Duke Energy Corporation SDuke 526 South Church Street rEnergy. P.O. Box 1006 Charlotte, NC 28201-1006 February 13, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, 50-270 and 50-287 Monthly Performance and Operation Status-January, 2003 Please find attached information concerning the performance and operation status of the Oconee Nuclear Station for the month of January, 2003.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:
L. A. Reyes, Regional Administrator USNRC, Region II Dave LaBarge, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Oconee NRC Inspector '7
Document Control Desk U.S. NRC - Oconee bxc:
L. E. Nicholson (ON03RC)
RGC Site Licensing File ELL (EC050)
Operating Data Report Docket No. 50-269 Date February 13,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Oconee 1
- 2. Reporting Period: January 1, 2003 - January 31, 2003 2568 Notes: Year-to-date
- 3. Licensed Thermal Power (MWt):
and cumulative
- 4. Nameplate Rating (Gross MWe): 934 capacity factors are
- 5. Design Electrical Rating (Net Mwe): 886 calculated using a
- 6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
- 7. Maximum Dependable Capacity(Net MWe). 846 maximum dependable
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 744.0 744.0 259009.0
- 12. Number of Hours Reactor was Critical 744.0 744.0 204307.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 744.0 744.0 200804.1
- 15. Unit Reserve Shutdown Hours 0.0 00 0.0
- 16. Gross Thermal Energy Generated (MWH) 1910592 1910592 497113246
- 17. Gross Electrical Energy Generated (MWH) 671202 671202 171922509
- 18. Net Electrical Energy Generated (MWH) 644087 644087 163518133
- 19. Unit Service Factor 100.0 100.0 77.5
- 20. Unit Availability Factor 100.0 100.0 77.5
- 21. Unit Capacity Factor (Using MDC Net) 102.3 102.3 74.0
- 22. Unit Capacity Factor (Using DER Net) 97.7 97.7 71.3
- 23. Unit Forced Outage Rate 0.0 0.0 9.2
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1037 937 KVA x 0.90 Pf=934 MW 3A - 2/13/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-269 UNIT NAME: Oconee 1 DATE: February 13,2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: January, 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 2/13/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 1
- 2. Scheduled next refueling shutdown: September 2003
- 3. Scheduled restart following refueling: November 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 926*
(c) in the ISFSI: 1776****
- 8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9. Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: February 13, 2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
- Represents the combined total for Units 1 and 2
- On March 29, 1990, received a site specific license for ISFSI which will store 2112 assemblies (88 modules). Forty (40) site specific modules were constructed and loaded.
- In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
- Represents the combined total for Units 1, 2, and 3
Operating Data Report Docket No. 50-270 Date February 13,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Oconee 2
- 2. Reporting Period: January 1, 2003 - January 31, 2003
- 3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date and cumulative
- 4. Nameplate Rating (Gross MWe): 934 capacity factors are
- 5. Design Electrical Rating (Net Mwe): 886 calculated using a
- 6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
- 7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 744.0 744.0 248929.0
- 12. Number of Hours Reactor was Critical 744.0 744.0 201829.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 744.0 744.0 199250.7
- 15. Unit Reserve Shutdown Hours 00 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1908127 3818719 494372274
- 17. Gross Electrical Energy Generated (MWH) 673641 673641 169326625
- 18. Net Electrical Energy Generated (MWH) 647281 647281 161373599
- 19. Unit Service Factor 1000 100.0 80.0
- 20. Unit Availability Factor 1000 100.0 800
- 21. Unit Capacity Factor (Using MDC Net) 102.8 102.8 76.0
- 22. Unit Capacity Factor (Using DER Net) 98.2 98.2 73.2
- 23. Unit Forced Outage Rate 0.0 0.0 8.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 2/13/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-270 UNIT NAME: Oconee 2 DATE: February 13, 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: January. 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown RMX Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 2/13/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 2
- 2. Scheduled next refueling shutdown: March, 2004
- 3. Scheduled restart following refueling: June, 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 926*
(c) in the ISFSI: See unit 1 ****
- 8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9. Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: February 13,2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
- Represents the combined total for Units I and 2
- See footnote on Unit 1
- In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
- See footnote on Unit 1
Operating Data Report Docket No. 50-287 Date February 13,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Oconee 3
- 2. Reporting Period: January 1, 2003 - January 31, 2003
- 3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date
- 4. Nameplate Rating (Gross MWe): 934 and cumulative capacity factors are
- 5. Design Electrical Rating (Net Mwe): 886 calculated using a
- 6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
- 7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 744.0 744.0 246576.0
- 12. Number of Hours Reactor was Critical 744.0 744.0 195796.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 00
- 14. Hours Generator On-Line 744.0 744.0 193150.1
- 15. Unit Reserve Shutdown Hours 0.0 00 0.0
- 16. Gross Thermal Energy Generated (MWH) 1910592 5729311 486988971
- 17. Gross Electrical Energy Generated (MWH) 673637 673637 167222912
- 18. Net Electrical Energy Generated (MWH) 646841 646841 159546486
- 19. Unit Service Factor 100.0 1000 78.3
- 20. Unit Availability Factor 1000 1000 78.3
- 21. Unit Capacity Factor (Using MDC Net) 102.8 102.8 75.8
- 22. Unit Capacity Factor (Using DER Net) 98.1 98.1 73.0
- 23. Unit Forced Outage Rate 0.0 0.0 9.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 2/13/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-287 UNIT NAME: Oconee 3 DATE: February 13,2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: January, 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C - 2/13/2003
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Oconee Unit 3
- 2. Scheduled next refueling shutdown: April 2003
- 3. Scheduled restart following refueling: May 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 440 (c) in the ISFSI: See Unit 1 ****
- 8. Present licensed fuel pool capacity: 825 Size of requested or planned increase: **
- 9. Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: February 13, 2003 Name of
Contact:
R. A Williams Phone: (7064) - 382-5346
- See footnote of Unit 1
"***' In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
- See footnote on Unit 1
OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT DECEMBER 2002
- 1. Personnel Exposure The total station liquid release for DECEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for DECEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.