May 2002 Monthly Operating Report for Oconee Units 1, 2 & 3
ML021720432
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/13/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021720432 (12)


Text

Duke Power Company

. Duke A Duke Energy Company OPower. Energy Center P.O. Box 1006 A Duke Energy Company Charlotte, NC 28201-1006 June 13, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, 50-270 and 50-287 Monthly Performance and Operation Status-May, 2002 Please find attached information concerning the performance and operation status of the Oconee Nuclear Station for the month of May, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerel*,

Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L. A. Reyes, Regional Administrator USNRC, Region II Dave LaBarge, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Oconee NRC Inspector 17ýý V_/

X

Document Control Desk U.S. NRC - Oconee bxc:

L. E. Nicholson (ON03RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No. 50-269 Date June 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: Oconee 1
2. Reporting Period: May 1, 2002 - May 31, 2002
3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date and cumulative
4. Nameplate Rating (Gross MWe): 934 capacity factors are
5. Design Electrical Rating (Net Mwe): 886 calculated using a
6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 3623.0 253128.0
12. Number of Hours Reactor was Critical 744.0 2758.6 198472.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 2720.3 194991.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1872996 6918807 482237747
17. Gross Electrical Energy Generated (MWH) 656450 2427583 166764355
18. Net Electrical Energy Generated (MWH) 628214 2319229 158585818
19. Unit Service Factor 100.0 75.1 77.0
20. Unit Availability Factor 100.0 75.1 77.0
21. Unit Capacity Factor (Using MDC Net) 99.8 75.7 73.4
22. Unit Capacity Factor (Using DER Net) 95.3 72.3 70.7
23. Unit Forced Outage Rate 0.0 0.6 9.4
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:

1 037 937 KVA x 0.90 Pf=-934 MW 3A - 6/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-269 UNIT NAME: Oconee 1 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

The unit began the month of May operating at approximately 21% power at midnight and increasing power. The unit held at 26.6% power from 05/01/02 at 0013 to 0125 due to hotwell pump discharge pressure. The unit resumed power escalation, and held at 40% power from 0200 to 0227 due to power escalation testing. Problems with 1B feedwater pump turbine motor speed resulted in a hold at 59.2% power from 0630 to 2259. On 05/02/02 from 0153 to 0804 the unit held at 73% power to perform the power imbalance detector correlation test. The unit held at 90% power on 05/02/02 from 1120 to 1125 due to nuclear instrumentation calibration check. The unit returned to 100% full power on 05/02/02 at 1525 and operated at or near 100% full power the remainder of the month.

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 6/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 1
2. Scheduled next refueling shutdown: September 2003
3. Scheduled restart following refueling: November 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 962*

(c) in the ISFSI: 1584****

8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
9. Projected date of last refueling which can be accommodated by present capacity: January 2005***

DUKE POWER COMPANY DATE: June 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

  • Represents the combined total for Units 1 and 2
    • On March 29, 1990, received a license for ISFSI which will store 2112 assemblies
      • We currently have 60 modules of which 49 modules are loaded.

Additional modules will be built on an as-needed basis.

        • Represents the combined total for Units 1, 2, and 3

Operating Data Report Docket No. 50-270 Date June 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: Oconee 2
2. Reporting Period: May 1, 2002 -May 31, 2002
3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date and cumulative
4. Nameplate Rating (Gross MWe): 934 capacity factors are
5. Design Electrical Rating (Net Mwe): 886 calculated using a
6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 3623.0 243048.0
12. Number of Hours Reactor was Critical 744.0 3623.0 196938.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 3623.0 194385.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1909359 16223390 486967804
17. Gross Electrical Energy Generated (MWH) 670194 3264475 165009600
18. Net Electrical Energy Generated (MWH) 642381 3130478 157245682
19. Unit Service Factor 100.0 100.0 80.0
20. Unit Availability Factor 100.0 100.0 80.0
21. Unit Capacity Factor (Using MDC Net) 102.1 102.1 75.8
22. Unit Capacity Factor (Using DER Net) 97.5 97.5 73.0
23. Unit Forced Outage Rate 0.0 0.0 8.8
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:

1 037 937 KVA x 0.90 Pf=934 MW 3A - 6/13/2002

Page: 1 of t UNIT SHUTDOWNS DOCKET NO. 50-270 UNIT NAME: Oconee 2 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 6/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 2
2. Scheduled next refueling shutdown: October, 2002
3. Scheduled restart following refueling: November, 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 962*

(c) in the ISFSI: See unit 1 ****

8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
9. Projected date of last refueling which can be accommodated by present capacity: January 2005***

DUKE POWER COMPANY DATE: June 13. 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

  • Represents the combined total for Units 1 and 2
    • See footnote on Unit 1 We currently have 60 modules of which 49 modules are loaded.

Additional modules will be built on an as needed basis.

        • See footnote on Unit 1

Operating Data Report Docket No. 50-287 Date June 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: Oconee 3
2. Reporting Period: May 1, 2002- May 31, 2002
3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date
4. Nameplate Rating (Gross MWe): 934 and cumulative capacity factors are
5. Design Electrical Rating (Net Mwe): 886 calculated using a
6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 3623.0 240695.0
12. Number of Hours Reactor was Critical 744.0 3623.0 189980.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 3623.0 187341.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1908127 25513182 484523073
17. Gross Electrical Energy Generated (MWH) 670642 3273306 162027217
18. Net Electrical Energy Generated (MWH) 642895 3139415 154573539
19. Unit Service Factor 100.0 100.0 77.8
20. Unit Availability Factor 100.0 100.0 77.8
21. Unit Capacity Factor (Using MDC Net) 102.1 102.4 75.2
22. Unit Capacity Factor (Using DER Net) 97.5 97.8 72.5
23. Unit Forced Outage Rate 0.0 0.0 9.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:

1 037 937 KVA x 0.90 Pf=934 MW 3A - 6/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-287 UNIT NAME: Oconee 3 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May. 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 6/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 3
2. Scheduled next refueling shutdown: April 2003
3. Scheduled restart following refueling: May 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 536 (c) in the ISFSI: See Unit 1 ****
8. Present licensed fuel pool capacity: 825 Size of requested or planned increase: **
9. Projected date of last refueling which can be accommodated by present capacity: January 2005***

DUKE POWER COMPANY DATE: June 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

    • See footnote of Unit 1
      • We currently have 60 modules of which 49 modules are loaded.

Additional modules will be built on an as needed basis.

        • See footnote on Unit 1

OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2002

1. Personnel Exposure The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.