Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate Request (Tac No. MB5603)
ML022400225
Person / Time
Site: Pilgrim
Issue date: 08/30/2002
From: Travis Tate
Office of Nuclear Reactor Regulation
To: Bellamy M
Entergy Nuclear Operations
Tate T, NRR/DLPM, 415-8474
References
Download: ML022400225 (5)


Text

August 30, 2002 Mr. Mike Bellamy Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION RE: APPENDIX K MEASUREMENT UNCERTAINTY RECOVERY - POWER UPRATE REQUEST (TAC NO. MB5603)

Dear Mr. Bellamy:

By letter dated July 5, 2002, Entergy Nuclear Operations, Inc., submitted a license amendment request for proposed changes to the Operating License and Technical Specifications associated with an increase in the licensed power level for Pilgrim Nuclear Power Station from 1,998 MWt to 2,028 MWt (1.5%).

The U.S. Nuclear Regulatory Commission staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter and was discussed with Mr. Steve Brennion of your staff during a telephone call on August 21, 2002. In a follow up call on August 22, 2002, Mr. Brennion agreed that your staff will respond to the requested information within 30 days from the date of this letter. If circumstances result in the need to revise the response date, please contact me at (301) 415-8474.

Sincerely,

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Request for Additional Information cc w/encl: See next page

August 30, 2002 Mr. Mike Bellamy Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION RE: APPENDIX K MEASUREMENT UNCERTAINTY RECOVERY - POWER UPRATE REQUEST (TAC NO. MB5603)

Dear Mr. Bellamy:

By letter dated July 5, 2002, Entergy Nuclear Operations, Inc., submitted a license amendment request for proposed changes to the Operating License and Technical Specifications associated with an increase in the licensed power level for Pilgrim Nuclear Power Station from 1,998 MWt to 2,028 MWt (1.5%).

The U.S. Nuclear Regulatory Commission staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter and was discussed with Mr. Steve Brennion of your staff during a telephone call on August 21, 2002. In a follow up call on August 22, 2002, Mr. Brennion agreed that your staff will respond to the requested information within 30 days from the date of this letter. If circumstances result in the need to revise the response date, please contact me at (301) 415-8474.

Sincerely,

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PDI-2 Reading C. Anderson, RI PUBLIC T. Clark M. Shuaibi J. Zimmerman T. Tate N. Trehan C. Holden M. Reinhart F. Arner, RI J. Bobiak, RI S. LaVie S. Richards Accession Number: ML022400225 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC(A)

NAME TTate TClark JBoska for JZimmerman DATE 8/30/02 8/30/02 8/30/02 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION APPENDIX K MEASUREMENT UNCERTAINTY RECOVERY - POWER UPRATE REQUEST PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293

1. Section 9.2 of Attachment 2 to the licensing amendment application dated July 5, 2002, addresses Design Basis Accidents (DBA). The submittal states that radiological consequences due to postulated DBAs have been calculated using a source term of 102% of the current licensed reactor thermal power. However, the staff finds that the analyses addressed in the Updated Final Safety Analysis Report (UFSAR) appears to indicate that the radiological consequences may have been determined at the current rated thermal power. Please provide discussion on the analyses/evaluation addressed in Section 9.2, identifying changes, if any, to the assumptions, methodologies, and accidents analyzed from those documented in the UFSAR. Please provide the results and acceptance criteria of the analyses referenced in Section 9.2.
2. Provide details about the grid stability analysis including assumptions and results and conclusions for the power uprate condition. Also, provide in detail (including the ratings) the effect of the power uprate on the following equipment:
a. Main generator
b. Isophase bus
c. Main power transformer
d. Startup transformer
e. Auxiliary transformer
f. Non-Class 1E loads increased Enclosure

Pilgrim Nuclear Power Station cc:

Resident Inspector Mr. C. Stephen Brennion U. S. Nuclear Regulatory Commission Licensing Superintendent Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station Post Office Box 867 600 Rocky Hill Road Plymouth, MA 02360 Plymouth, MA 02360-5599 Chairman, Board of Selectmen Mr. Jack Alexander 11 Lincoln Street Manager, Reg. Relations and Plymouth, MA 02360 Quality Assurance Pilgrim Nuclear Power Station Chairman, Duxbury Board of Selectmen 600 Rocky Hill Road Town Hall Plymouth, MA 02360-5599 878 Tremont Street Duxbury, MA 02332 Mr. David F. Tarantino Nuclear Information Manager Office of the Commissioner Pilgrim Nuclear Power Station Massachusetts Department of 600 Rocky Hill Road Environmental Protection Plymouth, MA 02360-5599 One Winter Street Boston, MA 02108 Ms. Jane Perlov Secretary of Public Safety Office of the Attorney General Executive Office of Public Safety One Ashburton Place One Ashburton Place 20th Floor Boston, MA 02108 Boston, MA 02108 Mr. Stephen J. McGrail, Director Dr. Robert M. Hallisey, Director Attn: James Muckerheide Radiation Control Program Massachusetts Emergency Management Commonwealth of Massachusetts Agency Executive Offices of Health and 400 Worcester Road Human Services Framingham, MA 01702-5399 174 Portland Street Boston, MA 02114 Chairman Nuclear Matters Committee Regional Administrator, Region I Town Hall U. S. Nuclear Regulatory Commission 11 Lincoln Street 475 Allendale Road Plymouth, MA 02360 King of Prussia, PA 19406 Mr. William D. Meinert John M. Fulton Nuclear Engineer Assistant General Counsel Massachusetts Municipal Wholesale Pilgrim Nuclear Power Station Electric Company 600 Rocky Hill Road P.O. Box 426 Plymouth, MA 02360-5599 Ludlow, MA 01056-0426