9)

COMMUNICATIONS CABINET, ROOM. 112 Telephone ..... 8-276-6185 1 Telephone ..... 8-276-6186 1 Telephone ..... 8-276-6188 1 Telephone ..... 8-286-4750 Telephone ..... 8-286-4752 Telephone....8-286-4753 I Telephone ..... 8-286-4754 Telephone ..... 8-286-4755

__..__Telephone ..... 8-286-4756 1 Page 1 of 4 Version 40

I ) FNP-0-EIP-16.0 02/14/03 9:39:42 CHECKLIST VV EMERGENCY EQUIPMENT AND SUPPLIES ALTERNATE EOF HEADLAND.....(EP)

DESCRIPTION QUANTITY INITIALS I Telephone ..... 8-286-4757 I Telephone ..... 8-286-4758 I Telephone ..... 8-286-4759 I Telephone ..... 8-286-4760 II Telephone ..... 8-286-4761 1

Telephone ..... 8-286-4763 ENN (Operability is checked the first Tuesday of each month.)

ROOM 119 AND PI SUPPORT AREA NA Verify with office staff that the computer equipment necessary to send out press releases is operable NA Verify with office staff that the fax machine is operable in its present location MIDAS COMPUTER CABINET Computer 1 1

Monitor 1 Keyboard 1 Mouse 1 Printer 1 ream

________Paper Printer cartridges (as required per printer) na 1 I Tone alert Radio 1 extension cord EIP 29/30 COMPUTER CABINET 1 Computer 1 Monitor 1

Keyboard Mouse Printer 1 ream Paper na Printer cartridges (as required per printer)

Tone alert Radio 1 I

extension cord Non Reg ERDS/ARDA Computer 1 1

Monitor 1 Keyboard / Mouse 1 Printer with cartidges SPDS/PPC Mimic 1

_______Computer 1 Monitor 1 Keyboard / Mouse Page 2 of 4 Version 40

02)/14/03 9:39:42 .FNP-0-EIP-16.0 02/1403 939:4 .) CHECKLIST VV EMERGENCY EQUIPMENT AND SUPPLIES ALTERNATE EOF HEADLAND.....(EP)

INITIALS DESCRIPTION QUANTITY ROOM 114 ALTERNATE EOF EQUIPMENT STORAGE ROOM Drawing A File storage box with misc. extra phone equipment and extra paper are Cabinet located in this cabinet but are not inventoried Miscellaneous Cabinet State of Alabama Emergency Plan I State of Georgia Emergency Plan 1 State of Florida Emergency Plan I FNP Emergency Plan (Site, reference RM Doc Cont. Inventory) I FNP Emergency Plan (Medical, reference RM Doc Cont. Inventory) I GO EIPs (reference RM) 1 sets Unit I Technical Specifications (reference Env Sup Doc Cont. Inventory) I Unit 2 Technical Specifications (reference Env Sup Doc Cont. Inventory) I Title 10 Code of Federal Regulations parts 0-99 1 IRAP-3 I

_SROO 1

NRC Region II Supp. to NUREG 0845 2

Form Books per book inventory (verify correct Revisions)

File storage box (Misc. extra office supplies and consumables) 1 box File storage box (First aid kit and misc. extra power strips, extension cords 1 box flashlights, telephone extension cords)

Miscellaneous in boxes and name plates NA Dothan telephone directory 1 Birmingham telephone directory (white and yellow pages)

/2 x 11 paper 18 >1/2 box ROOM 114, PHONE WIRED TABLES EOF, The tables listed below have been pre-wired for use with the phones in the Alternate verify that the tables are available and the phone connections are intact.

RM table labeled with 6186, 4759, 4760, 4761 and 4762 folding table labeled with 4750 and 6185 folding table labeled with 4752 and 6188 folding table labeled with 4755 folding table labeled with 4754 and 4756 folding table labeled with 4757 folding table labeled with FAX 4993 and 4758 Page 3 of 4 Version 40

FNP-0-EIP-16.0 02/14/03 9:39:42 OLT , CHECKLIST VV EMERGENCY EQUIPMENT AND SUPPLIES ALTERNATE EOF HEADLAND ..... (EP)

COMMENTS REASON FOR INSPECTION CHECKED BY:

T1TLE:

Quarterly Post Drill Emergency Use DATE:

Other Page 4 of 4 Version 40

02/14/03 9:39:42 QT F, T7 FNP-0-EIP-16.0 I.JL_ ~LL CHECKLIST WW EMERGENCY EQUIPMENT AND SUPPLIES Maintenance Vehicle # (MM)

CIRCLE ONE INITIALS DESCRIPTION sat / unsat Engine coolant, hoses and clamps sat / unsat

_Engine oil level sat / unsat Engine belts (condition and tightness) sat / unsat Tires (proper inflation,, wear acceptable sat / unsat Dents and noticeable new body damage sat / unsat Windows and mirrors (cracks and/or breaks) sat / unsat

_Spare tire and jack (proper inflation) sat / unsat Cigarette lighter (radio power supply) sat I unsat All vehicle driveability lights sat / unsat Windshield wipers and washers sat I unsat Clutch or transmission fluid (as applicable) sat / unsat Brakes (fluid) sat / unsat Steering (fluid) sat / unsat Seat belts sat / unsat Battery (corrosion) sat / unsat Drive vehicle for at least five minutes sat / unsat Interior clean NOTES:

1) Deficiencies should be reported to Shift Supervisor and appropriate group supervisor.
2) Appropriate corrective action should be initiated.
3) Return completed checklist to the Emergency Planning Nuclear Specialist.

COMMENTS-REASON FOR INSPECTION CHECKED BY:

Monthly TiTIP.:

Other DATE:

Page 1 of 1 Version 40

r~T Y A Pi FT FT

.6.0 FNP-0-EIP-16.0 FNP-0--IP 02/14/03 9:39:42 k.

-L 1J J.CHECKLIST XX EMERGENCY EQUIPMENT AND SUPPLIES FIRE FIGHTING EQUIPMENT SCBAs (EP)

L DESCRIPTION QUANTITY Ii CENTRAL SECURITY CONTROL BUILDING, FIRE DEPARTMENT CABINET 2

Self Contained Breathing Apparatus Verify that each SCBA unit is operational per step 10 of the EIP.

UNIT #2 UNIT #1 TURBINE BLDG. EL-155' NORTH WALL AT ENTRANCE TO TURBINE BUILDING 5

Self Contained Breathing Apparatus Verify that each SCBA unit is operational per step 10 of the EIP.

DIESEL GENERATOR BUILDING 3

Self Contained Breathing Apparatus Verify that each SCBA unit is operational per step 10 of the EIP.

FIRE BRIGADE VAN VEHICLE 5

Self Contained Breathing Apparatus Verify that each SCBA unit is operational per step 10 of the EIP.

3 Self Contained Breathing Apparatus air bottles..pressure >2000 psig

_Respirators for SCBA use (small) 2 CONTROL ROOM 8

Self Contained Breathing Apparatus 2 Respirators for SCBA use (small) located in large storage cabinet of the EIP.

_Verify that each SCBA unit is operational per step 10 8 SCBA Voice amplifier...Operation...Battery Compartment Operational Fully inspect the respirators for SCBAs during the last month of each quarter. Remove the respirator from the bag, inspect it, place it in a bag and seal the bag. IOCFR20 and Reg. Guide 8.15 for Respiratory Protection.

COMMENTS REASON FOR INSPECTION CHECKED BY:_

Monthly Post Drill Emergency Use TITLE:

Other DATE:

Page 1 of 1 Version 40

02/14/03 9:39:42 ST A. *?

  • FNP-0-EIP-16.0 3 h., -* , [fK CHECKLIST YY EMERGENCY EQUIPMENT AND SUPPLIES

',' THIS PAGE INTENTIONALLY LEFT BLANK Page 1 of 1 Version 40

02/14/03 9:39:42 . FNP-0-EIP-16.0 0: I* k;71&JI J

  • CHECKLIST ZZ EMERGENCY EQUIPMENT AND SUPPLIES

',' MATERIAL DEPARTMENT EYEWASHISHOWER STATIONS...(STR)

LOCATIONS:

Main Warehouse B Side North End Main Warehouse B Side South End Main Warehouse A Side by Double Doors Oil Storage Building at Entrance INITIALS DESCRIPTION Verify operability of the above equipment per FNP-0-CCP-333 Verify accessibility per FNP-0-CCP-333 Verify equipment is in the proper location per FNP-0-CCP-333 Verify the location is posted as an emergency location per FNP-0-CCP-333 COMMENTS REASON FOR INSPECTION CHECKED BY:

TITLE:

MONTHLY DATE:

Other Page 1 of 1 Version 40