ML030310348

From kanterella
Jump to navigation Jump to search
Notice of Cancelled Meeting with Omaha Public Power District Re Reactor Pressure Vessel Inspections Planned for Upcoming Refueling Outage
ML030310348
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/31/2003
From: Wang A
NRC/NRR/DLPM/LPD4
To: Stephen Dembek
NRC/NRR/DLPM/LPD4
Wang A, NRR/DLPM, 415-1445
References
Download: ML030310348 (5)


Text

CANCELLED January 31, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Alan B. Wang, Project Manager, Section 2 /RA/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD) - FORT CALHOUN STATION, UNIT 1 DATE & TIME: Monday, February 3, 2003 1:00 p.m. - 4:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-4B4 Rockville, Maryland 20852 PURPOSE: Meeting with OPPD to discuss reactor pressure vessel inspections planned for the upcoming refueling outage (see attached draft agenda).

CATEGORY*: This meeting is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation and Region IV.

NRC OPPD T. Tate R. Phelps A. Hiser J. McManis W. Bateman K. Woods C. Marschall B. Lisowyj S. Dembek J. Herman, et al.

A. Wang, et al.

Docket No. 50-285

Attachment:

Agenda (ADAMS Accession No. ML030310348) cc w/att: See next page Meeting

Contact:

Alan Wang (301-415-1445)

ABW@nrc.gov.

  • Commissions Policy Statement on "Enhancing Public Participation in NRC Meetings," 67 Federal Register 36920, May 28, 2002.

ML030310348) cc w/att: See next page Meeting

Contact:

Alan Wang (301-415-1445)

ABW@nrc.gov.

  • Commissions Policy Statement on "Enhancing Public Participation in NRC Meetings," 67 Federal Register 36920, May 28, 2002.

ADAMS Accession No.: ML030310348 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME AWang:rkb EPeyton SDembek DATE 1/31/03 1/31/03 1/31/03 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030310348.wpd DISTRIBUTION FOR MEETING NOTICE WITH OMAHA PUBLIC POWER DISTRICT (OPPD),

FEBRUARY 3, 2003 Hard Copy:

PUBLIC PDIV-2 Reading A. Wang E. Peyton Receptionist (OWFN and TWFN)

Electronic:

RidsNrrAdpt (BSheron)

RidsNrrDlpm (JZwolinski / TMarsh)

RidsNrrDlpmLpdiv (WRuland)

SDembek RidsNrrPMAWang RidsNrrLAEPeyton RidsNrrAdpt (KJohnson)

RidsOpaMail RidsRgn4MailCenter (AHowell)

TTate AHiser BBateman CMarschall, Region IV SMorris (EDO)

BHenderson (OPA)

MKotzalas RidsOgcMailCenter RidsAcrsAcnwMailCenter PMNS

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn Mr. Richard P. Clemens ATTN: James R. Curtiss, Esq. Division Manager - Nuclear Assessments 1400 L Street, N.W. Omaha Public Power District Washington, DC 20005-3502 Fort Calhoun Station P.O. Box 550 Chairman Fort Calhoun, Nebraska 68023-0550 Washington County Board of Supervisors Mr. Daniel K. McGhee P.O. Box 466 Bureau of Radiological Health Blair, NE 68008 Iowa Department of Public Health 401 SW 7th Street Mr. John Kramer, Resident Inspector Suite D U.S. Nuclear Regulatory Commission Des Moines, IA 50309 P.O. Box 310 Fort Calhoun, NE 68023 Mr. R. T. Ridenoure Division Manager - Nuclear Operations Regional Administrator, Region IV Omaha Public Power District U.S. Nuclear Regulatory Commission Fort Calhoun Station FC-2-4 Adm.

611 Ryan Plaza Drive, Suite 400 P.O. Box 550 Arlington, TX 76011-4005 Fort Calhoun, Nebraska 68023-0550 Ms. Sue Semerera, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Cententiall Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Mr. David J. Bannister Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. John B. Herman Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550

AGENDA FORT CALHOUN STATION (FCS) REACTOR VESSEL HEAD ASSEMBLY 2003 INSPECTION PLANS OPPD/NRC MEETING ON FEBRUARY 3, 2003

1. Introductions OPPD/NRC
2. Purpose and Objectives J. L. McManis (OPPD)
3. FCS Reactor Vessel Head (RVH) K. D. Woods (OPPD)

Assembly Description

4. FCS Susceptibility Categorization B. Lisowyj (OPPD)

PUBLIC COMMENT

5. FCS RVH Inspection Plan Methodology K. D. Woods (OPPD)
a. Operating Experience
b. Fabrication Data
c. Stagnation Model (1) Prediction Basis (2) Inspection Method
6. Recent FCS inspection results B. Lisowyj (OPPD)
7. Discussion of FCS design and operating B. Lisowyj (OPPD) attributes with respect to industry experience
8. Opportunity for discussion All PUBLIC COMMENT
9. Summarize meeting conclusions R. L. Phelps (OPPD)