Tennessee Valley Authonty, Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 February 26, 2003 TVA-SQN-TS-02-03, R2 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of Docket No. 50-328 Tennessee*Valley AUthoity:
)
SEQUOYAHTINUCLEAR*PLANT
ý-"-UNIT1_2 -
TECHNICAL SPECIFICATION (TS)
CHANGE NO.
02-03, REVISION 2, LICENSE AMENDMENT REQUEST (LAR)
TO SUPPORT 'UNIT '1 S'TEAM-'GENERATOR' REPLACEMENT PROJECT (TAC No.
MB5370)
References:
- 1. TVA letter to NRC dated November 15,
- 2002, "Sequoyah Nuclear Plant (SQN)
- Unit 2 Technical Specification (TS) Change No.
02-03, Revision 1, License Amendment Request (LAR) to Support-Unit 1 Generator Replacement Project" TAC No.
MB5370
- Steam Generator Replacement Project - Topical Report No. 24370-Tr-C-002, "Rigging And Heavy Load
- Handling Topical Report, ".Response To NRC "Request For -Additional' Irif6rmaition'"
Iniacco-d'danoewthCtHe prlbViii6ns o'f-*10:CFR 50:.90">TTVA":j2s requesting an amendment to Unit 2 Operating License (OL)
The proposed request adds a one-time condition for conduct-o6fheavy loadf'ifts associated with the Sequoyah Unit.'l steam g~nierator replacement project.
-The -one-itiriie Prrted on recycled paper
U.S. Nuclear Regulatory Commission Page 2 February 26, 2003 condition establishes special provisions and requirements for safe operation of Unit 2 while heavy load lifts are performed on Unit 1. The provision for heavy load lifts is described in Topical Report 24370-TR-C-002.
The topical report, as supplemented by Reference 2, contains prerequisite actions for heavy load movement, active monitoring during heavy load
- movement, and compensatory measures in response to the unlikely event of a heavy load drop.
The enclosed revised one-time license condition replaces the license condition proposed in TVA TS Change 02-03, Revision 1, provided by Reference 1. As discussed with the NRC staff, this revision is needed to direct the application of the license condition to a table (3.1) that is to be created in the NRC safety evaluation.
This table is intended to be a list of those actions TVA will take prior to performing the subject heavy load lifts as well as those actions to be taken for a postulated drop of the heavy load.
TVA has determined that there are no impacts to the significant hazards considerations provided by Revision 1 of this change request. Additionally, in accordance with 10 CFR 50.91(b) (1),
TVA is sending a copy of this letter and enclosure to the Tennessee State Department of Public Health.
The enclosure contains a page from Unit 2 OL marked-up to show the proposed change.
TVA requests NRC review and approval to support the Sequoyah Unit 1 steam generator replacement outage currently scheduled to begin March 16, 2003.
U.S. Nuclear Regulatory Commission Page 3 February 26, 2003 There are no additional commitments contained in this submittal.
This letter is being sent in accordance with NRC RIS 2001-05.
If you have any questions about this change, please telephone me at (423) 843-7170 or J.
D. Smith at (423) 843-6672.
Sincerely, Pedro Salas Licensing and Industry Affairs Manager I declare under penalty of perju that the foregoing is true and correct.
Executed on this day of tr.24k1.
Enclosure:
Marked-up pages from the Sequoyah Unit 2 License cc:
(Enclosure)
Mr. Raj K. Anand, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-8G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Lawrence E.
Nanney, Director Division of Radiological Health.
Third Floor L&C Annex 401 Church Street Nashville, Tennessee 37243-1532 Framatome ANP, Inc.
3315 Old Forest Road P.
- 0. Box 10935 Lynchburg, VA 24506-0935 ATTN: Mr.
Frank Masseth
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH PLANT (SQN)
UNIT 2 PROPOSED LICENSE AMENDMENT MARKED PAGES I.
AFFECTED PAGE LIST Unit 2 Operating License Page 11 II.
MARKED PAGES See attached.
E-1
INSERT A (19)
Steam Generator Replacement Project During the Unit 1 Cycle 12 refueling and steam generator replacement outage, lifts of heavy loads will be performed in accordance with Table 3.1 of NRC SER dated E-3