SDuke Duke Power 526 South Church Street Power P.O. Box 1006 A Duke Energy Company Charlotte, NC 28201-1006 October 15, 2002 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, 50-270 and 50-287 Monthly Performance and Operation Status-September, 2002 Please find attached information concerning the performance and operation status of the Oconee Nuclear Station for the month of September, 2002.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely, Terry Dimmeryanager Nuclear Business Support Attachment XC:
L.
A. Reyes, Regional Administrator
- USNRC, Region II Dave LaBarge, Project Manager
- USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Oconee NRC Inspector
Document Control Desk U.S. NRC - Oconee bxc:
L.
E. Nicholson (ON03RC)
RGC Site Licensing File ELL (EC050)
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Oconee 1
- 2. Reporting Period:
September 1, 2002 - September 30, 2002
- 3. Licensed Thermal Power (MWt):
2568
- 4. Nameplate Rating (Gross MWe):
934
- 5. Design Electrical Rating (Net Mwe):
886
- 6. Maximum Dependable Capacity (Gross MWe):
886
- 7. Maximum Dependable Capacity(Net MWe):
846
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-269 October 15,2002 Roger Williams 704-382-5346 Notes: Year-to-date and cumulative capacity factors are calculated using a weighted average for maximum dependable capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
- 11. Hours in Reporting Period
- 12. Number of Hours Reactor was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
This Month 720.0 720.0 0.0 720.0 0.0 1848960 634691 606035 100.0 100.0 99.5 95.0 0.0 YTD 6551.0 5640.6 0.0 5580.0 0.0 14217269 4937305 4716118 85.2 85.2 85.1 81.3 1.5 Cumulative 256056.0 201354.1 0.0 197851.1 0.0 489536209 169274077 160982707 77.3 77.3 73.6 71.0 9.4
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 10/15/2002
Page: 1 of t UNIT SHUTDOWNS DOCKET NO. 50-269 UNIT NAME: Oconee 1 DATE: October 15, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: September, 2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
- - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-10/15/2002
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
Oconee Unit 1
- 2.
Scheduled next refueling shutdown: September 2003
- 3.
Scheduled restart following refueling: November 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 866*
(c) in the ISFSI: 1728****
- 8.
Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9.
Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: October 15, 2002 Name of
Contact:
R. A Williams Phone: (704) - 382-5346 Represents the combined total for Units 1 and 2 On March 29, 1990, received a site specific license for ISFSI which will store 2112 assemblies (88 modules). Forty (40) site specific modules were constructed and loaded.
In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
Represents the combined total for Units 1, 2, and 3
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Oconee 2
- 2. Reporting Period:
September 1, 2002 - September 30, 2002
- 3. Licensed Thermal Power (MWt):
2568
- 4. Nameplate Rating (Gross MWe):
934
- 5. Design Electrical Rating (Net Mwe):
886
- 6. Maximum Dependable Capacity (Gross MWe):
886
- 7. Maximum Dependable Capacity(Net MWe):
846
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-270 October 15,2002 Roger Williams 704-382-5346 Notes: Year-to-date and cumulative capacity factors are calculated using a weighted average for maximum dependable capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 720.0
- 12. Number of Hours Reactor was Critical 720.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 720.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 1845879
- 17. Gross Electrical Energy Generated (MWH) 633551
- 18. Net Electrical Energy Generated (MWH) 605676
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 99.4
- 22. Unit Capacity Factor (Using DER Net) 94.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
YTD 6551.0 6551.0 0.0 6551.0 0.0 31037258 5856452 5611291 100.0 100.0 101.2 96.7 0.0 Cumulative 245976.0 199866.4 0.0 197313.8 0.0 501781672 167601577 159726495 80.2 80.2 76.1 73.3 8.7
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 10/1512002
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-270 UNIT NAME: Oconee 2 DATE: October 15, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: September, 2002 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-10/15/2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
Oconee Unit 2
- 2.
Scheduled next refueling shutdown: October, 2002
- 3.
Scheduled restart following refueling: November, 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 866*
(c) in the ISFSI: See unit 1 ****
- 8.
Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9.
Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: October 15, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346 Represents the combined total for Units 1 and 2 See footnote on Unit 1 In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
See footnote on Unit 1
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Oconee 3
- 2. Reporting Period:
September 1, 2002 - September 30, 2002
- 3. Licensed Thermal Power (MWt):
2568
- 4. Nameplate Rating (Gross MWe):
934
- 5. Design Electrical Rating (Net Mwe):
886
- 6. Maximum Dependable Capacity (Gross MWe):
886
- 7. Maximum Dependable Capacity(Net MWe):
846
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-287 October 15,2002 Roger Williams 704-382-5346 Notes: Year-to-date and cumulative capacity factors are calculated using a weighted average for maximum dependable capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 720.0
- 12. Number of Hours Reactor was Critical 720.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 720.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 1848960
- 17. Gross Electrical Energy Generated (MWH) 638315
- 18. Net Electrical Energy Generated (MWH) 610057
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 100.2
- 22. Unit Capacity Factor (Using DER Net) 95.6
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Initial Criticality Initial Electricity Commercial Operation YTD 6551.0 6551.0 0.0 6551.0 0.0 47843689 5875966 5630356 100.0 100.0 101.6 97.0 0.0 Cumulative 243623.0 192908.8 00 190269.2 0.0 506853580 164629877 157064480 78.1 78.1 75.5 72 8 9.1 Achieved NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 10115/2002
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-287 UNIT NAME: Oconee 3 DATE: October 15, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: September, 2002 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
-(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-10/15/2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION ýEOUEST
- 1.
Facility name:
Oconee Unit 3
- 2.
Scheduled next refueling shutdown: April 2003
- 3.
Scheduled restart following refueling: May 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 488 (c) in the ISFSI: See Unit 1 *I**
- 8.
Present licensed fuel pool capacity: 825 Size of requested or planned increase: **
- 9.
Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: October 15, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346 See footnote of Unit 1 In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
See footnote on Unit 1
OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT AUGUST 2002
- 1.
Personnel Exposure The total station liquid release for AUGUST has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for AUGUST has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.