Amendment EDG Allowed Outage
ML022200195
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/06/2002
From: Tam P
NRC/NRR/DLPM/LPD1
To: Leonard S
Nine Mile Point
Tam P, NRR/DLPM, 415-1451
References
TAC MB4612
Download: ML022200195 (4)


Text

From: Peter Tam To: INTernet:dosaj@nimo.com; internet:mackamanc@nimo.com; internet:steven.leonard@nmp.cn.com; internet:wolniakd@nimo.com Date: 8/6/02 4:23PM

Subject:

Amendment re. EDG allowed outage (TAC MB4612)

Steve:

By letter dated March 27, 2002, you proposed changes to the Nine Mile Point, Unit 1 (NMP1)

Technical Specifications for extending the allowed outage time (AOT) up to 14 days for the emergency diesel generators (EDGs) to perform a preventive or a corrective maintenance during plant operation. Our review of that application is ongoing. Our reviewer, Saba Saba, has the following issues to discuss with you. Please set up a conference call with me ASAP for these issues:

1. Discuss the reasons and bases to extend the present AOT for an inoperable EDG from 7 days to 14 days.
2. Discuss and provide information on the reliability and availability of offsite power sources relating to the proposed change. The discussion should include duration, cause, date and time of each loss-of-offsite power (partial or complete) event.
3. It is staffs understanding that the purpose of the requested amendment is to allow an increased outage time during plant power operation for performing EDG inspection, maintenance, and overhaul, which would include disassembly of the EDG. EDG operability verification after a major maintenance or overhaul may require a full load rejection test. If a full load rejection test is performed at power, please address the following:
a. What would be the typical and worse-case voltage transients on the 4160-V safety buses as a result of a full-load rejection?
b. If a full-load rejection test is used to test the EDG governor after maintenance, what assurance would there be that an unsafe transient condition on the safety bus (i.e., load swing or voltage transient) due to improperly performed maintenance or repair of a governor would not occur?
c. Using maintenance and testing experience on the EDG, identify possible transient conditions caused by improperly performed maintenance on the EDG governor and voltage regulator. Discuss the electrical system response to these transients.
d. Provide the tests to be performed after the overhaul to declare the EDG operable and provide justification of performing those tests at power.
4. What type of communication has been established between the control room operator of NMP1 and the System Load Dispatcher? Is the System Load Dispatcher notified in advance that the EDG is going to be out for an extended period of time?
5. It is our practice to grant an EDG AOT extension to those licensees who have either installed an alternate AC source that can be substituted for an inoperable EDG or excess power capacity from the existing EDGs supplied through bus cross-ties that can be temporarily used to compensate for an EDG in an extended AOT. Please indicate if you have an extra power source that can be used in this capacity.
6. You stated that fire pumps can be used to deliver water as a feed water make up source to the Reactor Vessel. Please discuss in detail, how this will be accomplished.
7. Discuss and provide information on the reliability and unavailability of EDGs, and how they are being controlled at NMP1. Are the EDG reliability goals chosen for Station Blackout being met?
8. Discuss how the EDG reliability and unavailability target values chosen to satisfy the requirements of Maintenance Rule are being maintained?

This email aims solely to prepare you for a conference call. It does not formally request additional information, nor does it convey a formal NRC staff position. Disposition of the above issues will be discussed in the conference call.

Peter S. Tam, Senior Project Manager Project Directorate I-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation e-mail: pst@nrc.gov Tel.: 301-415-1451 Mail Envelope Properties (3D503041.454 : 10 : 20510)

Subject:

Amendment re. EDG allowed outage (TAC MB4612)

Creation Date: 8/6/02 4:23PM From: Peter Tam Created By: PST@nrc.gov Recipients Action Date & Time nimo.com Transferred 08/06/02 04:23PM dosaj (INTernet:dosaj@nimo.com) mackamanc (internet:mackamanc@nimo.com) wolniakd (internet:wolniakd@nimo.com) steven Transferred 08/06/02 04:23PM leonard (internet:steven.leonard@nmp.cn.c Post Office Delivered Route nimo.com INTernet steven internet:nmp.cn.com Files Size Date & Time MESSAGE 5328 08/06/02 04:23PM Options Auto Delete: No

Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened