MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20240102024-03-13013 March 2024 Comprehensive Engineering Team Inspection Report 05000369/2024010 and 05000370/2024010 IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary 2024-09-05
[Table view] Category:Technical Specifications
MONTHYEARML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22263A0432022-09-0707 September 2022 Editorial Change to SLC 16.10-5 RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2021-12-20020 December 2021 License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits ML20174A0452020-08-0404 August 2020 Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits ML18355A6102019-01-25025 January 2019 Issuance of Amendments to Revise the Licensing Basis for Protection from Tornado Generated Missiles ML18318A3582019-01-16016 January 2019 Issuance of Amendment Nos. 311 and 290 to Correct Non-Conservative Technical Specification 3.4.11, Pressurizer Power Operated Relief Valves Porvs) RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2017-11-21021 November 2017 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating ML17269A0552017-10-25025 October 2017 McGuire, Units 1 and 2 - Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-283-A, Revision 3 (CAC NOS. MF9098 and MF9099) ML17248A4692017-08-29029 August 2017 Tech Spec and Tech Spec Bases TS-LOEP & TSB-LOES ML17237A0472017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification - List of Effected Pages (Rev. 111) RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17087A2732017-03-22022 March 2017 Issue Tech Specification List of Affected Pages (Loep), Revision 108 ML17087A2722017-03-22022 March 2017 Renewed Facility Operating License - Amendment 293 ML16236A0532016-09-26026 September 2016 Issuance of Amendments Regarding One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval ML16243A3532016-08-17017 August 2016 Technical Specifications 5.5, Revision 1 - Amendment No. 276/256 ML16124A6942016-06-0202 June 2016 Issuance of Amendments Regarding Changes to Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16139A4612016-05-10010 May 2016 Technical Specification 3.3.1, Rev. 001, Amendments 283 and 262 ML16081A3332016-04-29029 April 2016 Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML16082A0382016-04-18018 April 2016 Issuance of License Amendment Regarding Emergency Action Level Scheme Change ML16067A2292016-04-0808 April 2016 Issuance of Amendments Regarding Removal of Obsolete Technical Specification Requirements MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.2016-03-24024 March 2016 License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. ML15306A1412016-03-16016 March 2016 Issuance of License Amendment Regarding Nuclear Service Water System Allowed Outrage Time Extension ML16004A3522016-02-0303 February 2016 Issuance of Amendment Request to Revise Technical Specification for Residual Heat Removal System Air Handler Unit 1 ML16007A1762016-01-12012 January 2016 Issuance of Amendments Regarding Non-Conservative Technical Specification Allowable Value ML15320A3332015-12-18018 December 2015 Issuance of Amendments Regarding Non-Conservative Technical Specifications Allowable Value ML15174A1732015-08-24024 August 2015 Issuance of Amendments Regarding Technical Specification Definition of Rated Thermal Power ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15063A2712015-04-14014 April 2015 Issuance of Amendments Technical Specification 3.1.3, Moderator Temperature Coefficient and TS 5.6.5, Core Operating Limits Report. ML15119A2182015-04-0707 April 2015 Technical Specification (TS) and Tech Spec Bases (Tsb) Manual ML15027A3662015-03-25025 March 2015 Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement2015-03-23023 March 2015 Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas ML14231A6342014-09-10010 September 2014 Issuance of Amendments Regarding Technical Specification 3.8.4, DC Sources-Operating, ML14211A4032014-08-27027 August 2014 Issuance of Amendments Regarding Technical Specification 3.3.2 in Support of Compliance with NRC Order EA-12-049 CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate2014-06-23023 June 2014 License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate ML14142A0112014-05-0505 May 2014 Technical Specification & Technical Specification Bases ML14056A2172014-02-27027 February 2014 Issuance of Amendments Regarding Exigent License Amendment Request to Revise Technical Specification 3.3.4, Remote Shutdown System (TAC MF3473&74) ML13316A0072013-10-31031 October 2013 Updated Technical Specifications Manual and Bases ML13277A3602013-09-24024 September 2013 Technical Specifications Bases ML13135A1332013-04-25025 April 2013 Annual Radioactive Effluent Release Report ML12340A4062012-11-27027 November 2012 Technical Specifications & Technical Specification Bases Updates. Includes Tsb Loes (Revision 114) & Tsb 3.6.15 (Entire Section) Rev 125 ML12240A1962012-09-29029 September 2012 Issuance of Amendments, Regarding Changes to Diesel Generator Starting Air Pressure Limits ML12229A1462012-08-0909 August 2012 License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement ML12194A2182012-07-0909 July 2012 Response to NRC Request for Additional Information on Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML12082A2102012-03-0505 March 2012 License Amendment Request for Measurement Uncertainty Recapture Power Uprate 2024-04-08
[Table view] |
Text
IkDuke Duke Energy Corporation WPower. 526 South Church Street PO Box 1006 A Duke Energy Company Charlotte, NC 28201-1006 (704) 382-2200 OFFICE (704) 382-4360 FAX Michael S. Tuckman Executive Vice President Nuclear Generation January 29, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Corporation Catawba Nuclear Station, Units 1 and 2 Docket Numbers 50-413 and 50-414 McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Proposed Technical Specifications (TS) Amendments Technical Specification 5.5.2 (Containment Leakage Rate Testing Program)
One-Time Extension of Integrated Leak Rate Testing (ILRT) Interval
References:
Letters from Duke Energy Corporation to NRC, same subject, dated May 29, 2002, September 25, 2002, November 12, 2002, and January 8, 2003 Pursuant to 10 CFR 50.4 and 10 CFR 50.91, the enclosed information is being provided to NRC regarding the reference submittal. NRC had inquired as to the dates of the last ASME Section XI containment visual examinations for the Catawba and McGuire units, as well as the dates for the next scheduled examinations.
ASME Boiler and Pressure Vessel Code,Section XI (1992 Edition with the 1992 Addenda), Table IWE-2500-1, Item E1.11 examinations were completed and are tentatively scheduled as indicated in Table 1 below:
'/
U.S. Nuclear Regulatory Commission Page 2 January 29, 2003 Table 1 Containment Visual Examinations for Catawba and McGuire Unit Last Examination Next Scheduled Examination (Tentative)
Catawba Unit 1 November 2000 November 2003 (End of Cycle 12) (End of Cycle 14)
Catawba Unit 2 October 1998 September 2004 (End of Cycle 9) (End of Cycle 13)
McGuire Unit 1 November 1999 March 2004 (End of Cycle 13) (End of Cycle 16)
McGuire Unit 2 September 2000 September 2003 (End of Cycle 13) (End of Cycle 15)
Please note that the scheduled examination dates are tentative and are subject to change according to allowances by the ASME Code.
Also, in our letter dated January 8, 2003, a small numerical error was discovered in Table 19 for the 1 Test in 15 Years case for McGuire (the error was in the "LERF" and the "Increase Relative to Base" columns). This error did not result in any changes to the conclusions of the analysis.
The corrected page is contained in the attachment. Please replace the page previously transmitted via our January 8, 2003 letter with the one attached.
The original conclusions of the No Significant Hazards Consideration Analysis and the Environmental Analysis as delineated in our original submittal are unchanged as a result of this amendment request supplement.
Pursuant to 10 CFR 50.91, copies of this letter are being sent to the appropriate state officials.
There are no regulatory commitments contained in this letter or its attachment.
U.S. Nuclear Regulatory Commission Page 3 January 29, 2003 Inquiries on this matter should be directed to L.J. Rudy at (803) 831-3084.
Very truly yours, M.S. Tuckman LJR/s Attachment
U.S. Nuclear Regulatory Commission Page 4 January 29, 2003 M.S. Tuckman affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.
M.S. Tuckman, Executive Vice President Subscribed and sworn to me:
Date Notary Pub c My commission expires:
Date SEAL
U.S. Nuclear Regulatory Commission Page 5 January 29, 2003 xc (with attachment):
L.A. Reyes U.S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 E.F. Guthrie Senior Resident Inspector (CNS)
U.S. Nuclear Regulatory Commission Catawba Nuclear Station S.M. Shaeffer Senior Resident Inspector (MNS)
U.S. Nuclear Regulatory Commission McGuire Nuclear Station R.E. Martin (addressee only)
NRC Senior Project Manager (CNSIMNS)
U.S. Nuclear Regulatory Commission Mail Stop 08-H12 Washington, D.C. 20555-0001 H. Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control 2600 Bull St.
Columbia, SC 29201 B.O. Hall, Director Division of Radiation Protection 3825 Barrett Drive Raleigh, NC 27609-7221
I U.S. Nuclear Regulatory Commission Page 6 January 29, 2003 bxc (with attachment):
G.D. Gilbert L.J. Rudy K.E. Nicholson C.J. Thomas K.L. Crane L.B. Jones D.J. Goforth M.J. Ferlisi B.C. Carroll NCMPA-1 NCEMC PMPA SREC Catawba Document Control File 801.01 McGuire Document Control File Catawba RGC Date File ELL-EC050
ATTACHMENT REVISED PAGE FROM JANUARY 8, 2003 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION
Table 18 LERF (All Events) Associated with Corrosion Events for Catawba Test Interval Corrosion Non-LERF LERF Increase Increase Failure CDF Relative to Relative to Probability Base Current 3 Test in 10 2.99E-06 5.25E-05/yr 1.57E-10 Years 1 Test in 10 1.74E-05 5.25E-05/yr 9.13E-10 7.56E-10 Years 1 Test in 15 4.05E-05 5.25E-05/yr 2.13E-09 1.97E-09 1.22E-09 Years Table 19 LERF (Internal Events) Associated with Corrosion Events for McGuire Test Interval Corrosion Non-LERF LERF Increase Increase Failure CDF Relative to Relative to Probability Base Current 3 Test in 10 2.99E-06 2.71E-05/yr 8.11E-11 Years 1 Test in 10 1.74E-05 2.71E-05/yr 4.71E-10 3.90E-10 Years 1 Test in 15 4.05E-05 2.71E-05/yr 1.1OE-09 1.02E-09 6.27E-10 Years I I I Table 20 LERF (All Events) Associated with Corrosion Events for McGuire Test Interval Corrosion Non-LERF LERF Increase Increase Failure CDF Relative to Relative to Probability Base Current 3 Test in 10 2.99E-06 4.48E-05/yr 1.34E-10 Years 1 Test in 10 1.74E-05 4.48E-05/yr 7.79E-10 6.45E-09 Years 1 Test in 15 4.05E-05 4.48E-05/yr 1.82E-09 1.68E-09 1.04E-09 Years I The increase in LERF associated with corrosion events is estimated to be less than iE-07/yr.
3.4 Discussion of Results The results of this analysis for LERF (Class 3b) are lower than originally estimated by DEC. This result is consistent with our original conclusion that the increase in LERF as a result of the ILRT extension is small and acceptable.
Attachment 1 Page 15