MONTHYEARML0209100772002-03-27027 March 2002 License Amendment Application for the Technical Specification - Extension of Allowed Outage Time for an Inoperable Diesel Generator. Project stage: Request ML0222001952002-08-0606 August 2002 Amendment EDG Allowed Outage Project stage: Other ML0223300382002-08-20020 August 2002 Request for Additional Information - Amendment Application Diesel Generator Allowed Outage Time Project stage: RAI ML0229004522002-10-0707 October 2002 Request for Additional Information (RAI) - Amendment Application Diesel Generator Allowed Outage Time Project stage: Request ML0229600132002-10-22022 October 2002 NMP1 DG Outage Time Amendment Project stage: Other ML0303404602003-02-0303 February 2003 License Amendment, Diesel Generator Allowed Outage Time. TAC No. MB4612 Project stage: Other ML0303502152003-02-0303 February 2003 Technical Specifications Limiting Condition for Operation/Surveillance Requirement Project stage: Other ML0305600692003-02-25025 February 2003 Corrected Pages 4 & 6 to Safety Evaluation Supporting Amendment No. 179 Project stage: Approval 2002-08-20
[Table View] |
|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds NMP2L2880, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 2024-09-04
[Table view] |
Text
February 25, 2003 Mr. John T. Conway Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 - CORRECTION OF SAFETY EVALUATION SUPPORTING AMENDMENT NO. 179 - DIESEL GENERATOR ALLOWED OUTAGE TIME (TAC NO. MB4612)
Dear Mr. Conway:
On February 3, 2003, the Nuclear Regulatory Commission (NRC) staff issued the subject amendment in response to your application transmitted by letter dated March 27, 2002, as supplemented by letter dated October 7, 2002. The amendment revised portions of the Technical Specifications to extend the allowable outage time for an inoperable diesel generator from 7 days to 14 days.
Subsequent to the issuance, Mr. Clyde Mackaman of your staff pointed out a number of errors in the safety evaluation (SE) supporting the amendment. We agree that administrative errors had been inadvertently made, resulting in several inaccurate statements in the SE. Enclosed please find corrected pages 4 and 6 of the SE, with side bars highlighting the areas of correction. We apologize if these errors caused you any inconvenience.
Sincerely,
\RA\
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-220
Enclosure:
Corrected SE pages 4 and 6 cc w/encl: See next page
Mr. John T. Conway February 25, 2003 Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 - CORRECTION OF SAFETY EVALUATION SUPPORTING AMENDMENT NO. 179 - DIESEL GENERATOR ALLOWED OUTAGE TIME (TAC NO. MB4612)
Dear Mr. Conway:
On February 3, 2003, the Nuclear Regulatory Commission (NRC) staff issued the subject amendment in response to your application transmitted by letter dated March 27, 2002, as supplemented by letter dated October 7, 2002. The amendment revised portions of the Technical Specifications to extend the allowable outage time for an inoperable diesel generator from 7 days to 14 days.
Subsequent to the issuance, Mr. Clyde Mackaman of your staff pointed out a number of errors in the safety evaluation (SE) supporting the amendment. We agree that administrative errors had been inadvertently made, resulting in several inaccurate statements in the SE. Enclosed please find corrected pages 4 and 6 of the SE, with side bars highlighting the areas of correction. We apologize if these errors caused you any inconvenience.
Sincerely,
\RA\
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-220
Enclosure:
Corrected SE pages 4 and 6 cc w/encl: See next page Distribution PUBLIC PDI R/F RLaufer SLittle PTam SRichards OGC GHill (2)
WBeckner SSaba MWohl ACRS BPlatchek, RI GThomas Accession Number: ML0300560069 *Concurrence by email OFFICE PDI-1\PM PDI-1\LA SRXB* PDI-1\SC NAME PTam SLittle GThomas RLaufer DATE 2/21/03 2/20/03 2/20/03 2/24/03
- Concurred by e-mail OFFICIAL RECORD COPY
Weather conditions will be considered so that no preplanned maintenance will be scheduled when severe weather conditions are expected.
Testing and maintenance of equipment, load dispatching, equipment availability will be considered.
Inasmuch as the licensee uses the CRMP to satisfy the requirements of the Maintenance Rule (10 CFR 50.65(a)(4)), the above measures that are necessary to manage the increase in risk from the proposed DG maintenance activities will be appropriately controlled.
NMP1 is a boiling-water reactor (BWR)/2 design with an emergency cooling system (isolation condensers), a core spray system, automatic depressurization system (ADS) electromatic relief valves (ERV) and a high pressure coolant injection system (the feedwater system is not _
credited in the LOCA analysis). There are 2 isolation condensers, 4 core spray pumps, 6 ERVs _
and 2 motor-driven feedwater pumps. Isolation condenser and ADS ERV operations are _
independent of AC power.
Since the NMP1 design does not include jet pumps, core cooling following a design basis recirculation line break relies solely upon core spray. Adequate spray cooling is thus defined to exist in NMP1 when design spray flow requirements (TS Section 3.1.4) are satisfied. The licensee confirmed that, for the proposed extended outage time of 14 days, requirements in the TSs will ensure core spray pump operability during the outage (i.e., there is no change in the licensing basis and TS requirements for the core spray system).
For long-term operation of the isolation condensers, the minimum water level in the shell side is maintained with 10,680 gallons of water. This is sufficient to provide about 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of continuous system operation. This time is sufficient to restore additional makeup water from the two 200,000 gallon condensate storage tanks.
Thus, the systems described above are capable of maintaining NMP1 in a safe condition under all operating conditions, and defense-in-depth is maintained during the proposed extended DG AOT. The NRC staff finds the proposed change to extend the DG AOT from the current 7 days to 14 days to be acceptable as set forth above.
3.1.2 TS Sections 3.4.4, Emergency Ventilation System and 3.4.5, Control Room Air Treatment System The licensee proposed to revise paragraph a. of both these sections by eliminating the phrase and the diesel generators required for operation of such circuits. According to the current wording, the unit would be required to be shut down for an inoperable emergency ventilation system or control room air treatment system due solely to the inoperability of an emergency power source (i.e., the associated DG). This is contrary to the power source provisions of TS Section 3.0.1, which allows an inoperable system, subsystem, train, or device to be considered operable for satisfying the requirements of the applicable LCO when it is determined that the inoperability is solely because its emergency or normal power source is inoperable. The proposed change removes the DG operability requirement from the subject sections. The proposed change is necessary to accommodate the proposed extension of the DG AOT from 7 to 14 days, which the NRC staff has already found acceptable above. Therefore, the NRC staff finds the proposed change to Sections 3.4.4 and 3.4.5 acceptable on the basis that it has no Corrected by letter of 2/25/03
presented in this application and, upon completion, should incorporate them into the next PRA update. The present updated PRA model incorporates the following:
6 Plant-specific unreliability and unavailability data (Note: Failure data was evaluated through December 31, 2000, with a small gap in the 1991-1993 time frame between the IPE and the start of the institute of Nuclear Power Operations (INPO) Equipment Performance and Information Exchange System (EPIX). Unavailability is based on data between August 1, 1998, and July 31, 1999, which is considered representative).
Specifically, DG and DFP unavailability data updated through December 31, 2001.
6 Plant-specific initiating event data developed through December 31, 2001.
6 Plant-specific configuration information (design and operation) as of December 31, 2000. _
6 Insights from several years of plant-specific applications utilizing the original IPE and IPEEE.
6 Insights from NRC staff review comments.
Key safety-related goals of the licensees PRA model development process were to:
6 Understand the underlying plant risks and key sources of uncertainty.
6 Develop a tool to quantify nuclear safety and support a comprehensive risk management program.
6 Establish an in-house risk analysis capability to support plant decision-making.
An independent assessment of the licensees PRA, using the self-assessment process as part of the BWROG peer review certification program, was completed to assure that the licensees PRA was comparable to other PRA programs in use throughout the industry. The licensees PRA was certified by the BWROG in June 1998 following an inspection and review by a PRA peer review certification team. The certification review results were documented and evaluated for inclusion in the licensees last PRA model update. The review findings related primarily to improvements in the areas of guidance, documentation, models, and capturing of plant changes. Overall, the certification review provided high technical marks on the PRA, and there were no findings that significantly affected the PRA results. The certification team approved the suitability of the licensees PRA for applications such as single TS actions if supported by deterministic evaluations.
3.2.2 PRA Model Maintenance The PRA model is applied and controlled as defined in the licensees administrative procedure NIP-REL-02, Probabilistic Risk Assessment Program, and engineering department procedure NEP-REL-01, Evaluations, Analysis, and Update of the Probabilistic Risk Assessment (PRA)
Program. Ongoing assessments of the PRA model and reports are part of the normal duties of the PRA engineers. When a change to plant procedures, plant design, or operational data is identified that impacts the PRA model, the PRA engineer uses the guidance in the following Corrected by letter of 2/25/03
Nine Mile Point Nuclear Station Unit No. 1 Regional Administrator, Region I Mr. James M. Petro, Jr., Esquire U.S. Nuclear Regulatory Commission Counsel 475 Allendale Road Constellation Power Source, Inc.
King of Prussia, PA 19406 111 Market Place Suite 500 Resident Inspector Baltimore, MD 21202 U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group 750 East Pratt Street Baltimore, MD 21201-2437