ML022410117

From kanterella
Jump to navigation Jump to search
Response to RIS 2002-09 Dtd 8/19/02
ML022410117
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/19/2002
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Conte R
References
B18723, RIS-02-009
Download: ML022410117 (5)


Text

Dominion Nuclear Connecticut, Inc. TE CE IVE3 1 Dominion Millstone Power Station Rope Ferry Road Waterford, CT 06385 AUG 19 w02

? 6 R1 2: 44 Docket Nos. 50-336 50-423 B18723 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit Nos. 2 and 3 Response to NRC Regulatory Issue Summary 2002-09 NRC Regulatory Issue Summary 2002-09, "Preparation and Scheduling of Operator Licensing Examinations," dated June 6, 2002,('ý requests licensees provide operator licensing examination data to the U.S. Nuclear Regulatory Commission (NRC). In response to this request, Dominion Nuclear Connecticut, Inc., hereby provides a completed NRC Form 536 for Millstone Unit Nos. 2 and 3 as Attachments 1 and 2, respectively.

There are no regulatory commitments contained within this letter.

Should you have any questions regarding this matter, please contact Mr. Michael J. Wilson at (860) 437-2916.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

Sit&4c*e President - Millstone Attachments (2) cc: H. J. Miller, Region I Administrator R. J. Conte, Chief, Operational Safety Branch, Region I R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 NRC Senior Resident Inspector, Millstone Unit No. 2 V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 NRC Senior Resident Inspector, Millstone Unit No. 3 (1) NRC Regulatory Issue Summary 2002-09, "Preparation and Scheduling of Operator Licensing Examinations," dated June 6, 2002.

Docket Nos. 50-336 50-423 B18723 Attachment 1 Millstone Nuclear Power Station, Unit Nos. 2 and 3 NRC Form 536 for Millstone Unit No. 2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005 (7-2002)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources OPERATOR LICENSING for operator examinations. Send comments regarding burden estimate to the Records Management Branch (T-6 E6), U-S. Nuclear Regulatory Commission, EXAMINATION DATA Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Millstone Nuclear Power Station, Unit No. 2 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 NUMBER OF REACTOR OPERATORS 0 8 0 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 4 0 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 6 4 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE September 2003 December 2004 July 2006 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2003 CY 2005 PROPOSED NUMBER I ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (7-2002)

Docket Nos. 50-336 50-423 B18723 Attachment 2 Millstone Nuclear Power Station, Unit Nos. 2 and 3 NRC Form 536 for Millstone Unit No. 3

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005 (7-2002)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources OPERATOR LICENSING for operator examinations. Send comments regarding burden estimate to the Records Management Branch (T-6 E6), U.S- Nuclear Regulatory Commission, EXAMINATION DATA Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Millstone Nuclear Power Station, Unit No. 3 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 NUMBER OF REACTOR OPERATORS 0 8 0 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 4 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE August 2004 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2003 CY 2005 PROPOSED NUMBER FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF CANDIDATES 12 - 88--

kn s-uz

-u~v Io PRINTED ON RECYCLED PAPER Tis florm was designed using Inhorrns