Duke MD Energy.
Duke Energy Corporation 526 South Church Street P.O. Box 1006 Charlotte, NC 28201-1006 May 15, 2003 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2,
and 3 Docket Numbers 50-269, 50-270 and 50-287 Monthly Performance and Operation Status-April, 2003 Please find attached information concerning the performance and operation status of the Oconee Nuclear Station for the month of April, 2003.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:
L.
A. Reyes, Regional Administrator
- USNRC, Region II Dave LaBarge, Project Manager
- USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Oconee NRC Inspector
'_'
C- "L 14,
Document Control Desk U.S. NRC -
Oconee bxc:
L. E. Nicholson (ON03RC)
RGC Site Licensing File ELL (ECO50)
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Oconee 1
- 2. Reporting Period:
April 1, 2003 - April 30, 2003
- 3. Licensed Thermal Power (MWt):
2568
- 4. Nameplate Rating (Gross MWe):
934
- 5. Design Electrical Rating (Net Mwe):
886
- 6. Maximum Dependable Capacity (Gross MWe):
886
- 7. Maximum Dependable Capacity(Net MWe):
846
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-269 May 15,2003 Roger Williams 704-382-5346
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 719.0
- 12. Number of Hours Reactor was Critical 719.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 719.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 1845879
- 17. Gross Electrical Energy Generated (MWH) 649601
- 18. Net Electrical Energy Generated (MWH) 622726
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 102.4
- 22. Unit Capacity Factor (Using DER Net) 97.8
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
YTD 2879.0 2879.0 0.0 2879.0 0.0 7324964 2575694 2470208 100.0 100.0 101.4 96.8 0.0 Cumulative 261144.0 206442.1 0.0 202939.1 0.0 502527618 173827001 165344254 77.7 77.7 74.2 71.5 9.1
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 5/15/2003 Notes: Year-to-date and cumulative capacity factors are calculated using a weighted average for maximum dependable capacity.
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-269 UNIT NAME: Oconee I DATE: May 15, 2003 COMPLETED BY: Rozer Williams TELEPHONE: 704-382-5346 REPORT MONTH: April, 2003 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 5/15/2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
Oconee Unit 1
- 2.
Scheduled next refueling shutdown: September 2003
- 3.
Scheduled restart following refueling: November 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 926*
(c) in the ISFSI: 1800****
- 8.
Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9.
Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: May 15,2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346 Represents the combined total for Units 1 and 2 On March 29, 1990, received a site specific license for ISFSI which will store 2112 assemblies (88 modules). Forty (40) site specific modules were constructed and loaded.
In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
Represents the combined total for Units 1, 2, and 3
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Oconee 2
- 2. Reporting Period:
April 1, 2003 -April 30, 2003
- 3. Licensed Thermal Power (MWt):
2568
- 4. Nameplate Rating (Gross MWe):
934
- 5. Design Electrical Rating (Net Mwe):
886
- 6. Maximum Dependable Capacity (Gross MWe):
886
- 7. Maximum Dependable Capacity(Net MWe):
846
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-270 May 15.2003 Roger Williams 704-382-5346
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 719.0
- 12. Number of Hours Reactor was Critical 719.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 719.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 1843413
- 17. Gross Electrical Energy Generated (MWH) 650122
- 18. Net Electrical Energy Generated (MWH) 623475
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 102.5
- 22. Unit Capacity Factor (Using DER Net) 97.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
YTD 2879.0 2879.0 0.0 2879.0 0.0 14711559 2607162 2503598 100.0 100.0 102.8 98.1 0.0 Cumulative 251064.0 203964.8 0.0 201385.7 0.0 505265114 171260146 163229916 80.2 80.2 76.2 73.4 8.5
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 5/15/2003 Notes: Year-to-date and cumulative capacity factors are calculated using a weighted average for maximum dependable capacity.
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-270 UNIT NAME: Oconee 2 DATE: May 15, 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: April. 2003 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 5/15/2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
Oconee Unit 2
- 2.
Scheduled next refueling shutdown: March, 2004
- 3.
Scheduled restart following refueling: June, 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 926*
(c) in the ISFSI: See unit I ****
- 8.
Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9.
Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: May 15, 2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346 Represents the combined total for Units 1 and 2 See footnote on Unit 1 In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
See footnote on Unit 1
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Oconee 3
- 2. Reporting Period:
April 1, 2003 -April 30, 2003
- 3. Licensed Thermal Power (MWt):
2568
- 4. Nameplate Rating (Gross MWe):
934
- 5. Design Electrical Rating (Net Mwe):
886
- 6. Maximum Dependable Capacity (Gross MWe):
886
- 7. Maximum Dependable Capacity(Net MWe):
846
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-287 May 15.2003 Roger Williams 704-382-5346
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
- 11. Hours in Reporting Period
- 12. Number of Hours Reactor was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Initial Criticality Initial Electricity Commercial Operation This Month 719.0 603.0 0.0 601.0 0.0 1313994 461676 439085 83.6 83.6 72.2 68.9 0.0 YTD 2879.0 2763.0 0.0 2761.0 0.0 21563188 2414136 2313888 95.9 95.9 95.0 90.7 0.0 Cumulative 248711.0 197815.9 0.0 195167.1 0.0 502822848 168963411 161213533 78.5 78.5 76.0 73.2 8.9 Achieved NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 5/15/2003 Notes: Year-to-date and cumulative capacity factors are calculated using a weighted average for maximum dependable capacity.
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-287 UNIT NAME: Oconee 3 DATE: May 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: April. 2003 (I) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 5/15/2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
1 04/26/03 S
118.03 C
1 END-OF-CYCLE 20 REFUELING OUTAGE Summary:
Oconee unit 3 began the month of April operating at approximately 97.72% power coasting down to end-of-cycle 20 refueling outage. On 04/25/03 at 2303 the unit ended the coastdown and began decreasing power to end-of-cycle 20 refueling outage. The unit held at 15% power from 04/26/03 at 0141 to 0158 when the unit was taken off-line on 04/26/03 at 0158 to begin end-of-cycle 20 refueling outage. The unit remained in the end-of-cycle 20 refueling outage the remainder of the month
MONTHLY REFUELING INFORMATION REOUEST
- 1.
Facility name:
Oconee Unit 3
- 2.
Scheduled next refueling shutdown: Currently Refuelinn
- 3.
Scheduled restart following refueling: June 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 416 (c) in the ISFSI: See Unit 1 ****
- 8.
Present licensed fuel pool capacity: 825 Size of requested or planned increase: **
- 9.
Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: May 15. 2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346 See footnote of Unit 1 In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
See footnote on Unit 1
OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2003
- 1.
Personnel Exposure -
The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.